CN111066405B - Method for repairing quarry in frozen soil area - Google Patents

Method for repairing quarry in frozen soil area Download PDF

Info

Publication number
CN111066405B
CN111066405B CN201911306941.7A CN201911306941A CN111066405B CN 111066405 B CN111066405 B CN 111066405B CN 201911306941 A CN201911306941 A CN 201911306941A CN 111066405 B CN111066405 B CN 111066405B
Authority
CN
China
Prior art keywords
planting
edge
area
pits
soil layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201911306941.7A
Other languages
Chinese (zh)
Other versions
CN111066405A (en
Inventor
王红斌
王耀军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Jiaotong University Kaiyuan Land Survey And Planning Research Institute Co ltd
Original Assignee
Xi'an Jiaotong University Kaiyuan Land Survey And Planning Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Jiaotong University Kaiyuan Land Survey And Planning Research Institute Co ltd filed Critical Xi'an Jiaotong University Kaiyuan Land Survey And Planning Research Institute Co ltd
Priority to CN201911306941.7A priority Critical patent/CN111066405B/en
Publication of CN111066405A publication Critical patent/CN111066405A/en
Application granted granted Critical
Publication of CN111066405B publication Critical patent/CN111066405B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0208Gabions

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a method for repairing a quarry in a frozen soil area, and relates to the technical field of geological repair. Which comprises the following steps: step one, cleaning waste stones in a quarry area, and intensively stacking the waste stones for later use; manufacturing two circles of gabion retaining walls at the edges of the quarry, forming an edge planting area in the middle of the two circles of gabion retaining walls, and setting an area defined by the gabion retaining walls at the inner circle as an intermediate planting area; excavating an edge planting pit downwards on the rock of the edge planting area, and excavating an intermediate planting pit downwards on the rock of the intermediate planting area; planting plants in the edge planting pits and the middle planting pits, backfilling a first soil layer into the edge planting pits and the middle planting pits, and backfilling a second soil layer on the rock surfaces of the edge planting areas and the middle planting areas, wherein the sum of the thicknesses of the first soil layer and the second soil layer is more than or equal to 100 cm; and fifthly, watering and maintaining the plants to finish repairing. The invention has the advantages of less backfill soil, low cost and high plant survival rate.

Description

Method for repairing quarry in frozen soil area
Technical Field
The invention relates to the technical field of geological restoration, in particular to a method for restoring a quarry in a frozen soil area.
Background
The quarry is an area formed by artificially mining stones or mineral products, most of the existing quarries adopt an open-air quarry mode, the quarries can be subjected to abandonment treatment after resources are developed and utilized, the quarries are naturally wasted, the exposed rocks are formed on the surfaces of the quarries after the quarries are abandoned, the formed soil is few in substances, and the soil forming speed is low; the soil has small water content and high surface temperature, and the soil is easy to run off; the plant restoration process is slow, and the vegetation coverage rate is low; the ecological system has simple structure, low function and weak vegetation self-repairing capability, and the vegetation in the abandoned quarry is difficult to repair under the severe habitat conditions, so that the ecological environment in the area slowly moves towards stony desertification. Therefore, ecological remediation of the quarry is required. Particularly, a quarry in a frozen soil area is very difficult to repair, frozen soil refers to various rocks and soils with ice below zero centigrade, and even if seedlings are planted in spring, the seedlings are easy to die after being frozen because the root systems of the seedlings are shallow, tissues are tender and not lignified before coming in winter.
In a mountain area with higher elevation, the thickness of the frozen soil layer can reach 70 cm, and the thickness of the backfill soil is at least 100 cm, but the backfill soil restoration of a general quarry can only reach 50 cm, which can not meet the requirements of the frozen soil area, because most rocks are near the quarry, insufficient soil is used for backfilling, the soil needs to be transported from other areas, if the thickness of the backfill soil needs to reach 100 cm, the required volume of earth is too large, which leads to rapid cost rise,
the Chinese patent with publication number CN110454165A discloses a landfill method of a waste mine pit repairing matrix of a limestone quarry, which comprises the following steps: (a) paving an impermeable layer, namely paving the impermeable layer after the bottom layer of the abandoned mine pit before landfill is leveled and rolled and the underground water drainage system is paved, wherein the impermeable layer sequentially comprises a composite clay liner, a geomembrane layer, a geotechnical cloth layer 1, a sand gravel drainage layer and a geotechnical cloth layer 2 from bottom to top; (b) burying and repairing a matrix: according to the principle that different raw material proportions of the repair matrix are buried in different pit depths, compacting treatment is carried out for 1 time when the burying thickness is 1-2 m, and the compaction density is more than 1200kg/m 3; wherein: when the pit depth is more than or equal to 100m, the mixing proportion of the calcium oxide is 25 percent; the blending proportion of the tailing sand is 60 wt%, and when the depth of the pit is 100m and the depth of the pit is 10m to the ground surface, the blending proportion of the calcium oxide is reduced by 2% and the blending proportion of the tailing sand is reduced by 5%; the blending proportion of the calcium oxide is reduced to 8% and is not reduced any more; the blending proportion of the tailing sand is reduced to 15% and is not reduced any more; (c) arranging a layer of impermeable layer which is the same as the impermeable layer in the step (a) for every 5m of the landfill depth of the repair matrix; (d) and when the pit is buried to be 3-5 meters away from the ground surface by the repairing matrix, covering a planting soil layer. In the step (d), the thickness of the planting soil layer is 3-5 m.
The above prior art solution has the following drawbacks: although the scheme can be used for repairing limestone mine pits, the backfill cost is too high because a planting soil layer with the length of 3-5 m needs to be backfilled, and the method is difficult to be used for repairing a quarry in a frozen soil area, so that a method for repairing the quarry in the frozen soil area, which can take the repairing cost and the seedling survival rate into consideration, is urgently needed.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a method for repairing a quarry in a frozen soil area, which has the advantages of less backfill soil, low cost and high plant survival rate.
The above purpose of the invention is realized by the following technical scheme:
a method for repairing a quarry in a frozen soil area comprises the following steps:
step one, cleaning waste stones in a quarry area, and intensively stacking the waste stones for later use;
step two, manufacturing gabion cages, filling waste stones into the gabion cages to form gabion retaining walls, manufacturing two circles of gabion retaining walls which are arranged at intervals at the edges of a quarry, forming an edge planting area in the middle of the two circles of gabion retaining walls, and forming an intermediate planting area in an area surrounded by the gabion retaining walls at the inner circle;
excavating a plurality of edge planting pits downwards on the rocks of the edge planting areas, and excavating a plurality of middle planting pits downwards on the rocks of the middle planting areas;
planting plants in the edge planting pits and the middle planting pits, backfilling a first soil layer into the edge planting pits and the middle planting pits, and backfilling a second soil layer on the rock surfaces of the edge planting areas and the middle planting areas, wherein the sum of the thicknesses of the first soil layer and the second soil layer is more than or equal to 100 cm;
and step five, watering and maintaining the plants to finish the repair.
By adopting the technical scheme, because the edge planting pits and the middle planting pits are directly dug on the rocks of the quarry, the roots of the plants are buried in the edge planting pits and the middle planting pits, the backfill is divided into the first soil layer and the second soil layer, the sum of the thicknesses of the first soil layer and the second soil layer is more than or equal to 100 cm, compared with the soil layer which is directly backfilled by 100 cm, the consumption of the backfill is greatly reduced, the transportation cost and the backfill cost are reduced, the roots of the plants can be protected in the pits, and the total thickness of the backfill soil layer is more than the maximum thickness of the frozen soil layer, so the survival rate of the plants is greatly improved on the premise of reducing the cost.
According to the invention, the broken stones of the quarry are used for manufacturing the gabion retaining wall, so that waste stones are recycled, the cost is further reduced, and the gabion retaining wall can also prevent water and soil loss.
The invention in a preferred example may be further configured to: the diameters of the cross sections of the edge planting pits and the middle planting pits are gradually increased along the direction from the opening to the bottom of the edge planting pits and the middle planting pits.
Through adopting above-mentioned technical scheme, the edge is planted the hole and is trapezoidal with the perpendicular cross-section of middle planting hole, when raining, can store the rainwater in the hole and supply vegetation, and the opening is less can reduce the loss that the rainwater evaporation brought.
The present invention in a preferred example may be further configured to: and the upper surface of the second soil layer is covered with an insulating layer, and the insulating layer comprises withered leaves and/or hay.
By adopting the technical scheme, the heat-insulating layer plays a role in heat insulation, the influence of freezing injury on plants can be reduced, and the rotten leaves and the rotten hay can supplement nutrition for the plants and promote the growth and development of the plants.
The present invention in a preferred example may be further configured to: and the upper surface of the heat-insulating layer is covered with a protective net or a gravel layer.
By adopting the technical scheme, because the wind is large in the area with higher altitude, withered leaves and hay are easily blown away, the protection net and the broken stones can compress the withered leaves and the hay tightly, the withered leaves and the hay are prevented from being blown away, and soil can be prevented from being blown away.
The present invention in a preferred example may be further configured to: and a broken stone particle layer is laid below the first soil layer, and the thickness of the broken stone particle layer is less than or equal to 30 cm.
Through adopting above-mentioned technical scheme, the rock of morals and manners can be simulated to the rubble grained layer, and the plant can deepen more inside the rock when pricking the root, is favorable to the root of plant to prick more deeply.
The invention in a preferred example may be further configured to: the thickness of the first soil layer is 30-80 cm.
By adopting the technical scheme, on the premise that the total thickness of the first soil layer and the second soil layer is not changed, the thicker the first soil layer is, the less the backfill soil is used, however, the backfill soil is comprehensively considered, and the thickness of the first soil layer is preferably 30-80 cm.
The present invention in a preferred example may be further configured to: the cross sections of the edge planting pits and the middle planting pits are circular, and the opening diameters of the edge planting pits and the middle planting pits are 60-100 cm.
By adopting the technical scheme.
The present invention in a preferred example may be further configured to: the plant is a sapling, and the diameter of the sapling is 6-10 cm.
By adopting the technical scheme, the saplings with the diameters of 6-10 cm are lignified, and the survival rate in the frozen soil area is higher.
In summary, the present invention includes at least one of the following beneficial effects:
1. because the edge planting pits and the middle planting pits are directly dug on the rocks of the quarry, the roots of the plants are buried in the edge planting pits and the middle planting pits, the backfilling soil is divided into the first soil layer and the second soil layer, and the sum of the thicknesses of the first soil layer and the second soil layer is more than or equal to 100 cm.
2. Because the roots of the plants can be protected in the pits, and the total thickness of the backfill soil layer is greater than the maximum thickness of the frozen soil layer, the survival rate of the plants is greatly improved on the premise of reducing the cost.
3. The heat preservation layer plays a heat preservation role, can alleviate the influence of freeze injury to the plant, and leaf and hay can supply nutrition for the plant after rotting in addition, promote vegetation to develop, because the higher regional wind ratio of elevation is big, blow away withered leaf and hay easily, the guard net can compress tightly withered leaf and hay with the rubble, avoid being blown away, can also prevent that soil from being blown away.
Drawings
FIG. 1 is a schematic view of the construction of example 1;
FIG. 2 is a cross-sectional view after construction of example 1;
FIG. 3 is an enlarged view of portion A of FIG. 2;
FIG. 4 is an enlarged sectional view of examples 4 and 5;
FIG. 5 is an enlarged sectional view of example 6,
reference numerals: 1. a quarry; 2. gabion retaining walls; 3. a gabion cage; 4. waste stone; 5. an edge planting area; 6. an intermediate planting area; 7. planting pits at the edges; 8. a middle planting pit; 9. a first soil layer; 10. a second soil layer; 11. a heat-insulating layer; 12. a protection net; 13. a layer of crushed stone particles.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example 1: referring to fig. 1 to 3, the method for repairing a quarry in a frozen soil area disclosed by the invention comprises the following steps:
step one, waste rock 4 in the area of a quarry 1 is cleaned and is piled up in a centralized way for standby;
step two, manufacturing a gabion cage 3, filling waste stone 4 into the gabion cage 3 to form a gabion retaining wall 2, manufacturing two circles of gabion retaining walls 2 arranged at intervals at the edge of the quarry 1, wherein the distance between the two circles of gabion retaining walls 2 is 1 meter, forming an edge planting area 5 in the middle of the two circles of gabion retaining walls 2, and using broken stones of the quarry 1 to manufacture the gabion retaining wall 2 to recycle the waste stone 4, so that the cost is reduced, and the gabion retaining wall 2 can also prevent water and soil loss;
step three, downwards excavating a plurality of edge planting pits 7 on rocks of an edge planting area 5, and downwards excavating a plurality of middle planting pits 8 on rocks of a middle planting area 6, wherein in the embodiment, the number of the edge planting pits 7 is 100, and the number of the middle planting pits 8 is 100, in the embodiment, the diameters of the cross sections of the edge planting pits 7 and the middle planting pits 8 are gradually increased along the direction from the opening to the bottom of the cross sections, specifically, the vertical cross sections of the edge planting pits 7 and the middle planting pits 8 are trapezoidal, rainwater can be stored in the pits for plant growth during raining, the opening is small, so that the loss caused by rainwater evaporation can be reduced, the cross sections of the edge planting pits 7 and the middle planting pits 8 are circular, the opening diameter is 60 cm, the depth is 60 cm, and the bottom diameters of the edge planting pits 7 and the middle planting pits 8 are 100 cm;
fourthly, planting plants in the edge planting pits 7 and the middle planting pits 8, wherein the plants are saplings, preferably primary tree species, the diameter of each sapling is 6 centimeters, backfilling a first soil layer 9 into the edge planting pits 7 and the middle planting pits 8, backfilling a second soil layer 10 on the rock surfaces of the edge planting areas 5 and the middle planting areas 6, the sum of the thicknesses of the first soil layer 9 and the second soil layer 10 is larger than or equal to 100 centimeters, the height of the gabion retaining wall 2 is larger than that of the second soil layer 10, in the embodiment, the thickness of the first soil layer 9 is 60 centimeters, the thickness of the second soil layer 10 is 40 centimeters, and the height of the gabion retaining wall 2 is 50 centimeters;
and fifthly, watering and maintaining the plants to finish repairing.
Example 2: the difference between the method for repairing the quarry in the frozen soil area and the embodiment 1 is that the thickness of a first soil layer 9 is 30cm, the thickness of a second soil layer 10 is 70 cm, and the height of a gabion retaining wall 2 is 80 cm.
Example 3: the difference between the method for repairing the quarry in the frozen soil area and the embodiment 1 is that the thickness of a first soil layer 9 is 80 cm, the thickness of a second soil layer 10 is 20 cm, and the height of a gabion retaining wall 2 is 30 cm.
Example 4: a method for repairing a quarry in a frozen soil area is different from that in embodiment 1 in that referring to FIG. 4, the upper surface of a second soil layer 10 is covered with an insulating layer 11, the insulating layer 11 is made of withered leaves, and the thickness of the insulating layer 11 is 5 cm.
Example 5: a method for repairing a quarry in a frozen soil area is different from that in embodiment 4 in that referring to FIG. 4, the upper surface of a heat-insulating layer 11 is covered with a protection net 12, and the protection net 12 can be a waste fishing net.
Example 6: the difference between the method for repairing a quarry in a frozen soil area and the method in embodiment 1 is that referring to fig. 5, a gravel particle layer 13 is laid below a first soil layer 9, the thickness of the gravel particle layer 13 is less than or equal to 30cm, in this embodiment, the thickness of the gravel particle layer 13 is 10 cm, and the particle size of gravel particles is 5 +/-2 cm.
The insulating layer 11 may also be made of hay, or made of withered leaves and hay, which are determined according to the environment of withered leaves and hay in the field environment, or transported from outside. The heat preservation layer 11 plays a role in heat preservation, can reduce the influence of freezing injury on plants, and can supplement nutrition for the plants after the leaves and the hay are rotten, so that the growth and development of the plants are promoted.
The protection net 12 also can be replaced by the metalling, and the metalling can adopt 1 local useless building stones 4 in quarry, and the particle diameter of useless building stones 4 is 10 2 centimetres in the metalling, and the protection net 12 and metalling can compress tightly withered leaves and hay, avoid being blown away, can also prevent that soil from being blown away.
The broken stone particle layer 13 can simulate weathered rocks, and plants can go deeper into the rocks when being rooted, so that the roots of the plants can be rooted more deeply.
Comparative example 1: a method for repairing a quarry in a frozen soil area comprises the following steps of cleaning waste stone materials 4 in a quarry 1 area, manufacturing a circle of retaining wall at the edge of the quarry 1, enabling the height of the retaining wall to be 1 meter, enabling the area enclosed by the retaining wall to be 200 square meters, backfilling a soil layer with the height of 1 meter to the retaining wall, and planting 100 saplings.
The area enclosed by the gabion retaining wall of the inner ring is 200 square meters, and the backfill soil consumption and the survival rate of the seedlings after 1 year in the examples 1 to 6 and the comparative example 1 are calculated.
The backfill soil consumption is the backfill soil volume, and the calculation mode is as follows, wherein the backfill soil volume is equal to the first soil layer volume plus the second soil layer volume, and the first soil layer volume: and V is 1/3 pi h (R ^2+ Rr + R ^2) N, wherein R is the radius of the upper bottom of the middle planting pit, R is the radius of the lower bottom of the middle planting pit, h is the height of the middle planting pit, and N is the number of the middle planting pits. The second soil layer volume is 200 × H, H is the height of the second soil layer.
As can be seen from the table 1, the use amount of the backfill in the embodiments 1 to 3 is greatly lower than that in the comparative example 1, the backfill cost can be reduced, the survival rate is obviously improved, and compared with the embodiment 1, the survival rate is improved by 2 percent in the comparative example 4, so that the heat-insulating layer plays a role in heat insulation, the influence of freezing injury on plants can be reduced, and the leaves and the hay can supplement nutrition for the plants after being rotted, the growth and development of the plants are promoted, and the survival rate is improved.
Compared with the embodiment 1, the survival rate of the comparative example 5 is improved by 4%, compared with the embodiment 4, the survival rate is improved by 2%, and the protective net and the gravel layer can compress withered leaves and hay to avoid being blown away, and can prevent soil from being blown away, so that the survival rate is improved.
Compared with the example 1, the backfill soil consumption is reduced, the survival rate is improved, and the broken stone particle layer can simulate weathered rocks, so that the plants can go deeper into the rocks when the roots are pricked, the roots of the plants can be pricked deeper, and the survival rate is improved.
TABLE 1 backfill soil dosage and sapling survival rate after 1 year for examples 1-6 and comparative example 1
Figure BDA0002322602610000061
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (1)

1. A method for repairing a quarry in a frozen soil area is characterized by comprising the following steps:
cleaning waste stones (4) in a quarry (1) area, and stacking the waste stones in a centralized manner for later use;
step two, manufacturing a gabion cage (3), filling waste stones (4) into the gabion cage (3) to form a gabion retaining wall (2), manufacturing two circles of gabion retaining walls (2) arranged at intervals at the edge of a quarry (1), wherein the distance between the two circles of gabion retaining walls (2) is 1 meter, an edge planting area (5) is formed in the middle of the two circles of gabion retaining walls (2), and an area surrounded by the gabion retaining walls (2) at the inner circle is an intermediate planting area (6);
excavating a plurality of edge planting pits (7) downwards on the rocks of the edge planting area (5), and excavating a plurality of middle planting pits (8) downwards on the rocks of the middle planting area (6);
planting plants in the edge planting pits (7) and the middle planting pits (8), backfilling a first soil layer (9) into the edge planting pits (7) and the middle planting pits (8), backfilling a second soil layer (10) on the rock surfaces of the edge planting areas (5) and the middle planting areas (6), wherein the sum of the thicknesses of the first soil layer (9) and the second soil layer (10) is more than or equal to 100 cm, and the height of the gabion retaining wall (2) is more than the thickness of the second soil layer (10);
fifthly, watering and maintaining the plants to finish repairing;
the diameters of the cross sections of the edge planting pits (7) and the middle planting pits (8) are gradually increased along the direction from the opening to the bottom of the edge planting pits, a gravel particle layer (13) is laid below the first soil layer (9), the thickness of the gravel particle layer (13) is less than or equal to 30cm, the particle size of gravel particles is 5 +/-2 cm, and the thickness of the first soil layer (9) is 30-80 cm;
the upper surface of the second soil layer (10) is covered with an insulating layer (11), the insulating layer (11) comprises withered leaves and/or hay, the thickness of the insulating layer (11) is 5 cm, and the upper surface of the insulating layer (11) is covered with a protection net (12) or a gravel layer;
the cross sections of the edge planting pits (7) and the middle planting pits (8) are circular, and the opening diameters of the edge planting pits and the middle planting pits are 60-100 cm; the plant is a sapling, and the diameter of the sapling is 6-10 cm.
CN201911306941.7A 2019-12-17 2019-12-17 Method for repairing quarry in frozen soil area Expired - Fee Related CN111066405B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911306941.7A CN111066405B (en) 2019-12-17 2019-12-17 Method for repairing quarry in frozen soil area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911306941.7A CN111066405B (en) 2019-12-17 2019-12-17 Method for repairing quarry in frozen soil area

Publications (2)

Publication Number Publication Date
CN111066405A CN111066405A (en) 2020-04-28
CN111066405B true CN111066405B (en) 2022-07-22

Family

ID=70315319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911306941.7A Expired - Fee Related CN111066405B (en) 2019-12-17 2019-12-17 Method for repairing quarry in frozen soil area

Country Status (1)

Country Link
CN (1) CN111066405B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114223344B (en) * 2022-02-24 2022-05-13 中国煤炭地质总局勘查研究总院 Frozen soil layer repairing method for alpine mining areas in plateau

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105874959A (en) * 2016-04-13 2016-08-24 北京林业大学 Edge slope vegetation ecological restoration method and system
CN206655187U (en) * 2017-03-07 2017-11-21 南京朴厚生态科技有限公司 Vegetation type gabion for restoration of the ecosystem
CN208395856U (en) * 2018-06-15 2019-01-18 上海市园林工程有限公司 A kind of Ecotypic Stone Mesh-box barricade with planting groove
CN109487776A (en) * 2018-11-05 2019-03-19 厦门海石生态环境股份有限公司 A kind of restoration of the ecosystem structure for mining area and the restorative procedure for reducing soil erosion
CN209011085U (en) * 2018-10-24 2019-06-21 福建农林大学 A kind of Ecotypic Stone Mesh-box planting pot

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103371087A (en) * 2012-04-24 2013-10-30 李瑛� Short-rotation sprout forest drought-resistant anti-freezing cultivation and management method
CN104871892A (en) * 2014-02-28 2015-09-02 天津鑫顺祥农业科技有限公司 Chestnut cultivation method and anti-freezing device for land around chestnut trees
CN104365206B (en) * 2014-11-26 2016-03-23 天津海林园艺股份有限公司 A kind of water-saving marine solonchak local soil improvement and vegetation implantation methods
CN109197525B (en) * 2018-09-25 2021-07-13 华北水利水电大学 Farmland irrigation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105874959A (en) * 2016-04-13 2016-08-24 北京林业大学 Edge slope vegetation ecological restoration method and system
CN206655187U (en) * 2017-03-07 2017-11-21 南京朴厚生态科技有限公司 Vegetation type gabion for restoration of the ecosystem
CN208395856U (en) * 2018-06-15 2019-01-18 上海市园林工程有限公司 A kind of Ecotypic Stone Mesh-box barricade with planting groove
CN209011085U (en) * 2018-10-24 2019-06-21 福建农林大学 A kind of Ecotypic Stone Mesh-box planting pot
CN109487776A (en) * 2018-11-05 2019-03-19 厦门海石生态环境股份有限公司 A kind of restoration of the ecosystem structure for mining area and the restorative procedure for reducing soil erosion

Also Published As

Publication number Publication date
CN111066405A (en) 2020-04-28

Similar Documents

Publication Publication Date Title
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN101953245B (en) Reclamation method of subsided farm land after earthquake disaster
CN101451355B (en) Water retention method of back fill course
CN110832964A (en) Building aggregate mine in-situ soil improvement and greening method
CN103329658A (en) Sectional three-dimensional structure for fast desalting and soil improvement of saline-alkali soil of new tidal marsh reclamation area
CN102561366A (en) Vegetation recovery technology for coal gangue mountain of mining area
CN209941695U (en) Comprehensive treatment structure for steep slope type coal gangue dump
CN107439320A (en) A kind of greening method of concordant limestone breakage mountain body
CN111543233A (en) Construction method for planting seedlings in muddy saline-alkali soil in coastal island region
KR101241461B1 (en) Method for forming planting soil for roots
CN102523970A (en) Quick ecological rehabilitation method for steep rock slope
CN113875344A (en) Ecological restoration method for coal mine mountain geological environment
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN114134877B (en) Treatment method for mining ground cracks of shallow coal seam in hilly and hilly areas of peaked landform
CN109005722B (en) Comprehensive reclamation method for land reclamation of iron ore waste stone yard
CN108166520A (en) Electric power transmission line engineering construction soil and water conservation method
CN111066405B (en) Method for repairing quarry in frozen soil area
CN112400623B (en) Method for ecologically restoring mining area in ecologically vulnerable area lacking foreign soil and layered structure
CN113914265A (en) Waste ditch ecological restoration and treatment method based on coal gangue filling technology
CN113774934A (en) Ecological restoration method for coal gangue slag slope
CN113431062A (en) Slope restoration ecological buffer belt structure and construction method thereof
CN112012229A (en) Ecological restoration system for high steep slope rock slope of limestone mine stope
CN105756015B (en) Method for restoring biodiversity dynamic landscape ecological composite system
CN113243258B (en) Ecological restoration method for rock mountain vegetation
CN113216224A (en) Gravel soil slope greening technology for open-pit mining of green mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220722

CF01 Termination of patent right due to non-payment of annual fee