CN102819621A - Device for conducting construction simulation through building information model (BIM) - Google Patents

Device for conducting construction simulation through building information model (BIM) Download PDF

Info

Publication number
CN102819621A
CN102819621A CN2011101563255A CN201110156325A CN102819621A CN 102819621 A CN102819621 A CN 102819621A CN 2011101563255 A CN2011101563255 A CN 2011101563255A CN 201110156325 A CN201110156325 A CN 201110156325A CN 102819621 A CN102819621 A CN 102819621A
Authority
CN
China
Prior art keywords
construction
bim
data base
display
processor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101563255A
Other languages
Chinese (zh)
Other versions
CN102819621B (en
Inventor
黄蓓琦
张斌
季彤天
何真珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Jiulong Electric Power Technology Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Technology Co Ltd, Shanghai Municipal Electric Power Co filed Critical Shanghai Jiulong Electric Power Technology Co Ltd
Priority to CN201110156325.5A priority Critical patent/CN102819621B/en
Publication of CN102819621A publication Critical patent/CN102819621A/en
Application granted granted Critical
Publication of CN102819621B publication Critical patent/CN102819621B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a device for conducting construction simulation through a building information model (BIM). The device comprises a BIM data base memory, a construction scheme storage data base memory, a processor, a power supply module, a display and a comparer. The processor is respectively connected with the BIM data base memory, the construction scheme storage data base memory, the processor, the power supply module, the display and the comparer. Compared with prior art, the device has the advantages of being simple in structure, low in manufacture cost and capable of helping engineering building projects to improve efficiency, reduce risks and improve construction, operation, maintaining and management levels of the projects and the like.

Description

A kind of device that carries out construction simulation through BIM
Technical field
The present invention relates to a kind of construction simulation device, especially relate to a kind of device that carries out construction simulation through BIM.
Background technology
BIM (Building Information Modeling; Be BIM) be after CAD (computer-aided design (CAD)) technology, to appear at the another important Computer Applied Technology of engineering construction industry, causing the once beyond example thorough revolution of building trade.This techniques make use digital modeling software improves Project design, construction and efficiency of managing, and gives and adopt this technological building enterprise to bring great newly-increased value.
The Shanghai disaster recovery center is one of three integrated information system disaster recovery centers building in China of State Grid Corporation of China.This project relates to that specialty is numerous, device systems is complicated, the duration is tight, to cost control requirements such as material, manual work height.Mainly there is following problem in project in process of construction:
(1) disaster recovery center equipment is numerous; System complex; Space pipeline trend limited is very complicated, and traditional CAD drawing unavoidably exists equipment, pipeline, structure directly to collide conflict owing to use two-dimensional approach to do design, publish picture; These needs of work of past by construction enterprises and designing unit's comprehensive coordination, all have negative effect to project process and cost control at the construction field (site).
(2) the disaster recovery center duration very tight, the team that participates in project forms complicated.This need have very strong management and control to construction schedule, construction system design, personnel's crossed construction of working-yard.
(3) the disaster recovery center investment has strict control; But because numerous, the system complex of equipment; Equipment, the material engineering amount that in construction costs, accounts for important proportion added up the preliminary budget data that often reference design unit and unit in charge of construction provide, and lacks effective ladder of management as the owner.
(4) disaster recovery center is as a data center, and can the reliability of its related infrastructure is directly connected to the IT service system normally, continue, stable operation.The efficient of any part reduces or fault, all will cause the availability of IT service to reduce, and gently then causes message reference not smooth, and is heavy then bring the various heavy losses that can not estimate.As ensure data center's availability the first line of defence---" Centralized Monitoring " can help disaster recovery center to reach the target of " high availability " fast.
To the subject matter of above existence, need badly and carry out research targetedly, to improve engineering management level and usefulness monitoring capability, solve a difficult problem that exists in the construction.
Summary of the invention
The object of the invention is exactly for the defective that overcomes above-mentioned prior art existence a kind of simple in structure, low cost of manufacture to be provided, and can help engineering construction project to raise the efficiency, reduce the device that BIM carries out construction simulation that passes through of risk and raising project construction and operation management level.
The object of the invention can be realized through following technical scheme: a kind of device that carries out construction simulation through BIM; It is characterized in that; This device comprises BIM model data storehouse memorizer, arrangement and method for construction stored data base storer, processor, power module, display, comparer, and described processor is connected with BIM model data storehouse memorizer, arrangement and method for construction stored data base storer, power module, display, comparer respectively;
Described display is a LCD display.
Compared with prior art, the present invention has the following advantages:
1, simple in structure, low cost of manufacture;
2,, help engineering construction project to raise the efficiency, reduce risk through the application of BIM;
3, improve project construction and operation management level.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is elaborated.
Embodiment
As shown in Figure 1, a kind ofly carry out the device of construction simulation through BIM, this device comprises BIM model data storehouse memorizer 1, arrangement and method for construction stored data base storer 5, processor 2, power module 4, display 3, comparer 6.Processor 2 is connected with BIM model data storehouse memorizer 1, arrangement and method for construction stored data base storer 5, power module 4, display 3, comparer 6 respectively.Power module provides 220V voltage.Display is a LCD display.Processor generates construction process information according to the BIM model data in the BIM model data storehouse memorizer; Through comparer the arrangement and method for construction information of construction process information and arrangement and method for construction stored data base memory stores is compared judgement then, obtain optimum construction process information.
Using the present invention can carry out:
1) construction simulation progress monitoring.
Utilize the 4d construction simulation of the whole project of BIM modelling, but the design of visual simulation construction schedule and construction system improves construction link or critical path, the instant coordination through in investigation and the project process in advance greatly improves project construction efficient.Through carrying out the simulation of 4d construction speed; Optimize construction process, and with the original place under one deck arrangement and method for construction compare, civil engineering is divided into 4 stages substantially: in the phase one; Original scheme is a sequence construction, and the BIM prioritization scheme is that the machine room part is constructed with integral body simultaneously; In subordinate phase, the machine room of original scheme part has just begun construction, and a part has been carried out in the civil engineering of machine room in the BIM prioritization scheme; When accomplishing in the phase III, the machine room civil engineering of original scheme part is also being carried out, and the machine room civil engineering in the BIM prioritization scheme has finished, the electromechanical speciality construction of can marching into the arena; After proceeding to stage, the machine room civil engineering of original scheme just finishes, and the dynamo-electric construction of partly having marched into the arena in the BIM prioritization scheme.After stage was accomplished, 2 kinds of schemes were accomplished the civil engineering of B1 simultaneously.Through the BIM prioritization scheme, can see intuitively that the scheme after the optimization shifts to an earlier date the electromechanical speciality construction, and does not influence the civil engineering progress.Reach the purpose of practicing thrift the duration.
2) security control.
4D simulation through BIM; Construction plan is combined with on-the-spot actual conditions, simulate each professional construction area of each stage, stream of people's route, placing of material position, the path of equipment hoisting and dodge the zone; Avoid the crossed construction phenomenon of different specialties, stop potential safety hazard.Like the dynamo-electric construction of B1 machine room; Water, warm, electric three specialties are constructed simultaneously, and along with each professional perform region is constantly being adjusted, the stowed location of material also changes; Through BIM each staged construction scope and material stowed location are simulated in advance; Find out the most reasonably zone and path, avoid crossed construction, reduce potential safety hazard; Through simulation in advance, confirm key elements such as lifting mode and haulage track, transportation resources, security configuration to B1 cold-storage jar Hoisting Program.Scheme is deliberated repeatedly, avoided occurring potential safety hazard.

Claims (2)

1. device that carries out construction simulation through BIM; It is characterized in that; This device comprises BIM model data storehouse memorizer, arrangement and method for construction stored data base storer, processor, power module, display, comparer, and described processor is connected with BIM model data storehouse memorizer, arrangement and method for construction stored data base storer, power module, display, comparer respectively;
2. a kind of device that carries out construction simulation through BIM according to claim 1 is characterized in that described display is a LCD display.
CN201110156325.5A 2011-06-10 2011-06-10 Device for conducting construction simulation through building information model (BIM) Active CN102819621B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110156325.5A CN102819621B (en) 2011-06-10 2011-06-10 Device for conducting construction simulation through building information model (BIM)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110156325.5A CN102819621B (en) 2011-06-10 2011-06-10 Device for conducting construction simulation through building information model (BIM)

Publications (2)

Publication Number Publication Date
CN102819621A true CN102819621A (en) 2012-12-12
CN102819621B CN102819621B (en) 2015-04-01

Family

ID=47303732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110156325.5A Active CN102819621B (en) 2011-06-10 2011-06-10 Device for conducting construction simulation through building information model (BIM)

Country Status (1)

Country Link
CN (1) CN102819621B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440600A (en) * 2013-09-13 2013-12-11 成都中铁隆工程集团有限公司 BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
CN104484524A (en) * 2014-12-09 2015-04-01 张家驰 Method and system based on BIM (building information modeling) simulation model and in-site construction interaction
CN104951582A (en) * 2014-03-31 2015-09-30 中国石油天然气股份有限公司 Equipment installation scheme simulation development method and device based on CAM platform
CN104966154A (en) * 2015-06-09 2015-10-07 广州市水电设备安装有限公司 BIM technology-based temporary water and temporary electricity management method and system
CN105155461A (en) * 2015-09-24 2015-12-16 武汉英思工程科技股份有限公司 High-slope construction dynamic simulation method based on BIM (Building Information Modeling)
CN105259783A (en) * 2015-10-16 2016-01-20 中国葛洲坝集团三峡建设工程有限公司 Visual preview system for water-and-power engineering construction process
CN105424078A (en) * 2015-12-08 2016-03-23 中国一冶集团有限公司 Suspension rod collision tester and simulation method for hoisting process based on auxiliary BIM technology and the suspension rod collision tester
CN105512730A (en) * 2015-12-02 2016-04-20 中国南方电网有限责任公司 BIM model-based data center operation and maintenance system
CN105695650A (en) * 2016-04-27 2016-06-22 中国十九冶集团有限公司 Blast furnace five-way ball installation method
CN106682373A (en) * 2017-03-17 2017-05-17 江苏省建筑科学研究院有限公司 Construction simulation device working through BIM (building information modeling)
CN107215779A (en) * 2017-07-13 2017-09-29 中联重科股份有限公司 Assembled architecture component hoisting method, device and system
CN107357950A (en) * 2017-05-19 2017-11-17 河北省电力勘测设计研究院 Fabricated construction triaxial imitation design method
CN107908905A (en) * 2017-12-12 2018-04-13 东华理工大学 A kind of device that construction simulation is carried out by BIM
CN108269069A (en) * 2018-02-14 2018-07-10 安徽工大信息技术有限公司 A kind of analog platform and analogy method of the construction site based on dehumidifying antiseepage equipment
CN109292637A (en) * 2018-07-21 2019-02-01 中铁十八局集团有限公司 A kind of large-scale cable wisdom Lift-on/Lift-off System based on BIM
CN110200402A (en) * 2019-06-20 2019-09-06 四川省劲腾环保建材有限公司 One kind being based on BIM platform construction Ground arrangement simulator
CN110298629A (en) * 2019-06-20 2019-10-01 四川省劲腾环保建材有限公司 A kind of BIM implementation integration method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104850709B (en) * 2015-05-25 2018-05-25 苏州金螳螂建筑装饰股份有限公司 Building decoration engineering construction three-dimensional simulation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1162155A (en) * 1996-04-08 1997-10-15 狄宗楷 high-efficient dynamic engineering management system and method thereof
US20060038890A1 (en) * 2004-08-23 2006-02-23 Gamecaster, Inc. Apparatus, methods, and systems for viewing and manipulating a virtual environment
CN101016728A (en) * 2007-02-06 2007-08-15 同济大学 Construction monitoring method for exchanging course of half/through arch bridge suspender
CN201594263U (en) * 2010-03-30 2010-09-29 中十冶集团有限公司 Pipelining dynamic simulation device
CN201654582U (en) * 2010-04-30 2010-11-24 北京乐福能节能技术有限公司 Wireless temperature control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1162155A (en) * 1996-04-08 1997-10-15 狄宗楷 high-efficient dynamic engineering management system and method thereof
US20060038890A1 (en) * 2004-08-23 2006-02-23 Gamecaster, Inc. Apparatus, methods, and systems for viewing and manipulating a virtual environment
CN101016728A (en) * 2007-02-06 2007-08-15 同济大学 Construction monitoring method for exchanging course of half/through arch bridge suspender
CN201594263U (en) * 2010-03-30 2010-09-29 中十冶集团有限公司 Pipelining dynamic simulation device
CN201654582U (en) * 2010-04-30 2010-11-24 北京乐福能节能技术有限公司 Wireless temperature control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李恒,等.: "BIM在建设项目中应用模式研究", 《工程管理学报》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440600A (en) * 2013-09-13 2013-12-11 成都中铁隆工程集团有限公司 BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
CN104951582A (en) * 2014-03-31 2015-09-30 中国石油天然气股份有限公司 Equipment installation scheme simulation development method and device based on CAM platform
CN104951582B (en) * 2014-03-31 2018-07-13 中国石油天然气股份有限公司 Equipment mount scheme analog development method and device based on CAM platforms
CN104484524B (en) * 2014-12-09 2017-08-01 张家驰 A kind of method and system interacted based on BIM simulation models with site operation
CN104484524A (en) * 2014-12-09 2015-04-01 张家驰 Method and system based on BIM (building information modeling) simulation model and in-site construction interaction
CN104966154A (en) * 2015-06-09 2015-10-07 广州市水电设备安装有限公司 BIM technology-based temporary water and temporary electricity management method and system
CN105155461A (en) * 2015-09-24 2015-12-16 武汉英思工程科技股份有限公司 High-slope construction dynamic simulation method based on BIM (Building Information Modeling)
CN105259783A (en) * 2015-10-16 2016-01-20 中国葛洲坝集团三峡建设工程有限公司 Visual preview system for water-and-power engineering construction process
CN105512730A (en) * 2015-12-02 2016-04-20 中国南方电网有限责任公司 BIM model-based data center operation and maintenance system
CN105424078A (en) * 2015-12-08 2016-03-23 中国一冶集团有限公司 Suspension rod collision tester and simulation method for hoisting process based on auxiliary BIM technology and the suspension rod collision tester
CN105424078B (en) * 2015-12-08 2018-03-09 中国一冶集团有限公司 A kind of suspension rod crash tests instrument and based on the suspension rod crash tests instrument auxiliary BIM technology hoisting analogy method
CN105695650A (en) * 2016-04-27 2016-06-22 中国十九冶集团有限公司 Blast furnace five-way ball installation method
CN106682373A (en) * 2017-03-17 2017-05-17 江苏省建筑科学研究院有限公司 Construction simulation device working through BIM (building information modeling)
CN107357950A (en) * 2017-05-19 2017-11-17 河北省电力勘测设计研究院 Fabricated construction triaxial imitation design method
CN107215779A (en) * 2017-07-13 2017-09-29 中联重科股份有限公司 Assembled architecture component hoisting method, device and system
CN107908905A (en) * 2017-12-12 2018-04-13 东华理工大学 A kind of device that construction simulation is carried out by BIM
CN108269069A (en) * 2018-02-14 2018-07-10 安徽工大信息技术有限公司 A kind of analog platform and analogy method of the construction site based on dehumidifying antiseepage equipment
CN108269069B (en) * 2018-02-14 2021-03-02 安徽工大信息技术有限公司 Construction site simulation platform and simulation method based on dehumidification and seepage-proofing equipment
CN109292637A (en) * 2018-07-21 2019-02-01 中铁十八局集团有限公司 A kind of large-scale cable wisdom Lift-on/Lift-off System based on BIM
CN110200402A (en) * 2019-06-20 2019-09-06 四川省劲腾环保建材有限公司 One kind being based on BIM platform construction Ground arrangement simulator
CN110298629A (en) * 2019-06-20 2019-10-01 四川省劲腾环保建材有限公司 A kind of BIM implementation integration method

Also Published As

Publication number Publication date
CN102819621B (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN102819621B (en) Device for conducting construction simulation through building information model (BIM)
CN204303029U (en) For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance
CN202167019U (en) Device for construction simulation through Building Information Modeling
CN102819623A (en) Method for detecting collision positions through building information modeling (BIM)
CN104778747A (en) Three-dimensional modeling method for electric power underground pipe network
Kim et al. Policy directions for the smart grid in Korea
CN202167021U (en) System device capable of establishing BIM model
CN102819622A (en) System device for establishing building information model (BIM)
CN102819619A (en) Device for simulating streams of people through BIM (building information modeling)
Zhang Intelligent building planning system based on BIM and artificial intelligence
CN202120257U (en) Pedestrian flow simulative device through building information modeling (BIM)
Li et al. Intelligent building automation and control based on IndasIBMS
Li et al. Research on the informatization management of green construction based on Cloud-BIM
Li et al. Application of BIM technology in green building engineering construction
BENSALAH et al. Building information modeling & sustainability in railway
Lundgren et al. Adapting for shared use–evaluating the lifecycle carbon impact
Xiaolei Research on the Application of BIM Concept and BIM Software in Architectural Design
Li et al. Smart City Construction Visual Simulation Application Based on Intelligent BIM Technology
Chenjie Application of BIM Technology in New Assembly Type Green Building
Chen et al. The application of BIM technology in a comprehensive experimental building project
Peng et al. Application of Building Information Modeling (BIM) technology in the quality management of prefabricated buildings
Sun The Application of BIM Technology in Cost Control of Prefabricated Buildings
CN202167022U (en) Device for detecting collision position of BIM model
Jiang et al. The Analysis of BIM Technology Applicated in Prefabricated Buildings
Zhou et al. Research on construction mode of power Dispatching-Distribution-Repairing Integrative System

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI ELECTRIC

Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC POWER SCIENCE + TECHNOLOGY CO., LTD.

Effective date: 20121219

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121219

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Electric Power Communication Co., Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Jiulong Electric Power Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant