CN1207788A - 地下结构工程,尤其是建筑坑道,地下过道,停车场等,其建造方法和用于这些的预制部件 - Google Patents
地下结构工程,尤其是建筑坑道,地下过道,停车场等,其建造方法和用于这些的预制部件 Download PDFInfo
- Publication number
- CN1207788A CN1207788A CN96199581.5A CN96199581A CN1207788A CN 1207788 A CN1207788 A CN 1207788A CN 96199581 A CN96199581 A CN 96199581A CN 1207788 A CN1207788 A CN 1207788A
- Authority
- CN
- China
- Prior art keywords
- parts
- concrete
- platform
- reinforcing bar
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Lining And Supports For Tunnels (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)
Abstract
一种地下结构工程,特别是建造坑道,地下过道,停车场等,包括一对沿工程两相对侧边延伸的防护结构(2),这些结构(2)包括能够支撑工程的平台(10)的桩部件,工程基本由拱形平台部件构成,平台部件沿防护结构(2)的横向延伸。至少在一些桩部件中插在预制支撑部件(3),该预制支撑部件(3)包括一个纵向钢筋(4)和与钢筋(4)锚固的混凝土体(5)。每个平台部件包括确定一对边部(13)和中间部分(15)的混凝土预制部件(13,15),该中间部分介于二者之间。在边部分(13)和混凝土体(5)之间有自由空间,来现浇注混凝土互相锚固。
Description
本发明总体涉及预制钢筋混凝土部件,无论预压与否,这些部件用于地平以下结构的建造,如人工坑道,地下过道,地下停车场等。
大多数这样的工程是在露天开挖后建造、以及进入到基础水平或工程的底部以下建造的。一旦结构建成就要以如下方式用土壤盖住,该方式是将填土盖住顶板或用平台板盖住结构且在其侧面有垂直支撑。
然而在许多情况下不能以露天开挖的传统方式挖到结构的底部以下,这是由于其侧边无用做边坡的空间的原因或者其它对附近结构的稳定性产生危害的原因;在其它情形下由于要挖掘大量的土壤,所以建造侧边块的传统开挖并不经济。
为了避免在上述情况下建造边坡,挖方的侧边可以借助众所周知的防护结构支撑,如膨润土挡板,排桩,横梁桩壁,板桩等。一些防护结构,例如板桩或横梁桩壁,只是暂时采用使得能进行开挖,与此同时建造工程的侧边,例如坑道壁或地下过道的路肩,它们通常靠近暂时的防护结构边建造。
如果将现场建造坑道侧边,地下过道路肩或地下停车场的壁,则由膨润土挡板或大尺寸桩的排桩构成。在这些情形下,在实践中预制结构只是由平台或可能是间板构成。在两个膨润土挡板之间或在两排大尺寸桩之间的平台通常由预压的钢筋混凝土预制直梁构成,该预制直梁搁在现场制作的位于每个桩头或挡板顶部上的梁上。预制平台梁通过混凝土浇注件现场形成整体,该混凝土浇注件形成一个梁和下一个梁之间的罩盖且可能提高各个预制梁的坚固性。
然而已经广泛使用的这种结构有几个缺点。首先预制平台梁不能承担从一个梁头到下一个梁头传递水平力,以抵抗作用于每个桩上的土壤侧压力的任务,所以必须选定桩的尺寸使其靠本身来抵抗侧压力。
而且,如果平台梁刚性地固定在两个桩头之间,由于作用于梁头的热量变化,这些梁会膨胀变形,会由于与梁接触的土壤发生有限的变形而引起过度的压力。为了克服这个缺点,桩头由固定器或预压钢筋混凝土的拉筋将其锚固到土壤中来固定,通常在平台梁和桩头之间插入一个膨胀接头,它能吸收平台梁的热膨胀。但是这种结构削弱了结构和结构上覆的路面的顶板和平台的气密性。
第二点,平台梁常常尺寸很大,给运输带来了很大麻烦,因为它们都必须被简单地支撑以不形成与桩头的刚性联系且带来结构上的便利。由于在这些梁和桩头之间是这种形式的固定,所以不可能产生有益的优点,因为在梁的支撑上存在弯矩,所以在尺寸上也应当考虑到。
为了克服上述的缺点,本发明主题是所附权利要求1所述的结构形式。
由于根据本发明的结构特征,平台大大减小了厚度,因为弯矩位于平台梁的边端上而从中获益;这就导致弯矩的中点显著降低。尽管是在厚度上降低了,但由于位于端部,平台承受垂直荷载的刚度增加了,所以尽管部件的厚度减小了但荷载下平台的最大偏差也降低了。
预制部件的运输十分简便,因为最长部件的长度,通常是平台的中间部分,大约等于净跨距的60%,而不是象普通平台梁那样为跨距的110%。实际上,全部预制部件可以公路运输而不会超出公路规定(运输规定)的形状限制,可允许运输跨距超过25米的结构构件,与此同时可以路运的普通预制梁的尺寸最大跨度仅仅达到大约12-13米。
根据本发明的优选特征,每个平台部件的边部分为带有一个倾斜的中间部分的大致L形状。
这些倾斜部分的存在降低了平台自身的厚度,倾斜部分可削除平台的负弯矩点。
构成结构的平台中每个部件的部件的安装,由于混凝土主体的存在而十分方便,这些部件形成一个在现场与浇注件固定一起前,平衡但不稳定的铰接四边形物,上述混凝土体在其安装时构成平台的支撑部件。
优选地设有改变所述边部分状态的可调节装置,它插在这些部件和桩形部件之间,以使得在装配结构的平台时平衡这些部分。
这样,在平台的安装过程中,由于这些可调节装置,平台的L形边部分与相邻混凝土体固定在一起,优选的是可调节装置由拧入插在预制部件中的螺母的螺钉构成,上述固定方式防止铰接四边形物倾斜,而无需在其装配时采用基础模板。
如果有中间板,典型地对于地下停车场,它能做成用连接件固定到靠近工程壁的结构上的预制部件,该连接件确保与结构的可靠连接。弯矩的确保允许进一步显著地降低厚度,无论怎样,全部工程的建造速度大大提高了。
本发明主题进一步为地下结构,特别是坑道,地下过道,地下停车场等的建造方法,和应用在该结构中的预制部件,其特征分述在权利要求10到12中。
根据下文的详尽描述,参见附图及非限制性实例,将会更好地理解本发明的特征和优点。
图1和图2是横截面的前视立面图,表示用于制造地下工程在坑道施工中的连续阶段,
图3是根据本发明的地下隧道或地下过道的与图1和2类似的图,
图4是坑道的侧面防护结构中柱的预制插入部件的透视图,
图5到8分别是图3的V-V,VI-VI,VII-VII和VIII-VIII的截面图,
图9和10类似于图3,表示根据本发明的地下停车场的建造中的连续阶段,
图11表示图10中用箭头IX详细标明的部分的放大图。
参见附图,参数1表明大直径的竖向钻孔,这些钻孔在地下呈两列平行对齐的串孔,它们与将要建造的地下工程的侧边相一致,例如地下过道或地下停车场以提供一对防护结构2。每个孔1要接纳一个防护柱,该防护柱的制作将在下文描述。
尽管特别对称作“板桩”的由大直径柱做成的防护结构进行描述,但本发明也应用在由膨润土挡板构成的这些结构中。
至少在一些孔1中并且优选地在全部这些孔中以下列方式分别插入预制支撑部件,该方式是从钻孔的开口处向下延伸几米,或只向下伸出一点。每个部件3包括一条细长钢筋4以及在其朝上的端部与钢筋4锚固的混凝土细长主体5,它的一部分从钢筋轴向伸出来。钢筋4实质上包括许多直钢筋3a,它们大致绕圆周分布,钢筋3b绕直线筋呈螺旋状缠绕并固定到它们上。混凝土体5有不均匀的D形截面,其凸圆部分朝着坑道的外面,即朝着土壤并且与之接触。主体5选定尺寸,以便一旦插入桩里用于支撑不均匀作用于桩上的土壤的侧向压力。主体5通常由几根加强筋4加强,主体5与钢筋4连接,钢筋4靠近凸圆的土壤接触壁设置。加强筋3c在加强筋4的对侧从主体5的轴向内腔中伸出弯成U形。如果需要对土壤支撑到地平面,则其上部,在图中以虚线标出的部分将随后取下。
将部件3插入孔1中后,将混凝土以下列方式灌注到每一个中,该方式是填充钢筋4的内部间隙以现场形成许多包括各个预制部件3的桩,混凝土灌注限制在孔的最深部分,以便通过将其固定,刚性埋在桩里而只将每个主体5的底部结合在一起。每个孔1的上部填充有沙,石子或类似的可随意使用的材料,这是以充满主体5和土壤之间的周围空间和保持空的坑道上部的方式进行的。
在形成两列侧向桩后,这些组成一对土壤防护结构2,该结构只允许在它们所限定的范围内控掘。起初,以使其主体5的顶端从土壤中露出(见图2)的方式开挖露出桩的顶端,在这个阶段插在桩中的主体5起到支护墙的作用(在板桩的情况下不连续,在膨胀土挡板的情况下几乎是连续的)。填在钻孔上部的砂或石子与开挖出的材料一起拿开。
然后,浇注一对混凝土顶梁或横梁7,它们每一个连接每列桩的桩的顶端。这些梁起到限定一个精确平面的作用,在地下过道或坑道(图3)中将结构板或结构平台搁在该平面上,或者在地下停车场中将平台支在中间板11的边缘上(图9-11)。
随后继续开挖至将要形成的结构层,在这里浇注混凝土基础梁9。
平台10由拱形截面组成,该截面连续彼此相靠地沿结构的轴向延伸,每个截面由三个预制部件装配而成,尤其是一对边部分13,它们每一个都分别支撑在顶梁7上,中间实质为直线部分15放在两个边部分13之间。
为方便起见,每个边部分13为倒L形且其中间部分倾斜。每个边部分13由3个刚性固定在一起的直线部分组成,支柱13a,梁13b和梁13c。支柱13a有一个开口U形断面,带有一对指向填土的肋,还有一个前部以及钢筋14,前部设在与结构的轴线平行的垂直平面上,钢筋14在肋之间伸出且用来与主体5的U形钢筋3c和主体5之间限定的位置连接。支柱13a的形状是用来在装配现场限定它和邻近主体5之间一个自由空间、该自由空间用来浇注混凝土将这些部件连接在一起。
构成L形斜面的梁13b有一个封闭的截面且设置在一个倾斜的位置里,梁13c也有一个封闭的截面且几乎水平地设置以便于和中间部分15刚性连接。
两个边部分13已经可以做好,其形状为其就位时的形状或者由铰接的预制部分构成,也就是说,用同样的加强筋。在一个部件和另一个部件之间形成铰接通过铰接连接成一组钢筋混凝土预制部件,这些加强筋在平直状态下形成且在安装时有一些弯曲,如根据欧洲专利EP-0219501所述的那样。
中间部分15是由预应力钢筋混凝土形成的细长梁。它有端部突起16a,该突起呈鼻形从其较小边的中间部分伸出,容纳在横向部分13的相应端部上的位置16b内。
为了装配平台部件10,首先将边部分13安装在每个梁帽7上或如果存在中间板的话,安装在中间板11的端部上,这是通过把钢筋14与主体5的钢筋3c连接,在部分13和桩之间留下自由空间来实现的。部件13通过一个可调节距离的垂直支撑暂时靠近其自由端支撑,未示出。特别地,螺钉对19的头部倚靠在一个梁7上,如果有中间板11,同样部分13的一对螺钉19的头部倚靠在板11的一端,板通过类似的可调节螺钉19a搁在梁7上。
接着,通过将中间部分15的突起16a分别连接在边部分的位置16b中,再在部分13和部分15之间留出自由空间的方式,把中间部分15插在一对部分13中。靠近每个突起16a在相对边上成对设置的可调节螺钉允许相对于侧边部分13的每个中心部分15的状态以下述方式平衡,该方式是使每个平台部件完全刚性且稳定平衡。可以采用从部分15的端部伸出来的钢筋来代替螺钉20,同样也可采用从两个部分13的一端伸出来的钢筋,这些钢筋要焊在一起。此时,用于部件13的暂时支撑的高度以下述方式降低,该方式是它们绕螺钉19的头转动直到中间部分15突起16a与位置16b大致垂直的底部壁相接触。在这种情况下结构形成一个平衡的但不稳定铰接的四边形中间部分15,其为铰接连接物。通过调节一对水平螺钉18和垂直螺钉19使部件呈稳定,该垂直螺钉与各个埋在相关部分的混凝土内的套管接合。螺钉对18的头部直接倚靠在主体5朝向结构内部的一个面上。
在结构的变形形式中,在部分15和两个邻近部分13之间形成有各个静态铰接,例如在装配中由插入这些部件之间的聚氯丁橡胶或其它适合的材料构成的静态铰接。
在制造过程中全部结构的钢筋已经部分地插在各个预制部件中,部分插在一个预制部件和另一个之间。例如任何需要在防护结构2的桩和平台10之间确保良好连接时,就优先采用辅助钢筋21,它们部分插在桩和边部分13之间,部分沿桩本身延伸。
当平台部件部分10已经装配好后,它们通过以下方式喷注混凝土来体现刚性,该方式为向留在一个部件和另一个之间的自由空间填注混凝土,并将钢筋插在这些空间中以容纳新浇注的混凝土,不同的部分都在朝向结构内表面的角上设置有纵向突起。
正对着桩浇注结构的内壁的下部而完成的结构的建造,为实现该阶段有时采用壁板22作为可随意使用的模板。
在建造地下停车场时,通过一个靠近中间板11的预制部件的端部形成的一对圆锥形装置来容易地浇注混凝土,它形成漏斗状作为新混凝土的通道且允许钢筋21插入其中。这些钢筋21的上部插在梁7,支柱13a和相关主体5之间的浇注件中,其下部形成在相邻防护结构2的桩,相关板22和中间11之间的浇注件中。
用本发明的结构,有可能在防护结构2的大直径桩和结构的平台10之间形成极好的整体性。现场在插入桩里的主体5和平台10的边部分13的支柱13a之间的混凝土浇注件,形成通过钢筋能容易地传送弯曲和剪力的连接,该钢筋从不同预制部件伸出且插在浇注件中。
插入防护结构2的桩里的混凝土体5最初起到支撑壁部分,以抵抗在开挖过程中和平台10的安装过程中土壤的侧压力的作用,同时在已完成的结构中它们又起到促进桩和盖板10之间的整体连接,它承受相当大的压力。
通过在相邻预制部件之间的浇注件中插入连续的底部钢筋和在共同的板的浇注件中插入上部钢筋,达到边部分13和平台10的中间部分15的结合。
结构的平台10在结构上能很好地在一个顶梁7和另一个之间传递水平力,该水平力抵抗来自防护结构2的每一侧的侧压力,该平台10刚性固定到顶梁7,尽管没有钢筋从梁中伸出来,这些钢筋会给预制部件的定位带来困难。
此外得到如下优点:由于其中间部分和结构壁的连接区域之间的水平变化,平台10不能在侧向防护结构2之间形成足够刚性的连接。选定合适的尺寸,能容易得到盖板的热量变化和两个防护结构2之间的土壤的侧压力传递这两者的刚度协调。由于边部分13的斜切,该侧压力的传递在平台10中引起反向的弯曲力,该侧压力是由于重力和作用其上的荷载产生的,该侧压力减少尺寸和提高了弹性。通常,为正确选择尺寸需要形成的浇注件的上部水平和与之相一致的侧防护结构2比平台的拱内弧线的顶点要低一些。
Claims (13)
1.一种地下结构工程,尤其是地下过道,停车场或类似物的建造,其中有一对防护结构(2),该防护结构沿结构的相对边延伸且包括有桩或挡板形式的部件,该部件在开挖和结构建造过程中承受土壤的侧压力,这些部件还要支撑结构的平台(10),该结构由能跨越过防护结构(2)的预制平台部件构成,
其特征在于至少有一些以桩或挡板形式的部件包括有预制支承部件(3),该支承部件(3)包括有一个纵向钢筋(4)和与钢筋(4)锚固的混凝土体(5),其中每个平台部件基本为拱形且包括至少一个预制混凝土部件(13,15),每一个平台部件的端部(13a)以如下方式设置在混凝土体(5)的至少一部分的前面,该方式是在所述的平台部件端部(13a)和混凝土体(5)之间限定出自由空间,使得能现场浇注混凝土以把它们锚固起来。
2.根据权利要求1所述的结构,其特征在于每一个平台部件包括确定一个中间部(15)和一对边部(13)的许多预制混凝土部件,每个边部件(13)设置在中间部分(15)和一个防护结构(2)之间。
3.根据权利要求2所述的结构,其特征在于每个平台部件的边部分(13)有一个带有中间斜切部分的大致为L形的形状。
4.根据权利要求2或3所述的结构,其特征在于在中间部分(15)和每个平台部件的相关边部分(13)之间,以将这些部分刚性连接在一起的方式现场浇注混凝土。
5.根据权利要求2-4任何一项所述的结构,其特征在于混凝土体(5)和要设置在混凝土体(5)旁边的边部分(13)都有伸进一个有关自由空间的钢筋(3c,14),这些钢筋在现场插进混凝土浇注件里,以将边部分(13)与所述桩形部件刚性连接,有助于防护结构(2)和结构的平台(10)之间的应力传递。
6.根据权利要求1-5任何一项所述的结构,其特征在于位于混凝土体(5)和边部分(3)之间用来现场浇注混凝土的自由空间完全位于结构的平台(10)中间的拱内弧线以下。
7.根据权利要求1-6任何一项所述的结构,其特征在于设有用于改变所述边部分(13)的状态的可调节装置(18,19),它们插在这些部分(13)和桩形部件之间,用来在装配结构的平台(10)时平衡这些部分(13)。
8.根据权利要求1-6任何一项所述的结构,其特征在于结构包括一个中间板(11),其端部支撑在所述防护结构(2)的顶梁(7)上且支撑结构的平台(10),其中混凝土浇注件把边部分(13)和板(11)的一端和有关的防护结构(2)刚性连接起来。
9.根据权利要求8所述的结构,其特征在于在板(11)端部形成各个圆锥形部件(11a),它能确定混凝土浇注的通道以及便辅助钢筋(21)穿插过它。
10.一种制造地下工程,尤其是坑道,地下过道,停车场等的建造方法,其特征在于包括如下步骤,
在地下形成许多沿将要建造的结构的侧边排成两列的孔(1),
在至少一些孔(1)中分别插进一个预制部件(3),该部件包括一个纵向钢筋(4)和与钢筋(4)的上端锚固的混凝土体(5),
用以下方式向所述孔(1)中浇注混凝土,该方法是在现场形成许多包括有所述钢筋(4)和所述混凝土体(5)一部分的桩形部件,
用沙或石填充孔(1)的上部大致达到地平,
在形成在两列孔(1)中的桩之间开控,
对应每列桩形成顶梁(7),连接到所述钢筋(4)的顶端,
在顶梁(7)上形成成几段形式的结构的平台(10),其中每一段包括一对边部分(13)和中间部分(15)的部件,每个边部分倚靠在各个顶梁(7)上,中间部分(15)由边部分(13)支撑,自由空间形成在平台(10)的边部分(13)和所述桩部件的混凝土体(5)之间,
向所述自由空间里浇注混凝土,刚性地把边部分(13)和至少一个相关的桩部件连接起来。
11.根据权利要求10所述的方法,其中结构包括一个中间板(11),其特征在于在所述项梁(7)建成后将板(11)搁在它们上,结构的平台部件设置在板(11)的纵向端上。
12.一种用于防护结构的预制部件,包括由桩构成的支承部件,它能够在开挖和建造地下工程的过程中抵抗周围土壤的侧压力并与结构的平台(10)一起支撑,其特征在于它包括一个纵向钢筋(4)和一个在朝向所述平台(10)的一端与钢筋(4)锚固的混凝土体(5),而且它插入土壤中的孔(1)中且与混凝土浇注件一同现场形成一个所述的桩部件。
13.根据权利要求12所述的部件,其特征在于钢筋(4)包括许多大致绕圆周分布的直线筋(3a)和螺旋状缠绕在直线筋(3a)且固定住它们的钢筋(3b),混凝土体(5)为伸长形状且基本为D形截面,它从钢筋(4)端部伸出一部分,沿钢筋(4)方向从混凝土体(5)中伸出钢筋(3c)且弯成U形。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT95TO000923A IT1281032B1 (it) | 1995-11-17 | 1995-11-17 | Struttura di un'opera interrata, particolarmente per la reliazzazione di gallerie, sottopassaggi, autorimesse o simili, suo procedimento di |
ITTO95A000923 | 1995-11-17 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1207788A true CN1207788A (zh) | 1999-02-10 |
CN1119469C CN1119469C (zh) | 2003-08-27 |
Family
ID=11413967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN96199581.5A Expired - Fee Related CN1119469C (zh) | 1995-11-17 | 1996-11-14 | 地下结构及其建造方法 |
Country Status (11)
Country | Link |
---|---|
US (1) | US6234716B1 (zh) |
EP (1) | EP0861355B1 (zh) |
JP (1) | JP3828153B2 (zh) |
CN (1) | CN1119469C (zh) |
AT (1) | ATE199420T1 (zh) |
AU (1) | AU7571296A (zh) |
DE (1) | DE69611931T2 (zh) |
ES (1) | ES2157015T3 (zh) |
IT (1) | IT1281032B1 (zh) |
PT (1) | PT861355E (zh) |
WO (1) | WO1997019230A1 (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147771A (zh) * | 2013-03-24 | 2013-06-12 | 中铁二院工程集团有限责任公司 | 一种大跨度高回填明洞结构 |
CN103206221A (zh) * | 2013-03-24 | 2013-07-17 | 中铁二院工程集团有限责任公司 | 大跨度重荷载推力拱式明洞结构 |
CN103912011A (zh) * | 2014-04-04 | 2014-07-09 | 北京城建设计发展集团股份有限公司 | 明挖预制装配式地下结构 |
CN104631469A (zh) * | 2014-12-23 | 2015-05-20 | 安徽省城建设计研究院 | 用于深大基坑的无柱钢筋混凝土支撑构架及其搭建方法 |
CN112267557A (zh) * | 2020-10-20 | 2021-01-26 | 中国十九冶集团有限公司 | 地下挡板支撑结构的施工方法 |
CN115341570A (zh) * | 2022-07-01 | 2022-11-15 | 北京建工土木工程有限公司 | 一种下穿扩建地铁车站微变形的密贴硬接触支顶建造方法 |
Families Citing this family (41)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITGE20030005A1 (it) * | 2003-01-24 | 2004-07-25 | Ferrari De Nobili S R L | Metodo continuo di realizzazione di opere in sotterraneo, |
US7775966B2 (en) | 2005-02-24 | 2010-08-17 | Ethicon Endo-Surgery, Inc. | Non-invasive pressure measurement in a fluid adjustable restrictive device |
US7775215B2 (en) | 2005-02-24 | 2010-08-17 | Ethicon Endo-Surgery, Inc. | System and method for determining implanted device positioning and obtaining pressure data |
US7927270B2 (en) | 2005-02-24 | 2011-04-19 | Ethicon Endo-Surgery, Inc. | External mechanical pressure sensor for gastric band pressure measurements |
US8016744B2 (en) | 2005-02-24 | 2011-09-13 | Ethicon Endo-Surgery, Inc. | External pressure-based gastric band adjustment system and method |
US7699770B2 (en) | 2005-02-24 | 2010-04-20 | Ethicon Endo-Surgery, Inc. | Device for non-invasive measurement of fluid pressure in an adjustable restriction device |
US8066629B2 (en) | 2005-02-24 | 2011-11-29 | Ethicon Endo-Surgery, Inc. | Apparatus for adjustment and sensing of gastric band pressure |
US7658196B2 (en) | 2005-02-24 | 2010-02-09 | Ethicon Endo-Surgery, Inc. | System and method for determining implanted device orientation |
CN100425801C (zh) * | 2005-06-17 | 2008-10-15 | 上海市隧道工程轨道交通设计研究院 | 用于地下管涵直线暗挖的对拉装置 |
CN100425802C (zh) * | 2005-06-17 | 2008-10-15 | 上海市隧道工程轨道交通设计研究院 | 用于地下管涵直线暗挖的对拉方法 |
JP4865300B2 (ja) * | 2005-11-07 | 2012-02-01 | 株式会社ピーエス三菱 | 半地下道路の造成方法 |
US8870742B2 (en) | 2006-04-06 | 2014-10-28 | Ethicon Endo-Surgery, Inc. | GUI for an implantable restriction device and a data logger |
US8152710B2 (en) | 2006-04-06 | 2012-04-10 | Ethicon Endo-Surgery, Inc. | Physiological parameter analysis for an implantable restriction device and a data logger |
US8187163B2 (en) | 2007-12-10 | 2012-05-29 | Ethicon Endo-Surgery, Inc. | Methods for implanting a gastric restriction device |
US8100870B2 (en) | 2007-12-14 | 2012-01-24 | Ethicon Endo-Surgery, Inc. | Adjustable height gastric restriction devices and methods |
US8377079B2 (en) | 2007-12-27 | 2013-02-19 | Ethicon Endo-Surgery, Inc. | Constant force mechanisms for regulating restriction devices |
US8142452B2 (en) | 2007-12-27 | 2012-03-27 | Ethicon Endo-Surgery, Inc. | Controlling pressure in adjustable restriction devices |
US8591395B2 (en) | 2008-01-28 | 2013-11-26 | Ethicon Endo-Surgery, Inc. | Gastric restriction device data handling devices and methods |
US8192350B2 (en) | 2008-01-28 | 2012-06-05 | Ethicon Endo-Surgery, Inc. | Methods and devices for measuring impedance in a gastric restriction system |
US8337389B2 (en) | 2008-01-28 | 2012-12-25 | Ethicon Endo-Surgery, Inc. | Methods and devices for diagnosing performance of a gastric restriction system |
US7844342B2 (en) | 2008-02-07 | 2010-11-30 | Ethicon Endo-Surgery, Inc. | Powering implantable restriction systems using light |
US8221439B2 (en) | 2008-02-07 | 2012-07-17 | Ethicon Endo-Surgery, Inc. | Powering implantable restriction systems using kinetic motion |
US8114345B2 (en) | 2008-02-08 | 2012-02-14 | Ethicon Endo-Surgery, Inc. | System and method of sterilizing an implantable medical device |
US8057492B2 (en) | 2008-02-12 | 2011-11-15 | Ethicon Endo-Surgery, Inc. | Automatically adjusting band system with MEMS pump |
US8591532B2 (en) | 2008-02-12 | 2013-11-26 | Ethicon Endo-Sugery, Inc. | Automatically adjusting band system |
US8034065B2 (en) | 2008-02-26 | 2011-10-11 | Ethicon Endo-Surgery, Inc. | Controlling pressure in adjustable restriction devices |
US8233995B2 (en) | 2008-03-06 | 2012-07-31 | Ethicon Endo-Surgery, Inc. | System and method of aligning an implantable antenna |
US8187162B2 (en) | 2008-03-06 | 2012-05-29 | Ethicon Endo-Surgery, Inc. | Reorientation port |
ITTO20090768A1 (it) * | 2009-10-07 | 2011-04-08 | Franco & C S P A Ing | Prefabbricati cellulari in calcestruzzo armato atti a formare scatolari a telaio chiuso e/o strutture con comportamento ad arco, con eventuali cerniere e giunti organizzati |
ES2394569B1 (es) * | 2010-03-10 | 2013-12-09 | Prefabricados Tecnyconta S.L. | Metodo para la construccion de pasos inferiores y paso inferior construido con dicho metodo |
FR2979927B1 (fr) * | 2011-09-13 | 2019-03-15 | Mustapha Aboulcaid | Procede pour la construction d'ouvrages, notamment de passages sous des voies ferrees ou analogues en exploitation |
CN102410029A (zh) * | 2011-12-30 | 2012-04-11 | 中铁二院工程集团有限责任公司 | 大体积空心混凝土隧道衬砌结构 |
CN102606201B (zh) * | 2012-03-27 | 2014-07-16 | 招商局重庆交通科研设计院有限公司 | 组合拼装式震后隧道抢保通防护系统 |
CN103498477B (zh) * | 2013-10-23 | 2016-09-21 | 中铁二院工程集团有限责任公司 | 用于大型空洞回填的大体积空心混凝土结构 |
JP6543176B2 (ja) * | 2015-11-27 | 2019-07-10 | 鹿島建設株式会社 | 躯体構築方法 |
JP6543177B2 (ja) * | 2015-11-27 | 2019-07-10 | 鹿島建設株式会社 | 躯体構築方法 |
CN105714851B (zh) * | 2016-02-29 | 2018-02-06 | 济南轨道交通集团有限公司 | 装配式地连墙或预制桩与现浇地下车站一体化施工装置及采用其的施工方法 |
IT201700048973A1 (it) * | 2017-05-05 | 2018-11-05 | Paolo Chiaves | Struttura di un'opera sotterranea comprendente elementi di sostegno sotto forma di pali o diaframmi, e relativo procedimento di costruzione. |
CN109915150A (zh) * | 2019-04-26 | 2019-06-21 | 重庆交通大学 | 一种控制隧道沉降的桩基预加固支护结构及其施工方法 |
CN111749275B (zh) * | 2020-06-23 | 2021-10-15 | 中国建筑第二工程局有限公司 | 一种盖挖逆作地下通道结构及其施工方法 |
CN112878372A (zh) * | 2021-01-07 | 2021-06-01 | 广州铁路职业技术学院(广州铁路机械学校) | 一种明洞结构及其施工方法 |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE262879C (zh) | ||||
US1746566A (en) * | 1927-08-31 | 1930-02-11 | Robert B Tufts | Sewer construction |
US2194279A (en) * | 1935-06-01 | 1940-03-19 | John B Goldsborough | Skeleton framework structure and method of constructing the same |
US2512831A (en) * | 1947-02-26 | 1950-06-27 | Holmes Arthur Brannam | Production of concrete piles |
US2789419A (en) * | 1952-02-04 | 1957-04-23 | Frankignoul Pieux Armes | Method for forming reinforced foundation piles with an enlarged base |
AT290608B (de) * | 1967-09-13 | 1971-06-11 | Comar Reg Trust | Verfahren zur Herstellung von unterhalb von Verkehrsflächen od.dgl. liegenden Tiefbauwerken und Auflagerbalken zur Durchfüfrung des Verfahrens |
DE2062612C3 (de) | 1970-12-18 | 1974-08-01 | Held & Francke, Bauaktiengesellschaft, 8000 Muenchen | Verfahren zur Herstellung einer Unterfahrung |
IT1025608B (it) * | 1974-11-12 | 1978-08-30 | Alpina Spa | Elementi prefabbricati per la co struzione di strutture in trincea e procedimento relativo |
BE893573A (nl) | 1982-06-21 | 1982-10-18 | Algemene Aannemingen Karel Van | Werkwijze voor het vervaardigen van een koker in de grond |
IT1180072B (it) * | 1984-06-05 | 1987-09-23 | Carlo Chiaves | Struttura prefabbricata di sostegno e copertura particolarmente per la realizzazione di gallerie ponti e simili |
FR2578904B1 (fr) * | 1985-03-12 | 1987-07-03 | Koeckelberg Sa | Procede pour la realisation d'un tunnel |
EP0277399A1 (en) | 1987-02-02 | 1988-08-10 | Nihon Samicon Co. Ltd. | Prefabricated PC shelter structure |
EP0296013B2 (fr) | 1987-06-05 | 1998-04-01 | Marcel Matière | Construction tubulaire |
JP2813807B2 (ja) * | 1989-06-08 | 1998-10-22 | 大成建設株式会社 | 地下トンネルの構築方法 |
US5207038A (en) * | 1990-06-04 | 1993-05-04 | Yermiyahu Negri | Reinforced earth structures and method of construction thereof |
DE4302986C2 (de) | 1993-02-03 | 1995-06-01 | Zueblin Ag | Verfahren zur Herstellung eines Bauwerks in Deckelbauweise mit Stahlbetonfertigteil-Pfählen |
JP3188342B2 (ja) * | 1993-03-18 | 2001-07-16 | 株式会社鴻池組 | トンネル構築工法 |
JP3134265B2 (ja) * | 1993-03-31 | 2001-02-13 | 東日本旅客鉄道株式会社 | 地下構造物に用いるエレメントの構造 |
-
1995
- 1995-11-17 IT IT95TO000923A patent/IT1281032B1/it active IP Right Grant
-
1996
- 1996-11-14 WO PCT/EP1996/004988 patent/WO1997019230A1/en active IP Right Grant
- 1996-11-14 AU AU75712/96A patent/AU7571296A/en not_active Abandoned
- 1996-11-14 PT PT96938200T patent/PT861355E/pt unknown
- 1996-11-14 EP EP96938200A patent/EP0861355B1/en not_active Expired - Lifetime
- 1996-11-14 US US09/068,505 patent/US6234716B1/en not_active Expired - Fee Related
- 1996-11-14 AT AT96938200T patent/ATE199420T1/de active
- 1996-11-14 ES ES96938200T patent/ES2157015T3/es not_active Expired - Lifetime
- 1996-11-14 CN CN96199581.5A patent/CN1119469C/zh not_active Expired - Fee Related
- 1996-11-14 DE DE69611931T patent/DE69611931T2/de not_active Expired - Lifetime
- 1996-11-14 JP JP51935897A patent/JP3828153B2/ja not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147771A (zh) * | 2013-03-24 | 2013-06-12 | 中铁二院工程集团有限责任公司 | 一种大跨度高回填明洞结构 |
CN103206221A (zh) * | 2013-03-24 | 2013-07-17 | 中铁二院工程集团有限责任公司 | 大跨度重荷载推力拱式明洞结构 |
CN103206221B (zh) * | 2013-03-24 | 2016-05-11 | 中铁二院工程集团有限责任公司 | 大跨度重荷载推力拱式明洞结构 |
CN103912011A (zh) * | 2014-04-04 | 2014-07-09 | 北京城建设计发展集团股份有限公司 | 明挖预制装配式地下结构 |
CN103912011B (zh) * | 2014-04-04 | 2016-01-06 | 北京城建设计发展集团股份有限公司 | 明挖预制装配式地下结构 |
CN104631469A (zh) * | 2014-12-23 | 2015-05-20 | 安徽省城建设计研究院 | 用于深大基坑的无柱钢筋混凝土支撑构架及其搭建方法 |
CN104631469B (zh) * | 2014-12-23 | 2016-04-13 | 安徽省城建设计研究总院有限公司 | 用于深大基坑的无柱钢筋混凝土支撑构架及其搭建方法 |
CN112267557A (zh) * | 2020-10-20 | 2021-01-26 | 中国十九冶集团有限公司 | 地下挡板支撑结构的施工方法 |
CN112267557B (zh) * | 2020-10-20 | 2022-08-09 | 中国十九冶集团有限公司 | 地下挡板支撑结构的施工方法 |
CN115341570A (zh) * | 2022-07-01 | 2022-11-15 | 北京建工土木工程有限公司 | 一种下穿扩建地铁车站微变形的密贴硬接触支顶建造方法 |
Also Published As
Publication number | Publication date |
---|---|
IT1281032B1 (it) | 1998-02-11 |
WO1997019230A1 (en) | 1997-05-29 |
ITTO950923A0 (zh) | 1995-11-17 |
US6234716B1 (en) | 2001-05-22 |
CN1119469C (zh) | 2003-08-27 |
AU7571296A (en) | 1997-06-11 |
ITTO950923A1 (it) | 1997-05-17 |
JP2000513773A (ja) | 2000-10-17 |
DE69611931D1 (de) | 2001-04-05 |
JP3828153B2 (ja) | 2006-10-04 |
EP0861355B1 (en) | 2001-02-28 |
DE69611931T2 (de) | 2001-06-13 |
ES2157015T3 (es) | 2001-08-01 |
ATE199420T1 (de) | 2001-03-15 |
PT861355E (pt) | 2001-06-29 |
EP0861355A1 (en) | 1998-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1119469C (zh) | 地下结构及其建造方法 | |
US6408581B2 (en) | Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods | |
ES2217289T3 (es) | Cimentacion con pilotes sin tension. | |
CN101215815B (zh) | 适于陡峻山区的整体式悬挑结构复合道路的修筑方法 | |
CN111550262B (zh) | 一种隧道装配式预应力衬砌设计方法 | |
CN106321113B (zh) | 一种用于穿采空区的巷道空间框架结构及其支护方法 | |
US20220081868A1 (en) | Building Elements For Making Retaining Walls, And Systems And Methods Of Using Same | |
US5870789A (en) | Precast bridges | |
CN106012872A (zh) | 连续刚构桥的无背索斜拉加固体系及施工方法 | |
CN112411362A (zh) | 一种桥墩及其施工方法、桥梁 | |
CN113738023B (zh) | 一种半预制半现浇型构造柱及其组装结构和施工方法 | |
JP2008127834A (ja) | トンネル内部の構築工法およびプレキャスト床版 | |
CN213143117U (zh) | 一种装配式键槽基础挡土墙结构 | |
CN102828506A (zh) | 超深大截面方形支护桩及其施工方法 | |
CN100549311C (zh) | 用预制的结构件建造露天工程段的方法及相关的预制结构件 | |
CN1120916C (zh) | 用于加固岩石边坡的预应力锚梁 | |
CN109268030B (zh) | 一种用于隧道洞口支护的多级套拱结构、管棚套拱结构及其施工方法 | |
CN106049521A (zh) | 一种输电线路十字悬臂梁独柱自平衡基础及施工方法 | |
US5199817A (en) | Process of providing an elongate underground cavity | |
Lunardi | The cellular arch method: technical solution for the construction of the Milan railway's venezia station | |
CN212715016U (zh) | 一种道路防护挡墙结构 | |
KR102613254B1 (ko) | 자립 정착형 엄지 말뚝 및 이를 포함하는 흙막이 가시설의 시공 방법 | |
Whiting et al. | Changi Airport station design and construction | |
CN212614767U (zh) | 城门洞形半装配式衬砌 | |
JP2024087953A (ja) | 構造体ブロックおよび構造体ブロックを用いた構造物の施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20030827 Termination date: 20121114 |