CN104657512A - Method and device for realizing steel truss arch bridge engineering quantity statistics by employing BIM (building information modeling) - Google Patents

Method and device for realizing steel truss arch bridge engineering quantity statistics by employing BIM (building information modeling) Download PDF

Info

Publication number
CN104657512A
CN104657512A CN201510123013.2A CN201510123013A CN104657512A CN 104657512 A CN104657512 A CN 104657512A CN 201510123013 A CN201510123013 A CN 201510123013A CN 104657512 A CN104657512 A CN 104657512A
Authority
CN
China
Prior art keywords
steel truss
bridge beam
personnel
information
fund
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510123013.2A
Other languages
Chinese (zh)
Other versions
CN104657512B (en
Inventor
王俊
叶颜伟
丁睿
王晓棠
吴东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju 5th Engineering Co Ltd
Original Assignee
China Railway Erju 5th Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju 5th Engineering Co Ltd filed Critical China Railway Erju 5th Engineering Co Ltd
Priority to CN201510123013.2A priority Critical patent/CN104657512B/en
Publication of CN104657512A publication Critical patent/CN104657512A/en
Application granted granted Critical
Publication of CN104657512B publication Critical patent/CN104657512B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Geometry (AREA)
  • Educational Administration (AREA)
  • Evolutionary Computation (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Computer Hardware Design (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of bridge construction, in particular to a method and a device for realizing steel truss arch bridge engineering quantity statistics by employing BIM (building information modeling). The method comprises the following steps: customizing the content of steel truss arch bridge statistics through a material list function of a CATIA (computer aided three-dimensional interactive application) and generating a statistical form; inputting an engineering quantity statistics form corresponding to a simulation model of a steel truss arch bridge into the statistics form, and thus obtaining material statistics forms of corresponding material categories and materials type; preparing construction materials for the steel truss arch bridge according to the material statistics forms; and displaying current construction material information, capital information and personnel allocation information in real time through a progress simulation model of the steel truss arch bridge in the construction process of the steel truss arch bridge. By virtue of the method and the device for realizing steel truss arch bridge engineering quantity statistics by employing the BIM, the related engineering quantity data in the steel truss arch bridge construction can be integrated and can be displayed in real time, so as to provide data support for construction of the steel truss arch bridge.

Description

BIM is utilized to realize method and the device of steel truss arched bridge beam quantities statistics
Technical field
The present invention relates to bridge construction technical field, in particular to the method and the device that utilize BIM to realize steel truss arched bridge beam quantities statistics.
Background technology
Along with the development of bridge construction technology, Longspan Bridge is just with the situation rapid emergence maked rapid progress, and steel truss arched bridge is widely adopted because it has better cross-domain ability than pre-stress concrete bridge.
In the selection course of the design of steel truss arched bridge, erection and construction method, not only to consider type of bridge, span, width, the factors such as traffic, equipment, duration and cost, also need the geographic and geomorphic conditions such as the hydrology, geology, landform considering that bridge is positioned at.
In the work progress of steel truss arched bridge, thinking is not only in the management of construction plan progress, also needs the impact considering resource, such as manpower, material, facility and fund etc.
The method of adding up the quantities in the construction of steel truss arched bridge beam in correlation technique is generally based on two-dimensional signal table, but various information is difficult to integrate the project manager at the scene of passing to, and causes the bridge construction be difficult to for steel truss arched bridge to provide Data support.
Summary of the invention
In view of this, a kind of method that the object of the embodiment of the present invention is to provide BIM of utilization to realize steel truss arched bridge beam quantities statistics and device, to integrate quantities data involved in steel truss arch bridge construction construction, and show in real time, think that the construction of steel truss arched bridge provides Data support.
First aspect, is embodiments provided a kind of method that BIM of utilization realizes steel truss arched bridge beam quantities statistics, comprising: the statistical content of the bill of materials customizing functions steel truss arched bridge beam carried by CATIA, generate statistical report form; Quantities statistical form corresponding for the realistic model of described steel truss arched bridge beam is inputed in described statistical report form, obtains the materials statistical form of respective material classification and material model; The construction material of described steel truss arched bridge beam is prepared according to described materials statistical form; In the work progress of described steel truss arched bridge beam, show current construction materials information, fund information and personnel assignment information in real time by the progress realistic model of described steel truss arched bridge beam.
In conjunction with first aspect, embodiments provide the first possible embodiment of first aspect, wherein, show current construction materials information in real time by the progress realistic model of described steel truss arched bridge beam to comprise: the relating attribute arranging construction materials in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described construction materials comprises: title material, model, Fang Liang, bolt tricks; The material consumption situation of current work progress is added in the relating attribute of described construction materials; When after the Material Takeoff order receiving user, show the relating attribute of described construction materials.
In conjunction with first aspect, embodiments provide the embodiment that the second of first aspect is possible, wherein, show current fund information in real time by the progress realistic model of described steel truss arched bridge beam to comprise: the relating attribute arranging fund in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described fund comprises: materials funds and personnel's fund; The capital consumption situation of current work progress is added in the relating attribute of described fund; When after the fund stat commands receiving user, show the relating attribute of described fund.
In conjunction with first aspect, embodiments provide the third possible embodiment of first aspect, wherein, show current persons's assignment information in real time by the progress realistic model of described steel truss arched bridge beam to comprise: the relating attribute arranging personnel in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described personnel comprises: project label, personnel's name, total number of persons; The personnel assignment situation of current work progress is added in the relating attribute of described personnel; When after the demographic's order receiving user, show the relating attribute of described personnel.
In conjunction with first aspect, embodiments provide the 4th kind of possible embodiment of first aspect, wherein, described method also comprises: when receiving the order of derivation statistical information of user, construction materials information, fund information and the personnel assignment information of being added up by the progress realistic model of described steel truss arched bridge beam, be saved in memory block corresponding to described order.
Second aspect, the embodiment of the present invention additionally provides the device that a kind of BIM of utilization realizes steel truss arched bridge beam quantities statistics, comprise: statistical report form generation module, for the statistical content of bill of materials customizing functions steel truss arched bridge beam carried by CATIA, generate statistical report form; Materials statistical form acquisition module, for being inputed in described statistical report form by quantities statistical form corresponding for the realistic model of described steel truss arched bridge beam, obtains the materials statistical form of respective material classification and material model; Construction material preparation module, for preparing the construction material of described steel truss arched bridge beam according to described materials statistical form; Statistical information display module, in the work progress of described steel truss arched bridge beam, shows current construction materials information, fund information and personnel assignment information in real time by the progress realistic model of described steel truss arched bridge beam.
In conjunction with second aspect, embodiments provide the first possible embodiment of second aspect, wherein, described statistical information display module comprises: materials setup of attribute unit, for arranging the relating attribute of construction materials in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described construction materials comprises: title material, model, Fang Liang, bolt tricks; Material consumption adding device, for being added in the relating attribute of described construction materials by the material consumption situation of current work progress; Materials display unit, for when after the Material Takeoff order receiving user, shows the relating attribute of described construction materials.
In conjunction with second aspect, embodiments provide the embodiment that the second of second aspect is possible, wherein, described statistical information display module comprises: fund setup of attribute unit, for arranging the relating attribute of fund in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described fund comprises: materials funds and personnel's fund; Capital consumption adding device, for being added in the relating attribute of described fund by the capital consumption situation of current work progress; Fund display unit, for when after the fund stat commands receiving user, shows the relating attribute of described fund.
In conjunction with second aspect, embodiments provide the third possible embodiment of second aspect, wherein, described statistical information display module comprises: personnel's setup of attribute unit, for arranging the relating attribute of personnel in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described personnel comprises: project label, personnel's name, total number of persons; Personnel assignment adding device, for being added in the relating attribute of described personnel by the personnel assignment situation of current work progress; Personnel's display unit, for when after the demographic's order receiving user, shows the relating attribute of described personnel.
In conjunction with second aspect, embodiments provide the 4th kind of possible embodiment of second aspect, wherein, described device also comprises: statistical information derives module, for when receiving the order of derivation statistical information of user, construction materials information, fund information and the personnel assignment information of being added up by the progress realistic model of described steel truss arched bridge beam, be saved in memory block corresponding to described order.
The BIM that utilizes of the embodiment of the present invention realizes method and the device of steel truss arched bridge beam quantities statistics, and the bill of materials function utilizing CATIA to carry formulates the content of steel truss arched bridge beam statistics, generates statistical report form; And the realistic model correspondence of steel truss arched bridge beam is input in statistical report form, obtain materials statistical form, and prepare construction material according to materials statistical form, and the progress realistic model by steel truss arched bridge beam in work progress shows the information such as current materials, fund and personnel, realize the integration of quantities data involved during steel truss arch bridge construction is built, and show in real time, thus provide Data support for the construction of steel truss arched bridge.
For making above-mentioned purpose of the present invention, feature and advantage become apparent, preferred embodiment cited below particularly, and coordinate appended accompanying drawing, be described in detail below.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme of the embodiment of the present invention, be briefly described to the accompanying drawing used required in embodiment below, be to be understood that, the following drawings illustrate only some embodiment of the present invention, therefore the restriction to scope should be counted as, for those of ordinary skill in the art, under the prerequisite not paying creative work, other relevant accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 shows in the embodiment of the present invention method flow diagram utilizing BIM to realize steel truss arched bridge beam quantities statistics;
Fig. 2 shows in the embodiment of the present invention apparatus structure schematic diagram utilizing BIM to realize steel truss arched bridge beam quantities statistics;
Fig. 3 shows the overall design schematic diagram of quantities statistics in the embodiment of the present invention;
Fig. 4-Fig. 6 shows the effect schematic diagram that in the embodiment of the present invention, emulation action creates;
Fig. 7-Figure 10 shows in the embodiment of the present invention effect schematic diagram emulating attribute management;
Figure 11 and Figure 12 shows the effect schematic diagram of attribute information statistics in the embodiment of the present invention;
Figure 13-Figure 15 shows the effect schematic diagram of process simulation in the embodiment of the present invention.
Embodiment
Below in conjunction with accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.The assembly of the embodiment of the present invention describing and illustrate in usual accompanying drawing herein can be arranged with various different configuration and design.Therefore, below to the detailed description of the embodiments of the invention provided in the accompanying drawings and the claimed scope of the present invention of not intended to be limiting, but selected embodiment of the present invention is only represented.Based on embodiments of the invention, the every other embodiment that those skilled in the art obtain under the prerequisite not making creative work, all belongs to the scope of protection of the invention.
Embodiments provide a kind of method that BIM of utilization realizes steel truss arched bridge beam quantities statistics, as shown in Figure 1, main processing steps comprises:
Step S11: the content of the bill of materials customizing functions steel truss arched bridge beam statistics carried by CATIA, generates statistical report form;
Step S12: input in statistical report form by quantities statistical form corresponding for the realistic model of steel truss arched bridge beam, obtains the materials statistical form of respective material classification and material model;
Step S13: the construction material preparing steel truss arched bridge beam according to materials statistical form;
Step S14: in the work progress of steel truss arched bridge beam, shows current construction materials information, fund information and personnel assignment information in real time by the progress realistic model of steel truss arched bridge beam.
In the present invention, CATIA is a kind of Interactive CAD of Hydro-machine/CAE/CAM system, can support from item current stage, concrete design and analysis, simulate, be assembled into and be maintained in interior whole industrial design flow processs.
BIM model is the basis using every relevant information data of construction-engineering project as model, and the real information had by numerical information analogue simulation buildings, BIM model can embody the incidence relation of bridge data to be built intuitively.
The present invention, the bill of materials function utilizing CATIA to carry formulates the content of steel truss arched bridge beam statistics, generates statistical report form; And the realistic model correspondence of steel truss arched bridge beam is input in statistical report form, obtain materials statistical form, and prepare construction material according to materials statistical form, and the progress realistic model by steel truss arched bridge beam in work progress shows the information such as current materials, fund and personnel, realize the integration of quantities data involved during steel truss arch bridge construction is built, and show in real time, thus provide Data support for the construction of steel truss arched bridge.
In the present invention, show current construction materials information in real time by the progress realistic model of steel truss arched bridge beam to comprise: the relating attribute arranging construction materials in the progress realistic model of steel truss arched bridge beam, the relating attribute of construction materials comprises: title material, model, Fang Liang, bolt tricks; The material consumption situation of current work progress is added in the relating attribute of construction materials; When after the Material Takeoff order receiving user, the relating attribute of display construction materials.
In the present invention, show current fund information in real time by the progress realistic model of steel truss arched bridge beam and comprise: the relating attribute arranging fund in the progress realistic model of steel truss arched bridge beam, the relating attribute of fund comprises: materials funds and personnel's fund; The capital consumption situation of current work progress is added in the relating attribute of fund; When after the fund stat commands receiving user, the relating attribute of display fund.
In the present invention, show current persons's assignment information in real time by the progress realistic model of steel truss arched bridge beam to comprise: the relating attribute arranging personnel in the progress realistic model of steel truss arched bridge beam, the relating attribute of personnel comprises: project label, personnel's name, total number of persons; The personnel assignment situation of current work progress is added in the relating attribute of personnel; When after the demographic's order receiving user, the relating attribute of display personnel.
The BIM that utilizes of the embodiment of the present invention realizes also comprising in the method for steel truss arched bridge beam quantities statistics: when receiving the order of derivation statistical information of user, construction materials information, fund information and the personnel assignment information of being added up by the progress realistic model of steel truss arched bridge beam, be saved in memory block corresponding to order.
The corresponding above-mentioned BIM that utilizes realizes the method for steel truss arched bridge beam quantities statistics, and the embodiment of the present invention additionally provides the device that a kind of BIM of utilization realizes steel truss arched bridge beam quantities statistics, as shown in Figure 2, comprising:
Statistical report form generation module 21, the content that the bill of materials customizing functions steel truss arched bridge beam for being carried by CATIA is added up, generates statistical report form;
Materials statistical form acquisition module 22, for inputing in statistical report form by quantities statistical form corresponding for the realistic model of steel truss arched bridge beam, obtains the materials statistical form of respective material classification and material model;
Construction material preparation module 23, for preparing the construction material of steel truss arched bridge beam according to materials statistical form;
Statistical information display module 24, in the work progress of steel truss arched bridge beam, shows current construction materials information, fund information and personnel assignment information in real time by the progress realistic model of steel truss arched bridge beam.
In said apparatus, statistical information display module comprises: materials setup of attribute unit, for arranging the relating attribute of construction materials in the progress realistic model of steel truss arched bridge beam, the relating attribute of construction materials comprises: title material, model, Fang Liang, bolt tricks; Material consumption adding device, for being added in the relating attribute of construction materials by the material consumption situation of current work progress; Materials display unit, for when after the Material Takeoff order receiving user, shows the relating attribute of construction materials.
In said apparatus, statistical information display module comprises: fund setup of attribute unit, and for arranging the relating attribute of fund in the progress realistic model of steel truss arched bridge beam, the relating attribute of fund comprises: materials funds and personnel's fund; Capital consumption adding device, for being added in the relating attribute of fund by the capital consumption situation of current work progress; Fund display unit, for when after the fund stat commands receiving user, shows the relating attribute of fund.
In said apparatus, statistical information display module comprises: personnel's setup of attribute unit, and for arranging the relating attribute of personnel in the progress realistic model of steel truss arched bridge beam, the relating attribute of personnel comprises: project label, personnel's name, total number of persons; Personnel assignment adding device, for being added in the relating attribute of personnel by the personnel assignment situation of current work progress; Personnel's display unit, for when after the demographic's order receiving user, shows the relating attribute of personnel.
Also comprise in said apparatus: statistical information derives module, for when receiving the order of derivation statistical information of user, construction materials information, fund information and the personnel assignment information of being added up by the progress realistic model of steel truss arched bridge beam, be saved in memory block corresponding to order.
The calculating of quantities is the important process in bridge construction project management.As shown in Figure 3, based on quantities statistics, work order potential energy and material depot, Discourse of Enterprise's ration storehouse and equipment library are linked up with, for scheme carries out cost accounting early stage, for enterprise carry out recruiting, foundation of submitting a tender, simultaneously for the Cost Management of enterprise's overall process provides data supporting, for enterprise backend ERP system provides data message.This subject study is mainly for Complicated Steel purlin bridge structure, and the steel construction such as Sarasota, cable crane auxiliary equipment application BIM computational engineering amount, improves the coagulation civil engineering quantities calculation accuracy such as foundation excavation and bridge pier and statistical efficiency.
In the present invention, by CATIA platform secondary development model report function, the quick materials statistics of labyrinth can be realized, and material, rod member classification a point attribute collect.
First the bill of materials function carried by CATIA is customized and preview statistical content.
For receiving the requirement of boundary river projects amount statistical table form, by secondary development, form content being outputted in EXCEL form, can be formed with rod member statistics and two kinds of forms by material classification statistics
The management of Practical Project construction plan progress is not only four-dimensional, necessarily also will consider the impact of resource.Resource comprises manpower, material, facility even fund.These information two dimensions are very difficult to integrate pass to on-the-spot project manager, explores the realization of application BIM technology to the automatic accurate Calculation of resource requirement in work progress and real-time grading statistics, contribute to the management of workmen to engineering project.To BIM construction model increasing resource consumption data time correlation, forming construction 5D emulation, project resource discrete consuming predicted data can be provided to project management department managerial personnel.
By carrying out program development in DELMIA software, real-time tracing 3D emulates progress.Emulation progress is that DELMIA controls, and obtains Objects hide display properties and extracts progress, intuitively show current time, project start time, end time and fund expenditure volume by exploitation.Basic time, information fund information first need be arranged in model object attribute, extracted relevant information display by development interface.Interim personnel query, equipment and material use and allocation situation.Basic personnel equipment and logistics information first need be arranged in model object attribute, extract relevant information display by development interface.Selectivity derivation appointed task people, machine, material use and distribute data Excel inventory.Based on the information set, extract relevant information by development interface and optionally derive Microsoft Excel.Realize the 5D emulation of BIM construction management.
Flow process and the method for concrete enforcement are as follows:
1) emulation action creates: according to the assembled order of whole braced arch sections, utilize the ranking function of catia load module, arrange the assembled order of every root lifting rod member in each braced arch sections erection sequence and each sections, use " the emulation action creates " order in developing instrument, eject dialog box as shown in Figure 4:
Create under selecting father's technique namely to select technique, then select the parent product under ProductList, then input creates the title (in fact number, start if do not number acquiescence with 01) of technique.Click the Visibility Activity that batch creates " Hide " or " Show " type, the Visibility Activity created associates with the product under ProductList respectively automatically in turn, and automatically adds the control flow check between the Visibility Activity that creates out.The product selected and the final result created are as shown in Figure 5.
As shown in Figure 6, create after emulation terminates and need to carry out manual association control flow check logical relation.
2) attribute management is emulated: in Practical Project, each resource is accompanied with different multiple attributes, the quantities of such as rod member, human resources, activity duration, bolt tricks, unit in charge of construction etc." emulation attribute management " order in developing instrument is used to eject as dialog box as shown in Figure 7.
As shown in Figure 8, the one or more action will carrying out attributes edit are selected.
In technique list, select single technique, click " interpolation " order interpolation attribute on the right in the attribute list of this technique, then click " application " order and operation is come into force.The use that " amendment " and " removing " orders and this type.It should be noted that often carrying out single job not have forgotten click " application " and make to be preserved the amendment of attribute list.But, if forgotten once in a while also to have no relations, when you do not click " application " order just carry out next time attributes edit time, whether program can remind you to forget click " application ".
Can know there is between technique HanJie01 to HanJie10 a title and all identical attribute VisualizationMode of value, and they also to have identical cycle period 0.1S from Fig. 9.
Carrying out additions and deletions to the attribute of multiple technique, to change with single technique be similar.It should be noted that the amendment in cycle and the appointment of side's amount are all effective to all techniques chosen in " technique list " if that select in technique list is the editor of multiple that attribute of technique.
It should be noted that alternative in structure tree, just technique (action) is selected into technique list.Attribute, cycle period, the effective object of Fang Liang etc. is the object chosen in " technique list ".
As shown in Figure 10, the cycle acted separately checked and revises, additions and deletions being carried out to its attribute and changes operation and can add and the side's of calculating amount; Check the total attribute of multiple action, and carry out additions and deletions to it and change operation, if the periodic quantity of the multiple action of fruit is identical, can show, if the periodic quantity of multiple action is different, display is less than or equal to the value of 0.
3) attribute information statistics: after adding the attribute information of every root rod member, needs to carry out statistics and output report to these information, uses " attribute information statistics " order in developing instrument, ejects attribute information list dialog box.
As shown in figure 11, structure tree is selected one or more techniques (action) node that will add up, selected the attribute information that automatically can show selected process node and all sub-technique (sub-line is moved) node thereof in rear list box.
If a certain technique, without this attribute, represents with "/".Not close box, selects process node again in structure tree, and letter before can automatically empty and only show the attribute information of the process node chosen recently by list box.Namely the process node that list box can be selected according to you at every turn upgrades automatically.
As Figure 12, if want the data message in derived series bezel, cluster, " derived data " order can be clicked and be saved in excel file.
4) process simulation, resource statistics inquiry and derivation: add the attribute information of every root rod member and after defining the logical order of process simulation, use " process simulation " order in developing instrument, eject dialog box as shown in fig. 13 that:
Click and play emulation command, click in time needing the timing node of statistics and suspend emulation, click statistics button in Information Statistics frame after suspending emulation, system can the title, Fang Liang, bolt tricks etc. of programming count resource consumption under the current time node correlation attribute information of to have added early stage.
As shown in figure 14, click in Information Statistics frame and derive, specify and derive path and name, as shown in figure 15, open the correlation attribute information can seen in form and comprise all rod members.
If described function using the form of SFU software functional unit realize and as independently production marketing or use time, can be stored in a computer read/write memory medium.Based on such understanding, the part of the part that technical scheme of the present invention contributes to prior art in essence in other words or this technical scheme can embody with the form of software product, this computer software product is stored in a storage medium, comprising some instructions in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) perform all or part of step of method described in each embodiment of the present invention.And aforesaid storage medium comprises: USB flash disk, portable hard drive, ROM (read-only memory) (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. various can be program code stored medium.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, is anyly familiar with those skilled in the art in the technical scope that the present invention discloses; change can be expected easily or replace, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should described be as the criterion with the protection domain of claim.

Claims (10)

1. utilize BIM to realize a method for steel truss arched bridge beam quantities statistics, it is characterized in that, comprising:
The statistical content of the bill of materials customizing functions steel truss arched bridge beam carried by CATIA, generates statistical report form;
Quantities statistical form corresponding for the realistic model of described steel truss arched bridge beam is inputed in described statistical report form, obtains the materials statistical form of respective material classification and material model;
The construction material of described steel truss arched bridge beam is prepared according to described materials statistical form;
In the work progress of described steel truss arched bridge beam, show current construction materials information, fund information and personnel assignment information in real time by the progress realistic model of described steel truss arched bridge beam.
2. method according to claim 1, is characterized in that, shows current construction materials information in real time comprise by the progress realistic model of described steel truss arched bridge beam:
In the progress realistic model of described steel truss arched bridge beam, arrange the relating attribute of construction materials, the relating attribute of described construction materials comprises: title material, model, Fang Liang, bolt tricks;
The material consumption situation of current work progress is added in the relating attribute of described construction materials;
When after the Material Takeoff order receiving user, show the relating attribute of described construction materials.
3. method according to claim 1, is characterized in that, shows current fund information in real time comprise by the progress realistic model of described steel truss arched bridge beam:
In the progress realistic model of described steel truss arched bridge beam, arrange the relating attribute of fund, the relating attribute of described fund comprises: materials funds and personnel's fund;
The capital consumption situation of current work progress is added in the relating attribute of described fund;
When after the fund stat commands receiving user, show the relating attribute of described fund.
4. method according to claim 1, is characterized in that, shows current persons's assignment information in real time comprise by the progress realistic model of described steel truss arched bridge beam:
In the progress realistic model of described steel truss arched bridge beam, arrange the relating attribute of personnel, the relating attribute of described personnel comprises: project label, personnel's name, total number of persons;
The personnel assignment situation of current work progress is added in the relating attribute of described personnel;
When after the demographic's order receiving user, show the relating attribute of described personnel.
5. method according to any one of claim 1 to 4, is characterized in that, described method also comprises:
When receiving the order of derivation statistical information of user, construction materials information, fund information and the personnel assignment information of being added up by the progress realistic model of described steel truss arched bridge beam, be saved in memory block corresponding to described order.
6. utilize BIM to realize a device for steel truss arched bridge beam quantities statistics, it is characterized in that, comprising:
Statistical report form generation module, for the statistical content of bill of materials customizing functions steel truss arched bridge beam carried by CATIA, generates statistical report form;
Materials statistical form acquisition module, for being inputed in described statistical report form by quantities statistical form corresponding for the realistic model of described steel truss arched bridge beam, obtains the materials statistical form of respective material classification and material model;
Construction material preparation module, for preparing the construction material of described steel truss arched bridge beam according to described materials statistical form;
Statistical information display module, in the work progress of described steel truss arched bridge beam, shows current construction materials information, fund information and personnel assignment information in real time by the progress realistic model of described steel truss arched bridge beam.
7. device according to claim 6, is characterized in that, described statistical information display module comprises:
Materials setup of attribute unit, for arranging the relating attribute of construction materials in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described construction materials comprises: title material, model, Fang Liang, bolt tricks;
Material consumption adding device, for being added in the relating attribute of described construction materials by the material consumption situation of current work progress;
Materials display unit, for when after the Material Takeoff order receiving user, shows the relating attribute of described construction materials.
8. device according to claim 6, is characterized in that, described statistical information display module comprises:
Fund setup of attribute unit, for arranging the relating attribute of fund in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described fund comprises: materials funds and personnel's fund;
Capital consumption adding device, for being added in the relating attribute of described fund by the capital consumption situation of current work progress;
Fund display unit, for when after the fund stat commands receiving user, shows the relating attribute of described fund.
9. device according to claim 6, is characterized in that, described statistical information display module comprises:
Personnel's setup of attribute unit, for arranging the relating attribute of personnel in the progress realistic model of described steel truss arched bridge beam, the relating attribute of described personnel comprises: project label, personnel's name, total number of persons;
Personnel assignment adding device, for being added in the relating attribute of described personnel by the personnel assignment situation of current work progress;
Personnel's display unit, for when after the demographic's order receiving user, shows the relating attribute of described personnel.
10. the device according to any one of claim 6 to 9, is characterized in that, described device also comprises:
Statistical information derives module, and for when receiving the order of derivation statistical information of user, construction materials information, fund information and the personnel assignment information of being added up by the progress realistic model of described steel truss arched bridge beam, be saved in memory block corresponding to described order.
CN201510123013.2A 2015-03-19 2015-03-19 The method and device of steel truss arched bridge beam quantities statistics is realized using BIM Active CN104657512B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510123013.2A CN104657512B (en) 2015-03-19 2015-03-19 The method and device of steel truss arched bridge beam quantities statistics is realized using BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510123013.2A CN104657512B (en) 2015-03-19 2015-03-19 The method and device of steel truss arched bridge beam quantities statistics is realized using BIM

Publications (2)

Publication Number Publication Date
CN104657512A true CN104657512A (en) 2015-05-27
CN104657512B CN104657512B (en) 2017-12-12

Family

ID=53248639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510123013.2A Active CN104657512B (en) 2015-03-19 2015-03-19 The method and device of steel truss arched bridge beam quantities statistics is realized using BIM

Country Status (1)

Country Link
CN (1) CN104657512B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105608521A (en) * 2015-12-09 2016-05-25 中铁隧道集团有限公司 Construction engineering quantity calculation method of underground excavation metro stations and running tunnels
CN106169114A (en) * 2016-06-15 2016-11-30 陕西铁路工程职业技术学院 BIM technology application platform based on high-speed railway CRTS III plate-type Construction of Ballastless Track
CN107220438A (en) * 2017-05-27 2017-09-29 武汉市陆刻科技有限公司 A kind of method of the CAE Mechanics Simulations based on BIM information models
CN107463731A (en) * 2017-07-05 2017-12-12 西安理工大学 A kind of automatic classified statistic method of steel structure work amount based on Tekla
CN107657087A (en) * 2017-09-07 2018-02-02 中国建筑第六工程局有限公司 Pipeline layout method for arranging based on BIM technology
CN108427798A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of entrucking sequence based on BIM building elements determines method and device
CN108595766A (en) * 2018-03-27 2018-09-28 上海市城市建设设计研究总院(集团)有限公司 Beam lattice system bridge structure modeling method based on CATIA softwares
CN108694260A (en) * 2017-04-10 2018-10-23 中铁宝桥集团有限公司 Application process of the BIM technology in Steel Bridge processing and manufacturing
CN109145359A (en) * 2018-06-28 2019-01-04 中铁山桥集团有限公司 A kind of steel construction stock method based on BIM system and CAD software
CN109614697A (en) * 2018-12-10 2019-04-12 吉林省瑞凯科技股份有限公司 A kind of bridge management system based on BIM
CN110059121A (en) * 2019-03-12 2019-07-26 广州明珞汽车装备有限公司 A kind of method, system, device and the storage medium of quick export bill of materials
CN110298629A (en) * 2019-06-20 2019-10-01 四川省劲腾环保建材有限公司 A kind of BIM implementation integration method
CN110378568A (en) * 2019-06-24 2019-10-25 中铁四局集团有限公司 Construction calculation volume method, system, computer equipment and readable storage medium storing program for executing based on BIM technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140129912A1 (en) * 2012-11-08 2014-05-08 Solibri, Inc. System and Method for Express Spreadsheet Visualization for Building Information Modeling
US20140207774A1 (en) * 2013-01-24 2014-07-24 Mark Walter Virtual Building Browser Systems and Methods
CN104268213A (en) * 2014-09-24 2015-01-07 长安大学 Maintenance road segment dividing method based on multisource detection data
CN104424217A (en) * 2013-08-24 2015-03-18 上海莞东拿信息科技有限公司 MP4 format technology based ultra-capacity travel information system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140129912A1 (en) * 2012-11-08 2014-05-08 Solibri, Inc. System and Method for Express Spreadsheet Visualization for Building Information Modeling
US20140207774A1 (en) * 2013-01-24 2014-07-24 Mark Walter Virtual Building Browser Systems and Methods
CN104424217A (en) * 2013-08-24 2015-03-18 上海莞东拿信息科技有限公司 MP4 format technology based ultra-capacity travel information system
CN104268213A (en) * 2014-09-24 2015-01-07 长安大学 Maintenance road segment dividing method based on multisource detection data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨东旭: "基于BIM技术的施工可视化应用研究", 《中国优秀硕士学位论文全文数据库 工程科技2辑》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105608521A (en) * 2015-12-09 2016-05-25 中铁隧道集团有限公司 Construction engineering quantity calculation method of underground excavation metro stations and running tunnels
CN106169114A (en) * 2016-06-15 2016-11-30 陕西铁路工程职业技术学院 BIM technology application platform based on high-speed railway CRTS III plate-type Construction of Ballastless Track
CN108694260A (en) * 2017-04-10 2018-10-23 中铁宝桥集团有限公司 Application process of the BIM technology in Steel Bridge processing and manufacturing
CN107220438B (en) * 2017-05-27 2020-10-09 武汉市陆刻科技有限公司 CAE mechanical simulation method based on BIM information model
CN107220438A (en) * 2017-05-27 2017-09-29 武汉市陆刻科技有限公司 A kind of method of the CAE Mechanics Simulations based on BIM information models
CN107463731A (en) * 2017-07-05 2017-12-12 西安理工大学 A kind of automatic classified statistic method of steel structure work amount based on Tekla
CN108427798A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of entrucking sequence based on BIM building elements determines method and device
CN107657087A (en) * 2017-09-07 2018-02-02 中国建筑第六工程局有限公司 Pipeline layout method for arranging based on BIM technology
CN108595766A (en) * 2018-03-27 2018-09-28 上海市城市建设设计研究总院(集团)有限公司 Beam lattice system bridge structure modeling method based on CATIA softwares
CN108595766B (en) * 2018-03-27 2021-10-19 上海市城市建设设计研究总院(集团)有限公司 Beam lattice bridge structure modeling method based on CATIA software
CN109145359A (en) * 2018-06-28 2019-01-04 中铁山桥集团有限公司 A kind of steel construction stock method based on BIM system and CAD software
CN109145359B (en) * 2018-06-28 2023-05-16 中铁山桥集团有限公司 Steel structure material preparation method based on BIM system and CAD software
CN109614697A (en) * 2018-12-10 2019-04-12 吉林省瑞凯科技股份有限公司 A kind of bridge management system based on BIM
CN110059121A (en) * 2019-03-12 2019-07-26 广州明珞汽车装备有限公司 A kind of method, system, device and the storage medium of quick export bill of materials
CN110059121B (en) * 2019-03-12 2021-09-03 广州明珞汽车装备有限公司 Method, system, device and storage medium for rapidly exporting bill of materials
CN110298629A (en) * 2019-06-20 2019-10-01 四川省劲腾环保建材有限公司 A kind of BIM implementation integration method
CN110378568A (en) * 2019-06-24 2019-10-25 中铁四局集团有限公司 Construction calculation volume method, system, computer equipment and readable storage medium storing program for executing based on BIM technology

Also Published As

Publication number Publication date
CN104657512B (en) 2017-12-12

Similar Documents

Publication Publication Date Title
CN104657512A (en) Method and device for realizing steel truss arch bridge engineering quantity statistics by employing BIM (building information modeling)
Vilutiene et al. Building information modeling (BIM) for structural engineering: A bibliometric analysis of the literature
CN112053130A (en) Pumped storage power station integrated management method, platform, system, equipment and medium
CN102117367A (en) Visual simulation system for airplane assembly site
CN110134752B (en) Three-dimensional large-scene modeling data processing method and device
CN103500371A (en) Change control method based on BIM
Chen et al. 3D AR-based modeling for discrete-event simulation of transport operations in construction
Pavlovskis et al. Assessment of buildings redevelopment possibilities using MCDM and BIM techniques
CN110334441A (en) A kind of novel rocket projectile quickly designs and simulating analysis
Hajdasz Flexible management of repetitive construction processes by an intelligent support system
EP2866161A1 (en) System and method for visualization and optimization of system of systems
CN112069580A (en) Digital delivery method, platform, system, equipment and medium for pumped storage power station
Arrotéia et al. BIM critical success factors in different lifecycle phases: a review exploring the technology, people, and process BIM categories
CN108182497A (en) A kind of Forecasting Methodology of engineering material unit price
Do et al. Interactive analysis of product development experiments using On-line Analytical Mining
CN106055577B (en) Model intelligent recommendation method in serviceization GNSS emulation platform
CN114358850A (en) Intelligent advertisement putting management method and related device
Ziesak et al. Simulation technique for modelling the production chain in forestry
CN113987837A (en) Railway route selection evaluation system and method
Ekyalimpa et al. Effective strategies for simulating one-of-a-kind construction projects
Cuddy et al. Lean interfaces for integrated catchment management models: rapid development using ICMS
KR20090117519A (en) Construction management method and system adequate for construction design operation based on search of unit construction amount and computer-readable medium thereof
Chang et al. Big-data informed citizen participatory Urban identity design
Romanowski et al. Characteristics of the systems of computer modelling and simulation of production processes
RU2413305C2 (en) Method for automatic construction of three-dimensional geometrical models of radio articles in geometrical modelling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant