CN206205421U - A kind of off-load for climbing frame is shored - Google Patents
A kind of off-load for climbing frame is shored Download PDFInfo
- Publication number
- CN206205421U CN206205421U CN201621284464.0U CN201621284464U CN206205421U CN 206205421 U CN206205421 U CN 206205421U CN 201621284464 U CN201621284464 U CN 201621284464U CN 206205421 U CN206205421 U CN 206205421U
- Authority
- CN
- China
- Prior art keywords
- load
- shored
- screw rod
- climbing frame
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 24
- 230000013011 mating Effects 0.000 claims 2
- 238000009434 installation Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A kind of off-load for climbing frame is shored, including the fixed connecting plate being connected with support body;The unloading braces being detachably connected with the fixed connecting plate;The off-load screw rod being threadedly coupled with the unloading braces;The bearing bar being detachably connected with the off-load screw rod lower end;It is fixed on wall and supports the attached wall support of the bearing bar;The fixed connecting plate is provided with some equidistant support bars;The side of the unloading braces is provided with least two draw-in grooves being connected with the support bar.The utility model provide technical scheme, be connected by snap-in installation and removal between unloading braces and fixed connecting plate, with install, convenient disassembly is rapid the characteristics of.
Description
Technical field
The utility model is related to construction equipment technical field, is shored more particularly, to a kind of off-load for climbing frame.
Background technology
Climbing frame is the abbreviation of attachment type raise scaffold.It is towering in construction shear wall system, cylinder system and bridge pier Gui etc.
It is a kind of effective instrument in structure.Due to possessing from the ability climbed, therefore the handling of hoisting machinery is not required to, which reduces construction
The handling workload of middle Transport Machinery.The external scaffolding in work progress can be saved.Climbing frame can reduce hoisting machinery quantity, accelerate
Speed of application, therefore better economic benefit.Skyscraper flourishes in numerous cities in recent years, to shorten construction work
Phase, construction generally uses not contour construction technology, and Core Walls Structure is constructed using climbing frame.
Lifting finishes rear, it is necessary to be fixed support to climbing body support body every time, in the prior art, branch is fixed to climbing frame
The off-load of support is shored and is fixedly connected with bolt, is taken time and effort during installing/dismounting.
Utility model content
In order to overcome the defect of prior art, the technical problem that the utility model is solved to be:There is provided a kind of reliability high,
Off-load for climbing frame easy to loading and unloading is shored.
In order to solve the above-mentioned technical problem, the utility model provide a kind of off-load for climbing frame shore, including with support body
The fixed connecting plate of connection;The unloading braces being detachably connected with the fixed connecting plate;It is threadedly coupled with the unloading braces
Off-load screw rod;The bearing bar being detachably connected with the off-load screw rod lower end;It is fixed on wall and supports the bearing bar
Attached wall support;The fixed connecting plate is provided with some equidistant support bars;The side of the unloading braces is provided with least two
The draw-in groove being connected with the support bar.
Used as further improved technology scheme, the off-load for climbing frame that the utility model is provided is shored, also with setting
In the lockable mechanism of the draw-in groove openend.
Used as further improved technology scheme, the off-load for climbing frame that the utility model is provided is shored, the off-load spiral shell
The upper end of bar has polygon shell of column, and the polygon shell of column using electric wrench, pneumatic impact spanner or manual wrench for being turned
Off-load screw rod.
Used as further improved technology scheme, the off-load for climbing frame that the utility model is provided is shored, the bearing bar
Middle part top there is the groove being connected with the lower end of the off-load screw rod;The two ends lower section of bearing bar has attached with described
The bayonet lock that wall bracket is connected.
In the case where not conflicting, above-mentioned improvement project can be implemented alone or in combination.
The technical scheme that the utility model is provided, snap-in installation is connected by between unloading braces and fixed connecting plate
And dismounting, with install, convenient disassembly is rapid the characteristics of.
Brief description of the drawings
Accompanying drawing is used for providing being further understood to of the present utility model, constitutes the part of the application, of the present utility model
Schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model.In accompanying drawing
In:
Fig. 1 is that embodiment is used for the use state schematic diagram that the off-load of climbing frame is shored;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is that embodiment is used for the main structure diagram that the off-load of climbing frame is shored;
Fig. 4 is the left view structural representation of Fig. 3.
Specific embodiment
The off-load for climbing frame as shown in Figures 1 to 4 is shored, including the fixed connecting plate 2 being connected with support body 1;With it is solid
Determine the unloading braces 3 that connecting plate 2 is detachably connected;The off-load screw rod 4 being threadedly coupled with unloading braces 3;With the lower end of off-load screw rod 4
The bearing bar 5 being detachably connected;It is fixed on wall and supports the attached wall support 6 of bearing bar 5;Fixed connecting plate 2 is provided with some etc.
The support bar 7 of spacing;The side of unloading braces 3 is provided with three draw-in grooves being connected with three support bars 7 respectively.
Alternatively, the off-load for climbing frame that the utility model is provided is shored, also with the lock for being arranged on draw-in groove openend
Locking mechanism 8.
Alternatively, the off-load for climbing frame that the utility model is provided is shored, and the upper end of off-load screw rod 4 has polygon post
Section, polygon shell of column is for turning off-load screw rod 4 using electric wrench, pneumatic impact spanner or manual wrench.
Alternatively, the off-load for climbing frame that the utility model is provided is shored, and the middle part top of bearing bar 5 has and off-load
The groove that the lower end of screw rod 4 is connected;The two ends lower section of bearing bar 5 has the bayonet lock being connected with attached wall support 6.
During the Height Adjustment of support body 1, support body 1 is slightly improved with crane gear, bearing bar 5 is no longer undertaken the weight of support body 1
Amount, turns off-load screw rod 4, removes bearing bar 5, and after unloading braces 3 are taken out from fixed connecting plate 2, support body 1 can be in lifting
In the presence of equipment, the adjustment of height is completed.Height Adjustment in place after, the draw-in groove of unloading braces 3 snaps in the three of fixed connecting plate 2
On root support bar 7, bearing bar 5 is installed, turn off-load screw rod 4, bearing bar 5 is undertaken the weight of support body 1.
Obviously, the utility model is not limited to above preferred embodiment, can also be in the utility model claim and explanation
In the spirit that book is limited, the conversion and improvement of diversified forms are carried out, same technical problem can be solved, and obtain expected technology
Effect, therefore do not repeat.One of ordinary skill in the art can from the utility model disclosure directly or associate it is all
Scheme, as long as within the spirit that claim is limited, falling within protection domain of the present utility model.
Claims (4)
1. a kind of off-load for climbing frame is shored, it is characterised in that including with support body(1)The fixed connecting plate of connection(2);With institute
State fixed connecting plate(2)The unloading braces being detachably connected(3);With the unloading braces(3)The off-load screw rod of threaded connection
(4);With the off-load screw rod(4)The bearing bar that lower end is detachably connected(5);It is fixed on wall and supports the bearing bar(5)
Attached wall support(6);The fixed connecting plate(2)It is provided with some equidistant support bars(7);The unloading braces(3)One
Side is provided with least two with the support bar(7)The draw-in groove of mating connection.
2. the off-load for climbing frame according to claim 1 is shored, it is characterised in that also opened with being arranged on the draw-in groove
The lockable mechanism at mouth end(8).
3. the off-load for climbing frame according to claim 1 is shored, it is characterised in that the off-load screw rod(4)Upper end
With polygon shell of column, the polygon shell of column is for turning off-load screw rod using electric wrench, pneumatic impact spanner or manual wrench
(4).
4. the off-load for climbing frame according to claim 1 is shored, it is characterised in that the bearing bar(5)Middle part on
Side has and the off-load screw rod(4)Lower end be connected groove;Bearing bar(5)Two ends lower section have and the attached wall
Support(6)The bayonet lock of mating connection.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621284464.0U CN206205421U (en) | 2016-11-28 | 2016-11-28 | A kind of off-load for climbing frame is shored |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621284464.0U CN206205421U (en) | 2016-11-28 | 2016-11-28 | A kind of off-load for climbing frame is shored |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206205421U true CN206205421U (en) | 2017-05-31 |
Family
ID=58747578
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621284464.0U Expired - Fee Related CN206205421U (en) | 2016-11-28 | 2016-11-28 | A kind of off-load for climbing frame is shored |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206205421U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110173106A (en) * | 2019-05-30 | 2019-08-27 | 广西建工大都租赁有限公司 | A kind of full-automatic climbing frame supporting device of guide bracket cooperative bearing up and down |
| CN116838111A (en) * | 2023-07-04 | 2023-10-03 | 中亿丰建设集团股份有限公司 | High-strength bolt unloading device and construction method thereof |
-
2016
- 2016-11-28 CN CN201621284464.0U patent/CN206205421U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110173106A (en) * | 2019-05-30 | 2019-08-27 | 广西建工大都租赁有限公司 | A kind of full-automatic climbing frame supporting device of guide bracket cooperative bearing up and down |
| CN116838111A (en) * | 2023-07-04 | 2023-10-03 | 中亿丰建设集团股份有限公司 | High-strength bolt unloading device and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105064670B (en) | Exterior wall cantilevered plate formwork for placing sets up support | |
| CN206088920U (en) | Construction scaffold | |
| CN204876508U (en) | Portable height -adjustable scaffold | |
| CN105587113A (en) | Movable construction platform adapting to different slope surfaces | |
| CN206205421U (en) | A kind of off-load for climbing frame is shored | |
| CN106481061A (en) | Climbing frame | |
| CN206205415U (en) | A kind of climbing frame | |
| CN207863474U (en) | A kind of installation form structure for building | |
| CN204531341U (en) | A kind of for the passageway platform between building and construction elevator | |
| CN204435922U (en) | Protection device of elevator shaft | |
| CN105460164B (en) | A kind of fixing means of the interim mounting bracket of removable stern tube shaft and stern tube shaft | |
| CN205206268U (en) | Square tower support frame | |
| CN201062431Y (en) | Lifting device of cantilever scaffold | |
| CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
| CN207959948U (en) | A kind of conversion equipment of novel aluminum alloy pattern plate K plates | |
| CN204038917U (en) | Detachable external hanging type operating platform | |
| CN206245702U (en) | A kind of hanging construction of beam protection carrier | |
| CN203257075U (en) | Core tube inner lifting type multifunctional operating platform for high-rise building construction | |
| CN206359210U (en) | A kind of processing of steel construction is with stablizing lowering or hoisting gear | |
| CN204823649U (en) | Roof beam hoist gyration hoist is hung to four hoisting point electromagnetism | |
| CN203977833U (en) | A kind of wall-attached builder's jack | |
| CN202705932U (en) | T-beam reinforced hanger frame structure | |
| CN207794583U (en) | A kind of construction operation platform | |
| CN208456185U (en) | A kind of tower crane wall-connecting piece safe walkway | |
| CN106495061A (en) | Stable lifting device for steel structure machining |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170531 Termination date: 20191128 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |