CN102606201B - 组合拼装式震后隧道抢保通防护系统 - Google Patents
组合拼装式震后隧道抢保通防护系统 Download PDFInfo
- Publication number
- CN102606201B CN102606201B CN201210083852.2A CN201210083852A CN102606201B CN 102606201 B CN102606201 B CN 102606201B CN 201210083852 A CN201210083852 A CN 201210083852A CN 102606201 B CN102606201 B CN 102606201B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- support
- perpendicular support
- keeping
- traffic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
本发明公开了一种组合拼装式震后隧道抢保通防护系统,包括水平设置且沿隧道纵向延伸的顶部防护板和竖直设置的竖撑,所述竖撑分别位于顶部防护板横向两端下方且沿顶部防护板纵向间隔排列,所述竖撑与顶部防护板可拆卸式固定连接;本发明由顶部防护板和支撑体系组合拼装而成,支撑体系支撑顶部防护板形成行车道,在隧道抢通保通阶段,可以防止洞顶破碎体、破碎混凝土块掉落或砸落在行车道上,保障加固施工以及后继余震引起的坍塌、掉块不影响隧道内人员和车辆的安全,确保抢通保通效果,尤其对于保通阶段,可以保证隧道畅通、顺利;并且本发明各部件之间为组合拼装结构,结构轻便、便于组装和移动。
Description
技术领域
本发明涉及一种隧道抢通保通阶段的防护技术,具体涉及一种隧道防护系统。
背景技术
隧道抢通阶段,洞内多发生衬砌脱落、掉块、甚至整体坍塌,洞口段则可能发生飞石、落石或大型的坍塌;保通阶段则由于随时可能发生余震,围岩可能由于地震而处于不稳定状态,衬砌也由于震动而发生结构裂损,同时洞口边仰坡由于震动会变得松散和不稳定,可能发生飞石、落石,引发次生灾害;另外,隧道抢通保通阶段进行各种加固施工时,由于围岩和衬砌处于不稳定阶段,同时洞内各种抢通保通车辆、人员和物资流通频繁,施工过程中难以保证洞内行车安全,也难以保证施工技术人员和设备的安全。
因此,在隧道抢通保通阶段,必须采取必要的防护措施对隧道结构进行防护,保障加固施工以及后继余震引起的坍塌、掉块不影响隧道内人员和车辆的安全,确保抢通保通效果,尤其对于保通阶段,可以保证隧道畅通、顺利。
发明内容
有鉴于此,本发明提供了一种组合拼装式震后隧道抢保通防护系统,应用于隧道抢通保通阶段,保障加固施工以及后继余震引起的坍塌、掉块不影响隧道内人员和车辆的安全,确保抢通保通效果,保证隧道畅通、顺利。
本发明的组合拼装式震后隧道抢保通防护系统,包括水平设置且沿隧道纵向延伸的顶部防护板和竖直设置的竖撑,所述竖撑分别位于顶部防护板横向两端下方且沿顶部防护板纵向间隔排列,所述竖撑与顶部防护板可拆卸式固定连接。
进一步,还包括沿顶部防护板纵向设置的连接杆,所述连接杆与竖撑可拆卸式固定连接;
进一步,所述竖撑底部设有滚动轮;
进一步,还包括横向设置的壁撑,所述壁撑一端顶住隧道衬砌,另一端与竖撑铰接;
进一步,还包括斜撑,所述斜撑一端与竖撑铰接,另一端与外套于壁撑的套筒铰接;
进一步,所述壁撑顶住隧道衬砌的端部铰接有垫板,所述垫板上设有垫片;
进一步,还包括倾斜设置的地撑,所述地撑一端顶住路面,另一端与竖撑铰接;
进一步,所述可拆卸式固定连接为螺栓连接,所述竖撑、连接杆、壁撑、斜撑、套筒、垫板和地撑的连接部位上设有连接板,连接板上开有螺栓孔或销孔;
进一步,所述顶部防护板为钢板,所述竖撑、连接杆、壁撑、斜撑和地撑为型钢或木杆。
本发明的有益效果在于: 本发明由顶部防护板和支撑体系组合拼装而成,支撑体系支撑顶部防护板形成行车道,在隧道抢通保通阶段,可以防止洞顶破碎体、破碎混凝土块掉落或砸落在行车道上,保障加固施工以及后继余震引起的坍塌、掉块不影响隧道内人员和车辆的安全,确保抢通保通效果,尤其对于保通阶段,可以保证隧道畅通、顺利;并且本发明各部件之间为组合拼装结构,结构轻便、便于组装和移动。
附图说明
为了使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明作进一步的详细描述,其中:
图1为本发明的横向截面结构示意图(洞内部分);
图2为本发明的横向截面结构示意图(洞口部分);
图3为本发明的纵向截面结构示意图;
图4为竖撑与顶部防护板可拆卸式固定连接的结构示意图;
图5为连接杆与竖撑可拆卸式固定连接的一种结构示意图;
图6为连接杆与竖撑可拆卸式固定连接的另一种结构示意图;
图7为竖撑的铰接部位的结构示意图;
图8为壁撑的铰接部位的结构示意图;
图9为斜撑的铰接部位的结构示意图;
图10为垫板和垫片的结构示意图;
图11为滚动轮的结构示意图;
图12为套筒的结构示意图。
具体实施方式
以下将参照附图,对本发明的优选实施例进行详细的描述。
图1为本发明的横向截面结构示意图(洞内部分),图2为本发明的横向截面结构示意图(洞口部分),图3为本发明的纵向截面结构示意图,如图所示,本发明的组合拼装式震后隧道抢保通防护系统,包括水平设置且沿隧道3纵向延伸的顶部防护板1和竖直设置的竖撑2,所述竖撑2分别位于顶部防护板1横向两端下方且沿顶部防护板1纵向间隔排列,所述竖撑2与顶部防护板1可拆卸式固定连接;竖撑2与顶部防护板1采用可拆卸式固定连接结构,结构轻便、便于组装,竖撑2支撑顶部防护板1形成行车道,在隧道3抢通保通阶段,可以防止洞顶破碎体、破碎混凝土块掉落或砸落在行车道上,保障加固施工以及后继余震引起的坍塌、掉块不影响隧道3内人员和车辆的安全,确保抢通保通效果,尤其对于保通阶段,可以保证隧道3畅通、顺利。
作为本发明的进一步改进,还包括沿顶部防护板1纵向设置的连接杆4,所述连接杆4与竖撑2可拆卸式固定连接;连接杆4增强了结构的整体性和稳定性,同时考虑到结构轻便、便于组装,连接杆4与竖撑2采用可拆卸式固定连接结构。
本实施例中,所述连接杆4分别位于竖撑2顶部和中部。
作为本发明的进一步改进,所述竖撑2底部设有滚动轮5;滚动轮5的结构如图11所示,滚动轮5的材料可采用钢制轮或高分子硬质塑料,如需长距离运输,也可安装轮胎作为滚动轮5,方便运输;滚动轮5使本发明具有可移动特征,以方便本发明在远离隧道3或隧道3外开阔场地施工组装,组装好后便于移动到隧道3内。
作为本发明的进一步改进,还包括横向设置的壁撑6,所述壁撑6一端顶住隧道3衬砌,另一端与竖撑2铰接;壁撑6的作用是防止防护系统在隧道3内左右摆动,增强了防护系统洞内部分的稳定性,同时考虑到便于调节壁撑6的角度和位置,壁撑6采用铰接结构;本实施例中,壁撑6从上至下并列设置了两根,根据实际施工需要,壁撑6可以从上至下并列设置多根。
作为本发明的进一步改进,还包括斜撑7,所述斜撑7一端与竖撑2铰接,另一端与外套于壁撑6的套筒8铰接;斜撑7增强了壁撑6的稳定性。
作为本发明的进一步改进,所述壁撑6顶住隧道3衬砌的端部铰接有垫板9,所述垫板9上设有垫片10;垫板9和垫片10的结构如图10所示,通过调节垫片10的厚度和角度,可以使壁撑6的支撑更稳固。
作为本发明的进一步改进,还包括倾斜设置的地撑13,所述地撑13一端顶住路面14,另一端与竖撑2铰接;地撑13增强了防护系统洞口部分的稳定性,同时考虑到便于调节地撑13的角度和位置,地撑13与竖撑2采用铰接结构,地撑13可通过地脚螺栓等方式固定于路面14;本实施例中,地撑13从上至下并列设置了两根,根据实际施工需要,地撑13可以从上至下并列设置多根。
本实施例中,所述可拆卸式固定连接为螺栓连接;为了便于设置螺栓或连接铰,同时为了确保连接紧密可靠,所述竖撑2、连接杆4、壁撑6、斜撑7、套筒8、垫板9和地撑13的连接部位上设有连接板11,连接板11上开有螺栓孔11a或销孔11b,本发明组装时,如图4、图5和图6所示,在连接板11的螺栓孔11a内穿入螺栓12,形成螺栓连接结构,如图7、图8、图9、图10和图12所示,在连接板11的销孔11b内穿入锁销,形成铰接结构。
本实施例中,所述顶部防护板1为钢板,所述竖撑2、连接杆4、壁撑6、斜撑7和地撑13为工字钢;在隧道保通阶段,本发明的主要作用不是对坍塌体、剥落剥离体的支撑,而是防止坍塌和掉块体直接砸落在车辆、行人上,引起人员财产的损失,所以在隧道保通阶段本发明应该是一种轻型系统,而不是重型系统,因此不宜选择尺寸过大或过重的材料,竖撑2、连接杆4、壁撑6、斜撑7和地撑13还可以选用其它型钢,如果由于条件限制或材料供应不足,也可以选用木杆代替,顶部防护板1也可以选用合金板等其它板材;而在隧道抢通阶段,由于本发明需要承受荷载,因此钢板和工字钢等材料需要加强。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管通过参照本发明的优选实施例已经对本发明进行了描述,但本领域的普通技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离所附权利要求书所限定的本发明的精神和范围。
Claims (5)
1.一种组合拼装式震后隧道抢保通防护系统,其特征在于:包括水平设置且沿隧道(3)纵向延伸的顶部防护板(1)和竖直设置的竖撑(2),所述竖撑(2)分别位于顶部防护板(1)横向两端下方且沿顶部防护板(1)纵向间隔排列,所述竖撑(2)与顶部防护板(1)可拆卸式固定连接;还包括沿顶部防护板(1)纵向设置的连接杆(4),所述连接杆(4)与竖撑(2)可拆卸式固定连接,所述竖撑(2)底部设有滚动轮(5);还包括横向设置的壁撑(6),所述壁撑(6)一端顶住隧道(3)衬砌,另一端与竖撑(2)铰接;还包括斜撑(7),所述斜撑(7)一端与竖撑(2)铰接,另一端与外套于壁撑(6)的套筒(8)铰接。
2.根据权利要求1所述的组合拼装式震后隧道抢保通防护系统,其特征在于:所述壁撑(6)顶住隧道(3)衬砌的端部铰接有垫板(9),所述垫板(9)上设有垫片(10)。
3.根据权利要求2所述的组合拼装式震后隧道抢保通防护系统,其特征在于:还包括倾斜设置的地撑(13),所述地撑(13)一端顶住路面(14),另一端与竖撑(2)铰接。
4.根据权利要求3所述的组合拼装式震后隧道抢保通防护系统,其特征在于:所述可拆卸式固定连接为螺栓连接,所述竖撑(2)、连接杆(4)、壁撑(6)、斜撑(7)、套筒(8)、垫板(9)和地撑(13)的连接部位上设有连接板(11),连接板(11)上开有螺栓孔(11a)或销孔(11b)。
5.根据权利要求4所述的组合拼装式震后隧道抢保通防护系统,其特征在于:所述顶部防护板(1)为钢板,所述竖撑(2)、连接杆(4)、壁撑(6)、斜撑(7)和地撑(13)为型钢或木杆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210083852.2A CN102606201B (zh) | 2012-03-27 | 2012-03-27 | 组合拼装式震后隧道抢保通防护系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210083852.2A CN102606201B (zh) | 2012-03-27 | 2012-03-27 | 组合拼装式震后隧道抢保通防护系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102606201A CN102606201A (zh) | 2012-07-25 |
CN102606201B true CN102606201B (zh) | 2014-07-16 |
Family
ID=46523921
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210083852.2A Expired - Fee Related CN102606201B (zh) | 2012-03-27 | 2012-03-27 | 组合拼装式震后隧道抢保通防护系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102606201B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0861355A1 (en) * | 1995-11-17 | 1998-09-02 | Carlo Chiaves | Underground structural work, particularly for building tunnels, underpasses, carparks and the like, a process for its production and a prefabricated element for such structure |
CN200982203Y (zh) * | 2006-07-07 | 2007-11-28 | 郭洪学 | 隧道救援支承架 |
CN201155331Y (zh) * | 2008-01-31 | 2008-11-26 | 肖根祥 | 坑道掘进迎头安全防护罩 |
CN201273194Y (zh) * | 2008-09-28 | 2009-07-15 | 王跃平 | 组合液压机架 |
WO2011101716A2 (en) * | 2010-02-19 | 2011-08-25 | Council Of Scientific And Industrial Research | A device for roof support of underground mine/tunnel |
CN202483591U (zh) * | 2012-03-27 | 2012-10-10 | 招商局重庆交通科研设计院有限公司 | 组合拼装式震后隧道抢保通防护系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101002402B1 (ko) * | 2010-06-23 | 2010-12-17 | (주)대우건설 | 소음 및 진동 저감형 터널 확대용 강재 프로텍터 |
-
2012
- 2012-03-27 CN CN201210083852.2A patent/CN102606201B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0861355A1 (en) * | 1995-11-17 | 1998-09-02 | Carlo Chiaves | Underground structural work, particularly for building tunnels, underpasses, carparks and the like, a process for its production and a prefabricated element for such structure |
CN200982203Y (zh) * | 2006-07-07 | 2007-11-28 | 郭洪学 | 隧道救援支承架 |
CN201155331Y (zh) * | 2008-01-31 | 2008-11-26 | 肖根祥 | 坑道掘进迎头安全防护罩 |
CN201273194Y (zh) * | 2008-09-28 | 2009-07-15 | 王跃平 | 组合液压机架 |
WO2011101716A2 (en) * | 2010-02-19 | 2011-08-25 | Council Of Scientific And Industrial Research | A device for roof support of underground mine/tunnel |
CN202483591U (zh) * | 2012-03-27 | 2012-10-10 | 招商局重庆交通科研设计院有限公司 | 组合拼装式震后隧道抢保通防护系统 |
Also Published As
Publication number | Publication date |
---|---|
CN102606201A (zh) | 2012-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102966052B (zh) | 山区公路高陡边坡落石掉块危害防护的结构 | |
US20160160457A1 (en) | Light-Weight Temporary Bridge System and Building Method thereof | |
FI124609B (en) | Bridge crane assembly and method of installation | |
CN105064202B (zh) | 型钢与钢筋混凝土板装配式轻型组合梁桥及其施工方法 | |
CN205025072U (zh) | 一种用于高空作业的施工平台装置 | |
CN102606201B (zh) | 组合拼装式震后隧道抢保通防护系统 | |
CN105350760A (zh) | 边梁支承、圆钢斜拉、钢丝绳卸载,悬挑脚手架施工方法 | |
CN208411812U (zh) | 一种用于动压巷道的u型钢支架运输车 | |
CN202483591U (zh) | 组合拼装式震后隧道抢保通防护系统 | |
CN204126655U (zh) | 双线隧道新建棚洞衬砌施工用防电衬砌台车 | |
CN201778479U (zh) | 一种高空作业可拆卸平台 | |
CN206337850U (zh) | 一种山区公路落石防护棚 | |
CN108086207A (zh) | 一种公路维修用便于携带的围栏 | |
EP2998263B1 (fr) | Dispositif et procédé de protection d'un terrain lors de travaux de maintenance sur des lignes électriques aériennes | |
CN209040582U (zh) | 移动式基坑施工防护装置 | |
CN101435270B (zh) | 高层柱子分段对接作业方法 | |
CN205135634U (zh) | 一种应用于开敞式tbm的钢拱架防护与支护系统 | |
CN204644820U (zh) | 路面混凝土浇筑保护装置 | |
CN204253079U (zh) | 一种矿用锚杆托盘 | |
CN206956739U (zh) | 一种便携式临边防护装置 | |
CN107939133B (zh) | 一种火力发电厂煤仓间的剪切型偏心支撑结构 | |
CN102587276B (zh) | 桥梁混凝土防撞护栏多功能作业车及使用其的施工方法 | |
CN203257118U (zh) | 建筑工程安全防护钢筋防护棚 | |
CN105383891A (zh) | 设备的运输系统和运输流程 | |
CN201169922Y (zh) | 高层柱子分段对接作业的安全装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140716 Termination date: 20180327 |