CN108830539A - Task interaction and data statistics management method and storage medium - Google Patents

Task interaction and data statistics management method and storage medium Download PDF

Info

Publication number
CN108830539A
CN108830539A CN201810266715.XA CN201810266715A CN108830539A CN 108830539 A CN108830539 A CN 108830539A CN 201810266715 A CN201810266715 A CN 201810266715A CN 108830539 A CN108830539 A CN 108830539A
Authority
CN
China
Prior art keywords
task
actual
measurement
actual measurement
quantities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810266715.XA
Other languages
Chinese (zh)
Inventor
谢远玉
薛奇辉
单立新
肖发权
卢平
卢一平
徐福兵
陈小东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Thick Cloud Technology Co Ltd
Original Assignee
Beijing Thick Cloud Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Thick Cloud Technology Co Ltd filed Critical Beijing Thick Cloud Technology Co Ltd
Priority to CN201810266715.XA priority Critical patent/CN108830539A/en
Publication of CN108830539A publication Critical patent/CN108830539A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • G06Q50/165Land development

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of task interaction and data statistics management methods comprising establishes actual measurement actual quantities task library content and staff group;People from taskings in group enters actual measurement actual quantities task library, and the actual measurement actual quantities task in task library is distributed to main duty executor and task assists executor;Main duty executor and task assist executor to execute the actual measurement actual quantities task and submit;Completed actual measurement actual quantities task is rejected in actual measurement actual quantities people from taskings confirmation;Statistics summarizes, achievement trend and rectification notice are inquired.The present invention through the above steps can be in the work of actual measurement actual quantities, and it can be realized quick counting statistics and the storage of measurement result, automatically generate statistical data, project manager can inquire the actual measurement various statistical results of actual quantities, avoid the accurate inquiry that measurement point position and data are realized using cumbersome work such as excel file, mail transmission and manual entry statistics, traceable and actual measurement actual quantities data automatical and efficient filing, statistics.

Description

Task interaction and data statistics management method and storage medium
Technical field
The invention belongs to building fields, are related to a kind of interactive task and data statistics management method and storage medium, especially It is related to surveying the task interaction of actual quantities and data statistics management method and storage medium in a kind of engineering management.
Background technique
In existing main real estate development corporation's exploration project, the inadequate unified standard of actual measurement actual quantities work.It is existing Actual quantities way is surveyed, is construction site manual record mostly, the counting statistics table schema generated using excel office software, Carry out typing, statistics and the calculating of field measurement actual quantities.The executor for surveying actual quantities task when need to survey at the scene, needs advanced The drawings marked of row actual measurement area's point, takes the drawing marked, using paper, pen or electronic plane equipment, carries out field measurement The record of value needs to return to arrangement and typing work that office carries out data after the completion.The circulation interaction of each side still relies on paper The mail transmission for turning label or electronic document of matter file.The counting statistics table schema that existing excel office software generates, only It is able to achieve the automatic calculating and statistics of preset table content.
Summary of the invention
It is an object of the present invention to provide in a kind of engineering management survey actual quantities task interaction and data statistics management method and Storage medium, can be in the work of actual measurement actual quantities, and unified standard surveys actual quantities content and method, realizes each side's interaction, and And it can be realized quick counting statistics and the storage of measurement result, realize the accurate inquiry of measurement point position and data and can be traced Property.
The present invention solves technical problem and adopts the following technical scheme that:A kind of interaction of task and data statistics management method, Include the following steps:
S10, actual measurement actual quantities task library content is established;
S20, actual measurement actual quantities people from taskings establish staff group;
S30, actual measurement actual quantities people from taskings establish actual measurement actual quantities construction unit model;
People from taskings in S40, group enters actual measurement actual quantities task library, and the actual measurement actual quantities task in task library is pressed work Cheng Zi branch node carry out Detection task item preset value is determining or modification, and selected Detection task item clicks monomer building and pre- After the actual measurement actual quantities cloth point diagram deposited, distributes to main duty executor and task assists executor;
S50, main duty executor and task assist executor to execute the actual measurement actual quantities task and submit;
Completed actual measurement actual quantities task is rejected in S60, actual measurement actual quantities people from taskings confirmation;
S70, query statistic summarize, achievement trend and rectification notify.
Optionally, S10 is specially:
S101, it summarizes to obtain in actual measurement actual quantities task library according to expert's field measurement actual quantities experience and universal standard specification Hold, which includes:Each node of actual measurement measurement item is determined by the sub- branch of engineering, determines actual measurement respectively under each node Actual quantities task items;
Minimum actual measurement number of regions is determined under S102, each actual measurement actual quantities task items, every region at least measures points, accidentally Poor standard and measurement explanation.
Optionally, S30 is specially:
S301, actual measurement actual quantities organizer, select system established construction unit monomer building, can carry out the first of the monomer building Beginningization setting;
S402, monomer building Initialize installation, it can be achieved that monomer building unit number, the number of plies, the floor amount etc. setting;
S503, it is above-mentioned be provided with after, when actual measurement actual quantities performer, when inputting the measured data at scene, so that it may straight Contact choosing set unit number or level number or family number etc., realize the data statistics in S70 content.
Optionally, S40 is specially:
People from taskings in S401, group enters the pc client of system, uploads actual measurement actual quantities cloth point diagram;
People from taskings in S402, group enters actual measurement actual quantities task library and presses the actual measurement actual quantities task in task library The sub- branch's node of engineering is selected;
S403, the pre- construction unit monomer building for carrying out actual measurement actual quantities is clicked, corresponding actual measurement described in selection mounting S401 is real Cloth point diagram is measured, the preset value determination for clicking Detection task item or modification are carried out, the selected each Detection task item that need to be carried out is distributed to Main duty executor and task assist executor.
Optionally, S50 is specially:
S501, the main duty executor for surveying actual quantities task and task assist executor, after the account for logging in oneself, it is seen that Oneself assigned task carries out checking for task items actual measurement actual quantities cloth each eyeball bit number of point diagram by interface prompt, carries out Field measurement, and clicking for actual measurement site units number or level number or family number is carried out, input the record of eyeball bit number and measured value Enter;
After S502, task assistance executor complete the task of oneself, task is submitted;
S503, main duty executor press " COPY " task frame after the task that receives assists executor to complete oneself task, The measurement task data that executor can be assisted to complete task copy in the measurement task detection of main duty executor;
S504, main duty executor submit the measurement data task of completion;
Whether S505, calculating measurement zone and measurement point are qualified, and show the result that survey calculation obtains.
Optionally, S60 is specially:
S601, actual measurement actual quantities people from taskings are in actual measurement actual quantities inner boundary, it is seen that the main duty executor for having distributed task is complete At the prompt of measurement task, the measurement task that is had been filed on is checked;If it is confirmed that the allocated task has been completed, Then follow the steps S602;If it is confirmed that the allocated task does not complete, S605 is thened follow the steps;
S602, actual measurement actual quantities people from taskings click " confirmation " task frame and carry out confirmation processing;When in actual measurement actual quantities task In there are the task when unqualified detection, is shown, there are unqualified detections, if issue rectification notice prompt;
S603, if you do not need to rectified and improved, then click "No", complete the confirmation to actual measurement actual quantities task;Survey actual quantities Task and result are automatically stored to cloud;
S604, it is rectified and improved if necessary, then clicks "Yes", enter rectification selection interface;It carries out that measurement zone need to be rectified and improved Selection, rectification unit and need the selection of unit which be sent a duplicate to, and propose rectification related request;After the completion of rectifying and improving unit, passes through and be For messaging of uniting to check person, check is qualified, and notice actual measurement actual quantities rectification task promoter enters rectification notice interface, carries out whole Change the pin item processing of problem;And the result after surveying actual quantities task and rectifying and improving is stored to cloud;
S605, actual measurement actual quantities people from taskings click " rejection " task frame and carry out rejection processing;Reason is rejected in write-in, is determined After submitted;
S606, main duty executor and task assist executor to receive the rejected reason of task, and can be surveyed as required The corrective of amount task is implemented, and after implementing measurement task as required, carries out the submission of the measurement task again.
Optionally, S70 is specially:
S701, the actual measurement actual quantities task item data according to organizer's confirmation of actual measurement actual quantities task, system can automatically will be each Task item data is stored in cloud, when inquirer's click " statistical report form ", " achievement trend ", " rectification notice ", can be automatically performed Survey the automatic counting statistics of actual quantities confirmation data and the aggregate query of statistical data;
" project survey data statistics " is realized in S702, " statistical report form " inquiry:In monomer building, by unit or layer or layer family, Detection project, measurement unit and the period of measurement, each detection project specifically detects point Qualification, qualification rate summarizes Statistics, is shown with table and bar graph form;
" project collect statistics " are realized in S703, " statistical report form " inquiry:In monomer building, by unit or layer or layer family, detection The qualified total points of project, detection, measurement unit and the period of measurement, each detection project and check item and unqualified total point Several and qualification rate statistics;And detection time section is pressed, and between each monomer building of the Project Unit engineering of statistics, detection project, inspection The qualified points of actual measurement of item are surveyed, the actual measurement actual quantities collect statistics that the total points of actual measurement and qualification rate compare, with table and column figure Formula is shown;
" group's level collect statistics ", " regional level collect statistics " and " item layer are realized in S704, " statistical report form " inquiry Grade collect statistics ":It by each department company, projects, each bid section and respectively detects unit, carries out above-mentioned each comparative run, check item Mesh, detection and time interval section survey the collect statistics of actual quantities qualification rate and the comparison ranking that homogeneous data is mutual, with table Lattice and bar graph form are shown;
" group's level trend ", " regional level trend " and " project level trend " is realized in S705, " achievement trend " inquiry Display by each department company, projects, each bid section and respectively detects unit, carry out each comparative run, inspection item, detection, each Interval division and section number variation tendency and the mutual comparison ranking of homogeneous data are shown;
Each monomer building actual measurement actual quantities nonconformance rectification notice of construction unit of S706, " rectification notice " inquiry realization project The collect statistics of situation are shown.
Optionally, in S20, the people from taskings includes construction unit project line manager and the above persons, management list Position chief inspector and unit in charge of construction Deputy Project Manager, chief engineer and the above persons, and by above-noted persons, in team management setting, if It is set to band " ★ " personnel.
The present invention solves technical problem and adopts the following technical scheme that:A kind of storage medium is stored with program, described program For executing above-mentioned task interaction and data statistics management method.
The present invention has the advantages that:The present invention can realize in the work of actual measurement actual quantities through the above steps The collection and each side's interaction of actual quantities task data are surveyed, and can be realized quick counting statistics and the storage of measurement result, from Dynamic to generate statistical data, project manager can inquire the actual measurement various statistical results of actual quantities, avoid using excel file, mail The cumbersome work such as transmission and manual entry statistics realizes the accurate inquiry, traceable and survey actual quantities of measurement point position and data The automatical and efficient filing of data, statistics.
Detailed description of the invention
Fig. 1 is task interaction and data statistics management method flow chart of the invention;
Specific embodiment
Technical solution of the present invention is further elaborated below with reference to examples and drawings.
Embodiment 1
A kind of interaction of task and data statistics management method are present embodiments provided, is surveyed in especially a kind of engineering management The task interaction of actual quantities and data statistics management method comprising:
S10, actual measurement actual quantities task library content is established;
The actual measurement actual quantities task library content of foundation is summarized by expert according to field measurement actual quantities experience and universal standard specification Each node that actual measurement measurement item is determined by the sub- branch of engineering, actual measurement actual quantities task items are determined respectively under each node, after being detailed in " embodiment 2 ".It has been determined that minimum actual measurement number of regions, every region at least measure points, error under each actual measurement actual quantities task items Standard, and measurement explanation (guide of actual measurement actual quantities method).
In the present embodiment, described foundation actual measurement actual quantities task library (S10) content is specifically included:
S101, the actual measurement actual quantities task library content summarized according to expert's field measurement actual quantities experience and universal standard specification, The task library content includes:Each node of actual measurement measurement item is determined by the sub- branch of engineering, determines that actual measurement is real respectively under each node Measure task items;
Minimum actual measurement number of regions is determined under S102, each actual measurement actual quantities task items, every region at least measures points, accidentally Poor standard and measurement explanation.
S20, staff group is established.
In the present embodiment, to realize the actual measurement actual quantities in engineering management, it should be established first by actual measurement actual quantities taskings people Staff group may include construction unit project line manager and following personnel, management list in the staff group Position chief inspector and following personnel and unit in charge of construction project manager, chief engineer and following personnel;Meanwhile establishing the use of the staff group (actual measurement actual quantities people from taskings) can be managed the member in group at family, such as staff in deletion group, addition New staff, or after this surveys actual quantities task, which is dismissed.
S30, actual measurement actual quantities people from taskings establish actual measurement actual quantities construction unit model;
Actual quantities people from taskings is surveyed, system established construction unit monomer building is selected, Initialize installation is clicked, can press Unit number, the number of plies, the floor amount etc. in monomer building are configured in design and construction drawing, after being provided with, can show that this is arranged The each unit in monomer building, floor, every layer of family model.When actual measurement actual quantities performer, when inputting the measured data at scene, so that it may The unit number or level number or family number etc. in set model are directly clicked, realizes that the data statistics in S70 content summarizes and looks into It askes.
People from taskings in S40, group enters task library, by the actual measurement actual quantities task in task library, by engineering point Portion's node carries out the preset value determination or modification of Detection task item, and selected Detection task item, distributes to main duty executor and Ren Executor is assisted in business;Actual quantities task will be surveyed and distribute to main duty executor or main duty executor and task assistance executor.
All bands " ★ " member in group can enter respective task library, carry out surveying actual quantities task under node Distribution, and the selection that monomer building, main duty executor and task assist executor and deadline requirement is carried out by interface prompt, it can To be reset to related measurement data or standard etc..
In the present embodiment, before actual measurement task distribution, it is clear to comb the process that field measurement actual quantities works, by each section Task under point is combed by " the actual measurement general judgment criteria of actual quantities ", carries out actual measured value and standard value is compared or ties The formula that fruit determines is set, and the calculation formula under different node tasks is different.
The task library is by actual measurement actual quantities node tasks detection in it, for the distribution and measured data of panelists Acquisition and calculating, and the judgement for carrying out measurement result is shown.
Specifically, S40 may include:
People from taskings in S401, group enters the pc client of system, uploads actual measurement actual quantities cloth point diagram;
People from taskings in S402, group enters actual measurement actual quantities task library and presses the actual measurement actual quantities task in task library The sub- branch's node of engineering is selected;
S403, the pre- construction unit monomer building for carrying out actual measurement actual quantities is clicked, corresponding actual measurement described in selection mounting S401 is real Cloth point diagram is measured, the preset value determination for clicking Detection task item or modification are carried out, the selected each Detection task item that need to be carried out is distributed to Main duty executor and task assist executor.
Moreover, by third party's drawing application software, measuring actual measurement actual quantities drawing measurement needed for task items in S401 The mark at position, and by login system pc client, carry out the upload of the actual measurement actual quantities cloth point diagram.
In S303, by mobile phone terminal, people from taskings in group carries out corresponding real when carrying out the distribution of task detection Clicking for actual quantities cloth point diagram is surveyed, to help field measurement task execution people accurately to view the number feelings of actual measurement each point of task items Condition, by actual measurement actual quantities cloth point diagram measurement point position number carry out position and measured value typing, for subsequent measurement data statistics and Accurate inquiry, retrospect provide may.
S50, main duty executor and task assist executor to execute the actual measurement actual quantities task and submit.
The main duty executor for surveying actual quantities task and task assist executor, can be after the account for logging in oneself, in software Oneself assigned task is seen in the actual measurement actual quantities module of system, and the operation that executes of task is carried out by interface prompt, such as: Main duty executor can use the actual measurement actual quantities cloth point diagram of mounting, carries out the inquiry of eyeball bit number, clicks and modeled monomer The unit number or level number in building or family number, input the number of point and the data of live actual measurement, and main duty executor completes oneself Task after, measured data can be stored in Cloud Server by " submission " task frame, thus terminate it is main duty executor appoint Business.The task that task contributor in this way executes, the task can only submit to the main duty executor of task, and main duty executor is receiving , can be by " COPY " task frame after the completing oneself to task assistance executor of the task, the measurement for assisting executor to complete task Task data copies to measurement task lane database (the i.e. measurement zone quantity conjunction of completion measurement task data of main duty executor And).The measurement data task of completion is submitted by main duty executor.After submitting measurement task, system can be surveyed automatically Measure area and measurement point whether He Ge calculating, and show the result etc. that survey calculation obtains.
In the present embodiment, people from taskings in group can by survey actual quantities task distribute to oneself or group its He is member, when the actual measurement actual quantities task is distributed to oneself, can complete actual measurement actual quantities as main duty executor by oneself and appoint The execution of business.
Completed actual measurement actual quantities task is rejected in S60, actual measurement actual quantities people from taskings confirmation, and to not conforming to, lattice point execution is whole Change notice pin item.
Surveying actual quantities people from taskings can be in actual measurement actual quantities inner boundary, it is seen that the main duty executor for having distributed task completes The prompt of measurement task, the measurement task being had been filed on are checked.Determine that task is completed, the measurement task that can be completed is true Recognize or rejection is handled.
If carrying out confirmation processing, after clicking " confirmation ", prompting actual measurement actual quantities task, there are unqualified measurement zones, if It carries out issuing rectification notice;" rectification notice " is mainly mentioned by the judgement result of measurement data in " task library " and system-computed When friendship, the requirement whether automatic prompt is rectified and improved, the content for the carry out quality problems rectification item that storage is determined by organizer, and By the feedback after rectification, the processing of problem pin item can be carried out, and cloud storage is carried out to above-mentioned data.It is as logical in needed to issue rectification Know, after clicking "Yes", after system enters rectification selection interface, the selection that need to rectify and improve measurement zone can be carried out, unit is rectified and improved and need The selection of unit which be sent a duplicate to;And be proposed that rectification related request etc..After the completion of rectifying and improving unit, check can be sent to by system message People, check is qualified, and actual measurement actual quantities rectification task promoter can be notified to enter rectification notice interface, carried out at the pin item of rectification problem Reason.Rectification requires if there is no problem, can click "No", completes the confirmation to actual measurement actual quantities task.Survey actual quantities task and result certainly Cloud is arrived in dynamic storage.
If progress " rejection " is handled, after clicking " rejection ", write-in can be prompted to reject reason, be submitted after determining.It submits Afterwards, the reason that the task that receives is rejected by the main duty executor of this task, and the corrective that can as required, measure task is real It applies, after implementing measurement task as required, carries out the submission of the measurement task again.
S70, confirm data statistics summarize, achievement trend and rectification notice inquiry, generate statistical report form, achievement trend, Rectification notice summarizes.
When measurement task complete, and by actual measurement actual quantities people from taskings confirmation after, when click menu in " statistical report form " Or " achievement trend (there must be at least two measurement results in different time periods) " or " rectification notice " etc., it can be by system Prompt carries out the inquiry etc. of the statistical results such as relevant time period or measuring phases item.And according to the statistical result of inquiry or compare knot Fruit compares ranking, carries out the inquiry of ASSOCIATE STATISTICS summarized results or achievement trend and compares ranking, carries out matter to quality management person The analysis of amount problem improves or control administrative decision provides reference etc..
" statistical report form " and " achievement trend " is mainly to carry out collect statistics to the measured data in " task library ", is led to Each phasic results tendency chart is crossed to differentiate the sustained improvement situation of quality activity, provides related foundation for policymaker.
Specifically, according to actual measurement actual quantities task organizer confirmation actual measurement actual quantities task item data, system can automatically by Each task item data is stored in cloud, can be automatic complete when inquirer's click " statistical report form ", " achievement trend ", " rectification notice " At the automatic counting statistics of actual measurement actual quantities confirmation data and the aggregate query of statistical data.
" statistical report form " inquiry is, it can be achieved that " project survey data statistics ", i.e., in monomer building, by unit or layer or layer family, Detection project, measurement unit, period of measurement etc., each detection project specifically detects the remittance of point Qualification, qualification rate Total statistics.It is shown with table and bar graph form.
" statistical report form " inquiry that is, in monomer building, by unit or layer or layer family, detects, it can be achieved that " project collect statistics " The qualified total points of project, detection, measurement unit, period of measurement etc., each detection project and check item and unqualified total point Several and qualification rate statistics;And detection time section is pressed, and between each monomer building of the Project Unit engineering of statistics, detection project, inspection Survey the qualified points of actual measurement of item, the actual measurement actual quantities collect statistics that the total points of actual measurement and qualification rate compare.With table and column figure Formula is shown.
" statistical report form " is inquired, it can be achieved that " group's level collect statistics ", " regional level collect statistics " and " project level Collect statistics " carry out above-mentioned each comparative run, check item that is, by each department company, projects, each bid section, each detection unit etc. Mesh, detection, time interval section wait the collect statistics and the mutual comparison ranking of homogeneous data of actual measurement actual quantities qualification rate.With Table and bar graph form are shown.
" achievement trend " inquiry is, it can be achieved that " group's level trend ", " regional level trend " and " project level trend " is aobvious Show, i.e., by each department company, projects, each bid section, each detection unit etc., carries out each comparative run, inspection item, detection, each The display of interval division and section number variation tendency and the mutual comparison ranking of homogeneous data etc..
" rectification notice " inquiry is, it can be achieved that each monomer building actual measurement actual quantities nonconformance rectification notice feelings of the construction unit of project The collect statistics of condition are shown.
The present invention can realize each side's interaction in the work of actual measurement actual quantities through the above steps, and can be realized measurement As a result quick counting statistics and storage realize the accurate inquiry and trackability of measurement point position and data.
Embodiment 2
Based on identical design, task interaction and the statistics pipe that actual quantities is surveyed in a kind of engineering management are present embodiments provided Manage device comprising:
Group establishes module, establishes staff group for surveying actual quantities taskings people, similarly, the work people Member may include construction unit project line manager and following personnel, supervisor chief inspector and following personnel and unit in charge of construction's project Manager, chief engineer and following personnel;Meanwhile survey actual quantities people from taskings can also be established by group module in group at Member is managed, such as staff in deletion group, adds new staff, or terminate in this actual measurement actual quantities task Afterwards, which is dismissed.
Task library distribution module, the actual measurement actual quantities task library summarized according to field measurement actual quantities experience and universal standard specification Content instructs to survey actual quantities task for distributing, and in the present embodiment, people from taskings in group enters task library, is saved The distribution of the lower actual measurement actual quantities task of point, so that actual measurement actual quantities task is distributed to main duty executor and task assistance executor.
In the present embodiment, before actual measurement task distribution, it is clear to comb the process that field measurement actual quantities works, by each section Task under point is combed by " the actual measurement general judgment criteria of actual quantities ", carries out actual measured value and standard value is compared or ties The formula that fruit determines is set, and the calculation formula under different node tasks is different.
The actual measurement actual quantities task library is the actual measurement summarized according to expert's field measurement actual quantities experience and universal standard specification Actual quantities content inside enumerates actual measurement actual quantities node tasks detection content and measurement explanation, and most according to engineering measurement actual quantities Good statistical requirements, detection points are provided (system in the actual measurement area quantity and each actual measurement area to every batch of Detection task Default).
Surveying actual quantities task library content, totally ten six nodes, 120 actual measurement actual quantities task items specifically include:
Node 1:Concrete structure engineering has 7 Detection task items (wall/column cross-section size deviation;Wall/sleeper surface is flat Whole degree;Wall/column verticality;Top plate levelness is very poor;Slab thickness deviation;Concrete perception;Construction control line setting).
Node 2:Masonry project has 7 Detection task item (surface smoothness;Verticality;Squareness;Outer door-window opening ruler Very little deviation (height);Outer door-window opening dimensional discrepancy (width);Important prefabricated or site concrete;Build process).
Node 3:Hydropower installation set aside pre-embedded engineering has 6 Detection task items (pedestal toilet reserved drainpipe pitch-row deviation;It builds Body metope feed pipe secretly buries;Concrete building plate and concrete metope feed pipe secretly bury;Family distribution box/weak current comprehensive case absolute altitude deviation;Same room Interior back box elevation difference;Masonry wall conduit secretly buries).
Node 4:Plastering engineering has 24 Detection task item (surface of wall flatness;Degree of gravity vertical forwall surface;Interior net storey height is inclined Difference;Top plate levelness is very poor;Yin-yang angle is upright;Crack/hollowing;Room standard width of a room in an old-style house deviation;Room depth deviation;Squareness;Ground Surface smoothness;Ground level is very poor;Indoor door opening dimensional height deviation;Indoor door opening dimension width deviation;Indoor door opening ruler Very little wall thickness deviation;Thickness of wall body is very poor on the inside of outer wall window;It drops in plate (kitchen);It drops plate (toilet);With house type with kitchen and toilet pipe Well dimensional discrepancy (hard-cover room);With house type with kitchen and bath's window bottom frame absolute altitude deviation (hard-cover room);With house type with kitchen and bath's window side frame wall away from Deviation (hard-cover room) cabinet body is embedded in position dimensional discrepancy (height) (hard-cover room);It is (hard-cover that cabinet body is embedded in position dimensional discrepancy (width) Room);With house type with kitchen and toilet standard width of a room in an old-style house deviation (hard-cover room);With house type with kitchen and toilet depth deviation (hard-cover room)).
Node 5:Waterproofing work has 5 Detection task item (toilet coating thickness;Outer lining coating thickness;Toilet Additional waterproofing layer;The anti-bank waterproof such as toilet, air-conditioning plate, flue, pipe root is high;Toilet floor drain setting);
Node 6:Coating engineering (contains furred ceiling), there is 7 Detection task item (metope surface smoothness;Degree of gravity vertical forwall surface;Yin-yang Angle Founder (coating engineering);Ceiling (furred ceiling) levelness is very poor (coating engineering);Ceiling surface flatness (flat furred ceiling engineering);It hangs Apical grafting stitches difference of height (flat furred ceiling engineering);Crack/hollowing (coating engineering or brushing gypsum surface layer)).
Node 7:Metope is surface-veneer engineered, there is 10 Detection task items (surface smoothness (metope tapestry brick engineering);Verticality (metope tapestry brick engineering);Yin-yang angle Founder (metope tapestry brick engineering);Seam difference of height (metope tapestry brick engineering);Crack/ Hollowing (metope tapestry brick engineering);Surface smoothness (inner wall finishing plate engineering);Verticality (inner wall finishing plate engineering);Yin-yang angle Upright (inner wall finishing plate engineering);Seam difference of height (inner wall finishing plate engineering);Joint gap (inner wall finishing plate engineering)).
Node 8:Ground tapestry brick engineering has 3 Detection task items (surface smoothness (among big room plus a bit);It connects It stitches difference of height (ground tapestry brick engineering);Crack/hollowing (ground tapestry brick engineering)).
Node 9:Interior door installing engineering has 3 Detection task items (doorframe front verticality (interior door);Door leaf with Stay slit width degree (interior door) in ground;Slit width degree (kitchen and bath's door) is stayed on door leaf and ground).
Node 10:Aluminium alloy (or plastic-steel) erection of doors and windows engineering has 6 Detection task items (profile piece width (aluminium alloy Door and window);Profile piece difference of height (aluminium alloy-plastic-steel door and window);Aluminium alloy door or window frame front vertical degree (aluminium alloy-Plastic steel door Window);Sash fixes (aluminium alloy-plastic-steel window);Outline border outer surface waterproof layer (aluminium alloy-plastic-steel window);Frame closes up and stuff up a crack (aluminium alloy-plastic-steel window)).
Node 11:Timber floor installing engineering, having 5 Detection task items, ((reinforcing is compound, solid wood is compound, real for surface smoothness Timber floor);Floor gap width (solid wood compound, solid wooden floor board);Floor gap difference of height (solid wood compound, solid wooden floor board);Ground Plate levelness is very poor (reinforcing is compound, solid wood is compound, solid wooden floor board);(reinforcing is compound, solid wood is multiple for slit width between skirting and surface layer Close, solid wooden floor board)).
Node 12:Alien invasion has 9 Detection task items (outdoor furring brick facade verticality;Outdoor furring brick surfacing Degree;Outdoor furring brick yin-yang angle is upright;Alien invasion stone material seam difference of height;Alien invasion stone surface flatness (smooth surface);It is outer vertical Face stone surface flatness (pitted skin);Alien invasion glue-line perception;Alien invasion aluminium sheet seam difference of height;Alien invasion aluminium sheet piece is wide Degree).
Node 13:Roofworks has 5 Detection task item (slopes of roof;Roofing water falls a mouthful gradient;Parapet of roofing is high Degree;Parapet of roofing bears down on one the gradient;Exhaust pipe flashing construction).
Node 14:Ventilation and draining installing engineering, there is 6 Detection task item (damping noise reductions of Ventilator Room equipment;Wind system Heat preservation;Drainpipe deodorization;The installation of drainage ventilation pipe;Sewage pipe transverse tube drainage grade;Rain pipe transverse tube drainage grade).
Node 15:Electrical and intelligent building engineering has 14 Detection task items (same room switch socket distance, height difference;And Column panel height deviation (hard-cover is used);Lamp installation;Jack connector phase sequence;Lightning rod, band installation;Changed into switchhouse and power distribution station; Instrument installation;Fire fighting detector;Video camera installation;Manual fire alarm call point installation;The installation of fire light alarm device;Security protection prison Control system cabinet, console installation;Light current gantry, spool;The laying of light current cable, equipment installation).
Node 16:Fire-fighting has 3 Detection task items (fire hydrant box cabinet verticality;Fire hydrant bolt open height (1100mm);Standpipe and transverse tube bracket at fire hydrant cabinet).
Submit module, for main duty executor and task assistance executor execute the actual measurement actual quantities task after, will be complete At measurement data submit.The main duty executor for surveying actual quantities task in the present embodiment and task assist executor, can log in After the account of oneself, oneself assigned task is seen in the actual measurement actual quantities module of software systems, and carry out by interface prompt Task executes operation, such as:The upload of mark drawing photo needed for task items can be measured;By mark figure point and The data of live actual measurement carry out accurate typing as required.After task assistance executor completes the task of oneself, it can press Task is assisted data measured by executor to be stored in Cloud Server by " submission " task frame, so that the assistance that ends task executes The task of people.It is main to blame executor after the task that receives assists executor to complete the task of oneself, can be by " COPY " task frame, it will The measurement task lane database that the measurement task data that task assists executor to complete copy to main duty executor (completes measurement The measurement zone quantity of task data merges).The measurement data task of completion is submitted by main duty executor.Measurement is submitted to appoint After business, system can measure automatically area and measurement point whether He Ge calculating, and show the result etc. that survey calculation obtains.
Confirmation module executes rectification notice pin to lattice point is not conformed to for confirming or rejecting completed actual measurement actual quantities task ?.In the present embodiment, actual measurement actual quantities people from taskings can be in actual measurement actual quantities inner boundary, it is seen that has distributed task execution people and has completed The prompt of measurement task, the measurement task being had been filed on are checked.Determine that task is completed, the measurement task that can be completed is true Recognize or rejection is handled.
If carrying out confirmation processing, after clicking " confirmation ", prompting actual measurement actual quantities task, there are unqualified measurement zones, if It carries out issuing rectification notice;" rectification notice " is mainly mentioned by the judgement result of measurement data in " task library " and system-computed When friendship, the requirement whether automatic prompt is rectified and improved, the content for the carry out quality problems rectification item that storage is determined by organizer, and By the feedback after rectification, the processing of problem pin item can be carried out, and cloud storage is carried out to above-mentioned data.It is as logical in needed to issue rectification Know, after clicking "Yes", after system enters rectification selection interface, the selection that need to rectify and improve measurement zone can be carried out, unit is rectified and improved and need The selection of unit which be sent a duplicate to;And be proposed that rectification related request etc..After the completion of rectifying and improving unit, check can be sent to by system message People, check is qualified, and actual measurement actual quantities rectification task promoter can be notified to enter rectification notice interface, carried out at the pin item of rectification problem Reason.Rectification requires if there is no problem, can click "No", completes the confirmation to measurement task.Measurement task is automatically stored to cloud.
If progress " rejection " is handled, after clicking " rejection ", write-in can be prompted to reject reason, be submitted after determining.It submits Afterwards, the reason that the task that receives is rejected by the main duty people of this task, and the corrective that can as required, measure task is implemented, and presses It is required that carrying out the submission of the measurement task again after implementing measurement task.
Statistical module, for confirming that the statistics of data summarizes, achievement trend and rectification notice are inquired.
When measurement task is completed, and after being identified, when " statistical report form " clicked in menu or " achievement trend (must be deposited In at least two measurement results in different time periods) " or " rectification notice " etc., " project survey can be carried out by system prompt Data statistics ", " project collect statistics ", " group's level collect statistics ", " regional level collect statistics " and " project level summarizes Statistics ", and " group's level trend ", " regional level trend ", " project level trend " display, by selecting construction unit list The unit or floor in body building or family, detection project, detection, measurement unit, measurement period or press each department company, items Mesh, each bid section, each detection unit etc., it is real to carry out the actual measurements such as above-mentioned each comparative run, inspection item, detection, time interval section It measures the inquiries of data summarizations statistical result such as qualification rate and compares ranking.And compared according to the statistical result or comparison result of inquiry Ranking carries out analysis improvement or control administrative decision of quality problems etc..
Embodiment 3
The present embodiment provides a kind of storage mediums, are stored with program, described program is for executing described in embodiment 1 Task interaction and data statistics management method.
The sequencing of above embodiments is not only for ease of description, represent the advantages or disadvantages of the embodiments.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that:It still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (9)

1. a kind of task interaction and data statistics management method, which is characterized in that include the following steps:
S10, actual measurement actual quantities task library content is established;
S20, actual measurement actual quantities people from taskings establish staff group;
S30, actual measurement actual quantities people from taskings establish actual measurement actual quantities construction unit model;
People from taskings in S40, group enters actual measurement actual quantities task library, by the actual measurement actual quantities task in task library by engineering Branch's node carry out Detection task item preset value is determining or modification, and selected Detection task item clicks monomer building and prestores After surveying actual quantities cloth point diagram, distributes to main duty executor and task assists executor;
S50, main duty executor and task assist executor to execute the actual measurement actual quantities task and submit;
Completed actual measurement actual quantities task is rejected in S60, actual measurement actual quantities people from taskings confirmation;Unqualified test point is issued whole Change notice, recruiting unit executes rectification and replys, and check people confirms pin item;
S70, query statistic summarize, achievement trend and rectification notify.
2. task according to claim 1 interaction and data statistics management method, which is characterized in that S10 is specially:
S101, it summarizes to obtain actual measurement actual quantities task library content according to expert's field measurement actual quantities experience and universal standard specification, it should Task library content includes:Each node of actual measurement measurement item is determined by the sub- branch of engineering, determines actual measurement actual quantities respectively under each node Task items;
Minimum actual measurement number of regions is determined under S102, each actual measurement actual quantities task items, every region at least measures points, error mark Quasi- and measurement explanation.
3. task according to claim 1 interaction and data statistics management method, which is characterized in that S30 is specially:
S301, actual measurement actual quantities organizer, select system established construction unit monomer building, can carry out the initialization in the monomer building Setting;
S402, monomer building Initialize installation, it can be achieved that monomer building unit number, the number of plies, the floor amount etc. setting;
S503, it is above-mentioned be provided with after, when actual measurement actual quantities performer, input scene measured data when, so that it may direct point Choosing set unit number or level number or family number etc., realize the data statistics in S70 content.
4. task according to claim 1 interaction and data statistics management method, which is characterized in that S40 is specially:
People from taskings in S401, group enters the pc client of system, uploads actual measurement actual quantities cloth point diagram;
People from taskings in S402, group enters actual measurement actual quantities task library, by the actual measurement actual quantities task in task library, by engineering Sub- branch's node is selected;
S403, the pre- construction unit monomer building for carrying out actual measurement actual quantities, corresponding actual measurement actual quantities cloth described in selection mounting S401 are clicked Point diagram, carries out the preset value determination for clicking Detection task item or modification, and the selected each Detection task item that need to be carried out distributes to main duty Executor and task assist executor.
5. task according to claim 1 interaction and data statistics management method, which is characterized in that S50 is specially:
S501, the main duty executor for surveying actual quantities task and task assist executor, after the account for logging in oneself, it is seen that oneself Assigned task carries out checking for task items actual measurement actual quantities cloth each eyeball bit number of point diagram by interface prompt, carries out scene Actual measurement, and clicking for actual measurement site units number or level number or family number is carried out, input the typing of eyeball bit number and measured value;
After S502, task assistance executor complete the task of oneself, task is submitted;
S503, main duty executor press " COPY " task frame after the task that receives assists executor to complete oneself task, can will The measurement task data that task assists executor to complete copy in the measurement task detection of main duty executor;
S504, main duty executor submit the measurement data task of completion;
Whether S505, calculating measurement zone and measurement point are qualified, and show the result that survey calculation obtains.
6. task according to claim 1 interaction and data statistics management method, which is characterized in that S60 is specially:
S601, actual measurement actual quantities people from taskings are in actual measurement actual quantities inner boundary, it is seen that the main duty executor for having distributed task completes The prompt of measurement task, the measurement task being had been filed on are checked;If it is confirmed that the allocated task has been completed, then hold Row step S602;If it is confirmed that the allocated task does not complete, S605 is thened follow the steps;
S602, actual measurement actual quantities people from taskings click " confirmation " task frame and carry out confirmation processing;It is deposited when in actual measurement actual quantities task In unqualified detection, showing the task, there are unqualified detections, if issues the prompt of rectification notice;
S603, if you do not need to rectified and improved, then click "No", complete the confirmation to actual measurement actual quantities task;Survey actual quantities task Cloud is automatically stored to result;
S604, it is rectified and improved if necessary, then clicks "Yes", enter rectification selection interface;Need to rectify and improve the choosing of measurement zone It selects, rectification unit and the selection for needing unit which be sent a duplicate to, and proposes rectification related request;After the completion of rectifying and improving unit, disappeared by system Breath sends check person to, and check is qualified, and notice actual measurement actual quantities rectification task promoter enters rectification notice interface, carries out rectification and asks The pin item of topic is handled;And the result after surveying actual quantities task and rectifying and improving is stored to cloud;
S605, actual measurement actual quantities people from taskings click " rejection " task frame and carry out rejection processing;Reason is rejected in write-in, is determined laggard Row is submitted;
S606, main duty executor and task assist executor to receive the rejected reason of task, and can measure and appoint as required The corrective of business is implemented, and after implementing measurement task as required, carries out the submission of the measurement task again.
7. task according to claim 1 interaction and data statistics management method, which is characterized in that S70 is specially:
S701, the actual measurement actual quantities task item data confirmed according to the organizer of actual measurement actual quantities task, system can be automatically by each task Item data stores beyond the clouds, when inquirer's click " statistical report form ", " achievement trend ", " rectification notice ", can be automatically performed actual measurement Actual quantities confirms the automatic counting statistics of data and the aggregate query of statistical data;
" project survey data statistics " is realized in S702, " statistical report form " inquiry:In monomer building, by unit or layer or layer family, detection Project, measurement unit and the period of measurement, each detection project specifically detects point Qualification, qualification rate summarizes system Meter, is shown with table and bar graph form;
" project collect statistics " are realized in S703, " statistical report form " inquiry:In monomer building, by unit or layer or layer family, detection project, The qualified total points of detection, measurement unit and the period of measurement, each detection project and check item and unqualified total points, and The statistics of qualification rate;And press detection time section, and between each monomer building of the Project Unit engineering of statistics, detection project, detection The actual measurement actual quantities collect statistics that the qualified points of actual measurement, the total points of actual measurement and qualification rate compare, are shown with table and bar graph form;
S704, " statistical report form " inquiry realize " group's level collect statistics ", " regional level collect statistics " and " project level is converged Total statistics ":It by each department company, projects, each bid section and respectively detects unit, carries out above-mentioned each comparative run, inspection item, inspection Survey the collect statistics and the mutual comparison ranking of homogeneous data of item and time interval section actual measurement actual quantities qualification rate, with table and Bar graph form is shown;
" group's level trend ", " regional level trend " and " project level trend " display is realized in S705, " achievement trend " inquiry, By each department company, projects, each bid section and respectively unit is detected, carries out each comparative run, inspection item, detection, each section The comparison ranking mutual with section number variation tendency and homogeneous data is divided to show;
Each monomer building actual measurement actual quantities nonconformance rectification notice situation of construction unit of S706, " rectification notice " inquiry realization project Collect statistics show.
8. task interaction according to claim 1 and data statistics management method, which is characterized in that in S20, the task Organizer includes construction unit project line manager and the above persons, supervisor chief inspector and unit in charge of construction Deputy Project Manager, total Work and the above persons, and by above-noted persons, in team management setting, it is arranged to band " ★ " personnel.
9. a kind of storage medium, be stored with program, described program for perform claim require the interaction of task described in 1-8 and Data statistics management method.
CN201810266715.XA 2018-03-28 2018-03-28 Task interaction and data statistics management method and storage medium Pending CN108830539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810266715.XA CN108830539A (en) 2018-03-28 2018-03-28 Task interaction and data statistics management method and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810266715.XA CN108830539A (en) 2018-03-28 2018-03-28 Task interaction and data statistics management method and storage medium

Publications (1)

Publication Number Publication Date
CN108830539A true CN108830539A (en) 2018-11-16

Family

ID=64155282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810266715.XA Pending CN108830539A (en) 2018-03-28 2018-03-28 Task interaction and data statistics management method and storage medium

Country Status (1)

Country Link
CN (1) CN108830539A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109697183A (en) * 2018-11-30 2019-04-30 杭州丁卯智能科技有限公司 The management method of actual quantities is surveyed in a kind of work progress

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105761010A (en) * 2016-02-24 2016-07-13 国网山东省电力公司 Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition
CN107423886A (en) * 2017-06-29 2017-12-01 中国建筑局(集团)有限公司 Engineering data management by synchronization system and management method based on Track Table
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN107818198A (en) * 2017-09-27 2018-03-20 中建三局基础设施工程有限公司 A kind of science of bridge building management platform based on BIM technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105761010A (en) * 2016-02-24 2016-07-13 国网山东省电力公司 Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition
CN107423886A (en) * 2017-06-29 2017-12-01 中国建筑局(集团)有限公司 Engineering data management by synchronization system and management method based on Track Table
CN107818198A (en) * 2017-09-27 2018-03-20 中建三局基础设施工程有限公司 A kind of science of bridge building management platform based on BIM technology
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王鼎盛: ""上海电力电缆公司施工质量管理系统设计与实现"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *
邹礼礼: ""协同设计方法在房产测绘管理中的应用与研究"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109697183A (en) * 2018-11-30 2019-04-30 杭州丁卯智能科技有限公司 The management method of actual quantities is surveyed in a kind of work progress

Similar Documents

Publication Publication Date Title
CN107871193A (en) The task exchange method and device of actual quantities are surveyed in engineering management
CN108108543A (en) A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology
CN109559086A (en) Checking method, device and terminal device based on BIM light weighed model
US20210065259A1 (en) Method, system and computer program product for selecting and tracking a service provider in response to a customer request
Dalton Australian suburban house building: industry organisation, practices and constraints
CN112507442A (en) BIM project material and engineering cost statistical method
JP5490940B2 (en) Information processing apparatus, data structure, information processing method, and program
CN112800513A (en) Method and device for automatically generating ground material based on room information
CN108830539A (en) Task interaction and data statistics management method and storage medium
Pan et al. Problematic interfaces and prevention strategies in modular construction
Zimmermann et al. Early design stage building LCA using the LCAbyg tool: comparing cases for early stage and detailed LCA approaches
Nowogońska Proposal for determing the scale of renovation needs of residential buildings
Park et al. BIM application and adoption in the UK housing sector
De Silva et al. Maintainability approach for lean maintenance
CN108665128A (en) project management system
TWI576777B (en) Engineering management system
JP2016184427A (en) Process management system, management terminal, and method for managing process
Farah Review of current estimating capabilities of the 3D Building Information Model software to support design for production/construction
JP2013134686A (en) Process management system, management terminal, and process management method
Ting Optimisation of embodied energy in domestic construction
CN113269411A (en) Decoration system based on internet technology assembly decoration construction and convenient for customer quality inspection
Eroğlu Evaluation of the reliability of BIM-based quantity take-off processes in construction projects
KR20240001514A (en) Automatic finishing design system considering residential environment
Jaafar et al. Categorisation and Causes of Building Design Defect: A Case Study on Public Building Hospital
Xiao et al. A new approach to comparing the performance of contractors internationally

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116

RJ01 Rejection of invention patent application after publication