CN112651644A - Bridge potential safety hazard troubleshooting informatization management system and application method thereof - Google Patents
Bridge potential safety hazard troubleshooting informatization management system and application method thereof Download PDFInfo
- Publication number
- CN112651644A CN112651644A CN202011606161.7A CN202011606161A CN112651644A CN 112651644 A CN112651644 A CN 112651644A CN 202011606161 A CN202011606161 A CN 202011606161A CN 112651644 A CN112651644 A CN 112651644A
- Authority
- CN
- China
- Prior art keywords
- potential safety
- safety hazard
- bridge
- rectification
- bim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 128
- 238000013024 troubleshooting Methods 0.000 title claims abstract description 53
- 238000000034 method Methods 0.000 title claims abstract description 50
- 238000010276 construction Methods 0.000 claims abstract description 64
- 238000011835 investigation Methods 0.000 claims abstract description 42
- 238000007619 statistical method Methods 0.000 claims abstract description 26
- 230000008569 process Effects 0.000 claims abstract description 24
- 238000012986 modification Methods 0.000 claims description 38
- 230000004048 modification Effects 0.000 claims description 38
- 230000000977 initiatory effect Effects 0.000 claims description 14
- 238000007689 inspection Methods 0.000 claims description 14
- 230000000694 effects Effects 0.000 claims description 8
- 230000006870 function Effects 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 238000010561 standard procedure Methods 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000004891 communication Methods 0.000 claims description 4
- 230000004044 response Effects 0.000 claims description 3
- 230000007123 defense Effects 0.000 claims description 2
- 230000002452 interceptive effect Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 20
- 238000012545 processing Methods 0.000 abstract description 12
- 238000004458 analytical method Methods 0.000 description 7
- 230000006872 improvement Effects 0.000 description 5
- 238000007639 printing Methods 0.000 description 5
- 238000011161 development Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 230000002829 reductive effect Effects 0.000 description 3
- 210000002435 tendon Anatomy 0.000 description 3
- 238000012937 correction Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000003999 initiator Substances 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Computer Hardware Design (AREA)
- Marketing (AREA)
- Architecture (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Civil Engineering (AREA)
- Primary Health Care (AREA)
- Educational Administration (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a bridge potential safety hazard troubleshooting informatization management system and an application method thereof, wherein the bridge potential safety hazard troubleshooting informatization management system comprises a bridge potential safety hazard troubleshooting informatization management platform and a mobile APP terminal; a management platform: the BIM bridge three-dimensional model and additional information can be imported; permission setting can be carried out according to different roles of users; the BIM bridge three-dimensional model and the additional information can be connected to the mobile APP terminal in real time; the potential safety hazard type of the bridge can be established according to the structural type and the characteristics of the construction scheme of the bridge, and the potential safety hazard type is synchronously associated to the mobile APP end; the APP end is moved, potential safety hazard investigation management (potential safety hazard collection, rectification and acceptance) can be carried out on each construction process of the bridge on the construction site of the bridge; the method relies on the BIM technology, forms informatization and closed-loop management, shortens the handling time of the potential safety hazard of the bridge, improves the potential safety hazard processing capability, and can track and trace; the system also has a statistical analysis function, and can check the statistical analysis result according to the user permission and provide decision support for the project.
Description
Technical Field
The invention relates to the technical field of BIM model technology and informatization management, in particular to a bridge potential safety hazard troubleshooting informatization management system and an application method thereof.
Background
In recent decades, with the rapid development and wide application of a series of modern science such as computer technology, information technology, fine management and the like, a great and profound influence is generated on the civil engineering industry, a Building Information Model (BIM) is produced in the environment, and the BIM is researched and applied in the building field. Bridge workers try to apply the BIM technology to bridge engineering by taking the experience of the BIM technology in the fields of building construction and the like as a reference, the application of the BIM technology is mostly limited to simple application of a three-dimensional model at present, such as collision inspection, construction drawing depth inspection, automatic engineering quantity calculation and the like, and some projects start to practice 4D-BIM construction scheme simulation and 5D-BIM progress + cost control. The understanding and application of the BIM are fragmented, and the important reasons behind this are lack of project information management systems and unified data information management platforms. Under the background of the era of big data and mobile internet, only a project information management system based on BIM is not enough, background data needs to be pushed to the front end and directly reach the hands of a user, the data is directly used by the user, decision making and engineering management are assisted, and working experience at any time and any place is realized.
Before the BIM technology appears, the troubleshooting and management mode of bridge potential safety hazards still stays in a rough management state, information of constructors, supervision and project managers (owners) is asymmetric, a large amount of safety inspection data cannot be shared in time, a large amount of data are retained in a paper form, big data are deep and sleep, isolated islands and information is seriously lost, fine management in the bridge construction period cannot be called, fine management is difficult to achieve, the industrialization degree is low, the bridge potential safety hazards influence the bureau, the improvement of the overall quality of the bridge is not facilitated, under the new opportunity of national economic transformation development, the bridge construction and maintenance develop towards higher quality and green long service life, and the BIM technology provides an important support means for the purpose.
At present, bridge management based on the BIM technology mainly comprises the following steps: in the application of the BIM technology in the public road and bridge safety quality management, the application of the BIM technology in the safety meeting and safety protection scheme in the project is discussed, and the BIM technology is indicated to be suitable for safety management and is better than the conventional safety management method; in the BIM-based urban large-scale bridge safety management system architecture, a BIM-technology-based urban large-scale bridge safety management system architecture is provided for fire emergency management in bridge emergency safety management; in the application of the BIM technology to bridge construction safety management, the former applies a set of construction process management and control system and management rules from the aspects of bridge construction site management and control, safety technology convergence and safety quality coordination. However, the research does not relate to the bridge potential safety hazard troubleshooting informatization management technology and method based on the BIM technology.
Therefore, in the prior art, inconvenience and defects still exist in the aspect of bridge safety hazard investigation, and further improvement is urgently needed. How to create a traceable and traceable bridge potential safety hazard investigation informatization management system capable of shortening the processing time of the potential safety hazard of the bridge and improving the potential safety hazard processing capability and an application method thereof becomes an object which is in great need of improvement in the current industry.
Disclosure of Invention
The invention aims to solve the technical problems that the processing time of potential safety hazards of a bridge can be shortened, the potential safety hazard processing capability is improved, and the tracked and traceable bridge potential safety hazard investigation informatization management system and the application method thereof are provided, so that the problems of overdue delay and potential safety hazard tracing and traceable difficulty caused by inaccurate positioning due to the fact that the information of potential safety hazard investigation, rectification, acceptance and the like of the existing bridge cannot be inquired in real time are solved.
In order to solve the technical problems, the invention adopts the following technical scheme:
a bridge potential safety hazard troubleshooting informatization management system comprises a bridge potential safety hazard troubleshooting informatization management platform and a mobile APP terminal; the bridge potential safety hazard investigation informatization management platform comprises: the BIM bridge three-dimensional model and model additional information in IFC format can be imported; corresponding authority setting can be carried out according to different roles of the users, and corresponding use and management authorities are given to the users; the BIM bridge three-dimensional model and the model additional information can be connected to the mobile APP terminal in real time; the potential safety hazard type of the bridge can be established according to the structural type and the characteristics of the construction scheme of the bridge, and the potential safety hazard type is synchronously associated to the mobile APP end; the mobile APP end is used for carrying out potential safety hazard investigation and management on each construction process of the bridge on the construction site of the bridge; the potential safety hazard troubleshooting management comprises potential safety hazard acquisition, potential safety hazard rectification and acceptance inspection; the bridge potential safety hazard investigation informatization management platform comprises: when receiving potential safety hazard acquisition information of the mobile APP terminal, automatically associating the BIM bridge three-dimensional model, determining the position of the potential safety hazard, displaying the position in the BIM bridge model in real time, and pushing the potential safety hazard to a related rectification responsible person through the mobile APP terminal in a form of a potential safety hazard rectification notice according to the position and the type of the potential safety hazard; when potential safety hazard rectification and modification information of a mobile APP end is received, the bridge BIM model can be automatically associated, the position of the potential safety hazard rectification and modification, the rectification and modification measures and the rectification and modification effect are determined, the potential safety hazard rectification and modification measures and the rectification and modification effect are displayed in the bridge model BIM in real time, and meanwhile, according to the potential safety hazard rectification and modification implementation situation, the potential safety hazard rectification and modification response list is pushed to a relevant rectification, modification and acceptance responsible person through the mobile APP in a potential safety hazard rectification and modification answer form; when receiving the potential safety hazard acceptance information of the mobile APP terminal, automatically associating the BIM bridge model, updating the structural state after the bridge potential safety hazard acceptance, and automatically archiving; the bridge potential safety hazard investigation information management platform and/or the mobile APP terminal have an inquiry function, carry out statistical analysis on the potential safety hazard of the bridge, check the statistical analysis result according to the user permission, and provide decision support for the project.
As a further improvement of the invention, the BIM bridge three-dimensional model in IFC format and the additional information source of the model are as follows:
(1) building a BIM bridge three-dimensional model according to a bridge construction drawing; the BIM bridge three-dimensional model comprises: the system comprises an upper structure containing a concrete beam, a prestressed system and common steel bars, and a lower structure containing an abutment, a foundation, the common steel bars and the prestressed system, bridge auxiliary facilities and a temporary structure; the model fineness of the upper structure and the lower structure is LOD300, and the model fineness of the bridge auxiliary facilities and the temporary structure is LOD 200;
(2) standard procedures are hung under each subentry project of the bridge to serve as model additional information;
(3) and exporting and storing the BIM bridge three-dimensional model from BIM modeling software in an IFC (interactive field communication) format.
Further, the potential safety hazard acquisition information of the mobile APP terminal comprises: selecting a process, potential safety hazard types/details, importance degree, potential safety hazard acquisition personnel, potential safety hazard initiation time, potential safety hazard problem description, rectification requirements, acquiring photos and videos on site, designating potential safety hazard rectification responsible persons and rectification time limit; remove the potential safety hazard rectification information of APP end and include: potential safety hazard rectification time, whether the rectification time limit is out of date, rectification implementation situation description, on-site photo and video acquisition, and designation of potential safety hazard person in charge of inspection; remove potential safety hazard acceptance of APP end and include: time for checking and accepting potential safety hazards, checking and accepting modes, checking and accepting opinions, and acquiring photos and videos on site.
Further, when receiving potential safety hazard acceptance information of the mobile APP terminal, if the acceptance is unqualified, the person responsible for potential safety hazard rectification needs to reorganize rectification again until the acceptance is qualified.
Further, the bridge potential safety hazard troubleshooting informatization management platform can automatically generate a standard potential safety hazard rectification notice sheet, a potential safety hazard rectification implementation reply sheet and a potential safety hazard rectification acceptance sheet, and a user can download and print forms according to needs and authorities.
Further, the safety hazard rectification notice sheet comprises the following contents: potential safety hazard numbering, filing numbering, working procedures, potential safety hazard category/item, importance degree, potential safety hazard acquisition personnel, potential safety hazard acquisition units, potential safety hazard initiating time, potential safety hazard rectification time limit, problem description, rectification requirements, problem photos and videos, potential safety hazard rectification responsible persons and potential safety hazard rectification units; the potential safety hazard rectification implementation reply sheet comprises the following contents: potential safety hazard numbering, filing numbering, working procedures, potential safety hazard category/item, importance degree, potential safety hazard collecting personnel, potential safety hazard collecting units, potential safety hazard initiating time, potential safety hazard rectification time limit, potential safety hazard rectification responsible persons, potential safety hazard rectification units, potential safety hazard rectification time, rectification time limit, rectification implementation, problem photos and videos, potential safety hazard acceptance persons and potential safety hazard acceptance units; the potential safety hazard rectification acceptance bill comprises the following contents: potential safety hazard serial number, file serial number, process, potential safety hazard classification/item, degree of importance, potential safety hazard collection personnel, potential safety hazard collection unit, potential safety hazard initiation time, potential safety hazard rectification time limit, potential safety hazard rectification person of responsibility, potential safety hazard rectification unit, potential safety hazard rectification time, rectification time limit, potential safety hazard acceptance person of responsibility, potential safety hazard acceptance unit, potential safety hazard acceptance time, acceptance mode, acceptance opinion, problem photo and video.
Further, the potential safety hazard collection is responsible for project personnel; the potential safety hazard rectification is responsible for construction units; the potential safety hazard acceptance is responsible for supervision units or owners.
Further, the statistical analysis of the potential safety hazard of the bridge comprises the statistical analysis of the real-time state of the potential safety hazard of the bridge, and the statistical analysis is carried out according to the occurrence time of the potential safety hazard, the working procedure of the potential safety hazard, the type of the potential safety hazard, the cause, the rectification period, the construction progress and the potential safety hazard initiating unit.
Further, the statistical analysis of the potential safety hazards of the bridge comprises: according to the bridge potential safety hazard, initiating statistics of units according to the occurrence position, the rectification period and the potential safety hazard; counting according to the category of the potential safety hazard of the bridge and the rectification period; counting according to the construction progress and the rectification period; and counting according to the detailed safety hidden danger and the rectification time limit in the frontier defense.
The invention also provides an application method of the bridge potential safety hazard troubleshooting informatization management system, which comprises the following steps: s1, establishing a BIM bridge three-dimensional model according to the bridge construction drawing; s2, taking each project lower hanging standard procedure of the bridge as model additional information; s3, exporting and storing the BIM bridge three-dimensional model from BIM modeling software in an IFC (information and communication) format; s4, importing the BIM bridge three-dimensional model in the IFC format into a bridge potential safety hazard troubleshooting informatization management platform; s5, setting corresponding authority according to different roles of the users, and giving corresponding use and management authority to the users; s6, connecting the BIM bridge three-dimensional model and model additional information to a mobile APP terminal in real time through a bridge potential safety hazard troubleshooting informatization management platform; s7, according to the bridge structure type and the construction scheme characteristics, establishing a bridge potential safety hazard type on a bridge potential safety hazard troubleshooting informatization management platform, and synchronously associating the bridge potential safety hazard type to a mobile APP terminal; s8, performing potential safety hazard investigation and management on each construction process of the bridge by using the mobile APP end on the construction site of the bridge; the potential safety hazard troubleshooting management comprises three links of potential safety hazard acquisition, potential safety hazard rectification and acceptance inspection; s9, carrying out statistical analysis on the potential safety hazard of the bridge through a bridge potential safety hazard troubleshooting informatization management platform and/or a mobile APP terminal query mode, checking a statistical analysis result according to user permission, and providing decision support for projects.
By adopting the technical scheme, the invention at least has the following advantages:
1. the method and the system realize dynamic management of bridge potential safety hazard troubleshooting treatment based on the mobile terminal, and embed the site potential safety hazard troubleshooting treatment process into APP software. The method comprises the steps of establishing a complete closed-loop flow of collecting potential safety hazards of project personnel, rectifying the potential safety hazards of construction units, supervising, checking and accepting the potential safety hazards of owners, automatically outputting and printing a rectification notice sheet and a real rectification notice sheet, and enabling a user to timely perform operations such as recording, rectifying, rechecking and the like of the potential hazards through a mobile phone terminal at any time and any place; the system can automatically produce standard quality and potential safety hazard rectification notice sheets, rectification implementation reply sheets, potential hazard investigation and management ledgers and the like, and has the functions of uniformly exporting and printing forms; according to daily hidden danger troubleshooting and treatment dynamic management data, the system can automatically perform statistical analysis on the data to generate various hidden danger statistical graphs, statistical reports and the like. By utilizing the mobile APP, three links of hidden danger release, problem rectification and acceptance check are defined, closed-loop management is formed, and the problem closing time is shortened; associating the problems with the BIM components, and carrying out three-dimensional visual summarization and analysis; the hidden danger safety hazard of the bridge site is published, processed and checked in time, the hidden danger is prevented from further worsening, the hidden danger processing time is shortened, the hidden danger processing capacity is improved, and the working efficiency is improved.
2. The inspection and treatment progress conditions of the potential safety hazards can be reflected on the three-dimensional model of the bridge in real time, and the inspection and acceptance conditions are reflected by shooting and uploading photos by a mobile phone; and associating electronic informationized data of potential safety hazard detection of each bridge member to the corresponding three-dimensional model, and enabling the BIM three-dimensional bridge model on the APP or PC end management platform of the mobile end to check the whole set of archive files of the potential safety hazard of the bridge on site. The defects of inaccuracy, non-standardization, difficult statistics, asynchronous information and the like of the on-site form recording of the bridge are overcome. The method changes the development of the original extensive and random mode to the informationization, assimilation and traceability directions of the bridge potential safety hazard inspection, is favorable for the data accumulation of the bridge potential safety hazard, and provides data support for the bridge to process the potential safety hazard and avoid the potential safety hazard of the same type from occurring for many times.
3. The APP end is moved, a user can carry a mobile phone with him, and relevant work such as potential safety hazard collection, rectification, acceptance inspection and the like is carried out on the bridge site; the bridge potential safety hazard investigation informatization management platform can more intuitively display the real-time state of the potential safety hazard of the bridge through the three-dimensional model, can realize the space positioning and convenient query functions of the bridge potential safety hazard, and can realize automatic analysis and statistics of background data.
Drawings
The foregoing is only an overview of the technical solutions of the present invention, and in order to make the technical solutions of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and the detailed description.
FIG. 1 is a flowchart of an application method of a bridge potential safety hazard troubleshooting informatization management system in one embodiment of the invention;
FIG. 2 is a flow chart of potential safety hazard acquisition, rectification and verification;
FIG. 3 is a schematic diagram of classification output and statistics of potential safety hazards of a bridge;
FIG. 4 is a safety hazard proportion analysis diagram of different types of bridges;
FIG. 5 is a detailed proportion analysis chart of potential safety hazard of bridge edge protection;
FIG. 6 is a quarterly proportion analysis chart of bridge safety hazards.
Detailed Description
The embodiment provides a bridge potential safety hazard troubleshooting informatization management system which comprises a bridge potential safety hazard troubleshooting informatization management platform and a mobile APP terminal; wherein, bridge potential safety hazard investigation information-based management platform: the BIM bridge three-dimensional model and model additional information in IFC format can be imported; corresponding authority setting can be carried out according to different roles of the users, and corresponding use and management authorities are given to the users; the BIM bridge three-dimensional model and the model additional information can be connected to the mobile APP terminal in real time; the potential safety hazard type of the bridge can be established according to the structural type and the characteristics of the construction scheme of the bridge, and the potential safety hazard type is synchronously associated to the mobile APP end; the APP end is moved and used for carrying out potential safety hazard investigation and management on each construction process of the bridge on the construction site of the bridge; the potential safety hazard troubleshooting management comprises potential safety hazard acquisition, potential safety hazard rectification and acceptance inspection. The bridge potential safety hazard investigation informatization management platform comprises: when receiving potential safety hazard acquisition information of the mobile APP terminal, automatically associating the BIM bridge three-dimensional model, determining the position of the potential safety hazard, displaying the position in the BIM bridge model in real time, and pushing the potential safety hazard to a related rectification responsible person through the mobile APP terminal in a form of a potential safety hazard rectification notice according to the position and the type of the potential safety hazard; when potential safety hazard rectification and modification information of a mobile APP end is received, the bridge BIM model can be automatically associated, the position of the potential safety hazard rectification and modification, the rectification and modification measures and the rectification and modification effect are determined, the potential safety hazard rectification and modification measures and the rectification and modification effect are displayed in the bridge model BIM in real time, and meanwhile, according to the potential safety hazard rectification and modification implementation situation, the potential safety hazard rectification and modification response list is pushed to a relevant rectification, modification and acceptance responsible person through the mobile APP in a potential safety hazard rectification and modification answer form; when receiving the potential safety hazard acceptance information of the mobile APP terminal, automatically associating the BIM bridge model, updating the structural state after the bridge potential safety hazard acceptance, and automatically archiving; the bridge potential safety hazard troubleshooting informatization management platform and the mobile APP end have a query function, carry out statistical analysis on the potential safety hazard of the bridge, check the statistical analysis result according to the user permission, and provide decision support for projects.
The bridge potential safety hazard troubleshooting informatization management system and the application method thereof are described in detail with reference to fig. 1 as follows:
the first step is as follows: and establishing a BIM bridge three-dimensional model according to the bridge construction drawing. The three-dimensional model of the BIM bridge should include: the upper structure comprises a concrete beam, a prestressed system and common steel bars, and the lower structure comprises an abutment, a foundation, the common steel bars and the prestressed system, bridge auxiliary facilities, a temporary structure and the like.
The selection of the bridge three-dimensional modeling follows the following principle:
should be able to achieve design collaboration at the component level through the series of software or directed secondary development
Should have full parametric design capability
Should have the three-dimensional modeling capability of the special-shaped structure
Should be able to data interface with other BIM design software
The project adopts Tekla software to establish a BIM model according to a construction drawing of a bridge, and information contained in the BIM model and the fineness of the model are shown in table 1:
fineness of LOD200 model: approximate geometric dimensions, contours, shapes and orientations, which can reflect the approximate geometric characteristics of the object itself. The main appearance size can not be changed, but the detail size can be adjusted.
Fineness of LOD300 model: the main components of the object must be expressed geometrically accurately, the actual appearance of the object can be reflected, the wrong judgment in the construction simulation and the collision check can not be ensured, and the geometric fineness of the model is consistent with the design construction drawing. The model should reflect the exact internal configuration and spatial location of the component, etc.
The second step is that: hanging standard procedures under each subentry project of the bridge
And hanging a standard procedure for each project of the project. Combining the first project, disassembling the operation flow and quality control key points of the standardized construction process of each procedure to form a standardized process flow card, wherein partial procedures of the project bridge are shown in table 2:
the third step: exporting and storing the BIM bridge three-dimensional model from BIM modeling software in IFC format
The project data storage and export adopt the international common IFC standard, and the IFC uses the EXPRESS language to describe the relationship among the components, the attributes of the components, and the information of geometry, measurement, attributes and the like.
All the project BIM bridge three-dimensional models are in the range compatible with IFC, and all the attribute information of the bridge conforms to IFC export standards.
The fourth step: and leading the BIM bridge three-dimensional model in the IFC format into a PC (personal computer) end of the bridge potential safety hazard troubleshooting information management platform.
The PC end of the bridge potential safety hazard investigation informatization management platform is characterized in that: BIM central database, BIM model information bearing, BIM model display and mobile APP terminal connection
The BIM central database is divided into three layers: the bottom is a storage layer, the middle layer is a data layer, and the uppermost layer is a bridge potential safety hazard investigation application layer.
A storage layer: BIM model information data, various data, pictures, videos, documents and the like generated by bridge safety hazard investigation are stored in the layer.
And (3) a data layer: and the data layer adopts a distributed database based on cloud computing and Internet of things technology to store BIM data and integrates structured data and unstructured data in bridge potential safety hazard investigation. The structured data comprise service data and model data for hidden danger investigation, and support concurrent access of multiple users, processing analysis of big data, data backup and consistency correction; the unstructured data comprises documents, pictures, videos and the like, including model files, drawing documents and the like, and the data can be stored and managed through a file system, so that historical version management and query right modification control of the files are supported.
An application layer: the system provides functions of real-time data query, statistical analysis, event tracking and the like for project management personnel, and provides data analysis for decision-making personnel.
The fifth step: and according to different user roles, corresponding permission setting is carried out, and corresponding use and management permissions are given to the users.
The bridge potential safety hazard troubleshooting informatization management platform carries out unique identification coding on users (users), the users can operate different functional modules according to authority, and users without the authority are forbidden to use the platform.
And classifying the authority of the project personnel, and respectively setting the authority of management, reading and writing. The user can carry out operations such as uploading, inquiring and downloading according to the self authority.
The authority setting is carried out on the users of the project, so that the project users can not cross the authority to interfere with the data of other people; meanwhile, real-time updating and sharing of data are achieved, namely as long as data of a certain functional module or a certain terminal are changed, other cooperative functional modules and terminals can see the changed real-time data.
And a sixth step: and connecting the BIM bridge three-dimensional model and the model additional information to a mobile APP terminal in real time through a bridge potential safety hazard troubleshooting informatization management platform.
This project bridge potential safety hazard investigation information-based management platform's removal APP end is the removal end based on html5, and the main function: engineering information inquiry, model display, trace uploading, potential safety hazard investigation and management of a bridge site and the like.
The mobile APP end of the project contains a component list, and meanwhile, the bridge safety hazards are positioned to the BIM bridge three-dimensional model, so that a user can check the position where the bridge safety hazards occur more visually.
The seventh step: according to the bridge structure type and the characteristics of the construction scheme, the bridge potential safety hazard type is formulated on a bridge potential safety hazard troubleshooting informatization management platform and is synchronously associated to a mobile APP terminal.
The bridge is of a beam type bridge structure, and the potential safety hazard categories and the fine items of the bridge made according to the construction scheme are shown in the table 3:
eighth step: and (4) carrying out potential safety hazard investigation management on each construction process of the bridge by utilizing the mobile APP end on the construction site of the bridge. The potential safety hazard troubleshooting management comprises three links of potential safety hazard acquisition, potential safety hazard rectification and potential safety hazard acceptance, and forms closed-loop management, which is specifically shown in fig. 2.
Potential safety hazard acquisition: all constructors, supervisors and owners of the project have the authority of collecting potential safety hazards of the bridge, downloading and printing forms, when a supervision unit opens to the sun and finds that potential safety hazards exist in the upper structure of a bridge construction site and the 1 st span 1# prestressed tendon processing and tensioning process, the corresponding categories and the detailed items of the potential safety hazards are selected, and the potential safety hazards are divided into 'important' grades according to the severity of the potential safety hazards; the designated rectification period is 1 day, potential safety hazard information is filled in through a mobile APP in the sun, pictures and video data are uploaded, a platform automatically generates a potential safety hazard number and a filing number, a bridge potential safety hazard rectification notice sheet is formed and issued, meanwhile, a bridge potential safety hazard investigation informatization management platform can automatically associate a BIM bridge model, the position where the potential safety hazard occurs is determined, and the potential safety hazard information is displayed in the BIM bridge model in real time.
The item potential safety hazard rectification notice sheet is shown in table 4
The bridge potential safety hazard troubleshooting informatization management platform pushes the potential safety hazard troubleshooting information to a trustee Li good study in the form of a potential safety hazard rectification notice according to the position and the type of the potential safety hazard.
The bridge potential safety hazard troubleshooting informatization management platform can automatically generate a standard potential safety hazard rectification notice sheet, and a user can download and print forms according to needs and authorities.
Potential safety hazard rectification: the initiator of the potential safety hazard of the project, constructors of related procedures, technical responsible persons of construction units, quality responsible persons, overall supervision and owner personnel all have the authority of checking, downloading and printing the form of the potential safety hazard of the bridge in the implementation and modification condition; the potential safety hazard implementation rectification is responsible for the Lihao school responsible for the relevant processes (1 st span No. 1 prestressed tendon processing and tensioning) of the project construction unit, when the Lihao school receives a potential safety hazard rectification notice pushed to the mobile APP by the bridge potential safety hazard troubleshooting information management platform, the Lihao school needs to rectify the potential safety hazard organization of the bridge according to the requirement that a potential safety hazard publisher opens to the sun, the rectified Lihao school uploads pictures and video data in the rectification process and after rectification, and meanwhile, the bridge potential safety hazard troubleshooting information management platform can automatically associate a bridge BIM model, clearly defines the position, the measures, the effect and the like of the potential safety hazard rectification, and displays the picture, the video data, the effect and the like in the bridge BIM in real time.
The potential safety hazard implementation, modification and recovery sheet of the project is shown in Table 5
Bridge potential safety hazard investigation informatization management platform is according to the potential safety hazard rectification implementation condition to the form of potential safety hazard rectification implementation reply list is passed through the removal APP and is pushed it for relevant rectification and improvement acceptance responsible person's king morning.
The bridge potential safety hazard troubleshooting informatization management platform can automatically generate a standard potential safety hazard rectification implementation reply sheet, and a user can download and print forms according to needs and authorities.
And (4) checking and accepting potential safety hazards: the initiator of the potential safety hazard of the project, constructors of related procedures, technical responsible persons and quality responsible persons of construction units, all supervisors and owners have the authority of checking, downloading and printing the forms of the bridge potential safety hazard; the acceptance person of the potential safety hazard is the forever of the safety responsible person of the relevant processes (1 st span 1# prestressed tendon processing and tensioning) of the project supervision unit. After receiving a potential safety hazard rectification acceptance sheet pushed to a mobile APP by the bridge potential safety hazard investigation informatization management platform, organizing related personnel to accept the potential safety hazard rectification sheet according to the potential safety hazard rectification condition, uploading pictures and video data in the acceptance process and after acceptance, and meanwhile, automatically associating a BIM bridge model by the bridge potential safety hazard investigation informatization management platform, updating the structural state after acceptance of the bridge potential safety hazard, and automatically filing.
The item potential safety hazard rectification acceptance sheet is shown in table 6
The bridge potential safety hazard troubleshooting informatization management platform can automatically generate a standard potential safety hazard rectification acceptance sheet, and a user can download and print forms according to needs and authorities.
The ninth step: the bridge potential safety hazard troubleshooting information management platform and the mobile APP terminal query are used for carrying out statistical analysis on the potential safety hazard of the bridge, checking the statistical analysis result according to the user permission and providing decision support for the project.
Shown in a matched manner of figure 3, the technical responsible person, the quality responsible person, all the supervision and management of the project construction unit and the owner member all have the authority of checking the statistical analysis result, the real-time state of the bridge potential safety hazard is counted in two modes of checking the information management platform through the bridge potential safety hazard, and the mobile APP terminal is used for inquiring, meanwhile, the statistical analysis can be carried out according to the time, the process, the potential safety hazard category, the cause, the rectification time limit, the construction progress, the potential safety hazard initiating unit and the like of the potential safety hazard, and the decision support is provided for the project.
The project initiates statistics of units according to the bridge potential safety hazard, the rectification time limit and the potential safety hazard, and the results are shown in a table 7.
As can be seen from table 7, the bridge substructure enters the construction state at first, the potential safety hazard ratio is the largest and reaches 39.84%, the number of potential safety hazards of the bridge superstructure and the bridge auxiliary facilities in the subsequent construction is obviously reduced, and the bridge potential safety hazard troubleshooting informatization management platform plays a key role; in the construction process of the bridge substructure and the auxiliary engineering, more than 80% of potential safety hazards can be corrected according to the schedule, and because the construction operation cross faces of the bridge superstructure are more, the number of the potential safety hazards corrected according to the schedule is only 67.4%; the construction unit of the project is a main initiating unit of beam potential safety hazards, and then a supervision unit.
The project is counted according to the category of the potential safety hazards of the bridge and the rectification period, and the result is shown in table 8 and fig. 4.
The bridge potential safety hazard troubleshooting informatization management platform has the characteristics of very intuitive data statistics, and can be seen from a table 8 and a graph 4: the probability of occurrence of potential safety hazards of different types of bridges in the project is different, wherein the adjacent edge protection and the temporary support system protection are the maximum potential safety hazards of the bridges, account for 22.65% and 19.14% respectively, and have serious problems of over-period rectification and modification; the probability of occurrence of the potential safety hazards of individual protection, temporary electricity utilization and special equipment protection is concentrated at 12.50% -15.63%, the potential safety hazards are the main potential safety hazards of the project, but only individual cases are regularly corrected, 1 case is not corrected after being regularly corrected, reasons need to be found out and the causes need to be properly processed; the safety hidden danger occurrence probability of the bridge scaffold protection, identification label and common equipment protection is less concentrated at 3.53-7.03%, but the phenomenon of over-period rectification exists, and related responsible persons need to timely develop the treatment of the hidden danger and ensure the quality of the treatment of the hidden danger.
The project edge-bound protection is counted according to the detailed safety hazard and the adjustment period, and the result is shown in table 9 and fig. 5.
The critical protection is the main potential safety hazard of the bridge, and the proportion of the details of the bridge is analyzed, as shown in the table 9 and the figure 5, wherein the deep foundation pit is not properly protected, is the main potential safety hazard and is the weak point which most easily causes personnel and property loss, and related persons responsible for the project are required to check the statistical result of the information management platform according to the bridge potential safety hazard, increase the capital and personnel investment in a targeted manner, and carry out construction operation under the condition of ensuring proper protection; the limb protection is equivalent to the easier operation of deep foundation pit protection, the problem of improper safety protection with a higher proportion still exists in a construction site, and related responsible persons of the project should strictly implement the correction and modification measures according to the statistical result of the bridge safety hidden danger investigation informatization management platform and take charge of the persons.
The statistical results of the project according to the construction progress and the finishing period are shown in table 10 and fig. 6.
In the project, the proportion of the potential safety hazard in three quarters in 2018 is 18.75%, the proportion of the potential safety hazard reaches the maximum value of 24.22% as the construction working face is expanded and 4 quarters in 2018, and as the bridge potential safety hazard troubleshooting informatization management platform is pushed forward and used, project group workers pay more attention to the prevention and treatment of the bridge potential safety hazard, and the quantity of the potential safety hazard is gradually reduced; in the third quarter of 2019, due to the influence of rainy seasons on construction, the potential safety hazard of the bridge slightly rises compared with that of the bridge in the last quarter; overall speaking, but with the use of the information management platform for bridge potential safety hazard investigation, the frequency of occurrence of bridge potential safety hazards is obviously reduced, and by 2020 one quarter, the bridge potential safety hazards only account for 3.91%.
In conclusion, the invention breaks through the bottleneck of traditional bridge potential safety hazard management, and forms three links of ' potential safety hazard acquisition, ' potential safety hazard rectification ' and ' potential safety hazard acceptance check ' involved in the bridge construction process into informationized and closed-loop management by relying on the BIM technology, thereby shortening the handling time of the bridge potential safety hazard and improving the potential safety hazard processing capability. Meanwhile, the invention converts two-dimensional information management into three-dimensional visual information management, and increases the extraction efficiency of bridge safety information in the bridge construction period. In addition, the method can automatically perform statistic analysis on the collected bridge potential safety hazard data to generate various types of potential safety hazard statistic graphs and statistic reports, so that the safety management of the bridge in the construction period is more targeted, and a manager is assisted to make a decision.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the present invention in any way, and it will be apparent to those skilled in the art that the above description of the present invention can be applied to various modifications, equivalent variations or modifications without departing from the spirit and scope of the present invention.
Claims (10)
1. A bridge potential safety hazard troubleshooting informatization management system is characterized by comprising a bridge potential safety hazard troubleshooting informatization management platform and a mobile APP terminal;
the bridge potential safety hazard investigation informatization management platform comprises: the BIM bridge three-dimensional model and model additional information in IFC format can be imported; corresponding authority setting can be carried out according to different roles of the users, and corresponding use and management authorities are given to the users; the BIM bridge three-dimensional model and the model additional information can be connected to the mobile APP terminal in real time; the potential safety hazard type of the bridge can be established according to the structural type and the characteristics of the construction scheme of the bridge, and the potential safety hazard type is synchronously associated to the mobile APP end;
the mobile APP end is used for carrying out potential safety hazard investigation and management on each construction process of the bridge on the construction site of the bridge; the potential safety hazard troubleshooting management comprises potential safety hazard acquisition, potential safety hazard rectification and acceptance inspection;
the bridge potential safety hazard investigation informatization management platform comprises: when receiving potential safety hazard acquisition information of the mobile APP terminal, automatically associating the BIM bridge three-dimensional model, determining the position of the potential safety hazard, displaying the position in the BIM bridge model in real time, and pushing the potential safety hazard to a related rectification responsible person through the mobile APP terminal in a form of a potential safety hazard rectification notice according to the position and the type of the potential safety hazard; when potential safety hazard rectification and modification information of a mobile APP end is received, the bridge BIM model can be automatically associated, the position of the potential safety hazard rectification and modification, the rectification and modification measures and the rectification and modification effect are determined, the potential safety hazard rectification and modification measures and the rectification and modification effect are displayed in the bridge model BIM in real time, and meanwhile, according to the potential safety hazard rectification and modification implementation situation, the potential safety hazard rectification and modification response list is pushed to a relevant rectification, modification and acceptance responsible person through the mobile APP in a potential safety hazard rectification and modification answer form; when receiving the potential safety hazard acceptance information of the mobile APP terminal, automatically associating the BIM bridge model, updating the structural state after the bridge potential safety hazard acceptance, and automatically archiving;
the bridge potential safety hazard investigation information management platform and/or the mobile APP terminal have an inquiry function, carry out statistical analysis on the potential safety hazard of the bridge, check the statistical analysis result according to the user permission, and provide decision support for the project.
2. The bridge potential safety hazard investigation informatization management system of claim 1, wherein the BIM bridge three-dimensional model in IFC format and the model additional information source are as follows:
(1) building a BIM bridge three-dimensional model according to a bridge construction drawing; the BIM bridge three-dimensional model comprises: the system comprises an upper structure containing a concrete beam, a prestressed system and common steel bars, and a lower structure containing an abutment, a foundation, the common steel bars and the prestressed system, bridge auxiliary facilities and a temporary structure; the model fineness of the upper structure and the lower structure is LOD300, and the model fineness of the bridge auxiliary facilities and the temporary structure is LOD 200;
(2) standard procedures are hung under each subentry project of the bridge to serve as model additional information;
(3) and exporting and storing the BIM bridge three-dimensional model from BIM modeling software in an IFC (interactive field communication) format.
3. The bridge potential safety hazard investigation informatization management system of claim 1, wherein the potential safety hazard acquisition information of the mobile APP terminal comprises: selecting a process, potential safety hazard types/details, importance degree, potential safety hazard acquisition personnel, potential safety hazard initiation time, potential safety hazard problem description, rectification requirements, acquiring photos and videos on site, designating potential safety hazard rectification responsible persons and rectification time limit;
remove the potential safety hazard rectification information of APP end and include: potential safety hazard rectification time, whether the rectification time limit is out of date, rectification implementation situation description, on-site photo and video acquisition, and designation of potential safety hazard person in charge of inspection;
remove potential safety hazard acceptance of APP end and include: time for checking and accepting potential safety hazards, checking and accepting modes, checking and accepting opinions, and acquiring photos and videos on site.
4. The bridge potential safety hazard troubleshooting informatization management system of claim 1, wherein when receiving potential safety hazard acceptance information of the mobile APP terminal, if the acceptance is not qualified, the potential safety hazard rectification responsible person is required to reorganize rectification and modification until the acceptance is qualified.
5. The bridge potential safety hazard investigation informatization management system of claim 1, wherein the bridge potential safety hazard investigation informatization management platform can automatically generate a standard potential safety hazard rectification notice sheet, a potential safety hazard rectification implementation reply sheet and a potential safety hazard rectification acceptance sheet, and a user can download and print forms according to needs and authorities.
6. The bridge potential safety hazard investigation informatization management system of claim 1, wherein the potential safety hazard rectification notice sheet comprises the following contents: potential safety hazard numbering, filing numbering, working procedures, potential safety hazard category/item, importance degree, potential safety hazard acquisition personnel, potential safety hazard acquisition units, potential safety hazard initiating time, potential safety hazard rectification time limit, problem description, rectification requirements, problem photos and videos, potential safety hazard rectification responsible persons and potential safety hazard rectification units;
the potential safety hazard rectification implementation reply sheet comprises the following contents: potential safety hazard numbering, filing numbering, working procedures, potential safety hazard category/item, importance degree, potential safety hazard collecting personnel, potential safety hazard collecting units, potential safety hazard initiating time, potential safety hazard rectification time limit, potential safety hazard rectification responsible persons, potential safety hazard rectification units, potential safety hazard rectification time, rectification time limit, rectification implementation, problem photos and videos, potential safety hazard acceptance persons and potential safety hazard acceptance units;
the potential safety hazard rectification acceptance bill comprises the following contents: potential safety hazard serial number, file serial number, process, potential safety hazard classification/item, degree of importance, potential safety hazard collection personnel, potential safety hazard collection unit, potential safety hazard initiation time, potential safety hazard rectification time limit, potential safety hazard rectification person of responsibility, potential safety hazard rectification unit, potential safety hazard rectification time, rectification time limit, potential safety hazard acceptance person of responsibility, potential safety hazard acceptance unit, potential safety hazard acceptance time, acceptance mode, acceptance opinion, problem photo and video.
7. The bridge potential safety hazard investigation informatization management system of claim 1, wherein the potential safety hazard collection is responsible for project personnel; the potential safety hazard rectification is responsible for construction units; the potential safety hazard acceptance is responsible for supervision units or owners.
8. The bridge potential safety hazard investigation informatization management system of claim 1, wherein the statistical analysis of the bridge potential safety hazard comprises the statistical analysis of the real-time state of the bridge potential safety hazard and the statistical analysis according to the time of occurrence of the potential safety hazard, the working procedure of the bridge, the type of the potential safety hazard, the cause, the rectification period, the construction progress and the potential safety hazard initiating unit.
9. The bridge potential safety hazard investigation informatization management system of claim 1, wherein the statistical analysis of the bridge potential safety hazard comprises:
according to the bridge potential safety hazard, initiating statistics of units according to the occurrence position, the rectification period and the potential safety hazard; counting according to the category of the potential safety hazard of the bridge and the rectification period; counting according to the construction progress and the rectification period; and counting according to the detailed safety hidden danger and the rectification time limit in the frontier defense.
10. An application method of the bridge potential safety hazard troubleshooting informatization management system of any one of claims 1-9, characterized by comprising:
s1, establishing a BIM bridge three-dimensional model according to the bridge construction drawing;
s2, taking each project lower hanging standard procedure of the bridge as model additional information;
s3, exporting and storing the BIM bridge three-dimensional model from BIM modeling software in an IFC (information and communication) format;
s4, importing the BIM bridge three-dimensional model in the IFC format into a bridge potential safety hazard troubleshooting informatization management platform;
s5, setting corresponding authority according to different roles of the users, and giving corresponding use and management authority to the users;
s6, connecting the BIM bridge three-dimensional model and model additional information to a mobile APP terminal in real time through a bridge potential safety hazard troubleshooting informatization management platform;
s7, according to the bridge structure type and the construction scheme characteristics, establishing a bridge potential safety hazard type on a bridge potential safety hazard troubleshooting informatization management platform, and synchronously associating the bridge potential safety hazard type to a mobile APP terminal;
s8, performing potential safety hazard investigation and management on each construction process of the bridge by using the mobile APP end on the construction site of the bridge; the potential safety hazard troubleshooting management comprises three links of potential safety hazard acquisition, potential safety hazard rectification and acceptance inspection;
s9, carrying out statistical analysis on the potential safety hazard of the bridge through a bridge potential safety hazard troubleshooting informatization management platform and/or a mobile APP terminal query mode, checking a statistical analysis result according to user permission, and providing decision support for projects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011606161.7A CN112651644A (en) | 2020-12-28 | 2020-12-28 | Bridge potential safety hazard troubleshooting informatization management system and application method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011606161.7A CN112651644A (en) | 2020-12-28 | 2020-12-28 | Bridge potential safety hazard troubleshooting informatization management system and application method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112651644A true CN112651644A (en) | 2021-04-13 |
Family
ID=75363995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011606161.7A Pending CN112651644A (en) | 2020-12-28 | 2020-12-28 | Bridge potential safety hazard troubleshooting informatization management system and application method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112651644A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113112237A (en) * | 2021-04-20 | 2021-07-13 | 上海市环境科学研究院 | Information management method and system for environmental protection verification |
CN113643530A (en) * | 2021-07-15 | 2021-11-12 | 鄂尔多斯市公安局交通管理支队 | Road traffic potential safety hazard information management system based on big data background |
CN113947366A (en) * | 2021-08-31 | 2022-01-18 | 广州电力工程监理有限公司 | Supervision emergency management system based on mobile internet technology |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105652830A (en) * | 2015-12-25 | 2016-06-08 | 中国铁道科学研究院铁道建筑研究所 | Bridge monitoring system based on BIM |
CN107818198A (en) * | 2017-09-27 | 2018-03-20 | 中建三局基础设施工程有限公司 | A kind of science of bridge building management platform based on BIM technology |
CN108717604A (en) * | 2018-05-21 | 2018-10-30 | 西安科技大学 | A kind of production safety hidden danger closed loop management system |
-
2020
- 2020-12-28 CN CN202011606161.7A patent/CN112651644A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105652830A (en) * | 2015-12-25 | 2016-06-08 | 中国铁道科学研究院铁道建筑研究所 | Bridge monitoring system based on BIM |
CN107818198A (en) * | 2017-09-27 | 2018-03-20 | 中建三局基础设施工程有限公司 | A kind of science of bridge building management platform based on BIM technology |
CN108717604A (en) * | 2018-05-21 | 2018-10-30 | 西安科技大学 | A kind of production safety hidden danger closed loop management system |
Non-Patent Citations (1)
Title |
---|
邹建豪: "基于BIM的钢结构桥梁信息化运维管理", 《中国优秀博硕士学位论文全文数据库(硕士) 工程科技Ⅱ辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113112237A (en) * | 2021-04-20 | 2021-07-13 | 上海市环境科学研究院 | Information management method and system for environmental protection verification |
CN113643530A (en) * | 2021-07-15 | 2021-11-12 | 鄂尔多斯市公安局交通管理支队 | Road traffic potential safety hazard information management system based on big data background |
CN113947366A (en) * | 2021-08-31 | 2022-01-18 | 广州电力工程监理有限公司 | Supervision emergency management system based on mobile internet technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112651644A (en) | Bridge potential safety hazard troubleshooting informatization management system and application method thereof | |
CN111369158A (en) | BIM-based informatization quality management method and system | |
CN111598379A (en) | Project management method, platform, device, computer equipment and storage medium | |
CN113313387B (en) | Intelligent management and control method and system for major security risk classification of enterprise | |
CN111967077A (en) | Engineering construction management digital platform based on BIM technology | |
CN111814240A (en) | Highway engineering agronomy worker management system based on BIM technique | |
CN115375146A (en) | Digital construction integrated platform | |
CN112541748A (en) | Engineering project management system based on BIM technology | |
CN111062686A (en) | Mobile intelligent supervision and control method and system based on digital model | |
CN114092025B (en) | Temporary land use full life cycle monitoring method | |
CN111651818A (en) | BIM model rapid change method | |
CN106875091A (en) | A kind of Management System of Urban Dangers based on address cloud service | |
CN115619130A (en) | Intelligent comprehensive dispatching management and control platform for coal mine | |
CN111612523A (en) | Evaluation method and evaluation system for construction engineering cost operation | |
CN117035691B (en) | Engineering construction digital project management method and system based on BIM technology | |
CN109360291B (en) | Construction machinery equipment inspection service system | |
CN117455379A (en) | Basic intelligent management system and method | |
CN115759637A (en) | Intelligent construction informatization integrated management platform | |
CN113191685A (en) | Comprehensive evaluation system for safety of construction site | |
CN115424212A (en) | Electric power operation field violation identification system and application thereof | |
CN115147086A (en) | Monitoring and early warning platform system and method for salary payment of agricultural workers | |
CN109299924A (en) | Fining and intelligent project management method based on multistage control | |
CN114418547A (en) | Hazardous chemical substance enterprise information acquisition and management system convenient for government supervision | |
CN113077063A (en) | Power transformation equipment defect management method and equipment based on voice and image identification | |
CN112085341A (en) | Master station system suitable for risk management and control of overall process of power production operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |