CN108830539A - Task interaction and data statistics management method and storage medium - Google Patents
Task interaction and data statistics management method and storage medium Download PDFInfo
- Publication number
- CN108830539A CN108830539A CN201810266715.XA CN201810266715A CN108830539A CN 108830539 A CN108830539 A CN 108830539A CN 201810266715 A CN201810266715 A CN 201810266715A CN 108830539 A CN108830539 A CN 108830539A
- Authority
- CN
- China
- Prior art keywords
- task
- actual
- measurement
- actual measurement
- quantities
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 31
- 230000003993 interaction Effects 0.000 title claims abstract description 25
- 238000005259 measurement Methods 0.000 claims abstract description 271
- 238000012790 confirmation Methods 0.000 claims abstract description 22
- 238000001514 detection method Methods 0.000 claims description 71
- 239000000178 monomer Substances 0.000 claims description 30
- 238000010276 construction Methods 0.000 claims description 25
- 238000012797 qualification Methods 0.000 claims description 16
- 238000010586 diagram Methods 0.000 claims description 14
- 239000004744 fabric Substances 0.000 claims description 14
- 238000009434 installation Methods 0.000 claims description 13
- 238000012545 processing Methods 0.000 claims description 9
- 238000007689 inspection Methods 0.000 claims description 8
- 230000000052 comparative effect Effects 0.000 claims description 7
- 238000004364 calculation method Methods 0.000 claims description 6
- 238000012986 modification Methods 0.000 claims description 6
- 230000004048 modification Effects 0.000 claims description 6
- 210000005252 bulbus oculi Anatomy 0.000 claims description 5
- 230000008859 change Effects 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 abstract description 3
- 239000010410 layer Substances 0.000 description 12
- 239000011449 brick Substances 0.000 description 11
- 239000007787 solid Substances 0.000 description 9
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 7
- 229910052782 aluminium Inorganic materials 0.000 description 7
- 239000004411 aluminium Substances 0.000 description 7
- 150000001875 compounds Chemical class 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000011248 coating agent Substances 0.000 description 6
- 238000000576 coating method Methods 0.000 description 6
- 230000009545 invasion Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 239000002023 wood Substances 0.000 description 5
- 229910000838 Al alloy Inorganic materials 0.000 description 3
- 235000013399 edible fruits Nutrition 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 239000004575 stone Substances 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 238000012217 deletion Methods 0.000 description 2
- 230000037430 deletion Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000008447 perception Effects 0.000 description 2
- 239000002344 surface layer Substances 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 238000004332 deodorization Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229910052602 gypsum Inorganic materials 0.000 description 1
- 239000010440 gypsum Substances 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 238000000819 phase cycle Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/101—Collaborative creation, e.g. joint development of products or services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/16—Real estate
- G06Q50/165—Land development
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Economics (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of task interaction and data statistics management methods comprising establishes actual measurement actual quantities task library content and staff group;People from taskings in group enters actual measurement actual quantities task library, and the actual measurement actual quantities task in task library is distributed to main duty executor and task assists executor;Main duty executor and task assist executor to execute the actual measurement actual quantities task and submit;Completed actual measurement actual quantities task is rejected in actual measurement actual quantities people from taskings confirmation;Statistics summarizes, achievement trend and rectification notice are inquired.The present invention through the above steps can be in the work of actual measurement actual quantities, and it can be realized quick counting statistics and the storage of measurement result, automatically generate statistical data, project manager can inquire the actual measurement various statistical results of actual quantities, avoid the accurate inquiry that measurement point position and data are realized using cumbersome work such as excel file, mail transmission and manual entry statistics, traceable and actual measurement actual quantities data automatical and efficient filing, statistics.
Description
Technical field
The invention belongs to building fields, are related to a kind of interactive task and data statistics management method and storage medium, especially
It is related to surveying the task interaction of actual quantities and data statistics management method and storage medium in a kind of engineering management.
Background technique
In existing main real estate development corporation's exploration project, the inadequate unified standard of actual measurement actual quantities work.It is existing
Actual quantities way is surveyed, is construction site manual record mostly, the counting statistics table schema generated using excel office software,
Carry out typing, statistics and the calculating of field measurement actual quantities.The executor for surveying actual quantities task when need to survey at the scene, needs advanced
The drawings marked of row actual measurement area's point, takes the drawing marked, using paper, pen or electronic plane equipment, carries out field measurement
The record of value needs to return to arrangement and typing work that office carries out data after the completion.The circulation interaction of each side still relies on paper
The mail transmission for turning label or electronic document of matter file.The counting statistics table schema that existing excel office software generates, only
It is able to achieve the automatic calculating and statistics of preset table content.
Summary of the invention
It is an object of the present invention to provide in a kind of engineering management survey actual quantities task interaction and data statistics management method and
Storage medium, can be in the work of actual measurement actual quantities, and unified standard surveys actual quantities content and method, realizes each side's interaction, and
And it can be realized quick counting statistics and the storage of measurement result, realize the accurate inquiry of measurement point position and data and can be traced
Property.
The present invention solves technical problem and adopts the following technical scheme that:A kind of interaction of task and data statistics management method,
Include the following steps:
S10, actual measurement actual quantities task library content is established;
S20, actual measurement actual quantities people from taskings establish staff group;
S30, actual measurement actual quantities people from taskings establish actual measurement actual quantities construction unit model;
People from taskings in S40, group enters actual measurement actual quantities task library, and the actual measurement actual quantities task in task library is pressed work
Cheng Zi branch node carry out Detection task item preset value is determining or modification, and selected Detection task item clicks monomer building and pre-
After the actual measurement actual quantities cloth point diagram deposited, distributes to main duty executor and task assists executor;
S50, main duty executor and task assist executor to execute the actual measurement actual quantities task and submit;
Completed actual measurement actual quantities task is rejected in S60, actual measurement actual quantities people from taskings confirmation;
S70, query statistic summarize, achievement trend and rectification notify.
Optionally, S10 is specially:
S101, it summarizes to obtain in actual measurement actual quantities task library according to expert's field measurement actual quantities experience and universal standard specification
Hold, which includes:Each node of actual measurement measurement item is determined by the sub- branch of engineering, determines actual measurement respectively under each node
Actual quantities task items;
Minimum actual measurement number of regions is determined under S102, each actual measurement actual quantities task items, every region at least measures points, accidentally
Poor standard and measurement explanation.
Optionally, S30 is specially:
S301, actual measurement actual quantities organizer, select system established construction unit monomer building, can carry out the first of the monomer building
Beginningization setting;
S402, monomer building Initialize installation, it can be achieved that monomer building unit number, the number of plies, the floor amount etc. setting;
S503, it is above-mentioned be provided with after, when actual measurement actual quantities performer, when inputting the measured data at scene, so that it may straight
Contact choosing set unit number or level number or family number etc., realize the data statistics in S70 content.
Optionally, S40 is specially:
People from taskings in S401, group enters the pc client of system, uploads actual measurement actual quantities cloth point diagram;
People from taskings in S402, group enters actual measurement actual quantities task library and presses the actual measurement actual quantities task in task library
The sub- branch's node of engineering is selected;
S403, the pre- construction unit monomer building for carrying out actual measurement actual quantities is clicked, corresponding actual measurement described in selection mounting S401 is real
Cloth point diagram is measured, the preset value determination for clicking Detection task item or modification are carried out, the selected each Detection task item that need to be carried out is distributed to
Main duty executor and task assist executor.
Optionally, S50 is specially:
S501, the main duty executor for surveying actual quantities task and task assist executor, after the account for logging in oneself, it is seen that
Oneself assigned task carries out checking for task items actual measurement actual quantities cloth each eyeball bit number of point diagram by interface prompt, carries out
Field measurement, and clicking for actual measurement site units number or level number or family number is carried out, input the record of eyeball bit number and measured value
Enter;
After S502, task assistance executor complete the task of oneself, task is submitted;
S503, main duty executor press " COPY " task frame after the task that receives assists executor to complete oneself task,
The measurement task data that executor can be assisted to complete task copy in the measurement task detection of main duty executor;
S504, main duty executor submit the measurement data task of completion;
Whether S505, calculating measurement zone and measurement point are qualified, and show the result that survey calculation obtains.
Optionally, S60 is specially:
S601, actual measurement actual quantities people from taskings are in actual measurement actual quantities inner boundary, it is seen that the main duty executor for having distributed task is complete
At the prompt of measurement task, the measurement task that is had been filed on is checked;If it is confirmed that the allocated task has been completed,
Then follow the steps S602;If it is confirmed that the allocated task does not complete, S605 is thened follow the steps;
S602, actual measurement actual quantities people from taskings click " confirmation " task frame and carry out confirmation processing;When in actual measurement actual quantities task
In there are the task when unqualified detection, is shown, there are unqualified detections, if issue rectification notice prompt;
S603, if you do not need to rectified and improved, then click "No", complete the confirmation to actual measurement actual quantities task;Survey actual quantities
Task and result are automatically stored to cloud;
S604, it is rectified and improved if necessary, then clicks "Yes", enter rectification selection interface;It carries out that measurement zone need to be rectified and improved
Selection, rectification unit and need the selection of unit which be sent a duplicate to, and propose rectification related request;After the completion of rectifying and improving unit, passes through and be
For messaging of uniting to check person, check is qualified, and notice actual measurement actual quantities rectification task promoter enters rectification notice interface, carries out whole
Change the pin item processing of problem;And the result after surveying actual quantities task and rectifying and improving is stored to cloud;
S605, actual measurement actual quantities people from taskings click " rejection " task frame and carry out rejection processing;Reason is rejected in write-in, is determined
After submitted;
S606, main duty executor and task assist executor to receive the rejected reason of task, and can be surveyed as required
The corrective of amount task is implemented, and after implementing measurement task as required, carries out the submission of the measurement task again.
Optionally, S70 is specially:
S701, the actual measurement actual quantities task item data according to organizer's confirmation of actual measurement actual quantities task, system can automatically will be each
Task item data is stored in cloud, when inquirer's click " statistical report form ", " achievement trend ", " rectification notice ", can be automatically performed
Survey the automatic counting statistics of actual quantities confirmation data and the aggregate query of statistical data;
" project survey data statistics " is realized in S702, " statistical report form " inquiry:In monomer building, by unit or layer or layer family,
Detection project, measurement unit and the period of measurement, each detection project specifically detects point Qualification, qualification rate summarizes
Statistics, is shown with table and bar graph form;
" project collect statistics " are realized in S703, " statistical report form " inquiry:In monomer building, by unit or layer or layer family, detection
The qualified total points of project, detection, measurement unit and the period of measurement, each detection project and check item and unqualified total point
Several and qualification rate statistics;And detection time section is pressed, and between each monomer building of the Project Unit engineering of statistics, detection project, inspection
The qualified points of actual measurement of item are surveyed, the actual measurement actual quantities collect statistics that the total points of actual measurement and qualification rate compare, with table and column figure
Formula is shown;
" group's level collect statistics ", " regional level collect statistics " and " item layer are realized in S704, " statistical report form " inquiry
Grade collect statistics ":It by each department company, projects, each bid section and respectively detects unit, carries out above-mentioned each comparative run, check item
Mesh, detection and time interval section survey the collect statistics of actual quantities qualification rate and the comparison ranking that homogeneous data is mutual, with table
Lattice and bar graph form are shown;
" group's level trend ", " regional level trend " and " project level trend " is realized in S705, " achievement trend " inquiry
Display by each department company, projects, each bid section and respectively detects unit, carry out each comparative run, inspection item, detection, each
Interval division and section number variation tendency and the mutual comparison ranking of homogeneous data are shown;
Each monomer building actual measurement actual quantities nonconformance rectification notice of construction unit of S706, " rectification notice " inquiry realization project
The collect statistics of situation are shown.
Optionally, in S20, the people from taskings includes construction unit project line manager and the above persons, management list
Position chief inspector and unit in charge of construction Deputy Project Manager, chief engineer and the above persons, and by above-noted persons, in team management setting, if
It is set to band " ★ " personnel.
The present invention solves technical problem and adopts the following technical scheme that:A kind of storage medium is stored with program, described program
For executing above-mentioned task interaction and data statistics management method.
The present invention has the advantages that:The present invention can realize in the work of actual measurement actual quantities through the above steps
The collection and each side's interaction of actual quantities task data are surveyed, and can be realized quick counting statistics and the storage of measurement result, from
Dynamic to generate statistical data, project manager can inquire the actual measurement various statistical results of actual quantities, avoid using excel file, mail
The cumbersome work such as transmission and manual entry statistics realizes the accurate inquiry, traceable and survey actual quantities of measurement point position and data
The automatical and efficient filing of data, statistics.
Detailed description of the invention
Fig. 1 is task interaction and data statistics management method flow chart of the invention;
Specific embodiment
Technical solution of the present invention is further elaborated below with reference to examples and drawings.
Embodiment 1
A kind of interaction of task and data statistics management method are present embodiments provided, is surveyed in especially a kind of engineering management
The task interaction of actual quantities and data statistics management method comprising:
S10, actual measurement actual quantities task library content is established;
The actual measurement actual quantities task library content of foundation is summarized by expert according to field measurement actual quantities experience and universal standard specification
Each node that actual measurement measurement item is determined by the sub- branch of engineering, actual measurement actual quantities task items are determined respectively under each node, after being detailed in
" embodiment 2 ".It has been determined that minimum actual measurement number of regions, every region at least measure points, error under each actual measurement actual quantities task items
Standard, and measurement explanation (guide of actual measurement actual quantities method).
In the present embodiment, described foundation actual measurement actual quantities task library (S10) content is specifically included:
S101, the actual measurement actual quantities task library content summarized according to expert's field measurement actual quantities experience and universal standard specification,
The task library content includes:Each node of actual measurement measurement item is determined by the sub- branch of engineering, determines that actual measurement is real respectively under each node
Measure task items;
Minimum actual measurement number of regions is determined under S102, each actual measurement actual quantities task items, every region at least measures points, accidentally
Poor standard and measurement explanation.
S20, staff group is established.
In the present embodiment, to realize the actual measurement actual quantities in engineering management, it should be established first by actual measurement actual quantities taskings people
Staff group may include construction unit project line manager and following personnel, management list in the staff group
Position chief inspector and following personnel and unit in charge of construction project manager, chief engineer and following personnel;Meanwhile establishing the use of the staff group
(actual measurement actual quantities people from taskings) can be managed the member in group at family, such as staff in deletion group, addition
New staff, or after this surveys actual quantities task, which is dismissed.
S30, actual measurement actual quantities people from taskings establish actual measurement actual quantities construction unit model;
Actual quantities people from taskings is surveyed, system established construction unit monomer building is selected, Initialize installation is clicked, can press
Unit number, the number of plies, the floor amount etc. in monomer building are configured in design and construction drawing, after being provided with, can show that this is arranged
The each unit in monomer building, floor, every layer of family model.When actual measurement actual quantities performer, when inputting the measured data at scene, so that it may
The unit number or level number or family number etc. in set model are directly clicked, realizes that the data statistics in S70 content summarizes and looks into
It askes.
People from taskings in S40, group enters task library, by the actual measurement actual quantities task in task library, by engineering point
Portion's node carries out the preset value determination or modification of Detection task item, and selected Detection task item, distributes to main duty executor and Ren
Executor is assisted in business;Actual quantities task will be surveyed and distribute to main duty executor or main duty executor and task assistance executor.
All bands " ★ " member in group can enter respective task library, carry out surveying actual quantities task under node
Distribution, and the selection that monomer building, main duty executor and task assist executor and deadline requirement is carried out by interface prompt, it can
To be reset to related measurement data or standard etc..
In the present embodiment, before actual measurement task distribution, it is clear to comb the process that field measurement actual quantities works, by each section
Task under point is combed by " the actual measurement general judgment criteria of actual quantities ", carries out actual measured value and standard value is compared or ties
The formula that fruit determines is set, and the calculation formula under different node tasks is different.
The task library is by actual measurement actual quantities node tasks detection in it, for the distribution and measured data of panelists
Acquisition and calculating, and the judgement for carrying out measurement result is shown.
Specifically, S40 may include:
People from taskings in S401, group enters the pc client of system, uploads actual measurement actual quantities cloth point diagram;
People from taskings in S402, group enters actual measurement actual quantities task library and presses the actual measurement actual quantities task in task library
The sub- branch's node of engineering is selected;
S403, the pre- construction unit monomer building for carrying out actual measurement actual quantities is clicked, corresponding actual measurement described in selection mounting S401 is real
Cloth point diagram is measured, the preset value determination for clicking Detection task item or modification are carried out, the selected each Detection task item that need to be carried out is distributed to
Main duty executor and task assist executor.
Moreover, by third party's drawing application software, measuring actual measurement actual quantities drawing measurement needed for task items in S401
The mark at position, and by login system pc client, carry out the upload of the actual measurement actual quantities cloth point diagram.
In S303, by mobile phone terminal, people from taskings in group carries out corresponding real when carrying out the distribution of task detection
Clicking for actual quantities cloth point diagram is surveyed, to help field measurement task execution people accurately to view the number feelings of actual measurement each point of task items
Condition, by actual measurement actual quantities cloth point diagram measurement point position number carry out position and measured value typing, for subsequent measurement data statistics and
Accurate inquiry, retrospect provide may.
S50, main duty executor and task assist executor to execute the actual measurement actual quantities task and submit.
The main duty executor for surveying actual quantities task and task assist executor, can be after the account for logging in oneself, in software
Oneself assigned task is seen in the actual measurement actual quantities module of system, and the operation that executes of task is carried out by interface prompt, such as:
Main duty executor can use the actual measurement actual quantities cloth point diagram of mounting, carries out the inquiry of eyeball bit number, clicks and modeled monomer
The unit number or level number in building or family number, input the number of point and the data of live actual measurement, and main duty executor completes oneself
Task after, measured data can be stored in Cloud Server by " submission " task frame, thus terminate it is main duty executor appoint
Business.The task that task contributor in this way executes, the task can only submit to the main duty executor of task, and main duty executor is receiving
, can be by " COPY " task frame after the completing oneself to task assistance executor of the task, the measurement for assisting executor to complete task
Task data copies to measurement task lane database (the i.e. measurement zone quantity conjunction of completion measurement task data of main duty executor
And).The measurement data task of completion is submitted by main duty executor.After submitting measurement task, system can be surveyed automatically
Measure area and measurement point whether He Ge calculating, and show the result etc. that survey calculation obtains.
In the present embodiment, people from taskings in group can by survey actual quantities task distribute to oneself or group its
He is member, when the actual measurement actual quantities task is distributed to oneself, can complete actual measurement actual quantities as main duty executor by oneself and appoint
The execution of business.
Completed actual measurement actual quantities task is rejected in S60, actual measurement actual quantities people from taskings confirmation, and to not conforming to, lattice point execution is whole
Change notice pin item.
Surveying actual quantities people from taskings can be in actual measurement actual quantities inner boundary, it is seen that the main duty executor for having distributed task completes
The prompt of measurement task, the measurement task being had been filed on are checked.Determine that task is completed, the measurement task that can be completed is true
Recognize or rejection is handled.
If carrying out confirmation processing, after clicking " confirmation ", prompting actual measurement actual quantities task, there are unqualified measurement zones, if
It carries out issuing rectification notice;" rectification notice " is mainly mentioned by the judgement result of measurement data in " task library " and system-computed
When friendship, the requirement whether automatic prompt is rectified and improved, the content for the carry out quality problems rectification item that storage is determined by organizer, and
By the feedback after rectification, the processing of problem pin item can be carried out, and cloud storage is carried out to above-mentioned data.It is as logical in needed to issue rectification
Know, after clicking "Yes", after system enters rectification selection interface, the selection that need to rectify and improve measurement zone can be carried out, unit is rectified and improved and need
The selection of unit which be sent a duplicate to;And be proposed that rectification related request etc..After the completion of rectifying and improving unit, check can be sent to by system message
People, check is qualified, and actual measurement actual quantities rectification task promoter can be notified to enter rectification notice interface, carried out at the pin item of rectification problem
Reason.Rectification requires if there is no problem, can click "No", completes the confirmation to actual measurement actual quantities task.Survey actual quantities task and result certainly
Cloud is arrived in dynamic storage.
If progress " rejection " is handled, after clicking " rejection ", write-in can be prompted to reject reason, be submitted after determining.It submits
Afterwards, the reason that the task that receives is rejected by the main duty executor of this task, and the corrective that can as required, measure task is real
It applies, after implementing measurement task as required, carries out the submission of the measurement task again.
S70, confirm data statistics summarize, achievement trend and rectification notice inquiry, generate statistical report form, achievement trend,
Rectification notice summarizes.
When measurement task complete, and by actual measurement actual quantities people from taskings confirmation after, when click menu in " statistical report form "
Or " achievement trend (there must be at least two measurement results in different time periods) " or " rectification notice " etc., it can be by system
Prompt carries out the inquiry etc. of the statistical results such as relevant time period or measuring phases item.And according to the statistical result of inquiry or compare knot
Fruit compares ranking, carries out the inquiry of ASSOCIATE STATISTICS summarized results or achievement trend and compares ranking, carries out matter to quality management person
The analysis of amount problem improves or control administrative decision provides reference etc..
" statistical report form " and " achievement trend " is mainly to carry out collect statistics to the measured data in " task library ", is led to
Each phasic results tendency chart is crossed to differentiate the sustained improvement situation of quality activity, provides related foundation for policymaker.
Specifically, according to actual measurement actual quantities task organizer confirmation actual measurement actual quantities task item data, system can automatically by
Each task item data is stored in cloud, can be automatic complete when inquirer's click " statistical report form ", " achievement trend ", " rectification notice "
At the automatic counting statistics of actual measurement actual quantities confirmation data and the aggregate query of statistical data.
" statistical report form " inquiry is, it can be achieved that " project survey data statistics ", i.e., in monomer building, by unit or layer or layer family,
Detection project, measurement unit, period of measurement etc., each detection project specifically detects the remittance of point Qualification, qualification rate
Total statistics.It is shown with table and bar graph form.
" statistical report form " inquiry that is, in monomer building, by unit or layer or layer family, detects, it can be achieved that " project collect statistics "
The qualified total points of project, detection, measurement unit, period of measurement etc., each detection project and check item and unqualified total point
Several and qualification rate statistics;And detection time section is pressed, and between each monomer building of the Project Unit engineering of statistics, detection project, inspection
Survey the qualified points of actual measurement of item, the actual measurement actual quantities collect statistics that the total points of actual measurement and qualification rate compare.With table and column figure
Formula is shown.
" statistical report form " is inquired, it can be achieved that " group's level collect statistics ", " regional level collect statistics " and " project level
Collect statistics " carry out above-mentioned each comparative run, check item that is, by each department company, projects, each bid section, each detection unit etc.
Mesh, detection, time interval section wait the collect statistics and the mutual comparison ranking of homogeneous data of actual measurement actual quantities qualification rate.With
Table and bar graph form are shown.
" achievement trend " inquiry is, it can be achieved that " group's level trend ", " regional level trend " and " project level trend " is aobvious
Show, i.e., by each department company, projects, each bid section, each detection unit etc., carries out each comparative run, inspection item, detection, each
The display of interval division and section number variation tendency and the mutual comparison ranking of homogeneous data etc..
" rectification notice " inquiry is, it can be achieved that each monomer building actual measurement actual quantities nonconformance rectification notice feelings of the construction unit of project
The collect statistics of condition are shown.
The present invention can realize each side's interaction in the work of actual measurement actual quantities through the above steps, and can be realized measurement
As a result quick counting statistics and storage realize the accurate inquiry and trackability of measurement point position and data.
Embodiment 2
Based on identical design, task interaction and the statistics pipe that actual quantities is surveyed in a kind of engineering management are present embodiments provided
Manage device comprising:
Group establishes module, establishes staff group for surveying actual quantities taskings people, similarly, the work people
Member may include construction unit project line manager and following personnel, supervisor chief inspector and following personnel and unit in charge of construction's project
Manager, chief engineer and following personnel;Meanwhile survey actual quantities people from taskings can also be established by group module in group at
Member is managed, such as staff in deletion group, adds new staff, or terminate in this actual measurement actual quantities task
Afterwards, which is dismissed.
Task library distribution module, the actual measurement actual quantities task library summarized according to field measurement actual quantities experience and universal standard specification
Content instructs to survey actual quantities task for distributing, and in the present embodiment, people from taskings in group enters task library, is saved
The distribution of the lower actual measurement actual quantities task of point, so that actual measurement actual quantities task is distributed to main duty executor and task assistance executor.
In the present embodiment, before actual measurement task distribution, it is clear to comb the process that field measurement actual quantities works, by each section
Task under point is combed by " the actual measurement general judgment criteria of actual quantities ", carries out actual measured value and standard value is compared or ties
The formula that fruit determines is set, and the calculation formula under different node tasks is different.
The actual measurement actual quantities task library is the actual measurement summarized according to expert's field measurement actual quantities experience and universal standard specification
Actual quantities content inside enumerates actual measurement actual quantities node tasks detection content and measurement explanation, and most according to engineering measurement actual quantities
Good statistical requirements, detection points are provided (system in the actual measurement area quantity and each actual measurement area to every batch of Detection task
Default).
Surveying actual quantities task library content, totally ten six nodes, 120 actual measurement actual quantities task items specifically include:
Node 1:Concrete structure engineering has 7 Detection task items (wall/column cross-section size deviation;Wall/sleeper surface is flat
Whole degree;Wall/column verticality;Top plate levelness is very poor;Slab thickness deviation;Concrete perception;Construction control line setting).
Node 2:Masonry project has 7 Detection task item (surface smoothness;Verticality;Squareness;Outer door-window opening ruler
Very little deviation (height);Outer door-window opening dimensional discrepancy (width);Important prefabricated or site concrete;Build process).
Node 3:Hydropower installation set aside pre-embedded engineering has 6 Detection task items (pedestal toilet reserved drainpipe pitch-row deviation;It builds
Body metope feed pipe secretly buries;Concrete building plate and concrete metope feed pipe secretly bury;Family distribution box/weak current comprehensive case absolute altitude deviation;Same room
Interior back box elevation difference;Masonry wall conduit secretly buries).
Node 4:Plastering engineering has 24 Detection task item (surface of wall flatness;Degree of gravity vertical forwall surface;Interior net storey height is inclined
Difference;Top plate levelness is very poor;Yin-yang angle is upright;Crack/hollowing;Room standard width of a room in an old-style house deviation;Room depth deviation;Squareness;Ground
Surface smoothness;Ground level is very poor;Indoor door opening dimensional height deviation;Indoor door opening dimension width deviation;Indoor door opening ruler
Very little wall thickness deviation;Thickness of wall body is very poor on the inside of outer wall window;It drops in plate (kitchen);It drops plate (toilet);With house type with kitchen and toilet pipe
Well dimensional discrepancy (hard-cover room);With house type with kitchen and bath's window bottom frame absolute altitude deviation (hard-cover room);With house type with kitchen and bath's window side frame wall away from
Deviation (hard-cover room) cabinet body is embedded in position dimensional discrepancy (height) (hard-cover room);It is (hard-cover that cabinet body is embedded in position dimensional discrepancy (width)
Room);With house type with kitchen and toilet standard width of a room in an old-style house deviation (hard-cover room);With house type with kitchen and toilet depth deviation (hard-cover room)).
Node 5:Waterproofing work has 5 Detection task item (toilet coating thickness;Outer lining coating thickness;Toilet
Additional waterproofing layer;The anti-bank waterproof such as toilet, air-conditioning plate, flue, pipe root is high;Toilet floor drain setting);
Node 6:Coating engineering (contains furred ceiling), there is 7 Detection task item (metope surface smoothness;Degree of gravity vertical forwall surface;Yin-yang
Angle Founder (coating engineering);Ceiling (furred ceiling) levelness is very poor (coating engineering);Ceiling surface flatness (flat furred ceiling engineering);It hangs
Apical grafting stitches difference of height (flat furred ceiling engineering);Crack/hollowing (coating engineering or brushing gypsum surface layer)).
Node 7:Metope is surface-veneer engineered, there is 10 Detection task items (surface smoothness (metope tapestry brick engineering);Verticality
(metope tapestry brick engineering);Yin-yang angle Founder (metope tapestry brick engineering);Seam difference of height (metope tapestry brick engineering);Crack/
Hollowing (metope tapestry brick engineering);Surface smoothness (inner wall finishing plate engineering);Verticality (inner wall finishing plate engineering);Yin-yang angle
Upright (inner wall finishing plate engineering);Seam difference of height (inner wall finishing plate engineering);Joint gap (inner wall finishing plate engineering)).
Node 8:Ground tapestry brick engineering has 3 Detection task items (surface smoothness (among big room plus a bit);It connects
It stitches difference of height (ground tapestry brick engineering);Crack/hollowing (ground tapestry brick engineering)).
Node 9:Interior door installing engineering has 3 Detection task items (doorframe front verticality (interior door);Door leaf with
Stay slit width degree (interior door) in ground;Slit width degree (kitchen and bath's door) is stayed on door leaf and ground).
Node 10:Aluminium alloy (or plastic-steel) erection of doors and windows engineering has 6 Detection task items (profile piece width (aluminium alloy
Door and window);Profile piece difference of height (aluminium alloy-plastic-steel door and window);Aluminium alloy door or window frame front vertical degree (aluminium alloy-Plastic steel door
Window);Sash fixes (aluminium alloy-plastic-steel window);Outline border outer surface waterproof layer (aluminium alloy-plastic-steel window);Frame closes up and stuff up a crack
(aluminium alloy-plastic-steel window)).
Node 11:Timber floor installing engineering, having 5 Detection task items, ((reinforcing is compound, solid wood is compound, real for surface smoothness
Timber floor);Floor gap width (solid wood compound, solid wooden floor board);Floor gap difference of height (solid wood compound, solid wooden floor board);Ground
Plate levelness is very poor (reinforcing is compound, solid wood is compound, solid wooden floor board);(reinforcing is compound, solid wood is multiple for slit width between skirting and surface layer
Close, solid wooden floor board)).
Node 12:Alien invasion has 9 Detection task items (outdoor furring brick facade verticality;Outdoor furring brick surfacing
Degree;Outdoor furring brick yin-yang angle is upright;Alien invasion stone material seam difference of height;Alien invasion stone surface flatness (smooth surface);It is outer vertical
Face stone surface flatness (pitted skin);Alien invasion glue-line perception;Alien invasion aluminium sheet seam difference of height;Alien invasion aluminium sheet piece is wide
Degree).
Node 13:Roofworks has 5 Detection task item (slopes of roof;Roofing water falls a mouthful gradient;Parapet of roofing is high
Degree;Parapet of roofing bears down on one the gradient;Exhaust pipe flashing construction).
Node 14:Ventilation and draining installing engineering, there is 6 Detection task item (damping noise reductions of Ventilator Room equipment;Wind system
Heat preservation;Drainpipe deodorization;The installation of drainage ventilation pipe;Sewage pipe transverse tube drainage grade;Rain pipe transverse tube drainage grade).
Node 15:Electrical and intelligent building engineering has 14 Detection task items (same room switch socket distance, height difference;And
Column panel height deviation (hard-cover is used);Lamp installation;Jack connector phase sequence;Lightning rod, band installation;Changed into switchhouse and power distribution station;
Instrument installation;Fire fighting detector;Video camera installation;Manual fire alarm call point installation;The installation of fire light alarm device;Security protection prison
Control system cabinet, console installation;Light current gantry, spool;The laying of light current cable, equipment installation).
Node 16:Fire-fighting has 3 Detection task items (fire hydrant box cabinet verticality;Fire hydrant bolt open height
(1100mm);Standpipe and transverse tube bracket at fire hydrant cabinet).
Submit module, for main duty executor and task assistance executor execute the actual measurement actual quantities task after, will be complete
At measurement data submit.The main duty executor for surveying actual quantities task in the present embodiment and task assist executor, can log in
After the account of oneself, oneself assigned task is seen in the actual measurement actual quantities module of software systems, and carry out by interface prompt
Task executes operation, such as:The upload of mark drawing photo needed for task items can be measured;By mark figure point and
The data of live actual measurement carry out accurate typing as required.After task assistance executor completes the task of oneself, it can press
Task is assisted data measured by executor to be stored in Cloud Server by " submission " task frame, so that the assistance that ends task executes
The task of people.It is main to blame executor after the task that receives assists executor to complete the task of oneself, can be by " COPY " task frame, it will
The measurement task lane database that the measurement task data that task assists executor to complete copy to main duty executor (completes measurement
The measurement zone quantity of task data merges).The measurement data task of completion is submitted by main duty executor.Measurement is submitted to appoint
After business, system can measure automatically area and measurement point whether He Ge calculating, and show the result etc. that survey calculation obtains.
Confirmation module executes rectification notice pin to lattice point is not conformed to for confirming or rejecting completed actual measurement actual quantities task
?.In the present embodiment, actual measurement actual quantities people from taskings can be in actual measurement actual quantities inner boundary, it is seen that has distributed task execution people and has completed
The prompt of measurement task, the measurement task being had been filed on are checked.Determine that task is completed, the measurement task that can be completed is true
Recognize or rejection is handled.
If carrying out confirmation processing, after clicking " confirmation ", prompting actual measurement actual quantities task, there are unqualified measurement zones, if
It carries out issuing rectification notice;" rectification notice " is mainly mentioned by the judgement result of measurement data in " task library " and system-computed
When friendship, the requirement whether automatic prompt is rectified and improved, the content for the carry out quality problems rectification item that storage is determined by organizer, and
By the feedback after rectification, the processing of problem pin item can be carried out, and cloud storage is carried out to above-mentioned data.It is as logical in needed to issue rectification
Know, after clicking "Yes", after system enters rectification selection interface, the selection that need to rectify and improve measurement zone can be carried out, unit is rectified and improved and need
The selection of unit which be sent a duplicate to;And be proposed that rectification related request etc..After the completion of rectifying and improving unit, check can be sent to by system message
People, check is qualified, and actual measurement actual quantities rectification task promoter can be notified to enter rectification notice interface, carried out at the pin item of rectification problem
Reason.Rectification requires if there is no problem, can click "No", completes the confirmation to measurement task.Measurement task is automatically stored to cloud.
If progress " rejection " is handled, after clicking " rejection ", write-in can be prompted to reject reason, be submitted after determining.It submits
Afterwards, the reason that the task that receives is rejected by the main duty people of this task, and the corrective that can as required, measure task is implemented, and presses
It is required that carrying out the submission of the measurement task again after implementing measurement task.
Statistical module, for confirming that the statistics of data summarizes, achievement trend and rectification notice are inquired.
When measurement task is completed, and after being identified, when " statistical report form " clicked in menu or " achievement trend (must be deposited
In at least two measurement results in different time periods) " or " rectification notice " etc., " project survey can be carried out by system prompt
Data statistics ", " project collect statistics ", " group's level collect statistics ", " regional level collect statistics " and " project level summarizes
Statistics ", and " group's level trend ", " regional level trend ", " project level trend " display, by selecting construction unit list
The unit or floor in body building or family, detection project, detection, measurement unit, measurement period or press each department company, items
Mesh, each bid section, each detection unit etc., it is real to carry out the actual measurements such as above-mentioned each comparative run, inspection item, detection, time interval section
It measures the inquiries of data summarizations statistical result such as qualification rate and compares ranking.And compared according to the statistical result or comparison result of inquiry
Ranking carries out analysis improvement or control administrative decision of quality problems etc..
Embodiment 3
The present embodiment provides a kind of storage mediums, are stored with program, described program is for executing described in embodiment 1
Task interaction and data statistics management method.
The sequencing of above embodiments is not only for ease of description, represent the advantages or disadvantages of the embodiments.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that:It still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (9)
1. a kind of task interaction and data statistics management method, which is characterized in that include the following steps:
S10, actual measurement actual quantities task library content is established;
S20, actual measurement actual quantities people from taskings establish staff group;
S30, actual measurement actual quantities people from taskings establish actual measurement actual quantities construction unit model;
People from taskings in S40, group enters actual measurement actual quantities task library, by the actual measurement actual quantities task in task library by engineering
Branch's node carry out Detection task item preset value is determining or modification, and selected Detection task item clicks monomer building and prestores
After surveying actual quantities cloth point diagram, distributes to main duty executor and task assists executor;
S50, main duty executor and task assist executor to execute the actual measurement actual quantities task and submit;
Completed actual measurement actual quantities task is rejected in S60, actual measurement actual quantities people from taskings confirmation;Unqualified test point is issued whole
Change notice, recruiting unit executes rectification and replys, and check people confirms pin item;
S70, query statistic summarize, achievement trend and rectification notify.
2. task according to claim 1 interaction and data statistics management method, which is characterized in that S10 is specially:
S101, it summarizes to obtain actual measurement actual quantities task library content according to expert's field measurement actual quantities experience and universal standard specification, it should
Task library content includes:Each node of actual measurement measurement item is determined by the sub- branch of engineering, determines actual measurement actual quantities respectively under each node
Task items;
Minimum actual measurement number of regions is determined under S102, each actual measurement actual quantities task items, every region at least measures points, error mark
Quasi- and measurement explanation.
3. task according to claim 1 interaction and data statistics management method, which is characterized in that S30 is specially:
S301, actual measurement actual quantities organizer, select system established construction unit monomer building, can carry out the initialization in the monomer building
Setting;
S402, monomer building Initialize installation, it can be achieved that monomer building unit number, the number of plies, the floor amount etc. setting;
S503, it is above-mentioned be provided with after, when actual measurement actual quantities performer, input scene measured data when, so that it may direct point
Choosing set unit number or level number or family number etc., realize the data statistics in S70 content.
4. task according to claim 1 interaction and data statistics management method, which is characterized in that S40 is specially:
People from taskings in S401, group enters the pc client of system, uploads actual measurement actual quantities cloth point diagram;
People from taskings in S402, group enters actual measurement actual quantities task library, by the actual measurement actual quantities task in task library, by engineering
Sub- branch's node is selected;
S403, the pre- construction unit monomer building for carrying out actual measurement actual quantities, corresponding actual measurement actual quantities cloth described in selection mounting S401 are clicked
Point diagram, carries out the preset value determination for clicking Detection task item or modification, and the selected each Detection task item that need to be carried out distributes to main duty
Executor and task assist executor.
5. task according to claim 1 interaction and data statistics management method, which is characterized in that S50 is specially:
S501, the main duty executor for surveying actual quantities task and task assist executor, after the account for logging in oneself, it is seen that oneself
Assigned task carries out checking for task items actual measurement actual quantities cloth each eyeball bit number of point diagram by interface prompt, carries out scene
Actual measurement, and clicking for actual measurement site units number or level number or family number is carried out, input the typing of eyeball bit number and measured value;
After S502, task assistance executor complete the task of oneself, task is submitted;
S503, main duty executor press " COPY " task frame after the task that receives assists executor to complete oneself task, can will
The measurement task data that task assists executor to complete copy in the measurement task detection of main duty executor;
S504, main duty executor submit the measurement data task of completion;
Whether S505, calculating measurement zone and measurement point are qualified, and show the result that survey calculation obtains.
6. task according to claim 1 interaction and data statistics management method, which is characterized in that S60 is specially:
S601, actual measurement actual quantities people from taskings are in actual measurement actual quantities inner boundary, it is seen that the main duty executor for having distributed task completes
The prompt of measurement task, the measurement task being had been filed on are checked;If it is confirmed that the allocated task has been completed, then hold
Row step S602;If it is confirmed that the allocated task does not complete, S605 is thened follow the steps;
S602, actual measurement actual quantities people from taskings click " confirmation " task frame and carry out confirmation processing;It is deposited when in actual measurement actual quantities task
In unqualified detection, showing the task, there are unqualified detections, if issues the prompt of rectification notice;
S603, if you do not need to rectified and improved, then click "No", complete the confirmation to actual measurement actual quantities task;Survey actual quantities task
Cloud is automatically stored to result;
S604, it is rectified and improved if necessary, then clicks "Yes", enter rectification selection interface;Need to rectify and improve the choosing of measurement zone
It selects, rectification unit and the selection for needing unit which be sent a duplicate to, and proposes rectification related request;After the completion of rectifying and improving unit, disappeared by system
Breath sends check person to, and check is qualified, and notice actual measurement actual quantities rectification task promoter enters rectification notice interface, carries out rectification and asks
The pin item of topic is handled;And the result after surveying actual quantities task and rectifying and improving is stored to cloud;
S605, actual measurement actual quantities people from taskings click " rejection " task frame and carry out rejection processing;Reason is rejected in write-in, is determined laggard
Row is submitted;
S606, main duty executor and task assist executor to receive the rejected reason of task, and can measure and appoint as required
The corrective of business is implemented, and after implementing measurement task as required, carries out the submission of the measurement task again.
7. task according to claim 1 interaction and data statistics management method, which is characterized in that S70 is specially:
S701, the actual measurement actual quantities task item data confirmed according to the organizer of actual measurement actual quantities task, system can be automatically by each task
Item data stores beyond the clouds, when inquirer's click " statistical report form ", " achievement trend ", " rectification notice ", can be automatically performed actual measurement
Actual quantities confirms the automatic counting statistics of data and the aggregate query of statistical data;
" project survey data statistics " is realized in S702, " statistical report form " inquiry:In monomer building, by unit or layer or layer family, detection
Project, measurement unit and the period of measurement, each detection project specifically detects point Qualification, qualification rate summarizes system
Meter, is shown with table and bar graph form;
" project collect statistics " are realized in S703, " statistical report form " inquiry:In monomer building, by unit or layer or layer family, detection project,
The qualified total points of detection, measurement unit and the period of measurement, each detection project and check item and unqualified total points, and
The statistics of qualification rate;And press detection time section, and between each monomer building of the Project Unit engineering of statistics, detection project, detection
The actual measurement actual quantities collect statistics that the qualified points of actual measurement, the total points of actual measurement and qualification rate compare, are shown with table and bar graph form;
S704, " statistical report form " inquiry realize " group's level collect statistics ", " regional level collect statistics " and " project level is converged
Total statistics ":It by each department company, projects, each bid section and respectively detects unit, carries out above-mentioned each comparative run, inspection item, inspection
Survey the collect statistics and the mutual comparison ranking of homogeneous data of item and time interval section actual measurement actual quantities qualification rate, with table and
Bar graph form is shown;
" group's level trend ", " regional level trend " and " project level trend " display is realized in S705, " achievement trend " inquiry,
By each department company, projects, each bid section and respectively unit is detected, carries out each comparative run, inspection item, detection, each section
The comparison ranking mutual with section number variation tendency and homogeneous data is divided to show;
Each monomer building actual measurement actual quantities nonconformance rectification notice situation of construction unit of S706, " rectification notice " inquiry realization project
Collect statistics show.
8. task interaction according to claim 1 and data statistics management method, which is characterized in that in S20, the task
Organizer includes construction unit project line manager and the above persons, supervisor chief inspector and unit in charge of construction Deputy Project Manager, total
Work and the above persons, and by above-noted persons, in team management setting, it is arranged to band " ★ " personnel.
9. a kind of storage medium, be stored with program, described program for perform claim require the interaction of task described in 1-8 and
Data statistics management method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810266715.XA CN108830539A (en) | 2018-03-28 | 2018-03-28 | Task interaction and data statistics management method and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810266715.XA CN108830539A (en) | 2018-03-28 | 2018-03-28 | Task interaction and data statistics management method and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108830539A true CN108830539A (en) | 2018-11-16 |
Family
ID=64155282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810266715.XA Pending CN108830539A (en) | 2018-03-28 | 2018-03-28 | Task interaction and data statistics management method and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108830539A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109697183A (en) * | 2018-11-30 | 2019-04-30 | 杭州丁卯智能科技有限公司 | The management method of actual quantities is surveyed in a kind of work progress |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105761010A (en) * | 2016-02-24 | 2016-07-13 | 国网山东省电力公司 | Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition |
CN107423886A (en) * | 2017-06-29 | 2017-12-01 | 中国建筑局(集团)有限公司 | Engineering data management by synchronization system and management method based on Track Table |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN107818198A (en) * | 2017-09-27 | 2018-03-20 | 中建三局基础设施工程有限公司 | A kind of science of bridge building management platform based on BIM technology |
-
2018
- 2018-03-28 CN CN201810266715.XA patent/CN108830539A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105761010A (en) * | 2016-02-24 | 2016-07-13 | 国网山东省电力公司 | Method and system for real-time monitoring of group enterprise audit based on real-time data acquisition |
CN107423886A (en) * | 2017-06-29 | 2017-12-01 | 中国建筑局(集团)有限公司 | Engineering data management by synchronization system and management method based on Track Table |
CN107818198A (en) * | 2017-09-27 | 2018-03-20 | 中建三局基础设施工程有限公司 | A kind of science of bridge building management platform based on BIM technology |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
Non-Patent Citations (2)
Title |
---|
王鼎盛: ""上海电力电缆公司施工质量管理系统设计与实现"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
邹礼礼: ""协同设计方法在房产测绘管理中的应用与研究"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109697183A (en) * | 2018-11-30 | 2019-04-30 | 杭州丁卯智能科技有限公司 | The management method of actual quantities is surveyed in a kind of work progress |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107871193A (en) | The task exchange method and device of actual quantities are surveyed in engineering management | |
CN108108543A (en) | A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology | |
CN109559086A (en) | Checking method, device and terminal device based on BIM light weighed model | |
US20210065259A1 (en) | Method, system and computer program product for selecting and tracking a service provider in response to a customer request | |
Dalton | Australian suburban house building: industry organisation, practices and constraints | |
CN112507442A (en) | BIM project material and engineering cost statistical method | |
JP5490940B2 (en) | Information processing apparatus, data structure, information processing method, and program | |
CN112800513A (en) | Method and device for automatically generating ground material based on room information | |
CN108830539A (en) | Task interaction and data statistics management method and storage medium | |
Pan et al. | Problematic interfaces and prevention strategies in modular construction | |
Zimmermann et al. | Early design stage building LCA using the LCAbyg tool: comparing cases for early stage and detailed LCA approaches | |
Nowogońska | Proposal for determing the scale of renovation needs of residential buildings | |
Park et al. | BIM application and adoption in the UK housing sector | |
De Silva et al. | Maintainability approach for lean maintenance | |
CN108665128A (en) | project management system | |
TWI576777B (en) | Engineering management system | |
JP2016184427A (en) | Process management system, management terminal, and method for managing process | |
Farah | Review of current estimating capabilities of the 3D Building Information Model software to support design for production/construction | |
JP2013134686A (en) | Process management system, management terminal, and process management method | |
Ting | Optimisation of embodied energy in domestic construction | |
CN113269411A (en) | Decoration system based on internet technology assembly decoration construction and convenient for customer quality inspection | |
Eroğlu | Evaluation of the reliability of BIM-based quantity take-off processes in construction projects | |
KR20240001514A (en) | Automatic finishing design system considering residential environment | |
Jaafar et al. | Categorisation and Causes of Building Design Defect: A Case Study on Public Building Hospital | |
Xiao et al. | A new approach to comparing the performance of contractors internationally |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181116 |
|
RJ01 | Rejection of invention patent application after publication |