CN205714225U - 一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置 - Google Patents

一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置 Download PDF

Info

Publication number
CN205714225U
CN205714225U CN201620651876.7U CN201620651876U CN205714225U CN 205714225 U CN205714225 U CN 205714225U CN 201620651876 U CN201620651876 U CN 201620651876U CN 205714225 U CN205714225 U CN 205714225U
Authority
CN
China
Prior art keywords
culverts
railway
corrugated
tunnels
culvert
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620651876.7U
Other languages
English (en)
Inventor
孙勇
周永青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
China Railway Eryuan Engineering Group Co Ltd CREEC
Railway Engineering Research Institute of CARS
China Railway First Survey and Design Institute Group Ltd
Original Assignee
Hebei Chite Rail Transportation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Chite Rail Transportation Equipment Co Ltd filed Critical Hebei Chite Rail Transportation Equipment Co Ltd
Priority to CN201620651876.7U priority Critical patent/CN205714225U/zh
Application granted granted Critical
Publication of CN205714225U publication Critical patent/CN205714225U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型公开了一种涉及铁路涵洞、隧道病害金属波纹涵管内衬加固装置,属于铁路涵洞、隧道年久风化病害处理技术领域。本实用新型包括铺设在铁路涵洞、隧道内侧壁上的金属波纹涵管,以及设在铁路涵洞、隧道两端且与金属波纹涵管无缝连接的密封板,所述波纹涵管呈“冂”字状,其左右两侧根部埋设于原基础顶路面层内,所述波纹涵管包括多个左右宽边铆接,前后长边错位搭接的矩形波纹板,所述密封板上设有灌浆口。本实用新型主要用于铁路涵洞、隧道年久风化病害处理,旨在应用金属波纹涵管对涵洞、隧道进行内衬加固,最后对金属波纹涵管与旧涵、隧主体之间空隙进行注浆处理,有效保证作业空间,节省成本,施工周期缩短。

Description

一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置
技术领域
本实用新型涉及铁路涵洞、隧道年久风化病害处理技术,尤其涉及一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置。
背景技术
铁路涵洞、隧道年久失修、风化病害严重,若发生自然性灾害将难以抵抗,造成更大的损失,现在尚没有一种适合修补的装置。
实用新型内容
本实用新型所要解决的技术问题是提供一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置,旨在应用金属波纹涵管对涵洞、隧道进行内衬加固。
为解决上述技术问题,本实用新型所采取的技术方案是:一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置,其特征在于:包括铺设在铁路涵洞、隧道内侧壁上的金属波纹涵管,以及设在铁路涵洞、隧道两端且与金属波纹涵管无缝连接的密封板,所述波纹涵管呈“冂”字状,其左右两侧根部埋设于原基础顶路面层内,所述波纹涵管包括多个左右宽边铆接,前后长边错位搭接的矩形波纹板,所述密封板上设有灌浆口。
进一步的技术方案在于,所述波纹涵管左右两侧根部经角钢、螺栓固定于原基础顶路面层下方的原钢筋混凝土基础,所述波纹涵管根部左右两侧设有贯穿原基础顶路面层、原钢筋混凝土基础的加强筋。
进一步的技术方案还在于,所述波纹涵管纹理呈前后排列的凹凸状结构。
采用上述技术方案所产生的有益效果在于:本实用新型主要用于铁路涵洞、隧道年久风化病害处理,旨在应用金属波纹涵管对涵洞、隧道进行内衬加固,最后对金属波纹涵管与旧涵、隧主体之间空隙进行注浆处理,有效保证作业空间,节省成本,施工周期缩短。
附图说明
下面结合附图和具体实施方式对本实用新型作进一步详细的说明。
图1是本实用新型结构示意图;
图2是图1局部放大图;
图3-4是本实用新型的矩形波纹板结构示意图;
图5是本实用新型波纹涵管展开图;
其中:1、铁路涵洞、隧道;2、波纹涵管;3、密封板;4、灌浆口;5、原基础顶路面层;6、原钢筋混凝土基础;7、第一矩形波纹板;8、第二矩形波纹板;9、第三矩形波纹板;10、第四矩形波纹板;11、第五矩形波纹板;12、第六矩形波纹板;13、角钢;14、第一螺栓;15、第二螺栓;16、加强筋。
具体实施方式
下面结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。
在下面的描述中阐述了很多具体细节以便于充分理解本实用新型,但是本实用新型还可以采用其他不同于在此描述的其它方式来实施,本领域技术人员可以在不违背本实用新型内涵的情况下做类似推广,因此本实用新型不受下面公开的具体实施例的限制。
如图所示,本实用新型包括铺设在铁路涵洞、隧道内侧壁上的金属波纹涵管,以及设在铁路涵洞、隧道两端且与金属波纹涵管无缝连接的密封板,所述波纹涵管呈“冂”字状,其左右两侧根部埋设于原基础顶路面层内,所述波纹涵管包括多个左右宽边铆接,前后长边错位搭接的矩形波纹板,所述密封板上设有灌浆口。
优选地,所述波纹涵管左右两侧根部经角钢、螺栓固定于原基础顶路面层下方的原钢筋混凝土基础,所述波纹涵管根部左右两侧设有贯穿原基础顶路面层、原钢筋混凝土基础的加强筋。
优选地,所述波纹涵管纹理呈前后排列的凹凸状结构。
在现场施工时,首先顶起第一、第二、第三矩形波纹板做成环一,由于第一、第二、第三矩形波纹板都是预制好的,头部有弯度,所以直接安装固定即可,然后利用第六、第五、第四矩形波纹板顶起做成环二,然后环一与环2搭接,这样就可以错位搭接,接缝处、接缝夹层、螺栓部位用结构密封胶进行涂抹密封增强了波纹涵管的支撑力度,若将此展开,就如图5所示,根据铁路涵洞、隧道的长度设置多个由矩形波纹板组成的环,为了更好的灌浆,设置了密封板,密封板上有灌浆口,这样更容易使浆液填充铁路涵洞、隧道与金属波纹涵管之间,另外由于本装置密封性好,所以可以加大填充压力,以使浆液渗透进铁路涵洞、隧道墙壁内。
本实用新型主要用于铁路涵洞、隧道年久风化病害处理,旨在应用金属波纹涵管对涵洞、隧道进行内衬加固,最后对金属波纹涵管与旧涵、隧主体之间空隙进行注浆处理,有效保证作业空间,节省成本,施工周期缩短。

Claims (3)

1.一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置,其特征在于:包括铺设在铁路涵洞、隧道内侧壁上的金属波纹涵管,以及设在铁路涵洞、隧道两端且与金属波纹涵管无缝连接的密封板,所述波纹涵管呈“冂”字状,其左右两侧根部埋设于原基础顶路面层内,所述波纹涵管包括多个左右宽边铆接,前后长边错位搭接的矩形波纹板,所述密封板上设有灌浆口。
2.根据权利要求1所述的一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置,其特征在于:所述波纹涵管左右两侧根部经角钢、螺栓固定于原基础顶路面层下方的原钢筋混凝土基础,所述波纹涵管根部左右两侧设有贯穿原基础顶路面层、原钢筋混凝土基础的加强筋。
3.根据权利要求1所述的一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置,其特征在于:所述波纹涵管纹理呈前后排列的凹凸状结构。
CN201620651876.7U 2016-06-27 2016-06-27 一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置 Active CN205714225U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620651876.7U CN205714225U (zh) 2016-06-27 2016-06-27 一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620651876.7U CN205714225U (zh) 2016-06-27 2016-06-27 一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置

Publications (1)

Publication Number Publication Date
CN205714225U true CN205714225U (zh) 2016-11-23

Family

ID=57318609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620651876.7U Active CN205714225U (zh) 2016-06-27 2016-06-27 一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置

Country Status (1)

Country Link
CN (1) CN205714225U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110184956A (zh) * 2019-05-09 2019-08-30 中国铁道科学研究院集团有限公司铁道建筑研究所 一种加固涵洞的施工方法
CN113833299A (zh) * 2021-09-17 2021-12-24 浙江建设职业技术学院 基于虚拟现实技术的古建筑门洞加固方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110184956A (zh) * 2019-05-09 2019-08-30 中国铁道科学研究院集团有限公司铁道建筑研究所 一种加固涵洞的施工方法
CN113833299A (zh) * 2021-09-17 2021-12-24 浙江建设职业技术学院 基于虚拟现实技术的古建筑门洞加固方法
CN113833299B (zh) * 2021-09-17 2022-09-09 浙江建设职业技术学院 基于虚拟现实技术的古建筑门洞加固方法

Similar Documents

Publication Publication Date Title
CN105114105B (zh) 钢-混凝土复合式隧道衬砌支护结构及其制作与施工方法
CN103256052B (zh) 一种整体直中墙式双连拱隧道的施工方法
CN103225285B (zh) 一种钢膜面板堆石坝
CN204609900U (zh) 一种适用于台阶法开挖的波纹钢板初期支护结构
CN103953351B (zh) 一种不中断交通情况下的既有隧道下挖扩建施工方法
CN205503146U (zh) 一种适用于城市敏感区的浅埋隧道新型支护结构
CN112324458B (zh) 一种邻近输电铁塔盾构隧道被击穿管片的修复施工方法
CN107806349A (zh) 一种钢‑frp复合波纹板隧洞二次衬砌结构及其施作方法
CN101575859B (zh) 地下连续墙防渗接头及其施工方法
CN205714225U (zh) 一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置
CN108547316B (zh) 用于地下综合管廊的双层波纹钢结构
CN207261017U (zh) 隧道形式预应力管幕系统
CN109162741B (zh) 盾构穿越活塞风道与活塞风道上部结构同步施工的方法
CN110593320A (zh) 一种外墙后浇带提前封闭结构及其施工方法
CN203822325U (zh) 用于膨胀性土层隧道初期的钢格栅钢拱架联合支护
CN207568626U (zh) 一种用于膨胀性地层的隧道结构
CN211976106U (zh) 提高纵向刚度的顶管接口结构
CN204941551U (zh) 一种曲线顶管支护结构扩建盾构施工的地铁车站
CN212003200U (zh) 一种用于盾构隧道基础上的扩挖结构
CN217976235U (zh) 一种用于铁路隧道的加固结构
CN109577998B (zh) 一种盾构区间活塞风道回填过站的施工方法
CN207750084U (zh) 新建地下工程密贴穿越既有建筑的施工支护结构
CN207392241U (zh) 一种超高性能混凝土预制拼装综合管廊
CN111411968A (zh) 一种用于盾构隧道基础上的扩挖结构及其施工方法
CN217028942U (zh) 一种具有波形钢板的隧道衬砌结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ma Weibin

Inventor after: Fu Bingxian

Inventor after: Sun Yong

Inventor after: Zhou Yongqing

Inventor before: Sun Yong

Inventor before: Zhou Yongqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170510

Address after: 100081 Beijing city Haidian District Daliushu Road No. 2

Patentee after: Railway Construction Institute of China Academy of Railway Sciences

Address before: 053700 Hengshui city of Hebei province Fucheng Development Zone

Patentee before: HEBEI CHITE RAIL TRANSPORTATION EQUIPMENT CO., LTD.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 2, Da Liu Shu Road, Haidian District, Beijing

Patentee after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.

Address before: No. 2, Da Liu Shu Road, Haidian District, Beijing

Patentee before: Railway Construction Institute of China Academy of Railway Sciences

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191211

Address after: 100081 Beijing city Haidian District Daliushu Road No. 2

Co-patentee after: China Railway First Survey & Design Institute Group Co., Ltd.

Patentee after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.

Co-patentee after: China Railway Second Academy Engineering Group Co., Ltd.

Co-patentee after: The forth Survey and Design Institute (Group) Co., Ltd. Of CRCC

Address before: 100081 Beijing city Haidian District Daliushu Road No. 2

Patentee before: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.