CN110298629A - A kind of BIM implementation integration method - Google Patents
A kind of BIM implementation integration method Download PDFInfo
- Publication number
- CN110298629A CN110298629A CN201910538907.6A CN201910538907A CN110298629A CN 110298629 A CN110298629 A CN 110298629A CN 201910538907 A CN201910538907 A CN 201910538907A CN 110298629 A CN110298629 A CN 110298629A
- Authority
- CN
- China
- Prior art keywords
- construction
- bim
- data
- implementation
- construction material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 230000010354 integration Effects 0.000 title claims abstract description 18
- 238000010276 construction Methods 0.000 claims abstract description 75
- 239000004035 construction material Substances 0.000 claims abstract description 26
- 239000004566 building material Substances 0.000 claims abstract description 19
- 238000005516 engineering process Methods 0.000 claims abstract description 9
- 238000012795 verification Methods 0.000 claims abstract description 9
- 238000005259 measurement Methods 0.000 claims abstract description 6
- 238000012790 confirmation Methods 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims description 13
- 238000009472 formulation Methods 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims description 5
- 238000004458 analytical method Methods 0.000 claims description 3
- 230000008859 change Effects 0.000 claims description 3
- 238000004321 preservation Methods 0.000 claims description 3
- 238000004088 simulation Methods 0.000 claims description 3
- 238000004891 communication Methods 0.000 abstract description 4
- 230000007812 deficiency Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 230000036961 partial effect Effects 0.000 description 2
- 239000013589 supplement Substances 0.000 description 2
- 238000011960 computer-aided design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
Abstract
The present invention relates to BIM technology fields, and disclose a kind of BIM implementation integration method, the following steps are included: 1) carry out field survey by the designer of profession, measurement data is recorded and is saved, each data are analyzed by designer, and carry out Freehandhand-drawing by professional drawing personnel, confirmation will be after the accuracy of Freehandhand-drawing drawing, electronics shelves are made by manual draw is made of paper, and construction drawing is uploaded and achieved;2) data for the construction drawing that will confirm that upload in BIM, and it is integrated and is backed up according to quantity of the construction drawing to required construction material model and construction material, construction material model, construction material quantity, unit in charge of construction and the data such as departmental staff of constructing after integration are input in BIM, architecture information database is constructed.The BIM implements integration method, can carry out communication by BIM, implement tracking project progress and verification building materials, construction speed is prevented to be detained.
Description
Technical field
The present invention relates to BIM technology field, specially a kind of BIM implements integration method.
Background technique
BIM is also Building Information Model, and Building Information Model is the new tool of architecture, engineering science and civil engineering, builds
It builds information model or one word of Information The Nation implements Safety Manufacture Li-cense model is created by Autodesk, it describes those based on 3-D graphic, object
Part is oriented to related with architecture computer aided design, it can help to realize integrating for architecture information, from the design of building, applies
Until building the termination of life cycle management, various information are integrated in always in a three-dimensional model information database for work and operation,
The all parties such as design team, unit in charge of construction, installation fishery department and owner can be cooperated based on BIM, effectively be mentioned
High working efficiency saves resource, reduces cost and to realize sustainable development.
It is told somebody what one's real intentions are management according to a kind of novel construction based on BIM of Chinese patent CM 107705101A, passes through establishment construction and hand over
Bottom plan, data conformity of telling somebody what one's real intentions are, three-dimensional visualization are told somebody what one's real intentions are, content of telling somebody what one's real intentions are is checked and summary of telling somebody what one's real intentions are, and the content told somebody what one's real intentions are is by BIM skill
Art is presented, and the management process told somebody what one's real intentions are is realized by BIM cooperating management platform, and construction is told somebody what one's real intentions are and is converted to from an individual technology
A kind of management process of closed loop both ensure that there is time enough preparation before telling somebody what one's real intentions are, and saves time when implementing, in turn ensures and tell somebody what one's real intentions are
Middle three-dimensional intuitive expression, reduce the deviation in operation key shareholder's understanding, it is ensured that it is checked in time after telling somebody what one's real intentions are,
It allows tell somebody what one's real intentions are and not become a mere formality, however this mode is in the specific implementation process, each construction department cannot be understood in time
And communication, and be inconvenient to implement to check building materials, the phenomenon of building materials deficiency is caused, to be easy to cause in construction, it may appear that
Construction speed is detained, and can not be normally carried out construction, be leveraged construction efficiency, so propose that a kind of BIM implements integration method
To solve the above problems.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of BIM to implement integration method, and having can be carried out by BIM
The advantages that communication implements tracking project progress and verification building materials, construction speed is prevented to be detained, solves each construction department
It cannot be understood and be linked up in time, it has not been convenient to implemented verification building materials, cause the phenomenon of building materials deficiency, be easy to cause and constructing
When, the problem of there is construction speed delay, construction can not be normally carried out, leverage construction efficiency.
(2) technical solution
For realize it is above-mentioned can carry out communication by BIM, implement tracking project progress and verification building materials, prevent from constructing into
The purpose being detained is spent, the invention provides the following technical scheme:
The technical problem to be solved in the present invention is to provide a kind of BIM to implement integration method, comprising the following steps:
1) field survey is carried out by the designer of profession, measurement data is recorded and is saved, by designer
Member analyzes each data, and carries out Freehandhand-drawing by professional drawing personnel, and confirmation is by after the accuracy of Freehandhand-drawing drawing, by hand
Drawing paper is fabricated to electronics shelves, and construction drawing is uploaded and achieved;
2) data for the construction drawing that will confirm that upload in BIM, and according to construction drawing to required construction
Material model and the quantity of construction material are integrated and are backed up, by after integration construction material model, construction material quantity,
The data such as unit in charge of construction and construction departmental staff are input in BIM, construct architecture information database;
3) it analyzes and integrates by Various types of data of the professional to upload, thus to the rank of construction method and construction
Section makes different arrangement and method for construction, and optimal arrangement and method for construction is selected to construct, by the plan of optimal case and each
Partial action range uploads to BIM cooperating management platform and is shared;
4) it is carried out using BIM technology according to the drawing of upload, construction material model, the quantity of construction material and arrangement and method for construction
Threedimensional model is generated, and in implementation phase, regularly schedules staff and verification examination is carried out to the implementation of each department,
Implementation personnel are avoided not implement according to the working stage of formulation;
5) model in building to be simulated by BIM technology, simulation will lead to the data such as material quantity and change,
To simulate to each different construction stages, preservation analysis is carried out to the building materials quantity of variation, and arrange implementation personnel
Periodically the material quantity in the data and library in BIM database is checked and approved, avoids the data and actual number in BIM database
Amount differs greatly, and causes to impact the progress of engineering;
6) it is managed using BIM with practice of construction, to be changed and constantly to way to manage and implementation method
Optimization.
Preferably, the manual draw draw in electronics shelves drawing, and the electricity that CAD is depicted as by CAD software
Sub- shelves print drafting drawing by printer.
Preferably, the period that the material quantity in the data and library in the BIM database is checked and approved is fortnight,
And check and approve quantity, staff and job schedule that range includes each building materials.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of BIM implement integration method, have it is following the utility model has the advantages that
The BIM implements integration method, carries out field survey by the designer of profession, is recorded simultaneously to measurement data
And save, each data are analyzed by designer, and carry out Freehandhand-drawing by professional drawing personnel, by manual draw and more
A professional analyzes and modifies, to improve the accuracy of construction, construction drawing is avoided mistake occur, and causing need not
The economic loss wanted passes through construction material model, construction material quantity, unit in charge of construction and the construction departmental staff etc. after integrating
Data are input in BIM, construct architecture information database, can be by BIM database to the department of each construction personnel
Understood with information, and the construction of each department can be tracked, thus judged according to the workflow of itself be
It is no engineering to be implemented, to avoid construction speed delay occur in construction, the work of construction can not be normally carried out
With carrying out verification examination to the implementation of each department according to the data of BIM by the personnel of arranging work, avoid implementation personnel
Do not implement according to the working stage of formulation, leads to the influence to construction quality, it periodically will be in BIM database by implementing personnel
Dynamic data and library in material quantity checked and approved, avoid data and actual quantity in BIM database from differing greatly, can
Supplement building materials timely are carried out to engineering, prevent from influencing the progress of engineering because building materials quantity is inadequate, having reached BIM database
In data and library in period for being checked and approved of material quantity be fortnight, and check and approve the number that range includes each building materials
Amount, the purpose of staff and job schedule.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched
It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention
In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
A kind of BIM implementation integration method, comprising the following steps:
1) field survey is carried out by the designer of profession, measurement data is recorded and is saved, by designer
Member analyzes each data, and carries out Freehandhand-drawing by professional drawing personnel, and confirmation is by after the accuracy of Freehandhand-drawing drawing, by hand
Drawing paper is fabricated to electronics shelves, and construction drawing is uploaded and achieved, and manual draw draw in electricity by CAD software
Sub- shelves drawing, and the electronics shelves that CAD is depicted as are printed into drafting drawing by printer;
2) data for the construction drawing that will confirm that upload in BIM, and according to construction drawing to required construction
Material model and the quantity of construction material are integrated and are backed up, by after integration construction material model, construction material quantity,
The data such as unit in charge of construction and construction departmental staff are input in BIM, construct architecture information database;
3) it analyzes and integrates by Various types of data of the professional to upload, thus to the rank of construction method and construction
Section makes different arrangement and method for construction, and optimal arrangement and method for construction is selected to construct, by the plan of optimal case and each
Partial action range uploads to BIM cooperating management platform and is shared;
4) it is carried out using BIM technology according to the drawing of upload, construction material model, the quantity of construction material and arrangement and method for construction
Threedimensional model is generated, and in implementation phase, regularly schedules staff and verification examination is carried out to the implementation of each department,
Implementation personnel are avoided not implement according to the working stage of formulation;
5) model in building to be simulated by BIM technology, simulation will lead to the data such as material quantity and change,
To simulate to each different construction stages, preservation analysis is carried out to the building materials quantity of variation, and arrange implementation personnel
Periodically the material quantity in the data and library in BIM database is checked and approved, avoids the data and actual number in BIM database
Amount differs greatly, and causes to impact the progress of engineering, and the material quantity in data and library in BIM database is checked and approved
Period be fortnight, and check and approve range include each building materials quantity, staff and job schedule;
6) it is managed using BIM with practice of construction, to be changed and constantly to way to manage and implementation method
Optimization.
The beneficial effects of the present invention are: the designer by profession carries out field survey, measurement data is recorded
And save, each data analyzed by designer, and by professional drawing personnel carry out Freehandhand-drawing, by manual draw with
Multiple professionals analyze and modify, to improve the accuracy of construction, construction drawing are avoided mistake occur, caused not
Necessary economic loss passes through construction material model, construction material quantity, unit in charge of construction and the construction departmental staff after integrating
Etc. data be input in BIM, construct architecture information database, can be by BIM database to the place portion of each construction personnel
Door and information are understood, and can be tracked to the construction of each department, to be judged according to the workflow of itself
Whether engineering can be implemented, to avoid construction speed delay occur in construction, construction can not be normally carried out
Effect, carries out verification examination to the implementation of each department according to the data of BIM by the personnel of arranging work, and avoids implementing people
Member does not implement according to the working stage of formulation, leads to the influence to construction quality, by implementing personnel periodically by BIM database
In dynamic data and library in material quantity checked and approved, avoid data and actual quantity in BIM database from differing greatly,
Supplement building materials timely can be carried out to engineering, prevent from influencing the progress of engineering because building materials quantity is inadequate, having reached BIM data
The period that the material quantity in data and library in library is checked and approved is fortnight, and checks and approves the number that range includes each building materials
Amount, the purpose of staff and job schedule.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (3)
1. a kind of BIM implements integration method, which comprises the following steps:
1) field survey is carried out by the designer of profession, measurement data is recorded and is saved, by designer couple
Each data are analyzed, and carry out Freehandhand-drawing by professional drawing personnel, and confirmation is by after the accuracy of Freehandhand-drawing drawing, by manual draw
It is made of paper to be made electronics shelves, and construction drawing is uploaded and achieved;
2) data for the construction drawing that will confirm that upload in BIM, and according to construction drawing to required construction material
Model and the quantity of construction material are integrated and are backed up, by the construction material model after integration, construction material quantity, construction
The data such as unit and construction departmental staff are input in BIM, construct architecture information database;
3) it analyzes and integrates by Various types of data of the professional to upload, so that the stage to construction method and construction comes
Different arrangement and method for construction is made, and optimal arrangement and method for construction is selected to construct, by the plan and various pieces of optimal case
Action range upload to BIM cooperating management platform and shared;
4) it is generated using BIM technology according to the drawing of upload, construction material model, the quantity of construction material and arrangement and method for construction
Threedimensional model, and in implementation phase, it regularly schedules staff and verification examination is carried out to the implementation of each department, avoid
Implementation personnel do not implement according to the working stage of formulation;
5) model in building to be simulated by BIM technology, simulation will lead to the data such as material quantity and change, thus
Each different construction stages are simulated, preservation analysis are carried out to the building materials quantity of variation, and arrange implementation personnel regular
Material quantity in data and library in BIM database is checked and approved, avoids data in BIM database and actual quantity poor
It is different larger, cause to impact the progress of engineering;
6) it is managed using BIM with practice of construction, to be changed to way to manage and implementation method and constantly optimize.
2. a kind of BIM according to claim 1 implements integration method, which is characterized in that the manual draw passes through CAD software
Draw in electronics shelves drawing, and the electronics shelves that CAD is depicted as are printed into drafting drawing by printer.
3. a kind of BIM according to claim 1 implements integration method, which is characterized in that the data in the BIM database
It is fortnight with the period that the material quantity in library is checked and approved, and checks and approves the quantity that range includes each building materials, work people
Member and job schedule.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910538907.6A CN110298629A (en) | 2019-06-20 | 2019-06-20 | A kind of BIM implementation integration method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910538907.6A CN110298629A (en) | 2019-06-20 | 2019-06-20 | A kind of BIM implementation integration method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110298629A true CN110298629A (en) | 2019-10-01 |
Family
ID=68028556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910538907.6A Pending CN110298629A (en) | 2019-06-20 | 2019-06-20 | A kind of BIM implementation integration method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110298629A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113393140A (en) * | 2021-06-23 | 2021-09-14 | 深圳市德泰建设工程有限公司 | Building monitoring method, building monitoring system, building monitoring equipment and storage medium based on BIM |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102819621A (en) * | 2011-06-10 | 2012-12-12 | 上海市电力公司 | Device for conducting construction simulation through building information model (BIM) |
CN104657512A (en) * | 2015-03-19 | 2015-05-27 | 中铁二局第五工程有限公司 | Method and device for realizing steel truss arch bridge engineering quantity statistics by employing BIM (building information modeling) |
CN105046432A (en) * | 2015-07-20 | 2015-11-11 | 重庆建工第十一建筑工程有限责任公司 | Building dimensional guide construction method |
CN108053141A (en) * | 2017-12-29 | 2018-05-18 | 青建集团股份公司 | A kind of assembled architecture construction data adjustment control system |
CN108717483A (en) * | 2018-05-14 | 2018-10-30 | 华北水利水电大学 | The design and construction method of packaged type bridges based on BIM |
-
2019
- 2019-06-20 CN CN201910538907.6A patent/CN110298629A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102819621A (en) * | 2011-06-10 | 2012-12-12 | 上海市电力公司 | Device for conducting construction simulation through building information model (BIM) |
CN104657512A (en) * | 2015-03-19 | 2015-05-27 | 中铁二局第五工程有限公司 | Method and device for realizing steel truss arch bridge engineering quantity statistics by employing BIM (building information modeling) |
CN105046432A (en) * | 2015-07-20 | 2015-11-11 | 重庆建工第十一建筑工程有限责任公司 | Building dimensional guide construction method |
CN108053141A (en) * | 2017-12-29 | 2018-05-18 | 青建集团股份公司 | A kind of assembled architecture construction data adjustment control system |
CN108717483A (en) * | 2018-05-14 | 2018-10-30 | 华北水利水电大学 | The design and construction method of packaged type bridges based on BIM |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113393140A (en) * | 2021-06-23 | 2021-09-14 | 深圳市德泰建设工程有限公司 | Building monitoring method, building monitoring system, building monitoring equipment and storage medium based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111143915A (en) | Steel structure modular installation method based on Tekla software platform | |
Hamdi et al. | BIM and Lean interactions from the bim capability maturity model perspective: A case study | |
Schneider et al. | Experience in implementing a learning software organization | |
US20090204463A1 (en) | Method, tool, and system for analyzing a project | |
CN106445536A (en) | Automated business design management system | |
CN106570243A (en) | Missile design and simulation integrated platform | |
CN105518725A (en) | Production system simulation device, production system simulation method, and production system simulation program | |
CN110717685A (en) | Building material management system and method | |
CN105204834B (en) | A kind of visual software modeling editing machine for constructing software model | |
CN110298629A (en) | A kind of BIM implementation integration method | |
CN102597949A (en) | A method for computer assisted planning of a technical system | |
CN101930558A (en) | Process performance analysis method and process performance analysis system | |
CN106815719A (en) | The design and implementation methods of manufacturing enterprise's flexibility ERP system visual development platform | |
Russell et al. | The meaning of BIM | |
Santos et al. | Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs | |
Chiabert et al. | Visualization model for product lifecycle management | |
Xiao et al. | Study on Construction Engineering Management Based on BIM from the perspective of big data | |
JP2007207052A (en) | Simulation model generator | |
Miasnikova | AGILE and LEAN in the production enterprise innovative processes managing | |
Gusakov et al. | Improving the Systems for Increasing the Manufacturability of Products Under the Conditions of Industry 4.0 | |
Pinski et al. | Craft-based design for innovation: Potential in novelty, quality and sustainability through hands-on interaction | |
Jacob et al. | A model for product-process integration in the building industry using industry foundation classes and design structure matrix | |
Koh et al. | Database driven simulation/simulation-based scheduling of a job-shop | |
Tariq | Role of Industry 4.0 in Maintaining Sustainable Production and Services | |
Pawar et al. | Establishing concordance within concurrent engineering teams |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191001 |
|
RJ01 | Rejection of invention patent application after publication |