CN108571328A - 一种地层交界段盾构隧道管片衬砌结构及设计方法 - Google Patents
一种地层交界段盾构隧道管片衬砌结构及设计方法 Download PDFInfo
- Publication number
- CN108571328A CN108571328A CN201810693763.7A CN201810693763A CN108571328A CN 108571328 A CN108571328 A CN 108571328A CN 201810693763 A CN201810693763 A CN 201810693763A CN 108571328 A CN108571328 A CN 108571328A
- Authority
- CN
- China
- Prior art keywords
- segment
- bolt
- interface segment
- pipe sheet
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000013461 design Methods 0.000 title claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 42
- 239000010959 steel Substances 0.000 claims description 42
- 230000006835 compression Effects 0.000 claims description 19
- 238000007906 compression Methods 0.000 claims description 19
- 238000007689 inspection Methods 0.000 claims description 14
- 238000004088 simulation Methods 0.000 claims description 13
- 238000004364 calculation method Methods 0.000 claims description 6
- 230000001965 increasing effect Effects 0.000 claims description 6
- 239000002436 steel type Substances 0.000 claims description 6
- 238000010008 shearing Methods 0.000 claims description 5
- 239000002689 soil Substances 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 claims 1
- 239000000463 material Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000007596 consolidation process Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 230000007704 transition Effects 0.000 description 3
- 206010023230 Joint stiffness Diseases 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 208000037656 Respiratory Sounds Diseases 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000000265 homogenisation Methods 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
- E21D11/083—Methods or devices for joining adjacent concrete segments
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/15—Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
- E21D11/155—Laggings made of strips, slats, slabs or sheet piles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开了一种地层交界段盾构隧道管片衬砌结构及设计方法,所述结构其包括交界段,交界段的两侧为常规管段;所述交界段上相邻管片环间的纵向接头螺栓刚度大于常规管段的纵向接头螺栓刚度。所述设计方法包括建立盾构隧道纵向有限元数值计算模型,取隧道衬砌管片为混凝土管片,计算地层交界段产生的纵向沉降量及纵向变形曲线半径。本发明能够有效解决现有技术中软硬地层交界段的盾构隧道管片衬砌结构纵向变形过大、不均匀应力集中、环间纵向接头发生破坏的问题。
Description
技术领域
本发明涉及隧道工程领域,具体涉及一种地层交界段盾构隧道管片衬砌结构及设计方法。
背景技术
盾构隧道是在纵断方向上通过环间接头将管片环连接起来的柔性结构,在隧道由坚硬地层向软弱地层过渡区间,由于不同性质的下卧层沉降固结程度存在差异,容易使隧道发生较大的纵向不均匀沉降。
混凝土管片在不同大小的沉降变形作用下相互之间发生挤压、扭转,导致管片局部应力过大、边角碎裂、环间产生错台和张开变形等问题。现有研究指出隧道纵向沉降半径R越小,环间错台量越大,当半径小于1000m时环缝张开量过大造成止水措施失效,引发隧道渗漏水问题。
此外,错台变形超过容许值时,道床易与管片发生局部脱离,地铁运行引发的共振效应会加速道床破坏,对行车安全造成极大威胁,且纵向不均匀沉降引起的管片环间张开变形易使环间纵向接头螺栓所承受的拉力和剪切力急剧增大,当应力水平超过螺栓材料的极限强度后会发生接头屈曲破坏。因此,在盾构隧道研究和应用中不能忽视盾构隧道纵向不均匀沉降问题,尤其是隧道所处地层特性突变处。
针对盾构隧道在软硬地层交界段易产生不均匀沉降的问题,现有的应对措施和方法可归为三类:一是采取地层加固处理措施,如从隧道内使用袖阀管注浆加固技术对洞周软弱地层进行处理,降低工后沉降;二是采取衬砌刚度加强措施,包括在管片内壁增设横纵钢骨架支撑等,提高整体刚度;三是采取主动适应纵向变形措施,如在混凝土管片环中每间隔一段距离布设一环钢板复合管片,增大区间隧道局部纵向柔度。
但现有解决措施仍存在明显不足:一、地层加固需准确控制注浆压力、浆液配比及浆液耗量等参数,避免出现涌水、涌砂事故,施工难度较高;二、管片内增加支撑骨架会占用一定的内部净空,可能发生地铁限界不达标问题,且刚度增强后纵向变形引起的不均匀应力无法有效释放,易使混凝土管片出现裂缝;三、在地层交界处管片环间接头螺栓易因刚度不足而发生破坏,局部设置一环钢管片没有解决这一根本性问题。
发明内容
本发明针对现有技术的上述不足,提供了一种能够解决现有技术中软硬地层交界段的盾构隧道管片衬砌结构纵向变形过大、不均匀应力集中、环间纵向接头发生破坏的问题的地层交界段盾构隧道管片衬砌结构及设计方法。
为解决上述技术问题,本发明采用了下列技术方案:
提供了一种地层交界段盾构隧道管片衬砌结构,其包括交界段,交界段的两侧为常规管段;交界段上相邻管片环间的纵向接头螺栓刚度大于常规管段的纵向接头螺栓刚度。
上述技术方案中,优选的,交界段管片为钢管片,所述常规管段为混凝土管片。
本发明还提供了一种上述地层交界段盾构隧道管片衬砌结构的设计方法,其包括如下步骤:
S1、使用计算软件ANSYS建立盾构隧道纵向有限元数值计算模型,并将模型中的隧道衬砌管片参数设置为混凝土管片,通过模型计算地层交界段产生的纵向沉降量hi及纵向变形曲线半径R;
S2、当纵向变形曲线半径的目标设定值为Rs时,带入模型中,并计算交界段的长度L;
S3、将模型中的隧道衬砌管片参数设置替换为钢管片,带入模型中,计算地层交界段产生的纵向沉降量h’i及纵向变形曲线半径R’;
S4、增加交界段的纵向接头螺栓数量m或螺栓尺寸A,以提高环间螺栓刚度;
S5、调整交界段钢管片的钢材类型,得到调整后的钢管片的弹性模量ex6;
S6、将S4和S5调整后的纵向接头螺栓数量m、螺栓尺寸A和钢管片弹性模量ex6带入模型中,计算得到调整后的纵向沉降量h″i及纵向变形曲线半径R″;
S7、将调整后的纵向变形曲线半径R″与目标设定值Rs比较,当R″<Rs时,重复步骤S4至S6,当R″≥Rs时,对交界段的各管片环和环间纵向螺栓进行强度检算;
S8、当选取的参数使强度检算不成立时,重复步骤S4至S7,当选取的参数使强度检算成立时,设计完毕。
进一步地,建立隧道纵向数值计算模型的方法为,使用计算软件ANSYS进行建模,通过内置三维壳单元模拟混凝土管片,其中取ex1为混凝土管片的弹性模量;通过压杆单元模拟不同土层,三维销钉铰链单元模拟环向接头螺栓,拉杆单元模拟纵向接头螺栓,其中A为纵向接头螺栓截面面积;压杆模拟纵向抗压接头螺栓。
进一步地,取i为交界段L范围内管片环数、B为管片幅宽,则所述计算地层交界段产生的纵向沉降量hi及纵向变形曲线半径R的方法为:
进一步地,将交界段的混凝土管片替换为钢管片,即通过三维壳单元模拟钢管片,取ex6为钢管片弹性模量。
进一步地,强度检算为对环间纵向接头螺栓的剪应力检算。
进一步地,纵向螺栓的剪应力检算的方法为,取τ为环间纵向螺栓主截面计算剪应力,A为环间纵向接头螺栓截面,fv为螺栓钢材的抗剪强度设计值,则剪应力检算公式为:
本发明提供的上述地层交界段盾构隧道管片衬砌结构的主要有益效果在于:
通过将与软硬地层交界段的盾构隧道管片衬砌结构设置为交界段,并通过调整交界段上相邻管片环间的纵向接头螺栓的数量,有效提高管片纵向接头刚度,从而减少管片纵向接头变形,避免产生纵向不均匀沉降时接头螺栓失效破坏,提高隧道结构安全性。
通过将交界段的管片设置为钢管片,以便于灵活调整管片及接头刚度、提高管片柔性,避免现有混凝土管片刚度较大,隧道纵向变形引起的不均匀应力无法有效释放,易出现裂纹裂缝,且混凝土管片增加纵向螺栓数量会引起局部配筋集中问题。同时将常规管段的管片设置为混凝土管片,节省成本。
本发明提供的上述地层交界段盾构隧道管片衬砌结构的设计方法的主要有益效果在于:
通过对交界段盾构隧道管片衬砌结构的材质和刚度进行调整,并利用数值模拟,在隧道在满足横向承载强度要求基础上,使纵向沉降曲线半径达到设计要求,有效保证了交界段衬砌结构的抗变形性能。
通过对环间螺栓刚度的刚度和交界段的长度进行反复测试和调整,进一步保证了在软硬地层交界段的衬砌管片的良好过渡效果,从而实现降低错台量、使纵向变形均匀化、提高隧道纵向线路平顺性的目的,并得到一种在软硬地层交界段使用钢管片过渡的结构型式。
附图说明
图1为地层交界段盾构隧道管片衬砌结构的结构示意图。
其中,1、交界段,11、纵向接头螺栓,2、常规管段。
具体实施方式
下面结合附图对本发明作进一步说明:
如图1所示,其为地层交界段盾构隧道管片衬砌结构的结构示意图。
本发明的地层交界段盾构隧道管片衬砌结构包括交界段1,衬砌结构的交界段1位于软硬地层交界部,交界段1的两侧为常规管段2,常规管段2分别设置于软硬地层内。
交界段1上相邻管片环间的纵向接头螺栓11的刚度大于常规管段2上的刚度;可选的,交界段1上相邻管片环间的纵向接头螺栓11的数量和尺寸大于常规管段2上的数量和尺寸,以提高交界段1上管片纵向接头的刚度,从而减少管片纵向接头变形,避免产生纵向不均匀沉降时接头螺栓失效破坏,提高隧道结构安全性。
交界段1管片为钢管片,常规管段的管片为混凝土管片。通过将交界段1的管片设置为钢管片,以便于灵活调整管片及接头刚度、提高管片柔性,避免现有混凝土管片刚度较大,隧道纵向变形引起的不均匀应力无法有效释放,易出现裂纹裂缝,且混凝土管片增加纵向接头螺栓11数量会引起局部配筋集中问题。同时将常规管段2的管片设置为混凝土管片,节省成本。
下面是上述地层交界段盾构隧道管片衬砌结构的设计方法的说明,其包括如下步骤:
S1、使用计算软件ANSYS建立盾构隧道纵向有限元数值计算模型,并将模型中的隧道衬砌管片参数设置为混凝土管片,通过模型计算地层交界段产生的纵向沉降量hi及纵向变形曲线半径R。
进一步地,建立隧道纵向数值计算模型的方法为,使用计算软件ANSYS进行建模。
通过内置三维壳单元模拟混凝土管片,压杆单元模拟不同土层,三维销钉铰链单元模拟环向接头螺栓,拉杆单元模拟纵向抗拉接头螺栓,压杆模拟纵向抗压接头螺栓。
取ex1、prxz1、dens1、d1分别为混凝土管片的弹性模量、泊松比、密度及厚度;这几个参数的取值为结合具体工程管片所用混凝土强度及管片尺寸进行选择,弹性模量取值参照《混凝土结构设计规范》规定,混凝土管片厚度按照具体工程管片厚度进行设定。
r1、r2、r3分别为环向接头螺栓剪切、拉压、转动刚度;环向接头螺栓剪切及拉压刚度这里取一个安全值,即设为一个非常大的值,如3×1012Pa;转动刚度按照工程类比法进行取值。
A、ex2、ex3分别为纵向接头螺栓截面面积、纵向抗拉接头螺栓材料弹性模量以及纵向抗压接头螺栓材料弹性模量;纵向抗拉、抗压接头螺栓截面面积相同,均为A;环向接头螺栓与纵向抗压接头螺栓位置重合,数量均设置为m,实质为同一部件。
当管片为混凝土管片时,纵向抗压接头螺栓弹性模量为混凝土弹性模量ex1与环间抗压螺栓数量m的比值;当管片为钢管片时,抗压螺栓弹性模量为钢管片弹性模量ex4与环间抗压螺栓数量m的比值。纵向抗拉接头螺栓弹性模量为螺栓材料弹性模量,取值依据螺栓钢材类型所对应的弹性模量。
ex4、ex5分别为软、硬地层弹性模量,其取值参照具体工程地质勘察报告给出的地层刚度;取管片环数为n。
进一步地,将上述设定值分别取值后代入模拟单元,进行数值求解,由此得到软硬地层交界段隧道纵向沉降量hi,其中i为管片环的序号,i=1~n;将各沉降量连接并拟合得到隧道纵向沉降曲线,由此得到使用混凝土管片情况下隧道纵向变形半径R。
进一步地,取i为交界段范围内管片环数、B为管片幅宽,则计算地层交界段产生的纵向沉降量hi及纵向变形曲线半径R的方法为:
S2、当纵向变形曲线半径的目标设定值为Rs时,带入模型中,并计算交界段的长度L。
为进一步减小管片环错台量,因此根据设计需要满足的纵向曲线半径Rs的要求,代入公式(1)中,固定其他值不变,进而调整i的取值,通过管片环数i,由于交界段的长度L为i的固定倍数,倍率为管片幅宽,且管片幅宽为固定值,因此可得到交界段的长度L,其中Rs>R。
S3、将模型中的隧道衬砌管片参数设置替换为钢管片,带入模型中,计算地层交界段产生的纵向沉降量h’i及纵向变形曲线半径R’。
进一步地,将交界段的混凝土管片替换为钢管片,即通过三维壳单元模拟钢管片,取ex6、prxz2、dens2、d2分别为钢管片弹性模量、泊松比、密度及厚度;其中,钢管片弹性模量按照不同钢材类型通过查表选取,钢管片厚度按照具体工程管片厚度进行设定。
计算得到地层交界段产生的纵向沉降量h’i及纵向变形曲线半径R’的具体计算方法同S2。
S4、增加交界段的纵向接头螺栓数量m或螺栓尺寸A,以提高环间接头螺栓刚度。
为进一步控制不均匀变形,通过增加环间接头螺栓数量m,提高环间螺栓有效截面积A,以提高环间接头螺栓的拉压刚度。
S5、调整交界段钢管片的钢材类型,得到调整后的钢管片的弹性模量ex6。
通过调整钢材的类型,可以改变其弹性模量ex6取值,进而对钢管片的抗弯刚度进行调整。钢材对应的弹性模量ex6取值如表1所示。
表1
S6、将S4和S5调整后的纵向接头螺栓数量m、螺栓尺寸A和钢管片弹性模量ex6带入模型中,得到调整后的纵向沉降量h″i及纵向变形曲线半径R″。
S7、将调整后的纵向变形曲线半径R″与目标设定值Rs比较,当R″<Rs时,重复步骤S4至S6,当R″≥Rs时,对交界段的环间纵向螺栓进行强度检算。
S8、当选取的参数使强度检算不成立时,重复步骤S4至S7,当选取的参数使强度检算成立时,设计完毕。
进一步地,强度检算包括对环间纵向螺栓的剪应力检算。
取τ为环间纵向螺栓主截面计算剪应力,fv为螺栓钢材的抗剪强度设计值,则纵向螺栓的剪应力检算的方法为:
其中,fv由环间纵向螺栓钢材类型对应的允许抗拉强度,通过查钢材的材质表得到。
通过对管片环和环间纵向螺栓进行反复的强度检算测试和调整,进一步保证了在软硬地层交界段的衬砌管片的良好过渡效果,从而实现降低错台量、使纵向变形均匀化、提高隧道纵向线路平顺性的目的,并得到一种在软硬地层交界段使用钢管片过渡的结构型式。
上面对本发明的具体实施方式进行描述,以便于本技术领域的技术人员理解本发明,但应该清楚,本发明不限于具体实施方式的范围,对本技术领域的普通技术人员来讲,只要各种变化在所附的权利要求限定和确定的本发明的精神和范围内,这些变化是显而易见的,一切利用本发明构思的发明创造均在保护之列。
Claims (8)
1.一种地层交界段盾构隧道管片衬砌结构,其特征在于,包括交界段,交界段的两侧为常规管段;所述交界段上相邻管片环间的纵向接头螺栓刚度大于常规管段的纵向接头螺栓刚度。
2.根据权利要求1所述的地层交界段盾构隧道管片衬砌结构,其特征在于,所述交界段的管片为钢管片,所述常规管段的管片为混凝土管片。
3.一种权利要求1或2所述的地层交界段盾构隧道管片衬砌结构的设计方法,其特征在于,包括如下步骤:
S1、使用计算软件ANSYS建立盾构隧道纵向有限元数值计算模型,并将模型中的隧道衬砌管片参数设置为混凝土管片,通过模型计算地层交界段产生的纵向沉降量hi及纵向变形曲线半径R;
S2、当纵向变形曲线半径的目标设定值为Rs时,带入模型中,并计算交界段的长度L;
S3、将模型中的隧道衬砌管片参数设置替换为钢管片,带入模型中,计算地层交界段产生的纵向沉降量h’i及纵向变形曲线半径R’;
S4、增加交界段的纵向接头螺栓数量m或螺栓尺寸A,以提高环间螺栓刚度;
S5、调整交界段钢管片的钢材类型,得到调整后的钢管片的弹性模量ex6;
S6、将S4和S5调整后的纵向接头螺栓数量m、螺栓尺寸A和钢管片弹性模量ex6带入模型中,计算得到调整后的纵向沉降量h″1及纵向变形曲线半径R″;
S7、将调整后的纵向变形曲线半径R″与目标设定值Rs比较,当R″<Rs时,重复步骤S4至S6,当R″≥Rs时,对交界段的环间纵向螺栓进行强度检算;
S8、当选取的参数使强度检算不成立时,重复步骤S4至S7,当选取的参数使强度检算成立时,设计完毕。
4.根据权利要求3所述的地层交界段盾构隧道管片衬砌结构的设计方法,其特征在于,所述建立隧道纵向数值计算模型的方法为:
使用计算软件ANSYS进行建模,通过内置三维壳单元模拟混凝土管片,其中取ex1为混凝土管片的弹性模量;通过压杆单元模拟不同土层,三维销钉铰链单元模拟环向接头螺栓,拉杆单元模拟纵向接头螺栓,螺栓尺寸为纵向接头螺栓截面尺寸;压杆模拟纵向抗压接头螺栓。
5.根据权利要求3所述的地层交界段盾构隧道管片衬砌结构的设计方法,其特征在于,计算地层交界段产生的纵向沉降量hi及纵向变形曲线半径R:
其中,i为交界段范围内管片环数;B为管片幅宽;。
6.根据权利要求4所述的地层交界段盾构隧道管片衬砌结构的设计方法,其特征在于,所述将交界段的混凝土管片替换为钢管片,为通过三维壳单元模拟钢管片,取ex6为钢管片弹性模量。
7.根据权利要求3所述的地层交界段盾构隧道管片衬砌结构的设计方法,其特征在于,所述强度检算包括对环间纵向接头螺栓的剪应力检算。
8.根据权利要求7所述的地层交界段盾构隧道管片衬砌结构的设计方法,其特征在于,所述纵向螺栓的剪应力检算公式为:
其中,τ为环间纵向螺栓主截面计算剪应力;fv为螺栓钢材的抗剪强度设计值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810693763.7A CN108571328B (zh) | 2018-06-29 | 2018-06-29 | 一种地层交界段盾构隧道管片衬砌结构及设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810693763.7A CN108571328B (zh) | 2018-06-29 | 2018-06-29 | 一种地层交界段盾构隧道管片衬砌结构及设计方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108571328A true CN108571328A (zh) | 2018-09-25 |
CN108571328B CN108571328B (zh) | 2023-08-04 |
Family
ID=63573648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810693763.7A Active CN108571328B (zh) | 2018-06-29 | 2018-06-29 | 一种地层交界段盾构隧道管片衬砌结构及设计方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108571328B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110608053A (zh) * | 2019-10-30 | 2019-12-24 | 华东交通大学 | 一种模拟盾构隧道环缝接头的结构 |
CN110909406A (zh) * | 2019-11-20 | 2020-03-24 | 西南交通大学 | 基于模拟接头模型的盾构隧道内力计算方法 |
CN111950184A (zh) * | 2020-08-21 | 2020-11-17 | 上海市隧道工程轨道交通设计研究院 | 一种多环盾构衬砌结构的三维仿真计算方法 |
CN112632655A (zh) * | 2020-11-19 | 2021-04-09 | 同济大学 | 一种模拟盾构隧道环缝的有限元单元模型 |
Citations (53)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2200801A1 (de) * | 1971-01-11 | 1972-07-20 | Celmac Ag | Auskleidung fuer Tunnel,Schaechte u.a. |
GB8303526D0 (en) * | 1982-08-06 | 1983-03-16 | Tsuzuki J | Tunnel wall structure |
JPH02256800A (ja) * | 1989-03-29 | 1990-10-17 | Sumitomo Metal Ind Ltd | 合成セグメント |
JPH04357300A (ja) * | 1991-06-03 | 1992-12-10 | Kumagai Gumi Co Ltd | 鋼製セグメントの継手装置及び該継手装置に用いる鋼製セグメント |
JPH0754593A (ja) * | 1993-08-12 | 1995-02-28 | Ishikawajima Constr Materials Co Ltd | トンネル構造体におけるセグメントと補強材の連結構造 |
JPH0762988A (ja) * | 1993-08-30 | 1995-03-07 | Sumitomo Metal Ind Ltd | 合成セグメントの継手 |
JPH09132997A (ja) * | 1995-11-08 | 1997-05-20 | Daiho Constr Co Ltd | セグメントの高剛性継手 |
JPH10169386A (ja) * | 1996-12-13 | 1998-06-23 | Kajima Corp | 短ボルト、長ボルト併用式セグメント |
JPH10169383A (ja) * | 1996-12-10 | 1998-06-23 | Kajima Corp | セグメントの組立方法 |
JPH10169387A (ja) * | 1996-12-16 | 1998-06-23 | Kajima Corp | 長ボルト式合成セグメント |
JPH10280887A (ja) * | 1997-04-10 | 1998-10-20 | Taisei Corp | シールドトンネル用セグメント |
JPH11190195A (ja) * | 1997-12-25 | 1999-07-13 | Nippon Steel Corp | 鋼製または合成セグメント構造と、そのセグメント間及びセグメントリング間の継手構造 |
JPH11210388A (ja) * | 1998-01-29 | 1999-08-03 | Kajima Corp | シールドトンネルの覆工用セグメントの継手構造 |
JP2000080892A (ja) * | 1998-09-08 | 2000-03-21 | Kajima Corp | 鋼製セグメントの継手構造および継手方法 |
US20020098043A1 (en) * | 1999-03-03 | 2002-07-25 | Mcnally Michael P. | Method and apparatus for feeding a tunnel roof support system from the roof shield of a TBM |
JP2003184490A (ja) * | 2001-12-13 | 2003-07-03 | Nippon Steel Corp | シールドトンネルの一次覆工構造 |
CN1814988A (zh) * | 2006-02-23 | 2006-08-09 | 上海交通大学 | 基于双圆盾构隧道侧向滚动纠偏的衬砌结构确定方法 |
CN101299008A (zh) * | 2008-06-13 | 2008-11-05 | 同济大学 | 可模拟盾构隧道管片接头的试验模型及其制作方法 |
WO2009124421A1 (zh) * | 2008-04-11 | 2009-10-15 | 北京联合大学 | 确定材料载荷变形曲线初始直线段和力学性能参数的方法 |
CN101586463A (zh) * | 2009-06-18 | 2009-11-25 | 苏州市交通设计研究院有限责任公司 | 一种盾构隧道衬砌设计方法 |
CN201407054Y (zh) * | 2009-05-26 | 2010-02-17 | 中铁第四勘察设计院集团有限公司 | 地铁盾构隧道管片连接结构 |
CN101667220A (zh) * | 2009-09-22 | 2010-03-10 | 同济大学 | 盾构隧道接头构造的模拟方法 |
CN201756968U (zh) * | 2010-06-18 | 2011-03-09 | 中铁第四勘察设计院集团有限公司 | 一种九等分分块方式的盾构隧道衬砌环 |
CN102425430A (zh) * | 2011-11-04 | 2012-04-25 | 上海交通大学 | 软土地层盾构隧道结构抵抗纵向变形的保护控制方法 |
CN202451167U (zh) * | 2011-12-29 | 2012-09-26 | 长安大学 | 一种管片半通缝拼接的盾构管道 |
CN202522428U (zh) * | 2012-01-31 | 2012-11-07 | 西南交通大学 | 卧式隧道衬砌模型试验台模块化加载机架 |
CN103790598A (zh) * | 2014-02-12 | 2014-05-14 | 同济大学 | 一种盾构隧道纵向预应力混凝土衬砌管片的制备方法 |
CN203702164U (zh) * | 2013-11-04 | 2014-07-09 | 北京城建设计发展集团股份有限公司 | 采用千斤顶活动支撑的暗挖隧道顶撑装置 |
CN103924982A (zh) * | 2014-04-16 | 2014-07-16 | 中铁第四勘察设计院集团有限公司 | 一种圆端形凹凸榫型盾构隧道管片环间抗剪结构 |
CN104464500A (zh) * | 2014-11-21 | 2015-03-25 | 陕西铁路工程职业技术学院 | 一种高铁隧道的实训基地及其建造方法 |
CN104453948A (zh) * | 2014-12-01 | 2015-03-25 | 中铁隆工程集团有限公司 | 一种大断面暗挖隧道竖向预应力钢管支撑结构及施工工艺 |
CN104537162A (zh) * | 2014-12-16 | 2015-04-22 | 上海交通大学 | 确定盾构隧道衬砌环间接缝抵抗错台与张开变形能力方法 |
CN104612700A (zh) * | 2014-12-16 | 2015-05-13 | 上海交通大学 | 一种纵向沉降变形引起盾构隧道附加内力的确定方法 |
CN104612724A (zh) * | 2015-01-09 | 2015-05-13 | 同济大学 | 一种类椭圆带立柱盾构隧道管片拼装结构 |
CN204646256U (zh) * | 2015-05-15 | 2015-09-16 | 中交第二公路勘察设计研究院有限公司 | 一种加大限界富余量的地铁盾构隧道通用环衬砌结构 |
CN105426619A (zh) * | 2015-11-29 | 2016-03-23 | 北京市勘察设计研究院有限公司 | 一种确定盾构隧道纵向弯曲刚度的分析方法 |
CN105649648A (zh) * | 2015-12-29 | 2016-06-08 | 宁波市轨道交通集团有限公司 | 类矩形盾构隧道的管片连接结构及其施工方法 |
CN105890834A (zh) * | 2015-07-30 | 2016-08-24 | 中铁建设投资集团有限公司 | 一种盾构管片连接螺栓受力状态的检测方法 |
CN106948833A (zh) * | 2017-04-05 | 2017-07-14 | 宁波大学 | 拼装式联络通道结构及其施工方法 |
CN107301305A (zh) * | 2017-07-31 | 2017-10-27 | 中铁隧道集团有限公司 | 一种实现管片三维受载的结构力学性能的建模方法 |
CN107355239A (zh) * | 2017-08-22 | 2017-11-17 | 华东交通大学 | 适应盾构隧道纵向沉降的波纹钢板复合管片及其拼装方法 |
CN107503767A (zh) * | 2017-10-13 | 2017-12-22 | 北京工业大学 | 一种预制混凝土‑frp波纹板隧道底部支护施工方法 |
CN206801595U (zh) * | 2017-03-21 | 2017-12-26 | 佛山轨道交通设计研究院有限公司 | 一种盾构管片 |
CN206801584U (zh) * | 2017-03-21 | 2017-12-26 | 佛山轨道交通设计研究院有限公司 | 一种盾构管片 |
CN107762530A (zh) * | 2017-11-08 | 2018-03-06 | 西南交通大学 | 一种盾构隧道衬砌环及分块方法 |
CN107795325A (zh) * | 2016-08-31 | 2018-03-13 | 江苏宇隧通隧道装备有限公司 | 一种盾构钢管片及其加工工艺 |
CN207194905U (zh) * | 2017-04-21 | 2018-04-06 | 天津大学 | 一种用于盾构模型试验的隧道模型 |
WO2018086085A1 (zh) * | 2016-11-12 | 2018-05-17 | 苏州大学 | 一种隧道土压力荷载计算方法 |
CN207420587U (zh) * | 2017-11-23 | 2018-05-29 | 中国铁路总公司 | 一种适用于tbm隧道衬砌环 |
CN207437092U (zh) * | 2017-11-28 | 2018-06-01 | 中铁十二局集团第二工程有限公司 | 一种富水软土地层盾构区间联络通道洞门钢管片 |
CN207485448U (zh) * | 2017-11-08 | 2018-06-12 | 西南交通大学 | 一种盾构隧道衬砌环 |
CN207499872U (zh) * | 2017-11-08 | 2018-06-15 | 中国建筑第八工程局有限公司 | 盾构过节点井处的管片结构 |
CN208330399U (zh) * | 2018-06-29 | 2019-01-04 | 西南交通大学 | 一种地层交界段盾构隧道管片衬砌结构 |
-
2018
- 2018-06-29 CN CN201810693763.7A patent/CN108571328B/zh active Active
Patent Citations (53)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2200801A1 (de) * | 1971-01-11 | 1972-07-20 | Celmac Ag | Auskleidung fuer Tunnel,Schaechte u.a. |
GB8303526D0 (en) * | 1982-08-06 | 1983-03-16 | Tsuzuki J | Tunnel wall structure |
JPH02256800A (ja) * | 1989-03-29 | 1990-10-17 | Sumitomo Metal Ind Ltd | 合成セグメント |
JPH04357300A (ja) * | 1991-06-03 | 1992-12-10 | Kumagai Gumi Co Ltd | 鋼製セグメントの継手装置及び該継手装置に用いる鋼製セグメント |
JPH0754593A (ja) * | 1993-08-12 | 1995-02-28 | Ishikawajima Constr Materials Co Ltd | トンネル構造体におけるセグメントと補強材の連結構造 |
JPH0762988A (ja) * | 1993-08-30 | 1995-03-07 | Sumitomo Metal Ind Ltd | 合成セグメントの継手 |
JPH09132997A (ja) * | 1995-11-08 | 1997-05-20 | Daiho Constr Co Ltd | セグメントの高剛性継手 |
JPH10169383A (ja) * | 1996-12-10 | 1998-06-23 | Kajima Corp | セグメントの組立方法 |
JPH10169386A (ja) * | 1996-12-13 | 1998-06-23 | Kajima Corp | 短ボルト、長ボルト併用式セグメント |
JPH10169387A (ja) * | 1996-12-16 | 1998-06-23 | Kajima Corp | 長ボルト式合成セグメント |
JPH10280887A (ja) * | 1997-04-10 | 1998-10-20 | Taisei Corp | シールドトンネル用セグメント |
JPH11190195A (ja) * | 1997-12-25 | 1999-07-13 | Nippon Steel Corp | 鋼製または合成セグメント構造と、そのセグメント間及びセグメントリング間の継手構造 |
JPH11210388A (ja) * | 1998-01-29 | 1999-08-03 | Kajima Corp | シールドトンネルの覆工用セグメントの継手構造 |
JP2000080892A (ja) * | 1998-09-08 | 2000-03-21 | Kajima Corp | 鋼製セグメントの継手構造および継手方法 |
US20020098043A1 (en) * | 1999-03-03 | 2002-07-25 | Mcnally Michael P. | Method and apparatus for feeding a tunnel roof support system from the roof shield of a TBM |
JP2003184490A (ja) * | 2001-12-13 | 2003-07-03 | Nippon Steel Corp | シールドトンネルの一次覆工構造 |
CN1814988A (zh) * | 2006-02-23 | 2006-08-09 | 上海交通大学 | 基于双圆盾构隧道侧向滚动纠偏的衬砌结构确定方法 |
WO2009124421A1 (zh) * | 2008-04-11 | 2009-10-15 | 北京联合大学 | 确定材料载荷变形曲线初始直线段和力学性能参数的方法 |
CN101299008A (zh) * | 2008-06-13 | 2008-11-05 | 同济大学 | 可模拟盾构隧道管片接头的试验模型及其制作方法 |
CN201407054Y (zh) * | 2009-05-26 | 2010-02-17 | 中铁第四勘察设计院集团有限公司 | 地铁盾构隧道管片连接结构 |
CN101586463A (zh) * | 2009-06-18 | 2009-11-25 | 苏州市交通设计研究院有限责任公司 | 一种盾构隧道衬砌设计方法 |
CN101667220A (zh) * | 2009-09-22 | 2010-03-10 | 同济大学 | 盾构隧道接头构造的模拟方法 |
CN201756968U (zh) * | 2010-06-18 | 2011-03-09 | 中铁第四勘察设计院集团有限公司 | 一种九等分分块方式的盾构隧道衬砌环 |
CN102425430A (zh) * | 2011-11-04 | 2012-04-25 | 上海交通大学 | 软土地层盾构隧道结构抵抗纵向变形的保护控制方法 |
CN202451167U (zh) * | 2011-12-29 | 2012-09-26 | 长安大学 | 一种管片半通缝拼接的盾构管道 |
CN202522428U (zh) * | 2012-01-31 | 2012-11-07 | 西南交通大学 | 卧式隧道衬砌模型试验台模块化加载机架 |
CN203702164U (zh) * | 2013-11-04 | 2014-07-09 | 北京城建设计发展集团股份有限公司 | 采用千斤顶活动支撑的暗挖隧道顶撑装置 |
CN103790598A (zh) * | 2014-02-12 | 2014-05-14 | 同济大学 | 一种盾构隧道纵向预应力混凝土衬砌管片的制备方法 |
CN103924982A (zh) * | 2014-04-16 | 2014-07-16 | 中铁第四勘察设计院集团有限公司 | 一种圆端形凹凸榫型盾构隧道管片环间抗剪结构 |
CN104464500A (zh) * | 2014-11-21 | 2015-03-25 | 陕西铁路工程职业技术学院 | 一种高铁隧道的实训基地及其建造方法 |
CN104453948A (zh) * | 2014-12-01 | 2015-03-25 | 中铁隆工程集团有限公司 | 一种大断面暗挖隧道竖向预应力钢管支撑结构及施工工艺 |
CN104537162A (zh) * | 2014-12-16 | 2015-04-22 | 上海交通大学 | 确定盾构隧道衬砌环间接缝抵抗错台与张开变形能力方法 |
CN104612700A (zh) * | 2014-12-16 | 2015-05-13 | 上海交通大学 | 一种纵向沉降变形引起盾构隧道附加内力的确定方法 |
CN104612724A (zh) * | 2015-01-09 | 2015-05-13 | 同济大学 | 一种类椭圆带立柱盾构隧道管片拼装结构 |
CN204646256U (zh) * | 2015-05-15 | 2015-09-16 | 中交第二公路勘察设计研究院有限公司 | 一种加大限界富余量的地铁盾构隧道通用环衬砌结构 |
CN105890834A (zh) * | 2015-07-30 | 2016-08-24 | 中铁建设投资集团有限公司 | 一种盾构管片连接螺栓受力状态的检测方法 |
CN105426619A (zh) * | 2015-11-29 | 2016-03-23 | 北京市勘察设计研究院有限公司 | 一种确定盾构隧道纵向弯曲刚度的分析方法 |
CN105649648A (zh) * | 2015-12-29 | 2016-06-08 | 宁波市轨道交通集团有限公司 | 类矩形盾构隧道的管片连接结构及其施工方法 |
CN107795325A (zh) * | 2016-08-31 | 2018-03-13 | 江苏宇隧通隧道装备有限公司 | 一种盾构钢管片及其加工工艺 |
WO2018086085A1 (zh) * | 2016-11-12 | 2018-05-17 | 苏州大学 | 一种隧道土压力荷载计算方法 |
CN206801595U (zh) * | 2017-03-21 | 2017-12-26 | 佛山轨道交通设计研究院有限公司 | 一种盾构管片 |
CN206801584U (zh) * | 2017-03-21 | 2017-12-26 | 佛山轨道交通设计研究院有限公司 | 一种盾构管片 |
CN106948833A (zh) * | 2017-04-05 | 2017-07-14 | 宁波大学 | 拼装式联络通道结构及其施工方法 |
CN207194905U (zh) * | 2017-04-21 | 2018-04-06 | 天津大学 | 一种用于盾构模型试验的隧道模型 |
CN107301305A (zh) * | 2017-07-31 | 2017-10-27 | 中铁隧道集团有限公司 | 一种实现管片三维受载的结构力学性能的建模方法 |
CN107355239A (zh) * | 2017-08-22 | 2017-11-17 | 华东交通大学 | 适应盾构隧道纵向沉降的波纹钢板复合管片及其拼装方法 |
CN107503767A (zh) * | 2017-10-13 | 2017-12-22 | 北京工业大学 | 一种预制混凝土‑frp波纹板隧道底部支护施工方法 |
CN107762530A (zh) * | 2017-11-08 | 2018-03-06 | 西南交通大学 | 一种盾构隧道衬砌环及分块方法 |
CN207485448U (zh) * | 2017-11-08 | 2018-06-12 | 西南交通大学 | 一种盾构隧道衬砌环 |
CN207499872U (zh) * | 2017-11-08 | 2018-06-15 | 中国建筑第八工程局有限公司 | 盾构过节点井处的管片结构 |
CN207420587U (zh) * | 2017-11-23 | 2018-05-29 | 中国铁路总公司 | 一种适用于tbm隧道衬砌环 |
CN207437092U (zh) * | 2017-11-28 | 2018-06-01 | 中铁十二局集团第二工程有限公司 | 一种富水软土地层盾构区间联络通道洞门钢管片 |
CN208330399U (zh) * | 2018-06-29 | 2019-01-04 | 西南交通大学 | 一种地层交界段盾构隧道管片衬砌结构 |
Non-Patent Citations (7)
Title |
---|
HE CHUAN等: "Dynamic response of a double-lined shield tunnel to train impact loads", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, vol. 53, pages 329 - 339 * |
MOHAMMAD SHARGHI 等: "Investigation into the effects of two component grout properties on surface settlements", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, vol. 63, pages 205 - 216, XP029905412, DOI: 10.1016/j.tust.2017.01.004 * |
何川;曾东洋;唐志诚;吴兰婷;: "大断面越江盾构隧道管片接头选型研究", 现代隧道技术, vol. 42, no. 06, pages 17 - 22 * |
周济民;何川;肖明清;宋洪江;: "狮子洋水下盾构隧道衬砌结构受力的现场测试与计算分析", 铁道学报, vol. 34, no. 07, pages 119 - 125 * |
曾东洋, 何川: "地铁盾构隧道管片接头刚度影响因素研究", 铁道学报, no. 04, pages 92 - 97 * |
王如路: "上海地铁盾构隧道纵向变形分析", 地下工程与隧道, vol. 89, no. 4, pages 1 - 6 * |
苏宗贤;何川;: "荷载-结构模式的壳-弹簧-接触模型", 西南交通大学学报, no. 03, pages 37 - 41 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110608053A (zh) * | 2019-10-30 | 2019-12-24 | 华东交通大学 | 一种模拟盾构隧道环缝接头的结构 |
CN110909406A (zh) * | 2019-11-20 | 2020-03-24 | 西南交通大学 | 基于模拟接头模型的盾构隧道内力计算方法 |
CN110909406B (zh) * | 2019-11-20 | 2022-08-30 | 西南交通大学 | 基于模拟接头模型的盾构隧道内力计算方法 |
CN111950184A (zh) * | 2020-08-21 | 2020-11-17 | 上海市隧道工程轨道交通设计研究院 | 一种多环盾构衬砌结构的三维仿真计算方法 |
CN111950184B (zh) * | 2020-08-21 | 2024-04-09 | 上海市隧道工程轨道交通设计研究院 | 一种多环盾构衬砌结构的三维仿真计算方法 |
CN112632655A (zh) * | 2020-11-19 | 2021-04-09 | 同济大学 | 一种模拟盾构隧道环缝的有限元单元模型 |
CN112632655B (zh) * | 2020-11-19 | 2022-03-04 | 同济大学 | 一种模拟盾构隧道环缝的有限元单元模型 |
Also Published As
Publication number | Publication date |
---|---|
CN108571328B (zh) | 2023-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108571328A (zh) | 一种地层交界段盾构隧道管片衬砌结构及设计方法 | |
Zhang et al. | Experimental and numerical study of shear connection in composite beams of steel and steel-fibre reinforced concrete | |
CN109667598B (zh) | 一种基于总安全系数法的隧道复合式衬砌设计方法 | |
Fisher et al. | Fatigue of steel bridge infrastructure | |
CN105956256B (zh) | 既有混凝土桥梁复杂区域的承载力评估与加固计算方法 | |
CN104809312B (zh) | 岩溶地区桩基持力层安全厚度计算方法 | |
CN107060117A (zh) | 混凝土分次浇筑过程中实现接缝处纤维连续的施工方法 | |
CN208330399U (zh) | 一种地层交界段盾构隧道管片衬砌结构 | |
CN106836023B (zh) | 基于跨中挠度减小的上承式混凝土拱桥加固方法 | |
Zhu et al. | Hot-spot stress models of cutout detail on orthotropic steel bridge decks | |
CN106932250A (zh) | 一种再生混凝土抗剪梁 | |
Mashiri et al. | Effects of weld profile and undercut on fatigue crack propagation life of thin-walled cruciform joint | |
Maljaars et al. | Fatigue resistance of rib to deck, crossbeam to deck and deck to deck welds in orthotropic decks using structural stress | |
CN204530477U (zh) | 超高性能混凝土薄壁箱梁的体外预应力锚固结构 | |
CN203729264U (zh) | 适应三向大变形的竖向接缝止水结构 | |
Zhang et al. | Fatigue performance and optimal design of corrugated steel–concrete composite bridge deck | |
CN104036094B (zh) | 一种活性粉末混凝土大偏心受压构件开裂荷载的计算方法 | |
CN106677079A (zh) | 基于拱桥拱脚水平推力减小的连续拱桥加固方法 | |
Konjatić et al. | The influence of the weld width on fracture behaviour of the heterogeneous welded joint | |
CN105631190A (zh) | 混凝土深梁的配筋方法 | |
CN105677962B (zh) | 一种滑板设计优化方法 | |
CN205501848U (zh) | 一种箱形梁桥主梁腹板斜裂缝加固结构 | |
CN207878204U (zh) | 一种混凝土板路面构造 | |
CN207813075U (zh) | 一种梁柱节点钢抱箍加固结构 | |
CN101173566A (zh) | 后张法预应力混凝土结构内部锚固区配筋构筑方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |