ITGE20030005A1 - Metodo continuo di realizzazione di opere in sotterraneo, - Google Patents
Metodo continuo di realizzazione di opere in sotterraneo,Info
- Publication number
- ITGE20030005A1 ITGE20030005A1 IT000005A ITGE20030005A ITGE20030005A1 IT GE20030005 A1 ITGE20030005 A1 IT GE20030005A1 IT 000005 A IT000005 A IT 000005A IT GE20030005 A ITGE20030005 A IT GE20030005A IT GE20030005 A1 ITGE20030005 A1 IT GE20030005A1
- Authority
- IT
- Italy
- Prior art keywords
- realization
- continuous method
- underground works
- underground
- works
- Prior art date
Links
- 238000011437 continuous method Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
- E21D21/0053—Anchoring-bolts in the form of lost drilling rods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Soil Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Agronomy & Crop Science (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT000005A ITGE20030005A1 (it) | 2003-01-24 | 2003-01-24 | Metodo continuo di realizzazione di opere in sotterraneo, |
EP08169261A EP2034129A3 (en) | 2003-01-24 | 2004-01-07 | Method of consolidation, impermeabilisation and drainage of underground works by guided perforations |
EP04000097A EP1447521A3 (en) | 2003-01-24 | 2004-01-07 | Method of consolidation, impermeabilisation and drainage of underground works by guided perforations |
US10/754,078 US6893188B2 (en) | 2003-01-24 | 2004-01-07 | Continuous method of realization of works underground, tunnels and excavations in general with works of consolidation, permeabilization and drainage obtained through guided perforations |
CA2456303A CA2456303C (en) | 2003-01-24 | 2004-01-19 | Continuous method of realization of underground tunnels including peripheral perforations |
CNB2004100024750A CN100532738C (zh) | 2003-01-24 | 2004-01-20 | 地下工程的连续实现方法 |
AU2004200274A AU2004200274B2 (en) | 2003-01-24 | 2004-01-23 | Continuous method of realisation of works underground, tunnels and excavations in general with works of consolidation, impermeabilisation and drainage obtained through guided perforations |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT000005A ITGE20030005A1 (it) | 2003-01-24 | 2003-01-24 | Metodo continuo di realizzazione di opere in sotterraneo, |
Publications (1)
Publication Number | Publication Date |
---|---|
ITGE20030005A1 true ITGE20030005A1 (it) | 2004-07-25 |
Family
ID=32676840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
IT000005A ITGE20030005A1 (it) | 2003-01-24 | 2003-01-24 | Metodo continuo di realizzazione di opere in sotterraneo, |
Country Status (6)
Country | Link |
---|---|
US (1) | US6893188B2 (it) |
EP (2) | EP2034129A3 (it) |
CN (1) | CN100532738C (it) |
AU (1) | AU2004200274B2 (it) |
CA (1) | CA2456303C (it) |
IT (1) | ITGE20030005A1 (it) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100532786C (zh) * | 2004-09-02 | 2009-08-26 | 同济大学 | 浅埋洞室的开挖方法 |
IL169878A (en) * | 2005-07-26 | 2010-06-16 | Ofer Naaman | Method for tunnel construction |
CN100451247C (zh) * | 2006-03-27 | 2009-01-14 | 李海广 | 防空洞加固施工工艺 |
FR2934007B1 (fr) * | 2008-07-17 | 2010-09-10 | Ecole Polytech | Procede de construction d'une galerie souterraine ou d'un puits permettant de realiser un bouchon etanche pour un stockage de dechets dangereux et notamment radioactifs. |
CN103089280B (zh) * | 2011-11-01 | 2015-02-04 | 北京市政建设集团有限责任公司 | 一种隧道内地下水疏堵结合的注浆止水加固施工工艺 |
CN103696416B (zh) * | 2014-01-17 | 2016-05-25 | 黄滨 | 一种地基处理方法 |
CN105369774A (zh) * | 2015-11-09 | 2016-03-02 | 李先登 | 万里隧道暗河长渠的挖建方法 |
CN110872950A (zh) * | 2019-11-20 | 2020-03-10 | 赵丽娟 | 一种隧道施工的小导管超前支护方法 |
CN111734448B (zh) * | 2020-06-22 | 2022-05-17 | 上海隧道工程有限公司 | 地下空间结构与盾构隧道间竖向通道加固的结构及方法 |
CN111894033A (zh) * | 2020-07-14 | 2020-11-06 | 河海大学 | 一种先固化后开挖的管廊施工方法 |
CN113898379B (zh) * | 2021-09-29 | 2023-08-11 | 中铁二局第二工程有限公司 | 一种实测注浆固结地层压力及参数优化的装置及方法 |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3498674A (en) * | 1967-08-04 | 1970-03-03 | Dale M Matthews | Mining method and apparatus |
DE2320366A1 (de) * | 1973-04-21 | 1974-11-07 | Beton & Monierbau Ag | Verfahren zur sicherung des ausbruchs und begrenzung von gebirgsdeformationen bei der bergmaennischen herstellung von roehrenfoermigen hohlraeumen |
CH665878A5 (it) * | 1984-12-11 | 1988-06-15 | Rodio Found Eng Ltd | Procedimento per il consolidamento di terreno nello scavo di gallerie. |
US4785885A (en) * | 1987-05-13 | 1988-11-22 | Cherrington Martin D | Method and apparatus for cementing a production conduit within an underground arcuate bore |
WO1994025688A1 (de) * | 1993-04-28 | 1994-11-10 | Flowtex Technologie-Import Von Kabelverlegemaschinen Gmbh | Verfahren zur abdichtung von bodenkörpern und vorrichtung zur durchführung dieses verfahrens |
SE9400465L (sv) * | 1994-02-11 | 1995-08-12 | Atlas Copco Geotechnical Drill | Sätt att åstadkomma ett i huvudsak tätt skärmskikt i marken samt anordning för utförande av sättet |
JP3547096B2 (ja) * | 1994-08-22 | 2004-07-28 | 日本基礎技術株式会社 | フォアパイルの造成工法とこれに用いる削孔装置 |
US5515931A (en) * | 1994-11-15 | 1996-05-14 | Vector Magnetics, Inc. | Single-wire guidance system for drilling boreholes |
CN2233461Y (zh) * | 1995-06-29 | 1996-08-21 | 中国矿业大学 | 一种密封锚固式外锚内注锚杆 |
DE19542971C2 (de) * | 1995-11-17 | 1999-01-21 | Flowtex Technologie Import Von | Verfahren zur vorauseilenden Firstsicherung von Tunnelauffahrungen |
IT1281032B1 (it) * | 1995-11-17 | 1998-02-11 | Carlo Chiaves | Struttura di un'opera interrata, particolarmente per la reliazzazione di gallerie, sottopassaggi, autorimesse o simili, suo procedimento di |
EP0833011A1 (de) * | 1996-09-25 | 1998-04-01 | FLOWTEX TECHNOLOGIE-IMPORT VON KABELVERLEGEMASCHINEN GmbH | Verfahren zum Herstellen von parallel verlaufenden Injektionskörpern im Boden |
CN1231371A (zh) * | 1999-04-20 | 1999-10-13 | 日本Sho-Bond建设株式会社 | 补强加固混凝土建筑物的方法 |
US6241426B1 (en) * | 1999-05-25 | 2001-06-05 | Aerial Industrial, Inc. | Method for forming an interconnected underground structure |
DE19940774C2 (de) * | 1999-08-27 | 2003-03-06 | Keller Grundbau Gmbh | Verfahren und Vorrichtung zum Herstellen von flächenhaften Dichtelementen im Erdboden |
JP3440375B2 (ja) * | 1999-09-13 | 2003-08-25 | 大成建設株式会社 | トンネル用の水抜管及び先行水抜工法 |
-
2003
- 2003-01-24 IT IT000005A patent/ITGE20030005A1/it unknown
-
2004
- 2004-01-07 EP EP08169261A patent/EP2034129A3/en not_active Withdrawn
- 2004-01-07 US US10/754,078 patent/US6893188B2/en not_active Expired - Fee Related
- 2004-01-07 EP EP04000097A patent/EP1447521A3/en not_active Withdrawn
- 2004-01-19 CA CA2456303A patent/CA2456303C/en not_active Expired - Fee Related
- 2004-01-20 CN CNB2004100024750A patent/CN100532738C/zh not_active Expired - Fee Related
- 2004-01-23 AU AU2004200274A patent/AU2004200274B2/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
EP2034129A2 (en) | 2009-03-11 |
EP2034129A3 (en) | 2011-01-26 |
EP1447521A2 (en) | 2004-08-18 |
CN1517495A (zh) | 2004-08-04 |
AU2004200274A1 (en) | 2004-08-12 |
CA2456303C (en) | 2013-08-13 |
CA2456303A1 (en) | 2004-07-24 |
US20040144003A1 (en) | 2004-07-29 |
CN100532738C (zh) | 2009-08-26 |
US6893188B2 (en) | 2005-05-17 |
EP1447521A3 (en) | 2004-10-06 |
AU2004200274B2 (en) | 2010-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE60315041D1 (de) | Bohrverfahren | |
DE60327022D1 (de) | Standortsberechnungsverfahren | |
BRPI0313238A2 (pt) | método | |
NO20053650D0 (no) | Nedihullsverktoy | |
ITUD20060182A1 (it) | "metodo di perforazione" | |
NO20034840D0 (no) | Nedihulls verktöy | |
NO20034418D0 (no) | Underrömmer for borehull | |
NO20044293L (no) | Nedihulls-gjenvinningsverktoy | |
ITGE20030005A1 (it) | Metodo continuo di realizzazione di opere in sotterraneo, | |
DE112004001791D2 (de) | Bohrkopf | |
NO20035626D0 (no) | Metode | |
FI20022034A (fi) | Päällystysmenetelmä | |
DE50310824D1 (de) | Bohrkopf | |
NO20035401D0 (no) | Metode | |
GB0317846D0 (en) | Drilling method | |
SE0300721D0 (sv) | New method | |
SE0203388D0 (sv) | New method | |
SE0202650D0 (sv) | New method | |
SE0201576D0 (sv) | New method | |
SE0201024D0 (sv) | New method | |
SE0200924D0 (sv) | New method | |
NO20035619D0 (no) | Metode | |
SE0300045D0 (sv) | Method | |
SE0302781D0 (sv) | Method | |
SE0300044D0 (sv) | Method |