CN108108543A - A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology - Google Patents

A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology Download PDF

Info

Publication number
CN108108543A
CN108108543A CN201711343771.0A CN201711343771A CN108108543A CN 108108543 A CN108108543 A CN 108108543A CN 201711343771 A CN201711343771 A CN 201711343771A CN 108108543 A CN108108543 A CN 108108543A
Authority
CN
China
Prior art keywords
bim
secondary structure
establish
spring
application process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711343771.0A
Other languages
Chinese (zh)
Inventor
戴继涛
姜铭
姚建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Original Assignee
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haiwei Engineering Construction Co Ltd of FHEC of CCCC filed Critical Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority to CN201711343771.0A priority Critical patent/CN108108543A/en
Publication of CN108108543A publication Critical patent/CN108108543A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Abstract

The present invention provides a kind of secondary structure Deepen Design application processes of master craftsman of the Spring and Autumn period's BIM technology, belong to BIM application fields, including step:S1:Establish structural model and corresponding document;S2:Establish secondary structure model and corresponding document;S3:Establish electromechanical each Professional Model and corresponding document;S4:It molds detection in each system after collision detection again, if detection is qualified, carries out step S5, if detection is unqualified, carry out step S6;S5:Determine that electromechanical pipeline is reserved and wall slotting position;S6:Solution and in-depth are adjusted for each specialty, then carries out step S4 again;S7:Optimize positions and the numbers such as ring beam and construction column, lintel, row's brick optimization reduces spillage of material;S8:Quantization system is analyzed, and generates the flat profile in elevation of each node at any time as needed;S9:BIM threedimensional models are carried out to the integrated optimization of a variety of BIM softwares.The present invention concentrates on multiple information in one model, based on the actuarial of BIM Deepen Design modules, can realize the optimal arrangement of secondary structure.

Description

A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology
Technical field
The present invention relates to BIM application fields, in particular to a kind of secondary structure Deepen Design of master craftsman of the Spring and Autumn period's BIM technology Application process.
Background technology
1. architectural design defect would generally be exposed in project practice of construction, once problem exposure will be related to becoming More.One change generally requires unit in charge of construction and regroups associated construction scheme and schedule, also to carry out relevant skill Art is proved and confides a technological secret, and the manpower of input and time are excessive, this has just dragged slowly the construction speed of engineering significantly.
2. the establishment of construction schedule unreasonable the problem of will also result in progress control.Under normal conditions, engineering project The establishment of schedule tends to rely on the experience of project administrator, this will have many unreasonable places, once in item It goes wrong in mesh implementation process, the smooth delivery of project under construction will be influenced, huge loss is caused to project.
3. the main body for currently carrying out project construction is people, because this person is one of big factors that can engineering smoothly complete, Influence of the quality of construction personnel to project process simultaneously is also very big.Understanding of the construction personnel to drawing, to the ripe of construction technology Know construction quality, cost and progress that the factors such as degree are likely to influence project.
The content of the invention
It is an object of the invention to provide a kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology, to improve The problem of above-mentioned.
What the present invention was realized in:
Based on above-mentioned purpose, the present invention provides a kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology, Include the following steps:
S1:Establish structural model and corresponding document;
S2:Establish secondary structure model and corresponding document;
S3:Establish electromechanical each Professional Model and corresponding document;
S4:It molds detection in each system after collision detection again, if detection is qualified, carries out step S5, if detection is unqualified, Then carry out step S6;
S5:Determine that electromechanical pipeline is reserved and wall slotting position;
S6:Solution and in-depth are adjusted for each specialty, then carries out step S4 again;
S7:Optimize positions and the numbers such as ring beam and construction column, lintel, row's brick optimization reduces spillage of material;
S8:Quantization system is analyzed, and generates the flat profile in elevation of each node at any time as needed;
S9:BIM threedimensional models are carried out to the integrated optimization of a variety of BIM softwares.
In an embodiment of the present embodiment:The optimization process includes:
S61:Establish foundation structure;
S62:Establish underground agent structure;
S63:Establish secondary structure;
S64:Joined;
S65:Proceed by elevator engineering and fitting-out work.
In an embodiment of the present embodiment:After step S62 has been carried out, may be used also while step S63 is carried out To carry out step:
S621:Establish ground agent structure;
S622:Carry out roofing construction;
S633:Carry out alien invasion construction.
In an embodiment of the present embodiment:After step S63 has been carried out, may be used also while step S64 is carried out To carry out step S631:Electromechanics installation and adjustment.
In an embodiment of the present embodiment:In step s 5, the comprehensive of electromechanical pipeline should be first established to arrange, then into The collision detection of row and structure wall determines reserved opening position, and hole to be provided is determined with secondary structure again after solving collision problem Mouthful.
In an embodiment of the present embodiment:The structural model and corresponding document can be in work usually Erecting and improving.
In an embodiment of the present embodiment:In the step s 7, elevator spaced-apart beams include girder steel and beams of concrete, need To be considered with collar tie beam, door opening lintel.
In an embodiment of the present embodiment:In the step s 7, step is further included:The species of screening row's brick;If BIM The default size size in need carried, then can directly use;If the default size that BIM is carried does not have size in need, Then need the filling pattern by using custom size.
In an embodiment of the present embodiment:Also needed to when optimizing processing considering cost and《Masonry Structural Engineering job specfication》Requirement.
Based on above-mentioned purpose, the present invention also provides a kind of secondary structure Deepen Design application sides of master craftsman of the Spring and Autumn period's BIM technology Method includes the following steps:
S1:Establish structural model and corresponding document;
S2:Establish secondary structure model and corresponding document;
S3:Establish electromechanical each Professional Model and corresponding document;
S4:It molds detection in each system after collision detection again, if detection is qualified, carries out step S5, if detection is unqualified, Then carry out step S6;
S5:Determine that electromechanical pipeline is reserved and wall slotting position;
S6:Solution and in-depth are adjusted for each specialty, then carries out step S4 again;
S7:Optimize positions and the numbers such as ring beam and construction column, lintel, row's brick optimization reduces spillage of material;
S8:Quantization system is analyzed, and generates the flat profile in elevation of each node at any time as needed;
S9:BIM threedimensional models are carried out to the integrated optimization of a variety of BIM softwares;
S10:According to the BIM three-dimension modeling project level BIM embodiments of optimization.
Compared with prior art, the advantageous effect realized of the present invention is:
The shortcomings that based on existing form of construction work, the present invention solve traditional architecture construction working efficiency in Management of engineering schedule Low, information transfers the shortcomings of slipping.By establishing BIM models, by three-dimensional rendering, soon the amount of calculating quickly, accurate plan, calculate comparison, The information such as Virtual Construction, collision detection, conflict calling are concentrated in a model, once information typing model, it is equal to participate in each side Up-to-date information can be obtained at the first time.In such a mode, it is that need not return again to designing institute to change plan in work progress, material supplies It answers business that will not at will change material and carries out scheme change.Although this pattern early investment time energy is more, once open Work will not just waste again substantially human, financial, and material resources, when scheme change on.Final result is can to save considerably long duration and not Small cost.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art The attached drawing of required practicality is briefly described in embodiment or description of the prior art, it should be apparent that, it is described below attached Figure is some embodiments of the present invention, for those of ordinary skill in the art, in the premise not made the creative labor Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 shows the step of the secondary structure Deepen Design application process for master craftsman of the Spring and Autumn period's BIM technology that the embodiment of the present invention 1 provides Rapid figure;
Fig. 2 shows the total block diagram of optimization process that the embodiment of the present invention 1 provides;
Fig. 3 shows the Optimization Steps figure that the embodiment of the present invention 1 provides;
Fig. 4 shows the foundation structure establishment step figure that the embodiment of the present invention 1 provides;
Fig. 5 shows the step of the secondary structure Deepen Design application process for master craftsman of the Spring and Autumn period's BIM technology that the embodiment of the present invention 2 provides Rapid figure.
Specific embodiment
The present invention is described in further detail below through specific implementation examples and in conjunction with the accompanying drawings.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, above in conjunction in the embodiment of the present invention Attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.The present invention implementation being usually described and illustrated herein in the accompanying drawings The component of example can configure to arrange and design with a variety of.
Therefore, the detailed description of the embodiment of the present invention more than to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiments of the present invention, this field is common Technical staff's all other embodiments obtained without creative efforts belong to the model that the present invention protects It encloses.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
In the description of the present invention, it is to be understood that the term of indicating position or position relationship is based on shown in attached drawing Orientation or position relationship, be for only for ease of the description present invention and simplify description rather than instruction or imply signified equipment Or element must have specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In the present invention, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc. Term should be interpreted broadly, for example, it may be being fixedly connected or integral;Can be mechanical connection or electrical connection; It can be directly connected, can also be indirectly connected by intermediary, can be the connection inside two elements or two elements Interaction relationship.For the ordinary skill in the art, above-mentioned term can be understood at this as the case may be Concrete meaning in invention.
In the present invention, unless otherwise clearly defined and limited, fisrt feature can be on or below second feature Contacted directly including the first and second features, can also include the first and second features not be contact directly but by them it Between other characterisation contact.Moreover, fisrt feature is on second feature, top and above to include fisrt feature special second Directly over sign and oblique upper is merely representative of fisrt feature level height higher than second feature.Fisrt feature second feature it Under, lower section and fisrt feature included below immediately below second feature and obliquely downward or be merely representative of fisrt feature level height Less than second feature.
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
Embodiment 1
Referring to figs. 1 to Fig. 4, a kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology includes the following steps:
S1:Structural model and corresponding document are established, the structural model and corresponding document can be in work usually Erecting and improving;
S2:Establish secondary structure model and corresponding document;
S3:Establish electromechanical each Professional Model and corresponding document;
S4:It molds detection in each system after collision detection again, if detection is qualified, carries out step S5, if detection is unqualified, Then carry out step S6;
S5:Determine that electromechanical pipeline is reserved and wall slotting position, should first establish the comprehensive arrangement of electromechanical pipeline, then carry out with The collision detection of structure wall determines reserved opening position, and reserved opening is determined with secondary structure again after solving collision problem;
S6:Solution and in-depth are adjusted for each specialty, then carries out step S4 again;
S61:Establish foundation structure;
S62:Establish underground agent structure;
Step can also be carried out while step S63 is carried out:S621:Establish ground agent structure;
S622:Carry out roofing construction;
S633:Carry out alien invasion construction.
S63:Establish secondary structure;
Step S631 can also be carried out while step S64 is carried out:Electromechanics installation and adjustment;
S64:Joined;
S65:Proceed by elevator engineering and fitting-out work;
S7:Optimize ring beam and construction column, positions and the number such as lintel, elevator spaced-apart beams include girder steel and beams of concrete, it is necessary to Considered with collar tie beam, door opening lintel, step is further included in the brick optimization of the row of progress:The species of screening row's brick;If BIM The default size size in need carried, then can directly use;If the default size that BIM is carried does not have size in need, The filling pattern by using custom size is then needed, can so reduce spillage of material;
S8:Quantization system is analyzed, and generates the flat profile in elevation of each node at any time as needed;
S9:BIM threedimensional models are carried out to the integrated optimization of a variety of BIM softwares.
In the present embodiment, also needed to when optimizing processing considering cost and《Masonry structure engineering construction is advised Model》Requirement.
For a series of influence problems in previous traditional construction, the present invention so solves:
(1) establish secondary structure dependency structure model and solve the problems, such as that drawing describes
Model is established by BIM softwares, can intuitively know very much drawing is how to design using the visualization function of BIM , it is unclear, non-intuitive to solve the problems, such as that drawing describes.The model established can be utilized to can be visually seen each function room of each layer Layout, the flat profile in elevation including any position can also carry out real-time cutting, roam in a model in a model, geographical very well Solve design idea.
The in-depth of BIM technology secondary structure is on the basis of structural model, directly adds masonry panel model.And it often ties The foundation needs of structure model take considerable time.One ripe BIM application item, structural model should be in usually working It is set up perfect, directly brings use.If without complete structural model, for the in-depth of secondary structure, it is only necessary to establish With the relevant structural model of masonry panel, remaining unrelated time that need not expend goes to establish.For brick can establish race into It exercises and uses.
Project BIM team is complete using the time of 3 months in the case where completing one's work due to being substantially all to be part-time It establishes, has been solved using functions such as collision detections a large amount of electromechanical and concrete structure into concrete structure and electromechanical model Collision problem.After subsequent index bed secondary structure model foundation, collision detection is carried out again.
(2) visible environment solves CAD in-depth limitations
Deepened using model, constructional column covers cross wall, T-shaped wall, corner wall, end wall etc.. It carries out the setting of constructional column race and family parameter in advance by in-depth, effectively integrates and the quantity of constructional column race is controlled, it is only logical It crosses adjusting parameter and completes constructional column in-depth, greatly reduce workload.And can comprehensive adjustment collar tie beam absolute altitude, hand over each face Circle.Work efficiency, accuracy all increase.Recyclability is high, accuracy is high, and visual perception is strong.
It is that CAD can not expressed intact --- wall bar planting there are one detail structure.This planting reinforcement glue is expensive, Therefore strict control control bar planting quantity has saved cost well.In a model, require, will be related to according to design drawing The reinforcing bar distribution of the position respective diameters of bar planting in a model, not only can be with the radical of express statistic reinforcing bar implantation, Er Qieke To know the reinforcing bar regularity of distribution exactly, convenient for management.
(3) comprehensive each relevant speciality model solves the problems, such as hole indwelling
The comprehensive arrangement of this layer of electromechanical pipeline is established, then carries out the collision detection with structure wall, determines hole reserve position.By Electromechanical speciality carries out pipeline layout, collision detection, solves the collision problem in specialty, then solves the collision problem between specialty, most Afterwards reserved opening is determined with secondary structure.Wear the electromechanical pipeline of masonry panel, door-window opening, heating and ventilating equipment hole on masonry panel The correlation models such as girder steel embedded part, accurate with forms such as hole, pipeline, embedded part races in mouth, fire hydrant box reserved opening, elevator shaft Ground is embodied on masonry panel.Quality problems caused by avoiding later stage fluting, repeatedly slotting can have a significant impact to stress.
(4) BIM technology optimization spaced-apart beams, collar tie beam are utilized
This engineering elevator spaced-apart beams include girder steel and beams of concrete, consider with collar tie beam, door opening lintel, pass through BIM Technological synthesis is deepened and carries out collision detection, can find the spaced-apart beams of low area's hoistway design drawing paper low, after after optimization Lintel and collar tie beam can be reduced, pour the scale of construction, bar planting radical can all be reduced.
(5) arranging brick in-depth reduces spillage of material
It is most troublesome that brick is arranged in CAD, and different engineerings use different building block sizes, it is desirable that also differ to gray seam thickness anyhow Sample including detailed treatments such as some holes, constructional columns, is required to hand drawn.Quantities is very big, and different engineerings cannot weigh It is multiple to utilize.
It, can be to Wall model surface filling pattern into edlin in BIM softwares.Acquiescence building block pattern dimension in software Only 200mm × 400mm, 225mm × 225mm, 225mm × 400mm etc. are several, and size is very limited.This engineering uses facade ruler Very little is 600mm × 200mm autoclave aerated concrete building blocks.This size filling pattern need in advance make in designated software, be formed .pat then formatted file imports file in BIM softwares, you can using the filling pattern of custom size, once import BIM Part uses, can by the x of global pattern, y-coordinate come determine it is final at least arrange brick mode, accomplish precision management, control cost.
(6) data statistics refinement cost
Build the statistics of the in-depth model amount of progress by laying bricks or stones using index bed.According to building block usage quantity, materials arrival is rationally controlled Time saves construction site.Especially in the case where this project construction land tenure is at full stretch, fine-grained management is even more important.Root According to specification《Masonry structure engineering construction specification》Requirement, socket reinforcing steel implant inspection lot capacity be 1201~3200 when, sample This capacity is 50.Every layer of bar planting of index bed 2836 arranges every 2 layers to carry out 6 reinforcing bar pull-out tests of φ for 1 inspection lot accordingly.
Embodiment 2
With reference to Fig. 5, the present embodiment also provides a kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology, this Embodiment is being further improved on the basis of the technical solution of embodiment 1, and the technical solution that embodiment 1 describes is equally applicable In the present embodiment, 1 published technical solution of embodiment is not repeated to describe.
Specifically, the present embodiment is with embodiment 1, difference lies in the secondary knots of master craftsman of the Spring and Autumn period's BIM technology provided in this embodiment Structure Deepen Design application process is also needed to after BIM threedimensional models to be carried out to the integrated optimization of a variety of BIM softwares according to optimization BIM three-dimension modeling project level BIM embodiments.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. the secondary structure Deepen Design application process of a kind of master craftsman of the Spring and Autumn period's BIM technology, which is characterized in that include the following steps:
S1:Establish structural model and corresponding document;
S2:Establish secondary structure model and corresponding document;
S3:Establish electromechanical each Professional Model and corresponding document;
S4:It molds detection in each system after collision detection again, if detection is qualified, carries out step S5, if detection is unqualified, into Row step S6;
S5:Determine that electromechanical pipeline is reserved and wall slotting position;
S6:Solution and in-depth are adjusted for each specialty, then carries out step S4 again;
S7:Optimize positions and the numbers such as ring beam and construction column, lintel, row's brick optimization reduces spillage of material;
S8:Quantization system is analyzed, and generates the flat profile in elevation of each node at any time as needed;
S9:BIM threedimensional models are carried out to the integrated optimization of a variety of BIM softwares.
2. the secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology according to claim 1, which is characterized in that institute Stating optimization process includes:
S61:Establish foundation structure;
S62:Establish underground agent structure;
S63:Establish secondary structure;
S64:Joined;
S65:Proceed by elevator engineering and fitting-out work.
3. the secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology according to claim 1, which is characterized in that After having carried out step S62, step can also be carried out while step S63 is carried out:
S621:Establish ground agent structure;
S622:Carry out roofing construction;
S633:Carry out alien invasion construction.
4. the secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology according to claim 1, which is characterized in that After having carried out step S63, step S631 can also be carried out while step S64 is carried out:Electromechanics installation and adjustment.
5. the secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology according to claim 1, which is characterized in that In step S5, the comprehensive arrangement of electromechanical pipeline should be first established, then carries out the collision detection with structure wall, determines reserved opening position It puts, reserved opening is determined with secondary structure again after solving collision problem.
6. the secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology according to claim 1, which is characterized in that institute The structural model and corresponding document stated can in work usually Erecting and improving.
7. the secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology according to claim 1, which is characterized in that In step S7, elevator spaced-apart beams include girder steel and beams of concrete, it is necessary to be considered with collar tie beam, door opening lintel.
8. the secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology according to claim 1, which is characterized in that In step S7, step is further included:The species of screening row's brick;If the default size size in need that BIM is carried, can be direct It uses;If the default size that BIM is carried does not have size in need, the filling pattern by using custom size is needed.
9. the secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology according to claim 1, which is characterized in that Also needed to when optimizing processing considering cost and《Masonry structure engineering construction specification》Requirement.
10. the secondary structure Deepen Design application process of a kind of master craftsman of the Spring and Autumn period's BIM technology, which is characterized in that include the following steps:
S1:Establish structural model and corresponding document;
S2:Establish secondary structure model and corresponding document;
S3:Establish electromechanical each Professional Model and corresponding document;
S4:It molds detection in each system after collision detection again, if detection is qualified, carries out step S5, if detection is unqualified, into Row step S6;
S5:Determine that electromechanical pipeline is reserved and wall slotting position;
S6:Solution and in-depth are adjusted for each specialty, then carries out step S4 again;
S7:Optimize positions and the numbers such as ring beam and construction column, lintel, row's brick optimization reduces spillage of material;
S8:Quantization system is analyzed, and generates the flat profile in elevation of each node at any time as needed;
S9:BIM threedimensional models are carried out to the integrated optimization of a variety of BIM softwares;
S10:According to the BIM three-dimension modeling project level BIM embodiments of optimization.
CN201711343771.0A 2017-12-14 2017-12-14 A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology Pending CN108108543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711343771.0A CN108108543A (en) 2017-12-14 2017-12-14 A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711343771.0A CN108108543A (en) 2017-12-14 2017-12-14 A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology

Publications (1)

Publication Number Publication Date
CN108108543A true CN108108543A (en) 2018-06-01

Family

ID=62216101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711343771.0A Pending CN108108543A (en) 2017-12-14 2017-12-14 A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology

Country Status (1)

Country Link
CN (1) CN108108543A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162407A (en) * 2018-09-25 2019-01-08 重庆大学产业技术研究院 A kind of reinforced concrete member intersection region reinforcing bar automatic obstacle-avoiding method based on Artificial Potential Field Method
CN109740246A (en) * 2018-12-29 2019-05-10 江苏龙腾数字建造技术研究院有限公司 A kind of fine fitment Deepen Design optimization method based on BIM
CN110117994A (en) * 2019-05-28 2019-08-13 中建七局建筑装饰工程有限公司 A kind of constructing construction method based on BIM technology
CN110377937A (en) * 2019-06-06 2019-10-25 浙江伟星新型建材股份有限公司 High-precision pregroove marks body construction method
CN110727983A (en) * 2019-09-27 2020-01-24 贵州百胜工程建设咨询有限公司 BIM modeling method for public medical building
CN111475879A (en) * 2020-03-25 2020-07-31 青岛腾远设计事务所有限公司 Method and device for generating building entrance to a cave lintel based on BIM technology
CN111535482A (en) * 2020-04-18 2020-08-14 湖南顺天建设集团有限公司 Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN111651822A (en) * 2020-05-29 2020-09-11 深圳市华阳国际工程设计股份有限公司 Hole information generation method and device of BIM (building information modeling) model and storage device
CN111967073A (en) * 2020-07-01 2020-11-20 中国建筑一局(集团)有限公司 BIM-based secondary structure construction method
CN112733230A (en) * 2020-12-31 2021-04-30 江苏美城建筑规划设计院有限公司 Building electromechanical pipeline comprehensive optimization method based on BIM technology
CN112749431A (en) * 2020-12-28 2021-05-04 无锡市天宇民防建筑设计研究院有限公司 Wafer floor rapid arrangement method based on BIM technology
CN113863571A (en) * 2021-09-30 2021-12-31 中国五冶集团有限公司 Prefabricated wall and preparation method thereof
CN115329435A (en) * 2022-08-19 2022-11-11 山东建筑大学 BIM-based heat preservation and structure integrated outer wall batten arranging method and system
CN115906264A (en) * 2022-12-28 2023-04-04 中建七局建筑装饰工程有限公司 Masonry structure ring beam forward design method based on BIM technology
CN116228723A (en) * 2023-03-13 2023-06-06 航天轩宇(杭州)智能科技有限公司 Method and device for determining mold closing degree, readable medium and electronic equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19758003A1 (en) * 1997-01-08 1998-08-06 Volkswagen Ag Vehicle chassis linked with secondary structure
CN105260541A (en) * 2015-10-13 2016-01-20 中国十七冶集团有限公司 Pipeline deepening method based on BIM model
CN106529065A (en) * 2016-11-15 2017-03-22 中建六局土木工程有限公司 Installation construction method for carrying out component optimization by software
CN106978907A (en) * 2017-04-07 2017-07-25 中建二局第三建筑工程有限公司 A kind of construction method of tall and big curved wall secondary structure
CN107169231A (en) * 2017-06-09 2017-09-15 东风设计研究院有限公司 The Deepen Design method of structural metal containment system based on BIM
CN107330153A (en) * 2017-06-06 2017-11-07 中国建筑股份有限公司 A kind of prefabricated concrete structure BIM models two-stage parameterizes construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19758003A1 (en) * 1997-01-08 1998-08-06 Volkswagen Ag Vehicle chassis linked with secondary structure
CN105260541A (en) * 2015-10-13 2016-01-20 中国十七冶集团有限公司 Pipeline deepening method based on BIM model
CN106529065A (en) * 2016-11-15 2017-03-22 中建六局土木工程有限公司 Installation construction method for carrying out component optimization by software
CN106978907A (en) * 2017-04-07 2017-07-25 中建二局第三建筑工程有限公司 A kind of construction method of tall and big curved wall secondary structure
CN107330153A (en) * 2017-06-06 2017-11-07 中国建筑股份有限公司 A kind of prefabricated concrete structure BIM models two-stage parameterizes construction method
CN107169231A (en) * 2017-06-09 2017-09-15 东风设计研究院有限公司 The Deepen Design method of structural metal containment system based on BIM

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
KEYU CHEN,ET AL.: "AHP Based Weighting System for BIM Implementation & Assessment", 《IEEE》 *
王志珑 等: "利用BIM技术进行二次结构深化", 《建筑机械化》 *
王志珑 等: "利用BIM技术进行二次结构深化设计", 《施工技术》 *
顿志林 主编: "《建设工程监理概论》", 31 May 2017 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162407B (en) * 2018-09-25 2020-08-04 重庆大学产业技术研究院 Automatic obstacle avoidance method for reinforcing steel bars in crossed area of reinforced concrete member based on artificial potential field method
CN109162407A (en) * 2018-09-25 2019-01-08 重庆大学产业技术研究院 A kind of reinforced concrete member intersection region reinforcing bar automatic obstacle-avoiding method based on Artificial Potential Field Method
CN109740246A (en) * 2018-12-29 2019-05-10 江苏龙腾数字建造技术研究院有限公司 A kind of fine fitment Deepen Design optimization method based on BIM
CN110117994A (en) * 2019-05-28 2019-08-13 中建七局建筑装饰工程有限公司 A kind of constructing construction method based on BIM technology
CN110377937A (en) * 2019-06-06 2019-10-25 浙江伟星新型建材股份有限公司 High-precision pregroove marks body construction method
CN110727983A (en) * 2019-09-27 2020-01-24 贵州百胜工程建设咨询有限公司 BIM modeling method for public medical building
CN111475879A (en) * 2020-03-25 2020-07-31 青岛腾远设计事务所有限公司 Method and device for generating building entrance to a cave lintel based on BIM technology
CN111475879B (en) * 2020-03-25 2021-11-02 青岛腾远设计事务所有限公司 Method and device for generating building entrance to a cave lintel based on BIM technology
CN111535482A (en) * 2020-04-18 2020-08-14 湖南顺天建设集团有限公司 Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN111651822A (en) * 2020-05-29 2020-09-11 深圳市华阳国际工程设计股份有限公司 Hole information generation method and device of BIM (building information modeling) model and storage device
CN111967073A (en) * 2020-07-01 2020-11-20 中国建筑一局(集团)有限公司 BIM-based secondary structure construction method
CN112749431B (en) * 2020-12-28 2024-02-20 江苏天宇设计研究院有限公司 Wafer floor rapid arrangement method based on BIM technology
CN112749431A (en) * 2020-12-28 2021-05-04 无锡市天宇民防建筑设计研究院有限公司 Wafer floor rapid arrangement method based on BIM technology
CN112733230A (en) * 2020-12-31 2021-04-30 江苏美城建筑规划设计院有限公司 Building electromechanical pipeline comprehensive optimization method based on BIM technology
CN113863571A (en) * 2021-09-30 2021-12-31 中国五冶集团有限公司 Prefabricated wall and preparation method thereof
CN115329435A (en) * 2022-08-19 2022-11-11 山东建筑大学 BIM-based heat preservation and structure integrated outer wall batten arranging method and system
CN115329435B (en) * 2022-08-19 2023-11-24 山东建筑大学 BIM-based heat preservation and structure integrated exterior wall slat board arrangement method and system
CN115906264A (en) * 2022-12-28 2023-04-04 中建七局建筑装饰工程有限公司 Masonry structure ring beam forward design method based on BIM technology
CN116228723A (en) * 2023-03-13 2023-06-06 航天轩宇(杭州)智能科技有限公司 Method and device for determining mold closing degree, readable medium and electronic equipment
CN116228723B (en) * 2023-03-13 2023-11-10 航天轩宇(杭州)智能科技有限公司 Method and device for determining mold closing degree, readable medium and electronic equipment

Similar Documents

Publication Publication Date Title
CN108108543A (en) A kind of secondary structure Deepen Design application process of master craftsman of the Spring and Autumn period's BIM technology
CN106372302A (en) Tower crane automatic model selection and optimization system and method based on BIM (Building Information Modeling) technology
CN108268707A (en) A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT
CN108229808A (en) A kind of assembled architecture project construction Process Control System
KR20240004188A (en) Structure construction method for multiple buildings with wall structure
Tam et al. Evaluation of construction methods and performance for high rise public housing construction in Hong Kong
Laurini et al. Technology 4.0 for buildings management: from building site to the interactive building book
CN100570757C (en) The modular construction method that is used for nuclear island of nuclear power station
KR20230169923A (en) An apparatus and method for analyzing a working area and route of form worker and rebar worker at a housing construction
Nowotarski et al. Waste reduction by lean construction-office building case study
CN107871193A (en) The task exchange method and device of actual quantities are surveyed in engineering management
KR101163580B1 (en) Method for automatically generating Reinforced Concrete SHOP Drawing
CN101736925B (en) Modular construction method for nuclear island of nuclear power station
CN113761724A (en) Assembly type building construction organization and progress management method based on BIM technology
CN112052490A (en) BIM-based assembly type deepened design method and design tool thereof
CN101752017B (en) Modularization construction method for nuclear power station nuclear island
CN107237494A (en) A kind of adjustable hole to be provided construction mould and construction method
CN116561871A (en) Deep construction method for mounting embedded part of bridge bearing platform
CN101748915B (en) Modularization construction method for nuclear power station nuclear island
Zhen Application and Innovation of BIM Technology in Construction Management Stage of Large Medical Construction Projects
CN114386135A (en) Concrete slab steel bar construction arrangement method and system
CN113673017A (en) Automatic ceramic tile arrangement method and automatic ceramic tile arrangement system
CN106869387A (en) Multi-ribbed plate Structural Floor System HZ concrete film construction methods
Nowotarski et al. DMAIC method of quality improvement of ground works processes: case study
Heineck et al. Transparency in building construction: a case study

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180601