CN107423886A - Engineering data management by synchronization system and management method based on Track Table - Google Patents
Engineering data management by synchronization system and management method based on Track Table Download PDFInfo
- Publication number
- CN107423886A CN107423886A CN201710515970.9A CN201710515970A CN107423886A CN 107423886 A CN107423886 A CN 107423886A CN 201710515970 A CN201710515970 A CN 201710515970A CN 107423886 A CN107423886 A CN 107423886A
- Authority
- CN
- China
- Prior art keywords
- data
- engineering
- app clients
- management
- track table
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 49
- 238000013523 data management Methods 0.000 title claims abstract description 18
- 238000000034 method Methods 0.000 claims abstract description 39
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 20
- 238000007689 inspection Methods 0.000 claims abstract description 15
- 238000003860 storage Methods 0.000 claims abstract description 5
- 238000012546 transfer Methods 0.000 claims abstract description 5
- 238000011835 investigation Methods 0.000 claims abstract description 4
- 238000005192 partition Methods 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 claims description 24
- 238000012545 processing Methods 0.000 claims description 6
- 238000005516 engineering process Methods 0.000 claims description 5
- 238000012423 maintenance Methods 0.000 claims description 5
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 238000004458 analytical method Methods 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 238000012216 screening Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000003556 assay Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06314—Calendaring for a resource
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Engineering data management by synchronization system and management method disclosed by the invention based on Track Table, the management system includes APP clients, it includes intelligent mobile APP clients and PC desktop APP clients, intelligent mobile APP clients carry out collection in worksite data metadata, then upload, PC computer desktop APP clients provide process, flowing water section partition functionality, and build table automatically using gathered data completion, and realize the automation filling of engineering data trace list data;High in the clouds data, services, it is connected by interface with each APP clients, prompts the storage and business transfer service of data metadata;Data On line inspection management system for tracking, it is connected with each APP clients, high in the clouds data, services, engineering data is checked, instructed and is tracked by data on-line checking management system for tracking to apply for checking and examination program Track Table, it will feed back to APP clients in time simultaneously and rectified and improved the problem of discovery during follow-up investigations etc., the dynamic management of engineering data is realized, improves the efficiency of management and managerial skills.
Description
Technical field
The present invention relates to Engineering documents Management technical field, more particularly to the engineering data management by synchronization system based on Track Table
System and management method.
Background technology
Engineering data is engineering construction during the proposition of project, preparation, exploration, design, construction to completion operation etc.
The documents of formation, drawing, icon, calculate the various forms of information summations such as material, audio and/or video material.Engineering data reflects work
The actual conditions of journey process of construction and engineering entity quality, therefore authenticity is most basic to engineering data, most important requirement, work
The quality of journey data management is put on record completion of works, settled accounts, providing quality goods or brilliant, later stage O&M, reconstruction, enlarging it is most important.
At present there is problems with and deficiency in Engineering documents Management:
(1)Engineering documents Management system is unsound, it is difficult to ensures effective development of materials compilation work;
(2)Engineering documents Management system is unsound, it is difficult to ensures data management duty fulfillment;
(3)Engineering documents Management peopleware is not universal high, it is difficult to ensures the quality of engineering data;
(4)Engineering data establishment is not in place, poor synchronization, authenticity are difficult to ensure that, it is big to inquire about difficulty;
(5)Traditional data account can not intuitively reflect the complete association of engineering data comprehensively, cause completion information filing-up work
It is heavy, transfer not in time the problem of;
(6)For enterprise, the management of engineering data can not follow up in real time, can only inspect periodically, it is impossible to find in time, solve to ask
Topic, management difficulty is big, risk is high.
The content of the invention
The purpose of the present invention is to be directed to above-mentioned technical problem, there is provided the engineering data management by synchronization system based on Track Table
And management method, its step is reasonable, has returned the essence of Engineering documents Management, has really met the codes and standards of country, has solved
Certainly there is very big breakthrough in terms of engineering data data validity, efficiently solve the problems, such as the mistake of manual maintenance, realize engineering
The dynamic management of data, the efficiency of Engineering documents Management is improved, improve the managerial skills of engineering data.
