CN108647450A - A kind of pre-buried big foundation bolt construction method based on BIM technology - Google Patents

A kind of pre-buried big foundation bolt construction method based on BIM technology Download PDF

Info

Publication number
CN108647450A
CN108647450A CN201810459705.8A CN201810459705A CN108647450A CN 108647450 A CN108647450 A CN 108647450A CN 201810459705 A CN201810459705 A CN 201810459705A CN 108647450 A CN108647450 A CN 108647450A
Authority
CN
China
Prior art keywords
foundation bolt
big foundation
construction
bim technology
tekla
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810459705.8A
Other languages
Chinese (zh)
Inventor
王申杰
路希鑫
孙强
潘翔
史庆森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810459705.8A priority Critical patent/CN108647450A/en
Publication of CN108647450A publication Critical patent/CN108647450A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Architecture (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computer Hardware Design (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Electromagnetism (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of a kind of pre-buried big foundation bolt construction method based on BIM technology of steel structure hoisting based on BIM technology construction method in place, steps are as follows:One, using sharing functionality powerful between BIM technology information data, Autodesk Revit, Tekla is utilized respectively and creates visualization, the civil engineering of parametrization, big foundation bolt, steel construction threedimensional model, establishes related race library;Threedimensional model is set to carry out link integration using the sharing functionality between information data, the then three-dimensional inspection roaming detection of progress ensures accurate;Two, accurate model is integrated according to link and generates big foundation bolt and the prefabricated manuscript of steel construction;Three, it manufactures producer and manufacture is processed to big foundation bolt, steel construction by prefabricated manuscript;Four, finished product is marched into the arena verification;Five, it is confided a technological secret and site operation according to integrating three-dimensional model.The present invention effectively promotes the accurate and efficiency of pre-buried big foundation bolt, avoids rejection and waste, meets the theory of green construction, and apparent benefit is brought to engineering construction.

Description

A kind of pre-buried big foundation bolt construction method based on BIM technology
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of pre-buried big foundation bolt based on BIM technology is applied Work method.
Background technology
The mutual cooperation being often related to during installing construction between a variety of professions, in traditional work progress, It cooperates between different majors and confides a technological secret and two-dimentional drawing according only to simple, regular leads to pre-buried big foundation bolt Generation deviation is set in position, causes engineering to do over again, the waste of design alteration and construction material, is caused not to project progress and construction cost Profit influences.
The application of new technology BIM (Building InformationModeling), BIM models include between component Space geometry relationship, it is ensured that the accurate docking between each profession utilizes shared between information data, the technology of three-dimensional visualization The processing and manufacturing told somebody what one's real intentions are with component improves the efficiency that each profession cooperates, and realizes that work progress error is preferably minimized, to keep away Exempt from because construction personnel confide a technological secret and due to the understanding of two-dimentional drawing understands error caused by engineering do over again, design alteration and construction Waste of material problem.
Invention content
The present invention provides a kind of pre-buried big foundation bolt construction method based on BIM technology, it is therefore intended that solves background skill Itd is proposed in art because construction personnel confide a technological secret and due to the understanding of two-dimentional drawing understands error caused by engineering do over again, design change More problem is wasted with construction material.
To achieve the above object, the present invention provides a kind of pre-buried big foundation bolt construction method based on BIM technology, including Following steps:
Step 1. creates absolute altitude identical with construction drawing, axis with BIM technology software Autodesk Revit, Tekla Net system;
Step 2. using software Autodesk Revit, Tekla be respectively created civil engineering, big foundation bolt, steel construction three Dimension module, using the sharing functionality between information data, by the threedimensional model importing Autodesk Revit in Tekla, and with The threedimensional model that Autodesk Revit are created is integrated, it is ensured that after errorless, the prefabricated manuscript of export component;
Step 3. is fabricated by figure, manufactures producer according to the prefabricated manuscript of software export component to related big lower margin Bolt, steel construction carry out production and processing manufacture;
Big foundation bolt, the steel construction that step 4. has fabricated are marched into the arena, and are checked component and are checked;
Step 5. integrates accurate threedimensional model according to link, confide a technological secret and live pre-buried big foundation bolt is applied Work.
Preferably, in step 1, axis net is first established in Tekla, Tekla files are then utilized into the common format shelves of IFC The remittance of case is exported with export function, and is conducted into Autodesk Revit and is identified, is determined according to the point after identification Origin in Autodesk Revit.
Preferably, in step 2, described information data sharing, threedimensional model are integrated, including all BIM technology softwares are believed Cease shared, the link integration between threedimensional model between data.
Preferably, in step 2, the prefabricated manuscript of the export component includes that X-Y scheme, graphics and 3D printing are real Body Model etc., and it is corresponding with construction site that mark is numbered in all kinds of figures and in physical model to each component.
Preferably, in step 4, it is IFC formats when Tekla exports steel structure model, passes through Revit Import From Tekla To Revit plug-in units receive IFC files in the add-on module of Autodesk Revit using tekla input functions.
Compared with prior art, the beneficial effects of the invention are as follows:
The present invention uses the pre-buried big foundation bolt construction method based on BIM technology, and soil is created using BIM technology software It builds, big foundation bolt, steel construction threedimensional model, there is the sharing functionality between powerful information data using BIM technology, to mould Type carries out link integration, it is ensured that carries out the processing and manufacturing of component and fitting after errorless and carries out technology friendship using model three-dimensional visualization Bottom, it is ensured that the precise match between different majors, to avoid managing the understanding confided a technological secret with two-dimentional drawing because of construction personnel Solution error and caused by engineering do over again, design alteration and construction material waste problem.
Description of the drawings
Fig. 1 is the process flow chart of the present invention;
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described the application principle of the present invention.
Embodiment one
A kind of pre-buried big foundation bolt construction method based on BIM technology as shown in Figure 1, includes the following steps:
Step 1. creates absolute altitude identical with construction drawing, axis with BIM technology software Autodesk Revit, Tekla Net system;
Step 2. using software Autodesk Revit, Tekla be respectively created civil engineering, big foundation bolt, steel construction three Dimension module, using the sharing functionality between information data, by the threedimensional model importing Autodesk Revit in Tekla, and with The threedimensional model that Autodesk Revit are created is integrated, it is ensured that after errorless, the prefabricated manuscript of export component;
Step 3. is fabricated by figure, manufactures producer according to the prefabricated manuscript of software export component to related big lower margin Bolt, steel construction carry out production and processing manufacture;
Big foundation bolt, the steel construction that step 4. has fabricated are marched into the arena, and are checked component and are checked;
Step 5. integrates accurate threedimensional model according to link, confide a technological secret and live pre-buried big foundation bolt is applied Work.
Wherein, in step 1, axis net is first established in Tekla, Tekla files are then utilized into the common format archives of IFC Remittance and export function export, and be conducted into Autodesk Revit and identify, determined according to the point after identification Origin in Autodesk Revit;In step 2, described information data sharing, threedimensional model is integrated, including all BIM skills Shared between art software information data, the link between threedimensional model is integrated;In step 2, the export component is prefabricated adds Work figure includes X-Y scheme, graphics and 3D printing physical model etc., and in all kinds of figures and in physical model to each component into Row number mark is corresponding with construction site;In step 4, it is IFC formats when Tekla exports steel structure model, passes through Revit Import From Tekla To Revit plug-in units use tekla input functions in the add-on module of Autodesk Revit Receive IFC files.
The present invention proposes a kind of pre-buried big foundation bolt construction method based on BIM technology, according to construction drawing not Identical absolute altitude, axis net system are created with BIM technology software, quickly establishes corresponding three-dimensional visualization model;Utilize BIM technology Powerful sharing functionality between information data, link integrating three-dimensional model ensure accurate, and reduction is done over again and design alteration, drop Low waste and saving material, the purpose of direct guiding construction;
In the Anhui Province Huaibei City Suixi County west of a river, venue engineering project is applied achievement of the present invention, effectively Construction site is instructed.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment including a series of elements includes not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including institute State in the process, method, article or equipment of element that there is also other identical elements.
The above is only the specific implementation mode of the present invention, is made skilled artisans appreciate that or realizing this hair It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (5)

1. a kind of pre-buried big foundation bolt construction method based on BIM technology, which is characterized in that include the following steps:
Step 1. creates absolute altitude identical with construction drawing, axis net system with BIM technology software Autodesk Revit, Tekla System;
Step 2. using software Autodesk Revit, Tekla be respectively created civil engineering, big foundation bolt, steel construction three-dimensional mould Type, using the sharing functionality between information data, by the threedimensional model importing Autodesk Revit in Tekla, and with The threedimensional model that Autodesk Revit are created is integrated, it is ensured that after errorless, the prefabricated manuscript of export component;
Step 3. is fabricated by figure, manufactures producer according to the prefabricated manuscript of software export component to related big lower margin spiral shell Bolt, steel construction carry out production and processing manufacture;
Big foundation bolt, the steel construction that step 4. has fabricated are marched into the arena, and are checked component and are checked;
Step 5. integrates accurate threedimensional model according to link, the construction for confide a technological secret with the pre-buried big foundation bolt in scene.
2. a kind of pre-buried big foundation bolt construction method based on BIM technology according to claim 1, which is characterized in that In step 1, axis net is first established in Tekla, then Tekla files are utilized to the remittance and export of the common format archives of IFC Function exports, and is conducted into Autodesk Revit and identifies, is determined in Autodesk Revit according to the point after identification Origin.
3. a kind of pre-buried big foundation bolt construction method based on BIM technology according to claim 1, which is characterized in that In step 2, described information data sharing, threedimensional model is integrated, including being total between all BIM technology software information data It enjoys, the link between threedimensional model is integrated.
4. a kind of pre-buried big foundation bolt construction method based on BIM technology according to claim 1, which is characterized in that In step 2, the prefabricated manuscript of the export component includes X-Y scheme, graphics and 3D printing physical model etc., and all kinds of It is corresponding with construction site that mark is numbered in figure and in physical model to each component.
5. a kind of pre-buried big foundation bolt construction method based on BIM technology according to claim 1, which is characterized in that In step 4, it is IFC formats when Tekla exports steel structure model, passes through Revit Import From Tekla To Revit Plug-in unit receives IFC files in the add-on module of Autodesk Revit using tekla input functions.
CN201810459705.8A 2018-05-15 2018-05-15 A kind of pre-buried big foundation bolt construction method based on BIM technology Pending CN108647450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810459705.8A CN108647450A (en) 2018-05-15 2018-05-15 A kind of pre-buried big foundation bolt construction method based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810459705.8A CN108647450A (en) 2018-05-15 2018-05-15 A kind of pre-buried big foundation bolt construction method based on BIM technology

Publications (1)

Publication Number Publication Date
CN108647450A true CN108647450A (en) 2018-10-12

Family

ID=63755517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810459705.8A Pending CN108647450A (en) 2018-05-15 2018-05-15 A kind of pre-buried big foundation bolt construction method based on BIM technology

Country Status (1)

Country Link
CN (1) CN108647450A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138149A (en) * 2018-10-19 2019-01-04 河南中能国隆新材料科技有限公司 The construction method of installation of assembled architecture PC component and its assembled architecture obtained
CN109162365A (en) * 2018-11-05 2019-01-08 中国十七冶集团有限公司 A kind of connection structure and its construction method of large size built-in fitting and frame structure main reinforcement
CN110287513A (en) * 2019-05-09 2019-09-27 唐付 A kind of built-in fitting construction method based on BIM technology
CN111523166A (en) * 2020-04-17 2020-08-11 中国十七冶集团有限公司 BIM technology-based massive steel structure installation deepening construction method
CN111639371A (en) * 2020-05-07 2020-09-08 中国化学工程重型机械化有限公司 Novel modular design method for steel structure
CN111914325A (en) * 2020-07-06 2020-11-10 上海宝冶冶金工程有限公司 BIM technology-based blast furnace body frame structure model information interaction method
CN113256810A (en) * 2021-05-18 2021-08-13 中国建筑第八工程局有限公司 BIM technology-based embedded part construction method for assembled actuator

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100594970B1 (en) * 2005-08-29 2006-07-13 (주)이지로보틱스 Method for simulating provisional construction of steel structure
CN105887915A (en) * 2016-05-16 2016-08-24 武汉冶建筑安装工程有限责任公司 Foundation bolt locating method based on BIM

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100594970B1 (en) * 2005-08-29 2006-07-13 (주)이지로보틱스 Method for simulating provisional construction of steel structure
CN105887915A (en) * 2016-05-16 2016-08-24 武汉冶建筑安装工程有限责任公司 Foundation bolt locating method based on BIM

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
线登洲等: ""BIM在河北奥体中心项目中的应用"", 《低温建筑技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138149A (en) * 2018-10-19 2019-01-04 河南中能国隆新材料科技有限公司 The construction method of installation of assembled architecture PC component and its assembled architecture obtained
CN109162365A (en) * 2018-11-05 2019-01-08 中国十七冶集团有限公司 A kind of connection structure and its construction method of large size built-in fitting and frame structure main reinforcement
CN110287513A (en) * 2019-05-09 2019-09-27 唐付 A kind of built-in fitting construction method based on BIM technology
CN111523166A (en) * 2020-04-17 2020-08-11 中国十七冶集团有限公司 BIM technology-based massive steel structure installation deepening construction method
CN111639371A (en) * 2020-05-07 2020-09-08 中国化学工程重型机械化有限公司 Novel modular design method for steel structure
CN111914325A (en) * 2020-07-06 2020-11-10 上海宝冶冶金工程有限公司 BIM technology-based blast furnace body frame structure model information interaction method
CN111914325B (en) * 2020-07-06 2022-04-22 上海宝冶冶金工程有限公司 BIM technology-based blast furnace body frame structure model information interaction method
CN113256810A (en) * 2021-05-18 2021-08-13 中国建筑第八工程局有限公司 BIM technology-based embedded part construction method for assembled actuator

Similar Documents

Publication Publication Date Title
CN108647450A (en) A kind of pre-buried big foundation bolt construction method based on BIM technology
CN106988221B (en) Unit construction bridge beam construction method based on BIM
CN110580376B (en) Revit and Dynamo-based pile foundation model creation method
CN103440357B (en) Virtual reality roaming scence generates method and system
CN107818198A (en) A kind of science of bridge building management platform based on BIM technology
CN112257160B (en) BIM-based standardized forward design method for garbage incineration power plant
CN108647894A (en) One kind being based on the assembling type steel structure construction method of " BIM+RFID " technology
CN105844336A (en) BIM-based property management system and method
CN103578137A (en) Three-dimensional modeling system and method for prefabricated parts
CN108121704A (en) A kind of three-dimensional final acceptance of construction system
CN109086495A (en) The method that BIM goes out hard-cover construction drawing
CN109492311A (en) Shield tunnel BIM parametric modeling and light-weight technologg method
CN105224749A (en) Plant design CAD platform realizes the method for structure discipline three-dimensional design
CN107562980A (en) Geometric information extraction method based on BIM model
CN104598697A (en) Construction method of product simulation three-dimensional model
CN108694260A (en) Application process of the BIM technology in Steel Bridge processing and manufacturing
CN109918760A (en) Reinforcing bar modeling method based on Revit interoperability
CN103295085A (en) Highway engineering three-dimensional office system building method based on Google earth
CN108984876A (en) A kind of service sleeve automation modeling method and system based on BIM
CN108629141A (en) A kind of Construction of Steel Structure in-depth method based on BIM technology
CN101423106B (en) Design implement method of wind-pipe support and connection piece thereof during producing ship
CN111724475A (en) Construction method based on building information model for municipal engineering
Pippenger Three-dimensional model for manufacturing and inspection
CN105956346A (en) Aluminum alloy template design system and aluminum alloy template design method
JP2008287300A (en) Design support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181012

RJ01 Rejection of invention patent application after publication