CN108694260A - Application process of the BIM technology in Steel Bridge processing and manufacturing - Google Patents
Application process of the BIM technology in Steel Bridge processing and manufacturing Download PDFInfo
- Publication number
- CN108694260A CN108694260A CN201710227658.XA CN201710227658A CN108694260A CN 108694260 A CN108694260 A CN 108694260A CN 201710227658 A CN201710227658 A CN 201710227658A CN 108694260 A CN108694260 A CN 108694260A
- Authority
- CN
- China
- Prior art keywords
- management
- steel bridge
- tool
- manufacturing
- bim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Theoretical Computer Science (AREA)
- Mathematical Optimization (AREA)
- Computational Mathematics (AREA)
- Architecture (AREA)
- Mathematical Analysis (AREA)
- Structural Engineering (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of application process in Steel Bridge processing and manufacturing and work progress using BIM technology in Steel Bridge processing and manufacturing, (1) exploitation and application of the three-dimensional digital model to two-dimentional drawing conversion tool;It realizes quick, the accurate, information completely that Steel Bridge mathematical model is converted to engineering drawing, accordingly goes out figure tool for CATIA research and development of software and apply;(2) Drawing Management System:It will be associated with construction drawing counter structure in model, and drawing be set and calls, the application management systems such as change and abrogate, be managed collectively from time course.(3) material management system:It is divided in conjunction with mathematical model and structure processing, carries out material classification and summarize, forming material inventory.(4) Technical innova- tion system:In conjunction with mathematical model, visualized management is carried out to construction speed.(5) quality control system:Based on mathematical model, data base administration is carried out to quality document in production process.
Description
Technical field
The present invention relates to one kind to be fabricated using BIM technology in Steel Bridge in Steel Bridge processing and manufacturing and work progress
In application process, belong to Steel Bridge manufacturing technology and construction management field.
Background technology
Steel Bridge manufacture generally uses more ground manufacturing mode, i.e., purchases raw material in material producer, is fortune in factory process
It is assembled to carry out lifting elements in bridge location for defeated unit(Complicated project also needs to carry out secondary assembly at bridge location scene).Due to Steel Bridge
The complexity of structure, manufacturing project are changed morely, generally work out engineering drawing using traditional artificial CAD cartographic models, project uses
Traditional behavior adjustment management is arranged different personnel and carries out technical quality management, information system management, Management of engineering schedule etc., each to manage
Close fit is needed between personnel, ensures the timely communication of information.Steel Bridge manufactures for many years, adopts traditional management always
Pattern.
The BIM technology carried out in the industries such as aviation, automobile, building at present, construction characteristic and Steel Bridge manufacturing variation
It is too big, it can not directly apply.
Invention content
Purpose of design:The shortcoming in background technology is avoided, is required in conjunction with Steel Bridge manufacture characteristic and processing technology, with
Based on the three-dimensional digital model that CATIA softwares create, professional tool research and development are carried out with drawing for construction, are ensured quick, accurate
True realizes conversion of the three-dimensional digital model to two-dimensional engineering graphic;Meanwhile in conjunction with three-dimensional digital model, the management of Development Engineering figure,
Material application management, manufacturing schedule management, process quality management etc. manage system, realize the timely shared of management information, management
The visualization of work makes project reach application of the BIM technology of the management objectives of cost efficiency in Steel Bridge processing and manufacturing
Method.
Design scheme:BIM be one kind based on 3-dimensional digital technology, be integrated with the various relevant informations of construction-engineering project
Engineering Digital model, it have visualization, harmony, simulation, optimization property and five big feature of figure can be gone out.BIM is as one
The novel tool of kind, it is considered to be the change theory and milestone technology of global building trade, in recent years, with domestic construction
The fast development of industry, BIM technology engineering construction field obtained more and more widely accept and apply, design, construction,
Vital effect can be played in the whole life cycles such as later stage operation maintenance, the application of BIM technology will lead entire work
Journey construction field construction overall process.The application combination Steel Bridge manufacturing technical feature is carried out BIM and is answered based on CATIA softwares
With the exploitation item by item of technology, and sequential use plays new technology to the manufacturing promotion of Steel Bridge during project implementation
Power.
The application uses for reference the application example of previous BIM technology according to Steel Bridge construction characteristic, construction technology, from engineering drawing
Paper conversion, engineering drawing management, material application management, manufacturing schedule management, process quality management etc. carry out being based on CATIA
The exploitation of mathematical model forms mathematical model information management platform, is applied to work progress management.
Technical solution:A kind of application process of BIM technology in Steel Bridge processing and manufacturing, (1) three-dimensional digital model to two
It ties up drawing and converts tool:In order to realize three-dimensional digital model to two-dimentional drawing conversion quick, accurate, information completely, for
CATIA research and development of software accordingly converts tool;(2) Drawing Management System:For the ease of having access to processing drawing, to the modification of drawing or
It abrogates record to be registered, will be associated with engineering drawing counter structure in model, and drawing is set and called, changed and abrogate
Management system, is managed collectively from time course;(3) material management system:For the ease of the utilization and management of bridge steel plate, knot
It closes mathematical model and structure processes dividing elements, by coded system, all parts of composed structure are subjected to Unified coding,
And Material Takeoff is carried out using bill of materials extracting tool, the material of same requirement is subjected to Classifying Sum, forms material of main part
Shopping list and parts list;(4) Technical innova- tion system:In order to realize management of the BIM to production process, in conjunction with number
Word model defines related process attribute to each parts, and process attribute is corresponding with relevant colors, by controlling process attribute
Variation, change the body color of structural member, realize the visualized management of procedural information;(5) quality control system:To producing
The quality document generated in journey carries out centralization data base administration, calling, inquiry convenient for file;Quality node checking file with
Corresponding digital model association, is transferred convenient for passing through digital model from database.
Compared with the background technology, the present invention, it first, capableing of the carry out Project Running Process management of system, is built from mathematical model
Vertical, engineering drawing conversion, management of blueprint, handling of goods and materials, manufacturing process management, quality management etc. are many-sided to carry out data base administration,
The integration Management for realizing information, improves the quality of management;Second is that BIM technology management is based on mathematical model, it can be straight
Various management data are called on the mathematical model of sight, and there is intuitive, visual feature;Third, using systematized management, energy
Enough saving are artificial, are convenient for information communication, and under the terminal under same internet, can be carried out at the same time input, the output of information, change
It has been apt to the retardance of strange land information communication and unsmooth property;Fourth, using the management system based on mathematical model, it can be to production
Structure in manufacturing process carries out preassembling analysis, judges interstructural connection relation and precision, finds manufacturing issue simultaneously as early as possible
It is resolved, reduction process is done over again and rejection rate, achievees the purpose that cost efficiency;Fifth, Steel Bridge processing and manufacturing uses BIM skills
Art can form a whole set of management data file, have meaning of crucial importance for project later maintenance operation.
Description of the drawings
Fig. 1 is the schematic diagram of application process of the BIM technology in Steel Bridge processing and manufacturing.
Specific implementation mode
Embodiment 1:With reference to attached drawing 1.In order to preferably apply BIM technology in construction process, spy, which rides in, builds steel
Bridge manufacturing project carries out various functions exploitation.First, it is counted as fruit according to structure design and letter, establishes design mathematical model;Again
It is secondary, manufacture of steel structure dividing elements are carried out, and the handling of goods and materials program forming material of exploitation is detailed;Pass through the engineering of exploitation
Figure conversion tool carries the conversion that engineering plan module realizes drawing using CATIA softwares;By database, to drawing, matter
It measures file and carries out integrated management, and be associated with mathematical model;By be arranged parts attribute, and plan parts machining into
Degree, manufacturing schedule etc. is checked, manages by mathematical model.
Construction characteristic in conjunction with Steel Bridge manufacturing project and technique enterprise schema determine suitable BIM application framework systems,
Exploitation creates BIM technology platform.BIM technology Steel Bridge processing and manufacturing in application, include mainly:(1) three-dimensional digital model
Tool is converted to two-dimentional drawing:In order to realize three-dimensional digital model to quick, the accurate, information completely of two-dimentional drawing conversion, needle
Tool is accordingly converted to CATIA research and development of software.(2) Drawing Management System:For the ease of having access to processing drawing, to the modification of drawing
Or abrogate record and registered, it will be associated with engineering drawing counter structure in model, and drawing is set and calls, change and gives up
System is only managed, is managed collectively from time course.(3) material management system:For the ease of the utilization and management of bridge steel plate,
Dividing elements are processed in conjunction with mathematical model and structure, by coded system, all parts of composed structure are subjected to unified volume
Code, and Material Takeoff is carried out using bill of materials extracting tool, the material of same requirement is subjected to Classifying Sum, forms main body material
Expect shopping list and parts list.(4) Technical innova- tion system:In order to realize management of the BIM to production process, in conjunction with
Mathematical model defines related process attribute to each parts, and process attribute is corresponding with relevant colors, by controlling technique category
The variation of property, changes the body color of structural member, realizes the visualized management of procedural information.(5) quality control system:To production
The quality document generated in the process carries out centralization data base administration, calling, inquiry convenient for file;Quality node checking file
It is associated with corresponding digital model, is transferred from database convenient for passing through digital model.
It is to be understood that:Although above-described embodiment retouches the mentality of designing detailed word of contrasting of the present invention
It states, but these verbal descriptions, only the simple text of mentality of designing of the present invention is described, rather than to mentality of designing of the present invention
Limitation, any combination, increase or modification without departing from mentality of designing of the present invention each falls in protection scope of the present invention.
Claims (4)
1. a kind of application process of BIM technology in Steel Bridge processing and manufacturing, it is characterized in that:
(1) three-dimensional digital model converts tool to two-dimentional drawing:In order to realize three-dimensional digital model to the fast of two-dimentional drawing conversion
Speed, accurate, information completely, tool is accordingly converted for CATIA research and development of software;
(2) Drawing Management System:It for the ease of having access to processing drawing, to the modification of drawing or abrogates record and registers, by mould
It is associated with engineering drawing counter structure in type, and drawing is set and called, changed and abrogate management system, from time course
Unified management;
(3) material management system:For the ease of the utilization and management of bridge steel plate, drawn in conjunction with mathematical model and structure processing unit
Point, by coded system, all parts of composed structure are subjected to Unified coding, and carry out using bill of materials extracting tool
The material of same requirement is carried out Classifying Sum, forms material of main part shopping list and parts list by Material Takeoff;
(4) Technical innova- tion system:In order to realize management of the BIM to production process, in conjunction with mathematical model, to each parts
Related process attribute is defined, process attribute is corresponding with relevant colors, by controlling the variation of process attribute, changes structural member
Body color realizes the visualized management of procedural information;
(5) quality control system:Centralization data base administration is carried out to the quality document generated in production process, convenient for file
It calls, inquiry;Quality node checking file is associated with corresponding digital model, is adjusted from database convenient for passing through digital model
It takes.
2. application process of the BIM technology according to claim 1 in Steel Bridge processing and manufacturing, it is characterized in that:It is described
It refers to being directed to CATIA softwares that CATIA research and development of software, which accordingly converts tool, and in conjunction with Steel Bridge construction drawing expression way, customization is opened
It sends out engineering drawing and converts tool, include mainly:Picture frame creates more new tool, weld seam annotation tool, size with title bar and quickly marks
In note tool, construction drawing detail drawing parameter dissolve module, the coordinate representation aids of user coordinate system, ball mark movement replicate and
Merging tool, Typeset and Print tool etc. help to quickly generate two-dimensional engineering graphic using CATIA softwares.
3. application process of the BIM technology according to claim 1 in Steel Bridge processing and manufacturing, it is characterized in that:It is described to set
It refers to the application by BIM technology to set drawing and call, change and abrogate management system, establishes project BIM management platforms, will apply
The three-dimensional modeling data of work drawing and BIM are associated, and establish construction drawing private database.BIM threedimensional models can be passed through
Call the construction drawing of corresponding construction;If changing BIM threedimensional models, its associated construction drawing also can be accordingly modified, and
Preserve change record;If being related to structure Important Adjustment, former threedimensional model need to be abrogated, construction drawing should also preserve and abrogate the time
And the related origin of an incident.
4. application process of the BIM technology according to claim 1 in Steel Bridge processing and manufacturing, it is characterized in that:The volume
Code refers to the structure expressed according to BIM threedimensional models, technical merit is fabricated in conjunction with Steel Bridge, if its structure is divided into
Machinable parts are done, using the system coding program of customized development, by the way that certain rule, zero divided to it is arranged
Part carries out Uniform Name, convenient for the management of Steel Bridge processing and manufacturing.Coded program uses CAA(Component application component)It is opened
Hair, it is special to belong to DS CATIA secondary development, it then follows COM framework specifications are a kind of faces using a kind of architecture mode of loose coupling
Programming to object.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710227658.XA CN108694260A (en) | 2017-04-10 | 2017-04-10 | Application process of the BIM technology in Steel Bridge processing and manufacturing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710227658.XA CN108694260A (en) | 2017-04-10 | 2017-04-10 | Application process of the BIM technology in Steel Bridge processing and manufacturing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108694260A true CN108694260A (en) | 2018-10-23 |
Family
ID=63843234
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710227658.XA Pending CN108694260A (en) | 2017-04-10 | 2017-04-10 | Application process of the BIM technology in Steel Bridge processing and manufacturing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108694260A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109815540A (en) * | 2018-12-20 | 2019-05-28 | 中铁宝桥集团有限公司 | A kind of reference line distribution method of space curve component |
CN110502819A (en) * | 2019-08-14 | 2019-11-26 | 上海市城市建设设计研究总院(集团)有限公司 | The computer-implemented method of concrete-bridge strip member outer closure stirrup |
CN112818448A (en) * | 2021-01-29 | 2021-05-18 | 中国电建集团成都勘测设计研究院有限公司 | Design method of underground factory building rock wall crane beam based on BIM technology |
CN114186308A (en) * | 2021-10-30 | 2022-03-15 | 郑州宝冶钢结构有限公司 | Machining data deriving method based on BIM model and application |
CN115318532A (en) * | 2022-07-29 | 2022-11-11 | 深圳模德宝科技有限公司 | Drawing software-based method for quoting and realizing automatic painting attribute of part |
CN117115406A (en) * | 2023-10-24 | 2023-11-24 | 玛斯特轻量化科技(天津)有限公司 | Automatic drawing method and device and electronic equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100223032A1 (en) * | 2007-05-01 | 2010-09-02 | M.E.P. CAD Inc. | Methods and Apparatuses for Proposing Resolutions to Conflicts in a CAD Drawing with Reflections |
CN104573999A (en) * | 2015-01-30 | 2015-04-29 | 浙江精工钢结构集团有限公司 | Application method of steel structure BIM (building information modeling) information platform |
CN104657512A (en) * | 2015-03-19 | 2015-05-27 | 中铁二局第五工程有限公司 | Method and device for realizing steel truss arch bridge engineering quantity statistics by employing BIM (building information modeling) |
CN104965947A (en) * | 2015-06-29 | 2015-10-07 | 广州瀚阳工程咨询有限公司 | BIM (Building Information Modeling) technology based bridge three-dimensional design method |
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
-
2017
- 2017-04-10 CN CN201710227658.XA patent/CN108694260A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100223032A1 (en) * | 2007-05-01 | 2010-09-02 | M.E.P. CAD Inc. | Methods and Apparatuses for Proposing Resolutions to Conflicts in a CAD Drawing with Reflections |
CN104573999A (en) * | 2015-01-30 | 2015-04-29 | 浙江精工钢结构集团有限公司 | Application method of steel structure BIM (building information modeling) information platform |
CN104657512A (en) * | 2015-03-19 | 2015-05-27 | 中铁二局第五工程有限公司 | Method and device for realizing steel truss arch bridge engineering quantity statistics by employing BIM (building information modeling) |
CN104965947A (en) * | 2015-06-29 | 2015-10-07 | 广州瀚阳工程咨询有限公司 | BIM (Building Information Modeling) technology based bridge three-dimensional design method |
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
Non-Patent Citations (4)
Title |
---|
李兴: "基于CATIA的BIM技术在桥梁设计中的应用", 《北京建筑大学学报》 * |
琚娟: "基于BIM的设计施工跨阶段数据交换标准研究", 《土木建筑工程信息技术》 * |
田建德 等: "《桥梁工程与施工技术研究》", 30 November 2016, 黄河水利出版社 * |
黄威 等: "《经典实例学设计CATIA V5从入门到精通》", 30 September 2016, 机械工业出版社 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109815540A (en) * | 2018-12-20 | 2019-05-28 | 中铁宝桥集团有限公司 | A kind of reference line distribution method of space curve component |
CN109815540B (en) * | 2018-12-20 | 2023-05-12 | 中铁宝桥集团有限公司 | Datum line layout method for space curve component |
CN110502819A (en) * | 2019-08-14 | 2019-11-26 | 上海市城市建设设计研究总院(集团)有限公司 | The computer-implemented method of concrete-bridge strip member outer closure stirrup |
CN112818448A (en) * | 2021-01-29 | 2021-05-18 | 中国电建集团成都勘测设计研究院有限公司 | Design method of underground factory building rock wall crane beam based on BIM technology |
CN114186308A (en) * | 2021-10-30 | 2022-03-15 | 郑州宝冶钢结构有限公司 | Machining data deriving method based on BIM model and application |
CN115318532A (en) * | 2022-07-29 | 2022-11-11 | 深圳模德宝科技有限公司 | Drawing software-based method for quoting and realizing automatic painting attribute of part |
CN117115406A (en) * | 2023-10-24 | 2023-11-24 | 玛斯特轻量化科技(天津)有限公司 | Automatic drawing method and device and electronic equipment |
CN117115406B (en) * | 2023-10-24 | 2024-03-08 | 玛斯特轻量化科技(天津)有限公司 | Automatic drawing method and device and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108694260A (en) | Application process of the BIM technology in Steel Bridge processing and manufacturing | |
Sulankivi et al. | 4D-BIM for construction safety planning | |
Hauschild et al. | Digital processes: planning, designing, production | |
CN101739478B (en) | Spacecraft assembly simulation technique-based virtual assembly system and virtual assembly method | |
Schimanski et al. | Pushing digital automation of configure-to-order services in small and medium enterprises of the construction equipment industry: A design science research approach | |
CN106803150A (en) | Municipal Engineering Construction progress msg management method and system based on BIM | |
CN107862094A (en) | Product parts classification and coding system construction method based on group technology | |
CN109035060A (en) | A kind of structured processes management system and management method | |
CN105447253B (en) | Integration method of three-dimensional process data | |
CN113642920B (en) | Quick construction method for digital application in industrial manufacturing field | |
Oztemel et al. | A taxonomy of industry 4.0 and related technologies | |
CN112446937B (en) | Project progress three-dimensional visualization method based on BIM technology | |
CN110096270A (en) | A kind of design drawing method for splitting and system based on .NET plug-in unit | |
CN107808042A (en) | The LOD500 model implementation methods of BIM technology | |
CN106169114A (en) | BIM technology application platform based on high-speed railway CRTS III plate-type Construction of Ballastless Track | |
CN109740245A (en) | A kind of application method in the prefabricated middle BIM technology of bar desk Combinatorial resolution | |
CN104899401A (en) | Aircraft research & development process and adjoint acknowledge combined method | |
Kuzminykh et al. | 4D and 5D design processes automation using databases, classification and applied programming | |
Wally et al. | ISA-95 based task specification layer for REA in production environments | |
Salwin et al. | Value-Stream Mapping as a Tool to Improve Production and Energy Consumption: A Case Study of a Manufacturer of Industrial Hand Tools | |
Daniotti et al. | Evolution of the building sector due to digitalization | |
Zancul | PLM reference model: a preliminary proposal for reference model evolution | |
CN103500314A (en) | Authorization control system construction method and device | |
CN108876287A (en) | data management system based on BIM | |
Mohandes et al. | Building information modeling in construction industry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181023 |