Technical scheme
In order to solve the above technical problems, the engineering data management by synchronization system provided by the invention based on Track Table, it includes:
APP clients:It includes intelligent mobile APP clients and PC desktop APP clients, and intelligent mobile APP clients are carried out
Collection in worksite data metadata, is then uploaded;PC desktop APP clients provide process, flowing water section partition functionality, and utilize collection
Data are completed to build table automatically, realize the automation filling of engineering data trace list data;
High in the clouds data, services:It is connected by interface with each APP clients, prompts storage and the business transfer clothes of data metadata
Business;
Data On line inspection management system for tracking:It is connected with each APP clients, high in the clouds data, services, is examined online by data
Management system for tracking is surveyed to be checked, instructed and tracked engineering data to apply for checking and examination program Track Table, while by during follow-up investigations
It was found that the problem of feed back to APP clients in time and rectified and improved, realize effective management.
Further, the intelligent mobile APP clients user is section chief, quality person, surveyor, materialman and experiment
The live post personnel of member;PC desktop APP clients user is that section chief, quality person, surveyor, materialman, documenter, project are total
Work;Data On line inspection management system for tracking user is the pipe such as company chief engineer, data director, project manager, project chief engineer
Reason personnel.
Disclosed herein as well is the engineering data synchronization management method based on Track Table, it comprises the following steps:
S1, the establishment of engineering project information is first carried out by data On line inspection management system for tracking, is recorded according to builder's licence
Enter engineering, the information of construction unit, and carry out the distribution of project personnel;
S2, before commencement of works, the screening of project process is carried out by PC desktop APP clients, establishes the work for being adapted to project
Sequence storehouse;After drawing determination, flowing water section division is carried out;Data are submitted to be taken to cloud data after the completion of project process and the division of flowing water section
Business, cloud data, services send message to intelligent mobile APP clients and other PC desktop clients ends using message mechanism, can carried out
Timely synchronized update;
After S3, intelligent mobile APP client log in, the first of data can be carried out for the first time according to the engineering where active user by logging in
Beginningization, the standard criterion storehouse data involved by engineering, project process data, flowing water section can be divided data, engineering essential information
Etc. data, new data is only updated when logging on;, can be according to work in intelligent mobile APP clients after the completion of data initialization
The construction speed of journey, select process to carry out the collection typing of corresponding engineering data metadata, carrying for data is carried out after the completion of collection
Hand over, cloud data, services can send prompting message PC desktop APP clients in real time after submission data are received and carry out building table, and complete
Into automatic filling;
S4, PC desktop APP clients carry out the establishment of engineering data form, and utilize intelligence automatically according to the message received
The gathered data that mobile APP clients provide completes filling in for form, can carry out secondary editor for the form of establishment, edit
After the completion of, upload the engineering data list data of completion;Documenter is entered by PC desktop APP clients to engineering data Track Table
Row safeguards that trace list data is automatically performed filling by client;
S5, company chief engineer, data supervisor, each project manager, chief engineer are by data On line inspection management system for tracking to pipe
Engineering data tracking data in the range of linchpin check in real time, tracked, while data in engineering data Track Table can be entered
Row exceeds early warning alarm, and directly engineering data form can be checked in real time according to the date, pinpoints the problems and issues problem
Rectification.
Further, in step s 4, the apply for checking and examination manufacturing process of program Track Table of engineering data is:
S4-1, it is tracked according to the different phase of construction unit, the process content to be tracked is selected from engineering process, can be right
Track content carry out deeper into maintenance;
S4-2, the flowing water section content to be tracked is selected according to construction unit, the scope of construction part is determined by flowing water section;
S4-3, process data are the column data of Track Table, and construction part data are row data, establish engineering data Track Table
Afterwards, client can carry out the filling of data automatically.Trace list data can carry out human intervention processing according to practice of construction situation, right
The link that need not be tracked or not produce engineering data carries out special marking processing, to more meet the actual feelings of job site
Condition.
Further, in step s 5, the early warning mechanism includes time early warning, and it is according to the analysis to process and process
The correlation of content, the planned time of interval time and this process in engineering data form between arrangement step, realize dynamic
State is reminded.
Beneficial effect of the present invention:
Engineering data management by synchronization system and management method provided by the invention based on Track Table, its step is reasonable, effectively solution
The mistake problem for manual maintenance of having determined, the dynamic management of engineering data is realized, improve the efficiency of Engineering documents Management, lifted
The managerial skills of engineering data.Have the advantages that:
(1)The application furthers investigate the incidence relation of working procedure and engineering data, and establishes a set of be directed on this basis
The system mechanism of Engineering documents Management;
(2)On the basis of based on Track Table management system, using process and inspection lot division plan, according to the complete of engineering data
Into situation, the technology for managing Track Table is automatically generated;
(3)Whether created according to engineering data form corresponding to process and position retrieval, according to trace list data fill rule, from
Move and corresponding data is filled on Track Table(Form date created, missing, without content etc.), complete the dynamic life of Track Table
Into.
(4)In Track Table dynamic formation, early warning and integrity check are carried out to the engineering data form in Track Table, it is right
The engineering data form pinpointed the problems, is directly marked respectively in Track Table, and specific assay content can be entered
Row is checked and issues corresponding warning information.
(5)Using the decomposition of process, professional guidance content is distributed in corresponding link, forms dynamic and specific aim
Stronger prompting, prompting and professional guidance system.
(6)By the corresponding function of mobile App assistant, the regular reporting mechanism to project progress, builder's diary are realized
Registration, the collection of acoustic scene picture arrange.By mobile App assistant by data syn-chronization corporate management can be realized to item simultaneously
The inspection and tracking of mesh scene progress, builder's diary, acoustic scene picture.
(7)Traditional papery version storage archives are distinguished, both can fast and easily inquire about, the true of data can be ensured again
Property, it has been truly realized the trackability of data.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, above-mentioned advantage of the invention will be apparent and be easier reason
Solution, these accompanying drawings are simply schematical, are not intended to limit the present invention, wherein:
Fig. 1 is the schematic diagram of the engineering data management by synchronization system of the present invention based on Track Table;
Fig. 2 is the flow chart of the engineering data synchronization management method based on Track Table of the present invention;
Fig. 3 is the process of the present invention, flow section division schematic diagram;
The engineering data that Fig. 4 is the present invention applies for checking and examination the Making programme figure of program Track Table.
Embodiment
With reference to specific embodiments and the drawings, to engineering data management by synchronization system and pipe of the present invention based on Track Table
Reason method is described in detail.
The embodiment recorded herein is the specific embodiment of the present invention, for illustrating the design of the present invention, is
It is explanatory and exemplary, it should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except the reality recorded herein
Exception is applied, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious and easy
The other technical schemes seen, these technical schemes include any obviously replacing using to making for the embodiment recorded herein
The technical scheme changed and changed.
Fig. 1 is the schematic diagram of the engineering data management by synchronization system of the present invention based on Track Table, and it includes:
APP clients:It includes intelligent mobile APP clients and PC desktop APP clients, and intelligent mobile APP clients are carried out
Collection in worksite data metadata, is then uploaded;PC desktop APP clients provide process, flowing water section partition functionality, and utilize collection
Data are completed to build table automatically, realize the automation filling of engineering data trace list data;
The intelligent mobile APP clients user is section chief, quality person, surveyor, materialman and laboratory technician scene people from post
Member;PC desktop APP clients user is section chief, quality person, surveyor, materialman, documenter, project chief engineer;Data is online
It is the administrative staff such as company chief engineer, data director, project manager, project chief engineer to check management system for tracking user.
High in the clouds data, services:It is connected by interface with each APP clients, prompts the storage and business transfer of data metadata
Service;
Data On line inspection management system for tracking:It is connected with each APP clients, high in the clouds data, services, is examined online by data
Management system for tracking is surveyed to be checked, instructed and tracked engineering data to apply for checking and examination program Track Table, while by during follow-up investigations
It was found that the problem of feed back to APP clients in time and rectified and improved, realize effective management.
Present invention also offers the engineering data synchronization management method based on Track Table, its flow chart is as shown in Fig. 2 be based on
The engineering data synchronization management method of Track Table specifically includes following steps:
S1, the establishment of engineering project information is first carried out by data On line inspection management system for tracking, is recorded according to builder's licence
Enter engineering, the information of construction unit, and carry out the distribution of project personnel;
S2, before commencement of works, the screening of project process is carried out by PC desktop APP clients, establishes the work for being adapted to project
Sequence storehouse;After drawing determination, flowing water section division is carried out;Data are submitted to be taken to cloud data after the completion of project process and the division of flowing water section
Business, cloud data, services send message to intelligent mobile APP clients and other PC desktop clients ends using message mechanism, can carried out
Timely synchronized update;
In this step, after drawing determination, flowing water section division is carried out, by ordinary circumstance, " layer-section-position-axle can be used
The structure of line " is divided, as shown in Figure 3.
After S3, intelligent mobile APP client log in, data can be carried out for the first time according to the engineering where active user by logging in
Initialization, can by the standard criterion storehouse data involved by engineering, project process data, that flowing water section divides data, engineering is basic
The data such as information, only update new data when logging on;, can root in intelligent mobile APP clients after the completion of data initialization
According to the construction speed of engineering, select process to carry out the collection typing of corresponding engineering data metadata, data are carried out after the completion of collection
Submission, cloud data, services can receive submit data after in real time send prompting message PC desktop APP clients carry out building table,
And complete automatic filling.
S4, PC desktop APP clients carry out the establishment of engineering data form, and utilize automatically according to the message received
The gathered data that intelligent mobile APP clients provide completes filling in for form, and secondary editor can be carried out for the form of establishment,
After the completion of editor, the engineering data list data of completion is uploaded;Documenter is tracked by PC desktop APP clients to engineering data
Table is safeguarded that trace list data is automatically performed filling by client;
In this step, engineering data applies for checking and examination the manufacturing process figure of program Track Table, as shown in Figure 4.
S4-1, it is tracked according to the different phase of construction unit, the process content to be tracked is selected from engineering process,
Can to tracking content carry out deeper into maintenance;
S4-2, the flowing water section content to be tracked is selected according to construction unit, the scope of construction part is determined by flowing water section;
S4-3, process data are the column data of Track Table, and construction part data are row data, establish engineering data Track Table
Afterwards, client can carry out the filling of data automatically.Trace list data can carry out human intervention processing according to practice of construction situation, right
The link that need not be tracked or not produce engineering data carries out special marking processing, to more meet the actual feelings of job site
Condition.
S5, company chief engineer, data supervisor, each project manager, chief engineer pass through data On line inspection management system for tracking
Engineering data tracking data in compass of competency is carried out to check in real time, tracked, while can be to number in engineering data Track Table
According to carrying out exceeding early warning alarm, and directly engineering data form can in real time be checked according to the date, pinpoint the problems and issue
Problem is rectified and improved.
In this step, the early warning mechanism includes time early warning, and it is according to the analysis to process and the phase of process content
Mutual relation, the planned time of interval time and this process in engineering data form between arrangement step, realizes dynamic alerts.
The application realizes job site using the APP of client to relevant data acquisition, record, builder's diary, scene
The inspection tracking of acoustic image, project progress;Engineering data is synchronous with progress;Missing, the early warning of delay type engineering blasting data;Realize simultaneously
General headquarters' visualizations, it can be seen that list data collection, the process formed, to be truly realized to trace.Efficiently solve artificial dimension
The mistake problem of shield, the dynamic management of engineering data is realized, the efficiency of Engineering documents Management is improved, improves engineering data
Managerial skills.
The present invention is not limited to the above-described embodiments, and anyone can draw other various forms under the enlightenment of the present invention
Product, it is every that there is technical side identical or similar to the present application however, make any change in its shape or structure
Case, it is within the scope of the present invention.
Claims (5)
1. the engineering data management by synchronization system based on Track Table, it is characterised in that including:
APP clients:It includes intelligent mobile APP clients and PC desktop APP clients, and intelligent mobile APP clients are carried out
Collection in worksite data metadata, is then uploaded;PC desktop APP clients provide process, flowing water section partition functionality, and utilize collection
Data are completed to build table automatically, realize the automation filling of engineering data trace list data;High in the clouds data, services:By interface and respectively
APP clients connect, and prompt the storage and business transfer service of data metadata;Data On line inspection management system for tracking:Its
Be connected with each APP clients, high in the clouds data, services, checked, instructed by data on-line checking management system for tracking and with
Track engineering data applies for checking and examination program Track Table, while enters APP clients are fed back in time the problem of discovery during follow-up investigations
Row rectification, realize effective management.
2. the engineering data management by synchronization system based on Track Table according to claim 1, it is characterised in that the intelligent sliding
Dynamic APP clients user is section chief, quality person, surveyor, materialman and laboratory technician scene post personnel;PC desktops APP visitors
Family end user is section chief, quality person, surveyor, materialman, documenter, project chief engineer;Data On line inspection tracing management system
System user is the administrative staff such as company chief engineer, data director, project manager, project chief engineer.
3. the engineering data synchronization management method based on Track Table, it is characterised in that comprise the following steps:
S1, the establishment of engineering project information is first carried out by data On line inspection management system for tracking, is recorded according to builder's licence
Enter engineering, the information of construction unit, and carry out the distribution of project personnel;
S2, before commencement of works, the screening of project process is carried out by PC desktop APP clients, establishes the work for being adapted to project
Sequence storehouse;After drawing determination, flowing water section division is carried out;Data are submitted to be taken to cloud data after the completion of project process and the division of flowing water section
Business, cloud data, services send message to intelligent mobile APP clients and other PC desktop clients ends using message mechanism, can carried out
Timely synchronized update;
After S3, intelligent mobile APP client log in, the first of data can be carried out for the first time according to the engineering where active user by logging in
Beginningization, the standard criterion storehouse data involved by engineering, project process data, flowing water section can be divided data, engineering essential information
Etc. data, new data is only updated when logging on;, can be according to work in intelligent mobile APP clients after the completion of data initialization
The construction speed of journey, select process to carry out the collection typing of corresponding engineering data metadata, carrying for data is carried out after the completion of collection
Hand over, cloud data, services can send prompting message PC desktop APP clients in real time after submission data are received and carry out building table, and complete
Into automatic filling;
S4, PC desktop APP clients carry out the establishment of engineering data form, and utilize intelligence automatically according to the message received
The gathered data that mobile APP clients provide completes filling in for form, can carry out secondary editor for the form of establishment, edit
After the completion of, upload the engineering data list data of completion;Documenter is entered by PC desktop APP clients to engineering data Track Table
Row safeguards that trace list data is automatically performed filling by client;
S5, company chief engineer, data supervisor, each project manager, chief engineer are by data On line inspection management system for tracking to pipe
Engineering data tracking data in the range of linchpin check in real time, tracked, while data in engineering data Track Table can be entered
Row exceeds early warning alarm, and directly engineering data form can be checked in real time according to the date, pinpoints the problems and issues problem
Rectification.
4. the engineering data management by synchronization system based on Track Table according to claim 3, it is characterised in that in step S4
In, the apply for checking and examination manufacturing process of program Track Table of engineering data is:
S4-1, it is tracked according to the different phase of construction unit, the process content to be tracked is selected from engineering process, can be right
Track content carry out deeper into maintenance;
S4-2, the flowing water section content to be tracked is selected according to construction unit, the scope of construction part is determined by flowing water section;
S4-3, process data are the column data of Track Table, and construction part data are row data, establish engineering data Track Table
Afterwards, client can carry out the filling of data automatically, and trace list data can carry out human intervention processing according to practice of construction situation, right
The link that need not be tracked or not produce engineering data carries out special marking processing, to more meet the actual feelings of job site
Condition.
5. the engineering data management by synchronization system based on Track Table according to claim 3, it is characterised in that in step S5
In, the early warning mechanism includes time early warning, and it is according to the analysis to process and the correlation of process content, in engineering data
The planned time of interval time and this process in form between arrangement step, realize dynamic alerts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710515970.9A CN107423886A (en) | 2017-06-29 | 2017-06-29 | Engineering data management by synchronization system and management method based on Track Table |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710515970.9A CN107423886A (en) | 2017-06-29 | 2017-06-29 | Engineering data management by synchronization system and management method based on Track Table |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107423886A true CN107423886A (en) | 2017-12-01 |
Family
ID=60427462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710515970.9A Pending CN107423886A (en) | 2017-06-29 | 2017-06-29 | Engineering data management by synchronization system and management method based on Track Table |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107423886A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108229807A (en) * | 2017-12-28 | 2018-06-29 | 广州建软科技股份有限公司 | A kind of marketing programs construction rotation managing and control system |
CN108830539A (en) * | 2018-03-28 | 2018-11-16 | 北京地厚云图科技有限公司 | Task interaction and data statistics management method and storage medium |
CN109670796A (en) * | 2018-12-28 | 2019-04-23 | 北京城建勘测设计研究院有限责任公司 | Engineering documents Management method and system |
CN109784840A (en) * | 2018-12-28 | 2019-05-21 | 福建华闽通达信息技术有限公司 | A kind of construction survey automatic data collection processing method being associated with engineering structure task |
CN109829241A (en) * | 2019-02-20 | 2019-05-31 | 中建一局集团第二建筑有限公司 | A method of it is constructed using the administrative skill based on architectural engineering process data |
CN110110985A (en) * | 2019-04-28 | 2019-08-09 | 浙江明度智控科技有限公司 | A kind of record of production method and recording device |
CN110505452A (en) * | 2019-08-26 | 2019-11-26 | 广东电网有限责任公司 | A kind of capital construction power transmission engineering Schedule monitoring method and monitoring system |
CN110942272A (en) * | 2019-12-13 | 2020-03-31 | 河南城建学院 | Engineering project management cloud platform system based on material tracking |
CN111915273A (en) * | 2020-07-30 | 2020-11-10 | 北京航天发射技术研究所 | Assembly management method, system, terminal and storage medium based on process tracking card |
CN116501921A (en) * | 2023-06-25 | 2023-07-28 | 长沙计支宝信息科技有限公司 | Test data processing method and system for press machine for testing performance of building material |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140278694A1 (en) * | 2013-03-15 | 2014-09-18 | ConnectWise Inc. | Systems and methods for business management using product data with product classes |
CN104766155A (en) * | 2015-02-13 | 2015-07-08 | 上海同筑信息科技有限公司 | Engineering project element management method and system based on BIM |
CN204791127U (en) * | 2015-03-25 | 2015-11-18 | 裴正广 | Job site quality control information system |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
-
2017
- 2017-06-29 CN CN201710515970.9A patent/CN107423886A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140278694A1 (en) * | 2013-03-15 | 2014-09-18 | ConnectWise Inc. | Systems and methods for business management using product data with product classes |
CN104766155A (en) * | 2015-02-13 | 2015-07-08 | 上海同筑信息科技有限公司 | Engineering project element management method and system based on BIM |
CN204791127U (en) * | 2015-03-25 | 2015-11-18 | 裴正广 | Job site quality control information system |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108229807A (en) * | 2017-12-28 | 2018-06-29 | 广州建软科技股份有限公司 | A kind of marketing programs construction rotation managing and control system |
CN108830539A (en) * | 2018-03-28 | 2018-11-16 | 北京地厚云图科技有限公司 | Task interaction and data statistics management method and storage medium |
CN109670796A (en) * | 2018-12-28 | 2019-04-23 | 北京城建勘测设计研究院有限责任公司 | Engineering documents Management method and system |
CN109784840A (en) * | 2018-12-28 | 2019-05-21 | 福建华闽通达信息技术有限公司 | A kind of construction survey automatic data collection processing method being associated with engineering structure task |
CN109670796B (en) * | 2018-12-28 | 2023-03-14 | 北京城建勘测设计研究院有限责任公司 | Engineering data management method and system |
CN109829241B (en) * | 2019-02-20 | 2022-01-28 | 中建一局集团第二建筑有限公司 | Construction method by using management technology based on constructional engineering process data |
CN109829241A (en) * | 2019-02-20 | 2019-05-31 | 中建一局集团第二建筑有限公司 | A method of it is constructed using the administrative skill based on architectural engineering process data |
CN110110985A (en) * | 2019-04-28 | 2019-08-09 | 浙江明度智控科技有限公司 | A kind of record of production method and recording device |
CN110505452A (en) * | 2019-08-26 | 2019-11-26 | 广东电网有限责任公司 | A kind of capital construction power transmission engineering Schedule monitoring method and monitoring system |
CN110505452B (en) * | 2019-08-26 | 2021-04-23 | 广东电网有限责任公司 | Capital construction power transmission project progress monitoring method and monitoring system |
CN110942272A (en) * | 2019-12-13 | 2020-03-31 | 河南城建学院 | Engineering project management cloud platform system based on material tracking |
CN111915273A (en) * | 2020-07-30 | 2020-11-10 | 北京航天发射技术研究所 | Assembly management method, system, terminal and storage medium based on process tracking card |
CN116501921A (en) * | 2023-06-25 | 2023-07-28 | 长沙计支宝信息科技有限公司 | Test data processing method and system for press machine for testing performance of building material |
CN116501921B (en) * | 2023-06-25 | 2023-09-15 | 长沙计支宝信息科技有限公司 | Test data processing method and system for press machine for testing performance of building material |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107423886A (en) | Engineering data management by synchronization system and management method based on Track Table | |
CN107515953A (en) | One kind welding overall process quality tracing and analysis system | |
CN112232761B (en) | Infrastructure application system and method | |
CN115375146B (en) | Digital construction integrated platform | |
Yu et al. | RIOMS: An intelligent system for operation and maintenance of urban roads using spatio-temporal data in smart cities | |
US20130006688A1 (en) | Creating a 3rd party team project story board | |
CN109947068A (en) | A kind of field data acquisition system and method | |
CN114386807A (en) | Public health event emergency system and method | |
CN109711645A (en) | A kind of pipeline construction data management system and method based on two dimensional code | |
CN112988865B (en) | Industrial Internet service management system | |
US20130007694A1 (en) | Project story board to board communication tools | |
Ding et al. | BIM research vs BIM practice: a bibliometric-qualitative analysis from China | |
CN113377886A (en) | Production and construction project water and soil conservation supervision field investigation method | |
Guo et al. | Implementation of CIM-related technologies within transportation projects | |
CN110599116A (en) | Power grid decentralized collaborative design method and system based on cloud data center | |
CN111708827A (en) | Real estate unit coding system | |
US20130006687A1 (en) | Creating a sub-story for a project story board | |
Jing et al. | Development of BIM-Sensor integrated platform for MEP piping maintenance | |
Klosova et al. | Methods for identifying non-value-adding activities in construction processes | |
Wang et al. | BIM-based government engineering quality supervision system | |
Hafez | Managing heritage through facilities data management heritage information system | |
Zhong et al. | Visible project management system for highway construction based on 3d virtual reality and information technology | |
Masrom et al. | Reinventing Operation Through Visual Asset Management System & Digitalization | |
Li | Analysis on construction practice of intelligent prefabricated building based on BIM technology | |
CN117436634A (en) | Management platform based on NFC and GIS garden data association |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171201 |
|
RJ01 | Rejection of invention patent application after publication |