CN108647450A - A kind of pre-buried big foundation bolt construction method based on BIM technology - Google Patents
A kind of pre-buried big foundation bolt construction method based on BIM technology Download PDFInfo
- Publication number
- CN108647450A CN108647450A CN201810459705.8A CN201810459705A CN108647450A CN 108647450 A CN108647450 A CN 108647450A CN 201810459705 A CN201810459705 A CN 201810459705A CN 108647450 A CN108647450 A CN 108647450A
- Authority
- CN
- China
- Prior art keywords
- foundation bolt
- big foundation
- construction
- bim technology
- tekla
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 45
- 238000005516 engineering process Methods 0.000 title claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- 238000004519 manufacturing process Methods 0.000 claims abstract description 9
- 238000012545 processing Methods 0.000 claims description 5
- 238000010146 3D printing Methods 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 3
- 238000012905 input function Methods 0.000 claims description 3
- 239000002699 waste material Substances 0.000 abstract description 5
- 238000012800 visualization Methods 0.000 abstract description 4
- 230000010354 integration Effects 0.000 abstract description 3
- 230000008901 benefit Effects 0.000 abstract description 2
- 238000001514 detection method Methods 0.000 abstract 1
- 238000007689 inspection Methods 0.000 abstract 1
- 238000012795 verification Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 8
- 238000013461 design Methods 0.000 description 5
- 230000004075 alteration Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 239000004035 construction material Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4157—Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Architecture (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computer Hardware Design (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Electromagnetism (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of a kind of pre-buried big foundation bolt construction method based on BIM technology of steel structure hoisting based on BIM technology construction method in place, steps are as follows:One, using sharing functionality powerful between BIM technology information data, Autodesk Revit, Tekla is utilized respectively and creates visualization, the civil engineering of parametrization, big foundation bolt, steel construction threedimensional model, establishes related race library;Threedimensional model is set to carry out link integration using the sharing functionality between information data, the then three-dimensional inspection roaming detection of progress ensures accurate;Two, accurate model is integrated according to link and generates big foundation bolt and the prefabricated manuscript of steel construction;Three, it manufactures producer and manufacture is processed to big foundation bolt, steel construction by prefabricated manuscript;Four, finished product is marched into the arena verification;Five, it is confided a technological secret and site operation according to integrating three-dimensional model.The present invention effectively promotes the accurate and efficiency of pre-buried big foundation bolt, avoids rejection and waste, meets the theory of green construction, and apparent benefit is brought to engineering construction.
Description
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of pre-buried big foundation bolt based on BIM technology is applied
Work method.
Background technology
The mutual cooperation being often related to during installing construction between a variety of professions, in traditional work progress,
It cooperates between different majors and confides a technological secret and two-dimentional drawing according only to simple, regular leads to pre-buried big foundation bolt
Generation deviation is set in position, causes engineering to do over again, the waste of design alteration and construction material, is caused not to project progress and construction cost
Profit influences.
The application of new technology BIM (Building InformationModeling), BIM models include between component
Space geometry relationship, it is ensured that the accurate docking between each profession utilizes shared between information data, the technology of three-dimensional visualization
The processing and manufacturing told somebody what one's real intentions are with component improves the efficiency that each profession cooperates, and realizes that work progress error is preferably minimized, to keep away
Exempt from because construction personnel confide a technological secret and due to the understanding of two-dimentional drawing understands error caused by engineering do over again, design alteration and construction
Waste of material problem.
Invention content
The present invention provides a kind of pre-buried big foundation bolt construction method based on BIM technology, it is therefore intended that solves background skill
Itd is proposed in art because construction personnel confide a technological secret and due to the understanding of two-dimentional drawing understands error caused by engineering do over again, design change
More problem is wasted with construction material.
To achieve the above object, the present invention provides a kind of pre-buried big foundation bolt construction method based on BIM technology, including
Following steps:
Step 1. creates absolute altitude identical with construction drawing, axis with BIM technology software Autodesk Revit, Tekla
Net system;
Step 2. using software Autodesk Revit, Tekla be respectively created civil engineering, big foundation bolt, steel construction three
Dimension module, using the sharing functionality between information data, by the threedimensional model importing Autodesk Revit in Tekla, and with
The threedimensional model that Autodesk Revit are created is integrated, it is ensured that after errorless, the prefabricated manuscript of export component;
Step 3. is fabricated by figure, manufactures producer according to the prefabricated manuscript of software export component to related big lower margin
Bolt, steel construction carry out production and processing manufacture;
Big foundation bolt, the steel construction that step 4. has fabricated are marched into the arena, and are checked component and are checked;
Step 5. integrates accurate threedimensional model according to link, confide a technological secret and live pre-buried big foundation bolt is applied
Work.
Preferably, in step 1, axis net is first established in Tekla, Tekla files are then utilized into the common format shelves of IFC
The remittance of case is exported with export function, and is conducted into Autodesk Revit and is identified, is determined according to the point after identification
Origin in Autodesk Revit.
Preferably, in step 2, described information data sharing, threedimensional model are integrated, including all BIM technology softwares are believed
Cease shared, the link integration between threedimensional model between data.
Preferably, in step 2, the prefabricated manuscript of the export component includes that X-Y scheme, graphics and 3D printing are real
Body Model etc., and it is corresponding with construction site that mark is numbered in all kinds of figures and in physical model to each component.
Preferably, in step 4, it is IFC formats when Tekla exports steel structure model, passes through Revit Import From
Tekla To Revit plug-in units receive IFC files in the add-on module of Autodesk Revit using tekla input functions.
Compared with prior art, the beneficial effects of the invention are as follows:
The present invention uses the pre-buried big foundation bolt construction method based on BIM technology, and soil is created using BIM technology software
It builds, big foundation bolt, steel construction threedimensional model, there is the sharing functionality between powerful information data using BIM technology, to mould
Type carries out link integration, it is ensured that carries out the processing and manufacturing of component and fitting after errorless and carries out technology friendship using model three-dimensional visualization
Bottom, it is ensured that the precise match between different majors, to avoid managing the understanding confided a technological secret with two-dimentional drawing because of construction personnel
Solution error and caused by engineering do over again, design alteration and construction material waste problem.
Description of the drawings
Fig. 1 is the process flow chart of the present invention;
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described the application principle of the present invention.
Embodiment one
A kind of pre-buried big foundation bolt construction method based on BIM technology as shown in Figure 1, includes the following steps:
Step 1. creates absolute altitude identical with construction drawing, axis with BIM technology software Autodesk Revit, Tekla
Net system;
Step 2. using software Autodesk Revit, Tekla be respectively created civil engineering, big foundation bolt, steel construction three
Dimension module, using the sharing functionality between information data, by the threedimensional model importing Autodesk Revit in Tekla, and with
The threedimensional model that Autodesk Revit are created is integrated, it is ensured that after errorless, the prefabricated manuscript of export component;
Step 3. is fabricated by figure, manufactures producer according to the prefabricated manuscript of software export component to related big lower margin
Bolt, steel construction carry out production and processing manufacture;
Big foundation bolt, the steel construction that step 4. has fabricated are marched into the arena, and are checked component and are checked;
Step 5. integrates accurate threedimensional model according to link, confide a technological secret and live pre-buried big foundation bolt is applied
Work.
Wherein, in step 1, axis net is first established in Tekla, Tekla files are then utilized into the common format archives of IFC
Remittance and export function export, and be conducted into Autodesk Revit and identify, determined according to the point after identification
Origin in Autodesk Revit;In step 2, described information data sharing, threedimensional model is integrated, including all BIM skills
Shared between art software information data, the link between threedimensional model is integrated;In step 2, the export component is prefabricated adds
Work figure includes X-Y scheme, graphics and 3D printing physical model etc., and in all kinds of figures and in physical model to each component into
Row number mark is corresponding with construction site;In step 4, it is IFC formats when Tekla exports steel structure model, passes through Revit
Import From Tekla To Revit plug-in units use tekla input functions in the add-on module of Autodesk Revit
Receive IFC files.
The present invention proposes a kind of pre-buried big foundation bolt construction method based on BIM technology, according to construction drawing not
Identical absolute altitude, axis net system are created with BIM technology software, quickly establishes corresponding three-dimensional visualization model;Utilize BIM technology
Powerful sharing functionality between information data, link integrating three-dimensional model ensure accurate, and reduction is done over again and design alteration, drop
Low waste and saving material, the purpose of direct guiding construction;
In the Anhui Province Huaibei City Suixi County west of a river, venue engineering project is applied achievement of the present invention, effectively
Construction site is instructed.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or equipment including a series of elements includes not only those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including institute
State in the process, method, article or equipment of element that there is also other identical elements.
The above is only the specific implementation mode of the present invention, is made skilled artisans appreciate that or realizing this hair
It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest range caused.
Claims (5)
1. a kind of pre-buried big foundation bolt construction method based on BIM technology, which is characterized in that include the following steps:
Step 1. creates absolute altitude identical with construction drawing, axis net system with BIM technology software Autodesk Revit, Tekla
System;
Step 2. using software Autodesk Revit, Tekla be respectively created civil engineering, big foundation bolt, steel construction three-dimensional mould
Type, using the sharing functionality between information data, by the threedimensional model importing Autodesk Revit in Tekla, and with
The threedimensional model that Autodesk Revit are created is integrated, it is ensured that after errorless, the prefabricated manuscript of export component;
Step 3. is fabricated by figure, manufactures producer according to the prefabricated manuscript of software export component to related big lower margin spiral shell
Bolt, steel construction carry out production and processing manufacture;
Big foundation bolt, the steel construction that step 4. has fabricated are marched into the arena, and are checked component and are checked;
Step 5. integrates accurate threedimensional model according to link, the construction for confide a technological secret with the pre-buried big foundation bolt in scene.
2. a kind of pre-buried big foundation bolt construction method based on BIM technology according to claim 1, which is characterized in that
In step 1, axis net is first established in Tekla, then Tekla files are utilized to the remittance and export of the common format archives of IFC
Function exports, and is conducted into Autodesk Revit and identifies, is determined in Autodesk Revit according to the point after identification
Origin.
3. a kind of pre-buried big foundation bolt construction method based on BIM technology according to claim 1, which is characterized in that
In step 2, described information data sharing, threedimensional model is integrated, including being total between all BIM technology software information data
It enjoys, the link between threedimensional model is integrated.
4. a kind of pre-buried big foundation bolt construction method based on BIM technology according to claim 1, which is characterized in that
In step 2, the prefabricated manuscript of the export component includes X-Y scheme, graphics and 3D printing physical model etc., and all kinds of
It is corresponding with construction site that mark is numbered in figure and in physical model to each component.
5. a kind of pre-buried big foundation bolt construction method based on BIM technology according to claim 1, which is characterized in that
In step 4, it is IFC formats when Tekla exports steel structure model, passes through Revit Import From Tekla To Revit
Plug-in unit receives IFC files in the add-on module of Autodesk Revit using tekla input functions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810459705.8A CN108647450A (en) | 2018-05-15 | 2018-05-15 | A kind of pre-buried big foundation bolt construction method based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810459705.8A CN108647450A (en) | 2018-05-15 | 2018-05-15 | A kind of pre-buried big foundation bolt construction method based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108647450A true CN108647450A (en) | 2018-10-12 |
Family
ID=63755517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810459705.8A Pending CN108647450A (en) | 2018-05-15 | 2018-05-15 | A kind of pre-buried big foundation bolt construction method based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108647450A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138149A (en) * | 2018-10-19 | 2019-01-04 | 河南中能国隆新材料科技有限公司 | The construction method of installation of assembled architecture PC component and its assembled architecture obtained |
CN109162365A (en) * | 2018-11-05 | 2019-01-08 | 中国十七冶集团有限公司 | A kind of connection structure and its construction method of large size built-in fitting and frame structure main reinforcement |
CN110287513A (en) * | 2019-05-09 | 2019-09-27 | 唐付 | A kind of built-in fitting construction method based on BIM technology |
CN111523166A (en) * | 2020-04-17 | 2020-08-11 | 中国十七冶集团有限公司 | BIM technology-based massive steel structure installation deepening construction method |
CN111639371A (en) * | 2020-05-07 | 2020-09-08 | 中国化学工程重型机械化有限公司 | Novel modular design method for steel structure |
CN111914325A (en) * | 2020-07-06 | 2020-11-10 | 上海宝冶冶金工程有限公司 | BIM technology-based blast furnace body frame structure model information interaction method |
CN113256810A (en) * | 2021-05-18 | 2021-08-13 | 中国建筑第八工程局有限公司 | BIM technology-based embedded part construction method for assembled actuator |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100594970B1 (en) * | 2005-08-29 | 2006-07-13 | (주)이지로보틱스 | Method for simulating provisional construction of steel structure |
CN105887915A (en) * | 2016-05-16 | 2016-08-24 | 武汉冶建筑安装工程有限责任公司 | Foundation bolt locating method based on BIM |
-
2018
- 2018-05-15 CN CN201810459705.8A patent/CN108647450A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100594970B1 (en) * | 2005-08-29 | 2006-07-13 | (주)이지로보틱스 | Method for simulating provisional construction of steel structure |
CN105887915A (en) * | 2016-05-16 | 2016-08-24 | 武汉冶建筑安装工程有限责任公司 | Foundation bolt locating method based on BIM |
Non-Patent Citations (1)
Title |
---|
线登洲等: ""BIM在河北奥体中心项目中的应用"", 《低温建筑技术》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138149A (en) * | 2018-10-19 | 2019-01-04 | 河南中能国隆新材料科技有限公司 | The construction method of installation of assembled architecture PC component and its assembled architecture obtained |
CN109162365A (en) * | 2018-11-05 | 2019-01-08 | 中国十七冶集团有限公司 | A kind of connection structure and its construction method of large size built-in fitting and frame structure main reinforcement |
CN110287513A (en) * | 2019-05-09 | 2019-09-27 | 唐付 | A kind of built-in fitting construction method based on BIM technology |
CN111523166A (en) * | 2020-04-17 | 2020-08-11 | 中国十七冶集团有限公司 | BIM technology-based massive steel structure installation deepening construction method |
CN111639371A (en) * | 2020-05-07 | 2020-09-08 | 中国化学工程重型机械化有限公司 | Novel modular design method for steel structure |
CN111914325A (en) * | 2020-07-06 | 2020-11-10 | 上海宝冶冶金工程有限公司 | BIM technology-based blast furnace body frame structure model information interaction method |
CN111914325B (en) * | 2020-07-06 | 2022-04-22 | 上海宝冶冶金工程有限公司 | BIM technology-based blast furnace body frame structure model information interaction method |
CN113256810A (en) * | 2021-05-18 | 2021-08-13 | 中国建筑第八工程局有限公司 | BIM technology-based embedded part construction method for assembled actuator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108647450A (en) | A kind of pre-buried big foundation bolt construction method based on BIM technology | |
CN106988221B (en) | Unit construction bridge beam construction method based on BIM | |
CN110580376B (en) | Revit and Dynamo-based pile foundation model creation method | |
CN103440357B (en) | Virtual reality roaming scence generates method and system | |
CN107818198A (en) | A kind of science of bridge building management platform based on BIM technology | |
CN112257160B (en) | BIM-based standardized forward design method for garbage incineration power plant | |
CN108647894A (en) | One kind being based on the assembling type steel structure construction method of " BIM+RFID " technology | |
CN105844336A (en) | BIM-based property management system and method | |
CN103578137A (en) | Three-dimensional modeling system and method for prefabricated parts | |
CN108121704A (en) | A kind of three-dimensional final acceptance of construction system | |
CN109086495A (en) | The method that BIM goes out hard-cover construction drawing | |
CN109492311A (en) | Shield tunnel BIM parametric modeling and light-weight technologg method | |
CN105224749A (en) | Plant design CAD platform realizes the method for structure discipline three-dimensional design | |
CN107562980A (en) | Geometric information extraction method based on BIM model | |
CN104598697A (en) | Construction method of product simulation three-dimensional model | |
CN108694260A (en) | Application process of the BIM technology in Steel Bridge processing and manufacturing | |
CN109918760A (en) | Reinforcing bar modeling method based on Revit interoperability | |
CN103295085A (en) | Highway engineering three-dimensional office system building method based on Google earth | |
CN108984876A (en) | A kind of service sleeve automation modeling method and system based on BIM | |
CN108629141A (en) | A kind of Construction of Steel Structure in-depth method based on BIM technology | |
CN101423106B (en) | Design implement method of wind-pipe support and connection piece thereof during producing ship | |
CN111724475A (en) | Construction method based on building information model for municipal engineering | |
Pippenger | Three-dimensional model for manufacturing and inspection | |
CN105956346A (en) | Aluminum alloy template design system and aluminum alloy template design method | |
JP2008287300A (en) | Design support device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181012 |
|
RJ01 | Rejection of invention patent application after publication |