CN107818198A - A kind of science of bridge building management platform based on BIM technology - Google Patents
A kind of science of bridge building management platform based on BIM technology Download PDFInfo
- Publication number
- CN107818198A CN107818198A CN201710886889.1A CN201710886889A CN107818198A CN 107818198 A CN107818198 A CN 107818198A CN 201710886889 A CN201710886889 A CN 201710886889A CN 107818198 A CN107818198 A CN 107818198A
- Authority
- CN
- China
- Prior art keywords
- management
- model
- bim
- quality
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a kind of science of bridge building management platform based on BIM technology, comprise the following steps:S1, determine BIM application implementation targets, the progress control to become more meticulous is realized to project using BIM technology, supporting item quality, security management system are well run, S2, the modeling standard for working out science of bridge building BIM models, according to project management demand, formulation meets science of bridge building project management function and the BIM of management essentials implements standard, mainly splits rule, model naming rule, modeling depth requirements, model quality control requirement, models integrity from model.The present invention realizes the visualization of engineering-built overall process and informationization by BIM technology, Improving Project youth staff's benefits are horizontal, managerial skills and maturity is set to improve 1~2 year, supporting item construction project time management becomes more meticulous, reaches Semi-intelligent Modular state, supporting item quality management system, security management system are well run, and accomplish efficiently and accurately and rigorous orderly carry out engineering construction and management.
Description
Technical field
The present invention relates to construction engineering technical field, specially a kind of science of bridge building management platform based on BIM technology.
Background technology
Promotion and development based on BIM technology, BIM technology starts to influence the whole flow process of construction, in science of bridge building
It is confined to the management of the scattered point such as monomer engineering more Deng field, lacks construction management and the control device of overall process.In order to more
Good realization scene management and control, and reach the demand that visualized management is engaged with construction, pass through answering for BIM comprehensive management platforms
With work progress management is strengthened, project progress, safety, quality, the efficiency of management and precision of production are improved, promotes BIM technology to exist
The development in science of bridge building field.
There are the following problems for the bridge management platform of domestic application BIM technology:More to model, show, calculation amount, collision detection
And data statistics is characteristic feature, the value point application of fragmentation is rested on, or apply as typical case spy with monomer engineering information
Sign.
The content of the invention
(One)The technical problem of solution
In view of the shortcomings of the prior art, the invention provides a kind of science of bridge building management platform based on BIM technology, solve
State the problem of background technology is mentioned.
(Two)Technical scheme
To achieve the above object, the present invention provides following technical scheme:A kind of science of bridge building management platform based on BIM technology,
Comprise the following steps:
S1, BIM application implementation targets are determined, the progress control to become more meticulous, supporting item matter are realized to project using BIM technology
Amount, security management system are well run.
S2, the modeling standard for working out science of bridge building BIM models, according to project management demand, formulation meets science of bridge building item
The BIM of mesh management function and management essentials implements standard, and mainly splitting rule, model naming rule, modeling depth from model will
Ask, model quality controls requirement, models integrity, file size require, model and file format, model rendering are regular, model
Delivery form, examination standard and model modification rule etc. are studied.
S3, the software using CATIA and REVIT as core carry out engineering model establishment, by different software according to modeling standard
Carry out model creation, it is ensured that platform energy effective integration CATIA and REVIT software institute established model.
S4, the framework composition for determining BIM comprehensive management platforms and design research and development, with reference to bridge construction management flow and interior
Hold, using BIM-3D models as carrier, construction speed is served as theme, and based on inspection lot, builder's diary is supplementary means, integrates BIM
Comprehensive management platform, then the information such as integrated security, quality, forms projects information database, is patted by BIM integrated pipes
Platform carries out data comparison, adjustment, then pushes the work such as corresponding construction task deployment and early warning, supporting item to administrative staff
Management carries out realizing digital construction-database while material building.
S5, BIM comprehensive platform three-dimensional page are designed, and platform research and development are carried out based on game engine, and platform bandwagon effect is abided by
The directly perceived, principle of three-dimensional visible is followed, it is macroscopical completely all to show engineering in platform homepage in a manner of 3D models, access people
Member directly realizes all feature operations and message reference on threedimensional model as needed.
S6, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous progress control, comb the work of each subdivisional work
Skill flow, to each flow additional period attribute, progress control is become more meticulous to " people, material, machine, method, ring " each link, most entered at last
Degree plan and 3D model connections, with process data(Inspection lot)Drive actual progress, the progress that realizes a plan simulation, construction task point
Match somebody with somebody, action push and inspection, actual progress simulation and progress contrast.
S7, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous quality management, in the progress control that becomes more meticulous
On the basis of integrated quality management key element, realize construction drawing, confide a technological secret, after management system, critical process and model connection
Direct access queries, the real time propelling movement of quality critical point, quality rectification and check, process detection record are uploaded and closed with progress
Connection, quality information access directly is carried out from corresponding model, according to quality problems early warning rectify and improve the inspection of reply situation,
Supporting item carries out quality management.
S8, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous safety management, the integrated security pipe on model
Manage information, complete security management system, system, safety tell somebody what one's real intentions are, dangerous matter sources analysis and the mounting of model, realize to risk factor compared with
Big dangerous matter sources are prompted, and carry out prevention and control measure push, complete safety rectification check closed loop management.
Preferably, in step s 4, according to the demand of application project, comprehensive management platform state in realization progress, quality,
On the basis of safety management function, following function is included:Sign tears the system pipes such as management, equipment control, rights management, builder's diary open
The information management such as reason and project overview, organization, project data, subpackage management, Quick Response Code;Model and data import, mould
Type is roamed and visualization technique is told somebody what one's real intentions are.
Preferably, in step s 5, main interface include model of place, information profile, function menu, pattern switching, positioning,
The functions such as measurement, section cutting, small map, the management such as structure attribute, quality safety and construction production are directly realized by by model
Function.
(Three)Beneficial effect
The invention provides a kind of science of bridge building management platform based on BIM technology, possess and have the beneficial effect that:
The visualization of engineering-built overall process and informationization are realized by BIM technology, Improving Project youth staff's benefits are horizontal, make pipe
Reason is horizontal and maturity improves 1~2 year, and supporting item construction project time management becomes more meticulous, reaches Semi-intelligent Modular state, supporting item
Quality management system, security management system are well run, and accomplish efficiently and accurately and rigorous orderly carry out engineering construction and management.
Brief description of the drawings
Fig. 1 is the science of bridge building management platform implementing procedure figure based on BIM technology of the present invention;
The composition of the science of bridge building management platform business structure based on BIM technology of Fig. 2 present invention;
The science of bridge building management platform architecture distinguishing hierarchy based on BIM technology of Fig. 3 present invention;
The science of bridge building management platform Technical Architecture schematic diagram based on BIM technology of Fig. 4 present invention;
The composition of the science of bridge building management platform hardware structure based on BIM technology of Fig. 5 present invention;
The science of bridge building management platform progress monitoring operational flow diagram based on BIM technology of Fig. 6 present invention;
The science of bridge building management platform based on BIM technology of Fig. 7 present invention progress in progress control module that becomes more meticulous is reminded and pre-
Alert operational process schematic diagram;
The science of bridge building management platform quality safety management flow chart based on BIM technology of Fig. 8 present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
As shown in figures 1-8, the present invention provides a kind of technical scheme:A kind of science of bridge building management platform based on BIM technology,
Comprise the following steps:
S1, BIM application implementation targets are determined, the progress control to become more meticulous, supporting item matter are realized to project using BIM technology
Amount, security management system are well run.
S2, the modeling standard for working out science of bridge building BIM models, according to project management demand, formulation meets science of bridge building item
The BIM of mesh management function and management essentials implements standard, and mainly splitting rule, model naming rule, modeling depth from model will
Ask, model quality controls requirement, models integrity, file size require, model and file format, model rendering are regular, model
Delivery form, examination standard and model modification rule etc. are studied.
S3, the software using CATIA and REVIT as core carry out engineering model establishment, by different software according to modeling standard
Carry out model creation, it is ensured that platform energy effective integration CATIA and REVIT software institute established model.
S4, the framework composition for determining BIM comprehensive management platforms and design research and development, with reference to bridge construction management flow and interior
Hold, using BIM-3D models as carrier, construction speed is served as theme, and based on inspection lot, builder's diary is supplementary means, integrates BIM
Comprehensive management platform, then the information such as integrated security, quality, forms projects information database, is patted by BIM integrated pipes
Platform carries out data comparison, adjustment, then pushes the work such as corresponding construction task deployment and early warning, supporting item to administrative staff
Management carries out realizing digital construction-database while material building, and according to the demand of application project, comprehensive management platform is in reality
On the basis of existing above-mentioned progress, quality, safety management function, following function is included:Sign tear open management, equipment control, rights management,
The information management such as the system administrations such as builder's diary and project overview, organization, project data, subpackage management, Quick Response Code;Mould
Type and data are imported, model roaming and visualization technique are told somebody what one's real intentions are.
S5, BIM comprehensive platform three-dimensional page are designed, and platform research and development are carried out based on game engine, and platform bandwagon effect is abided by
The directly perceived, principle of three-dimensional visible is followed, it is macroscopical completely all to show engineering in platform homepage in a manner of 3D models, access people
Member directly realizes all feature operations and message reference on threedimensional model as needed, and main interface includes model of place, information
The function such as overview, function menu, pattern switching, positioning, measurement, section cutting, small map, component category is directly realized by by model
Property, quality safety and construction production etc. management function.
S6, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous progress control, comb the work of each subdivisional work
Skill flow, to each flow additional period attribute, progress control is become more meticulous to " people, material, machine, method, ring " each link, most entered at last
Degree plan and 3D model connections, with process data(Inspection lot)Drive actual progress, the progress that realizes a plan simulation, construction task point
Match somebody with somebody, action push and check, actual progress simulation and progress contrast, can by monthly plan, week plan etc. generation the next period based on
Draw the information such as the task amount completed.
S7, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous quality management, in the progress control that becomes more meticulous
On the basis of integrated quality management key element, realize construction drawing, confide a technological secret, after management system, critical process and model connection
Direct access queries, the real time propelling movement of quality critical point, quality rectification and check, process detection record are uploaded and closed with progress
Connection, quality information access directly is carried out from corresponding model, according to quality problems early warning rectify and improve the inspection of reply situation,
Supporting item carries out quality management.
S8, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous safety management, the integrated security pipe on model
Manage information, complete security management system, system, safety tell somebody what one's real intentions are, dangerous matter sources analysis and the mounting of model, realize to risk factor compared with
Big dangerous matter sources are prompted, and carry out prevention and control measure push, complete safety rectification check closed loop management.
It should be noted that herein, such as term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those
Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include
Intrinsic key element.In the absence of more restrictions.By sentence " including one ... the key element limited, it is not excluded that
Other identical element in the process including the key element, method, article or equipment also be present ".
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (3)
- A kind of 1. science of bridge building management platform based on BIM technology, it is characterised in that:Comprise the following steps:S1, BIM application implementation targets are determined, the progress control to become more meticulous, supporting item matter are realized to project using BIM technology Amount, security management system are well run;S2, the modeling standard for working out science of bridge building BIM models, according to project management demand, formulation meets science of bridge building project pipe The BIM for managing function and management essentials implements standard, mainly splits rule, model naming rule, modeling depth requirements, mould from model Type quality control requirement, models integrity, file size requirement, model and file format, model rendering rule, model deliver shape Formula, examination standard and model modification rule etc. are studied;S3, the software using CATIA and REVIT as core carry out engineering model establishment, are carried out by different software according to modeling standard Model creation, it is ensured that platform energy effective integration CATIA and REVIT software institute established model;S4, the framework composition for determining BIM comprehensive management platforms and design research and development, with reference to bridge construction management flow and content, with BIM-3D models are carrier, and construction speed is served as theme, and based on inspection lot, builder's diary is supplementary means, integrate BIM integrated pipes Platform, then the information such as integrated security, quality, forms projects information database, is carried out by BIM comprehensive management platforms Data compare, adjusted, and then push the work such as the deployment of corresponding construction task and early warning to administrative staff, supporting item manage into Row material realizes digital construction-database while building;S5, BIM comprehensive platform three-dimensional page are designed, and platform research and development are carried out based on game engine, and platform bandwagon effect follows directly See, the principle of three-dimensional visible, it is macroscopical completely all to show engineering in platform homepage in a manner of 3D models, access personnel's root All feature operations and message reference are directly realized on threedimensional model according to needs;S6, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous progress control, comb the technique stream of each subdivisional work Journey, to each flow additional period attribute, progress control is become more meticulous to " people, material, machine, method, ring " each link, most humidometer at last Draw with 3D model connections, with process data(Inspection lot)Actual progress is driven, the progress that realizes a plan is simulated, construction task is distributed, Action is pushed and checked, actual progress simulation and progress contrast;S7, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous quality management, on the basis for becoming more meticulous progress control Upper integrated quality management key element, construction drawing is realized, confides a technological secret, is after management system, critical process and model connection direct Access queries, the real time propelling movement of quality critical point, quality rectification and check, process detection record are uploaded and associated with progress, directly Connect from corresponding model and carry out quality information access, according to quality problems early warning rectify and improve the inspection of reply situation, auxiliary Project carries out quality management;S8, realize that by the BIM comprehensive management platforms of structure engineering becomes more meticulous safety management, on model integrated security management believe Breath, completion security management system, system, safety are told somebody what one's real intentions are, dangerous matter sources are analyzed and the mounting of model, are realized larger to risk factor Dangerous matter sources are prompted, and carry out prevention and control measure push, complete safety rectification check closed loop management.
- A kind of 2. science of bridge building management platform based on BIM technology according to claim 1, it is characterised in that:In step In S4, according to the demand of application project, on the basis of comprehensive management platform states progress, quality, safety management function in realization, Include following function:Sign tears the system administrations such as management, equipment control, rights management, builder's diary and project overview, tissue machine open The information managements such as structure, project data, subpackage management, Quick Response Code;Model and data are imported, model roaming and visualization technique are told somebody what one's real intentions are Deng.
- A kind of 3. science of bridge building management platform based on BIM technology according to claim 1, it is characterised in that:In step In S5, main interface includes model of place, information profile, function menu, pattern switching, positioning, measurement, section cutting, small map Etc. function, the management functions such as structure attribute, quality safety and construction production are directly realized by by model.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710886889.1A CN107818198A (en) | 2017-09-27 | 2017-09-27 | A kind of science of bridge building management platform based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710886889.1A CN107818198A (en) | 2017-09-27 | 2017-09-27 | A kind of science of bridge building management platform based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107818198A true CN107818198A (en) | 2018-03-20 |
Family
ID=61607377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710886889.1A Pending CN107818198A (en) | 2017-09-27 | 2017-09-27 | A kind of science of bridge building management platform based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107818198A (en) |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108830539A (en) * | 2018-03-28 | 2018-11-16 | 北京地厚云图科技有限公司 | Task interaction and data statistics management method and storage medium |
CN108921515A (en) * | 2018-07-04 | 2018-11-30 | 江苏南通三建集团股份有限公司 | A kind of construction site method of controlling security |
CN109299924A (en) * | 2018-10-19 | 2019-02-01 | 杭州数建科技有限公司 | Fining and intelligent project management method based on multistage control |
CN109410682A (en) * | 2018-12-11 | 2019-03-01 | 太原理工大学 | The method for building up of emulation platform for engineering surveying experimental teaching |
CN109460947A (en) * | 2018-12-27 | 2019-03-12 | 河南省交通规划设计研究院股份有限公司 | Highway engineering process based on BIM+GIS technology is applied for checking and examination system |
CN109544051A (en) * | 2019-01-25 | 2019-03-29 | 中铁三局集团广东建设工程有限公司 | A kind of construction management application platform based on BIM technology application |
CN109614697A (en) * | 2018-12-10 | 2019-04-12 | 吉林省瑞凯科技股份有限公司 | A kind of bridge management system based on BIM |
CN109703007A (en) * | 2018-12-27 | 2019-05-03 | 北京市政路桥股份有限公司 | A kind of science of bridge building 3D printing progress display method |
CN109784758A (en) * | 2019-01-30 | 2019-05-21 | 北京筑业志远软件开发有限公司 | Construction quality supervision early warning system and method based on BIM model |
CN110020798A (en) * | 2019-03-28 | 2019-07-16 | 上海荷福人工智能科技(集团)有限公司 | A kind of approaches to IM of tracing to the source of the project progress based on artificial intelligence |
CN110264158A (en) * | 2019-06-19 | 2019-09-20 | 国网上海市电力公司 | A kind of project of transmitting and converting electricity digitlization auditing system and implementation method |
CN110287604A (en) * | 2019-06-27 | 2019-09-27 | 厦门建研建筑产业研究有限公司 | A kind of Bridge Management & Maintenance system based on BIM-GIS |
CN110673909A (en) * | 2019-09-09 | 2020-01-10 | 北京中铁建电气化设计研究院有限公司 | One-rod one-file information processing method of overhead line system based on building information model |
CN110737936A (en) * | 2019-09-23 | 2020-01-31 | 江西毕姆工程技术有限公司 | full-process project management platform based on BIM technology |
CN110737713A (en) * | 2019-08-27 | 2020-01-31 | 广东一码通信科技有限公司 | Data platform-based visual project progress display method, equipment and medium |
CN111144783A (en) * | 2019-12-31 | 2020-05-12 | 重庆西恒工程咨询有限公司 | Construction management method applying intelligent construction site system |
CN111210199A (en) * | 2020-01-03 | 2020-05-29 | 广西路桥工程集团有限公司 | Bridge prefab BIM information management system |
CN111260325A (en) * | 2019-07-23 | 2020-06-09 | 上海建工集团股份有限公司 | Bridge construction progress management system based on BIM |
CN111335186A (en) * | 2020-03-05 | 2020-06-26 | 青岛理工大学 | Safety monitoring and early warning method and system for swivel bridge, storage medium and early warning platform |
CN111340458A (en) * | 2020-03-17 | 2020-06-26 | 中铁城建集团有限公司 | Construction progress informatization management method |
CN111369158A (en) * | 2019-12-30 | 2020-07-03 | 中铁四局集团有限公司 | BIM-based informatization quality management method and system |
CN111624325A (en) * | 2019-02-28 | 2020-09-04 | 上海捷规建筑工程咨询有限公司 | Steel structure weld nondestructive testing method and system based on BIM |
CN111813745A (en) * | 2020-07-27 | 2020-10-23 | 中交路桥北方工程有限公司 | System, device and method for civil construction technology and standard query |
CN111860895A (en) * | 2020-07-30 | 2020-10-30 | 福州大学 | BIM-based bridge auxiliary facility operation maintenance management system |
CN112541733A (en) * | 2020-12-12 | 2021-03-23 | 中冶天工集团有限公司 | Engineering construction stage management control method based on BIM |
CN112651644A (en) * | 2020-12-28 | 2021-04-13 | 重庆大学 | Bridge potential safety hazard troubleshooting informatization management system and application method thereof |
CN114511303A (en) * | 2022-04-06 | 2022-05-17 | 四川省大数据中心 | Investigation result examination system, method and equipment |
CN117541023A (en) * | 2024-01-05 | 2024-02-09 | 山东金呈阳建设工程有限公司 | BIM-based bridge construction progress management method and system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106169114A (en) * | 2016-06-15 | 2016-11-30 | 陕西铁路工程职业技术学院 | BIM technology application platform based on high-speed railway CRTS III plate-type Construction of Ballastless Track |
CN106447116A (en) * | 2016-10-10 | 2017-02-22 | 陕西铁路工程职业技术学院 | Application of BIM technology in metro track laying construction |
-
2017
- 2017-09-27 CN CN201710886889.1A patent/CN107818198A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106169114A (en) * | 2016-06-15 | 2016-11-30 | 陕西铁路工程职业技术学院 | BIM technology application platform based on high-speed railway CRTS III plate-type Construction of Ballastless Track |
CN106447116A (en) * | 2016-10-10 | 2017-02-22 | 陕西铁路工程职业技术学院 | Application of BIM technology in metro track laying construction |
Non-Patent Citations (1)
Title |
---|
陈兵 等: "《基于BIM技术的桥梁工程半智能化施工管理辅助系统》", 《城市住宅》 * |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108830539A (en) * | 2018-03-28 | 2018-11-16 | 北京地厚云图科技有限公司 | Task interaction and data statistics management method and storage medium |
CN108921515A (en) * | 2018-07-04 | 2018-11-30 | 江苏南通三建集团股份有限公司 | A kind of construction site method of controlling security |
CN109299924A (en) * | 2018-10-19 | 2019-02-01 | 杭州数建科技有限公司 | Fining and intelligent project management method based on multistage control |
CN109614697A (en) * | 2018-12-10 | 2019-04-12 | 吉林省瑞凯科技股份有限公司 | A kind of bridge management system based on BIM |
CN109410682A (en) * | 2018-12-11 | 2019-03-01 | 太原理工大学 | The method for building up of emulation platform for engineering surveying experimental teaching |
CN109460947A (en) * | 2018-12-27 | 2019-03-12 | 河南省交通规划设计研究院股份有限公司 | Highway engineering process based on BIM+GIS technology is applied for checking and examination system |
CN109703007A (en) * | 2018-12-27 | 2019-05-03 | 北京市政路桥股份有限公司 | A kind of science of bridge building 3D printing progress display method |
CN109703007B (en) * | 2018-12-27 | 2020-11-13 | 北京市政路桥股份有限公司 | 3D printing progress display method for bridge engineering |
CN109544051A (en) * | 2019-01-25 | 2019-03-29 | 中铁三局集团广东建设工程有限公司 | A kind of construction management application platform based on BIM technology application |
CN109784758A (en) * | 2019-01-30 | 2019-05-21 | 北京筑业志远软件开发有限公司 | Construction quality supervision early warning system and method based on BIM model |
CN111624325A (en) * | 2019-02-28 | 2020-09-04 | 上海捷规建筑工程咨询有限公司 | Steel structure weld nondestructive testing method and system based on BIM |
CN110020798A (en) * | 2019-03-28 | 2019-07-16 | 上海荷福人工智能科技(集团)有限公司 | A kind of approaches to IM of tracing to the source of the project progress based on artificial intelligence |
CN110264158A (en) * | 2019-06-19 | 2019-09-20 | 国网上海市电力公司 | A kind of project of transmitting and converting electricity digitlization auditing system and implementation method |
CN110287604A (en) * | 2019-06-27 | 2019-09-27 | 厦门建研建筑产业研究有限公司 | A kind of Bridge Management & Maintenance system based on BIM-GIS |
CN111260325A (en) * | 2019-07-23 | 2020-06-09 | 上海建工集团股份有限公司 | Bridge construction progress management system based on BIM |
CN110737713A (en) * | 2019-08-27 | 2020-01-31 | 广东一码通信科技有限公司 | Data platform-based visual project progress display method, equipment and medium |
CN110673909A (en) * | 2019-09-09 | 2020-01-10 | 北京中铁建电气化设计研究院有限公司 | One-rod one-file information processing method of overhead line system based on building information model |
CN110737936A (en) * | 2019-09-23 | 2020-01-31 | 江西毕姆工程技术有限公司 | full-process project management platform based on BIM technology |
CN111369158A (en) * | 2019-12-30 | 2020-07-03 | 中铁四局集团有限公司 | BIM-based informatization quality management method and system |
CN111144783A (en) * | 2019-12-31 | 2020-05-12 | 重庆西恒工程咨询有限公司 | Construction management method applying intelligent construction site system |
CN111210199A (en) * | 2020-01-03 | 2020-05-29 | 广西路桥工程集团有限公司 | Bridge prefab BIM information management system |
CN111210199B (en) * | 2020-01-03 | 2022-06-07 | 广西路桥工程集团有限公司 | Bridge prefab BIM information management system |
CN111335186A (en) * | 2020-03-05 | 2020-06-26 | 青岛理工大学 | Safety monitoring and early warning method and system for swivel bridge, storage medium and early warning platform |
CN111340458A (en) * | 2020-03-17 | 2020-06-26 | 中铁城建集团有限公司 | Construction progress informatization management method |
CN111813745A (en) * | 2020-07-27 | 2020-10-23 | 中交路桥北方工程有限公司 | System, device and method for civil construction technology and standard query |
CN111860895A (en) * | 2020-07-30 | 2020-10-30 | 福州大学 | BIM-based bridge auxiliary facility operation maintenance management system |
CN112541733A (en) * | 2020-12-12 | 2021-03-23 | 中冶天工集团有限公司 | Engineering construction stage management control method based on BIM |
CN112651644A (en) * | 2020-12-28 | 2021-04-13 | 重庆大学 | Bridge potential safety hazard troubleshooting informatization management system and application method thereof |
CN114511303A (en) * | 2022-04-06 | 2022-05-17 | 四川省大数据中心 | Investigation result examination system, method and equipment |
CN117541023A (en) * | 2024-01-05 | 2024-02-09 | 山东金呈阳建设工程有限公司 | BIM-based bridge construction progress management method and system |
CN117541023B (en) * | 2024-01-05 | 2024-04-05 | 山东金呈阳建设工程有限公司 | BIM-based bridge construction progress management method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107818198A (en) | A kind of science of bridge building management platform based on BIM technology | |
CN106988221B (en) | Unit construction bridge beam construction method based on BIM | |
CN112651059B (en) | Multi-scheme generation method for urban design of control and regulation land parcel based on artificial intelligence | |
CN108842782A (en) | Based on BIM technology deep pit digging and construction method for supporting | |
CN109766581B (en) | Method for establishing bridge BIM (building information modeling) model by adopting Dynamo software | |
CN107273640A (en) | Hydraulic and Hydro-Power Engineering Schedule monitoring method based on three-dimensional digital model | |
CN106202723A (en) | A kind of BIM subway work method | |
CN106339490A (en) | System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model | |
CN109447479A (en) | One kind being based on three-dimensional visualization project management system | |
CN107368655A (en) | Hydroenergy storage station dynamic monitoring monitoring and simulation training system and its implementation | |
CN109472483A (en) | A kind of building-site modeling method and system based on BIM model and technology of taking photo by plane | |
CN103093663A (en) | Hydropower station three-dimensional precise modeling and visualization simulation training system and implementation method thereof | |
CN108121704A (en) | A kind of three-dimensional final acceptance of construction system | |
CN104778742A (en) | Method for establishing 3D digital maintenance platform of aircraft based on 3D laser scanning technology | |
CN111967077A (en) | Engineering construction management digital platform based on BIM technology | |
CN107220438A (en) | A kind of method of the CAE Mechanics Simulations based on BIM information models | |
CN105893655B (en) | A kind of physical simulating method of petroleum reservoir configuration | |
CN108647450A (en) | A kind of pre-buried big foundation bolt construction method based on BIM technology | |
CN110110376A (en) | A kind of hinge dam type scheme analysis method for quantitatively evaluating and device based on BIM | |
CN109086495A (en) | The method that BIM goes out hard-cover construction drawing | |
CN112256815B (en) | Three-dimensional planning auxiliary examination and approval system and method | |
CN110532663A (en) | A kind of collaborative modeling woprk standardization process based on BIM | |
CN104504175A (en) | Simulation system and simulation method for spacecraft assembling | |
CN109740245A (en) | A kind of application method in the prefabricated middle BIM technology of bar desk Combinatorial resolution | |
CN108694260A (en) | Application process of the BIM technology in Steel Bridge processing and manufacturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180320 |