CN108921515A - A kind of construction site method of controlling security - Google Patents
A kind of construction site method of controlling security Download PDFInfo
- Publication number
- CN108921515A CN108921515A CN201810722549.XA CN201810722549A CN108921515A CN 108921515 A CN108921515 A CN 108921515A CN 201810722549 A CN201810722549 A CN 201810722549A CN 108921515 A CN108921515 A CN 108921515A
- Authority
- CN
- China
- Prior art keywords
- construction site
- construction
- app
- inspection
- rectification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 67
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000007689 inspection Methods 0.000 claims abstract description 26
- 238000012790 confirmation Methods 0.000 claims description 6
- 238000005034 decoration Methods 0.000 claims description 3
- 238000013461 design Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000012797 qualification Methods 0.000 claims description 3
- 238000004891 communication Methods 0.000 claims description 2
- 238000004458 analytical method Methods 0.000 abstract description 5
- 238000004140 cleaning Methods 0.000 abstract description 3
- 238000007405 data analysis Methods 0.000 abstract description 3
- 230000002265 prevention Effects 0.000 abstract description 2
- 238000013500 data storage Methods 0.000 abstract 1
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Alarm Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of construction site method of controlling security based on construction site three-dimensional place placement model and RFID chip, the present invention is convenient for prevention hidden danger:Inspection is periodically carried out, the place cleaning in time of security risk will be present, it is ensured that construction site safe construction;Improve working efficiency:Site administrator carries out the upload of problem in mobile phone terminal, rectifies and improves, check, data automatic flow, the conventional operation that compares mode, and efficiency has greatly improved;Convenient for recording data:On the server, each step can check, safety problem is decomposed for all data storages, corresponding person liable, where work it is not in place can check in time, be accurate to people;Convenient for data analysis:All safety problems are subjected to Macro or mass analysis, extract problem area, problem types, responsible person concerned finds emphasis accurately in the security control of next stage, and emphasis prevents, and provides data supporting to the examination of administrative staff and teams and groups.
Description
Technical field
The present invention relates to a kind of control systems, in particular to a kind of to be based on construction site three-dimensional place placement model and RFID
The construction site method of controlling security of chip.
Background technique
Construction site Safety Management is a systematicness, comprehensive management, and the content of management is related to building and applies
The links of work.Therefore, enterprise in charge of construction must adhere to that " Safety first, precaution crucial, Synthetic in safety management
The policy of reason ", traditional construction site security control is mainly to fill in rectification notification sheet after security official finds the problem, be issued to
It is rectified and improved in rectification manpower, because of the influence of human factor, many problems cannot timely carry out rectification closure, safety problem
Macro or mass analysis difficulty is big, can not targetedly be prevented safely, and many safety problem repeatability are higher.
Summary of the invention
The purpose of the present invention is to provide a kind of construction site method of controlling security.
The technical solution adopted by the present invention is that:
A kind of construction site method of controlling security, it is characterised in that:Include the following steps:
Step:1:The design drawing of temporary facility before being gone into operation according to architectural engineering, using area deploying software draw construction site
The Ground arrangement model of different construction stages is threedimensional model;
Step 2:According to project implementation program, Task-decomposing is carried out to construction project using WBS and task duration, creates project
Milestone node, in conjunction with the project working condition chart of Ground arrangement modelling different phase, including the basement construction stage,
Upper structure construction stage, secondary structure construction stage, decorations construction stage, electromechanical installation stage;
Step 33:It is right in conjunction with different phase construction site condition of construction according to construction site project security control relevant criterion
The major hazard source in each stage is summarized, and according to the three-dimensional place placement model of three-dimensional different phase, draws security personnel's day
The route of normal inspection;
Step 4:To step 3 summarize major hazard source category out establishment the scope of examination, determine major hazard source inspection people,
It period, inspection content, determines people, the period of security inspection, information is uploaded to construction site safety control system;
Step 5:The major hazard source and inspection route key node that summarize in step 4 are bound with RFID chip;
Step 6:According to the information of setting, patrolman patrols to danger source according to the time, in addition, being assigned to according to oneself
Inspection point, get RFID chip, and RFID chip is fixed on corresponding place;
Step 7:The patrolman's hand held tape NFC function and mobile phone for installing building safety control system APP periodically carries out inspection, band
NFC function and the mobile phone and construction site safety control system wireless connection for installing construction site safety control system APP
And it keeps communicating;
Step 8:Patrolman takes pictures to the place for security risk occur, selects on the safety control system APP of construction site
Rectification people is selected, region is rectified and improved the time limit, and rectification requires, and is submitted, and data are uploaded construction site security control system automatically by system APP
System, and remind rectification people to rectify and improve by APP;
Step 9:After rectification people receives the rectification hidden danger of APP push, corresponding worker is arranged to rectify and improve, after rectification is completed
It takes pictures, rectification is carried out on APP and completes confirmation, data are uploaded construction site safety control system automatically by system APP, and are passed through
APP reminds scrutineer to check;
Step 10:Scrutineer checks the place entirely completed, and confirmation check is closed on system APP if rectifying and improving qualification
Lattice repeat step 8,9,10 if unqualified.
Advantages of the present invention:Convenient for preventing hidden danger:Inspection is periodically carried out, the place cleaning in time of security risk will be present,
Ensure construction site safe construction;Improve working efficiency:Site administrator carries out the upload of problem in mobile phone terminal, rectifies and improves, multiple
It looks into, data automatic flow, the conventional operation that compares mode, efficiency has greatly improved;Convenient for recording data:All data are deposited
On the server, each step can check for storage, and safety problem is decomposed, corresponding person liable, where work it is not in place all
It can check in time, be accurate to people;Convenient for data analysis:All safety problems are subjected to Macro or mass analysis, extract problem area
Domain, problem types, responsible person concerned find emphasis accurately in the security control of next stage, and emphasis prevents, to administrative staff and Ban
The examination of group provides data supporting.
Detailed description of the invention
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
Fig. 1 is flow diagram of the invention.
Specific embodiment
As shown in Fig. 1, method proposed by the invention is divided into plan and executes two parts, and it is defeated that analysis is responsible in plan part
Enter data creation construction site three-dimensional place placement model, identification summarizes major hazard source and security inspection road in work progress
Line;Execution part is responsible for live inspection data, detects hidden danger, generates rectification check scheme.
A kind of construction site method of controlling security, includes the following steps:
Step:1:The design drawing of temporary facility before being gone into operation according to architectural engineering, using area deploying software draw construction site
The Ground arrangement model of different construction stages is threedimensional model;
Step 2:According to project implementation program, Task-decomposing is carried out to construction project using WBS and task duration, creates project
Milestone node, in conjunction with the project working condition chart of Ground arrangement modelling different phase, including the basement construction stage,
Upper structure construction stage, secondary structure construction stage, decorations construction stage, electromechanical installation stage;
Step 33:It is right in conjunction with different phase construction site condition of construction according to construction site project security control relevant criterion
The major hazard source in each stage is summarized, and according to the three-dimensional place placement model of three-dimensional different phase, draws security personnel's day
The route of normal inspection;
Step 4:To step 3 summarize major hazard source category out establishment the scope of examination, determine major hazard source inspection people,
It period, inspection content, determines people, the period of security inspection, information is uploaded to construction site safety control system;
Step 5:The major hazard source and inspection route key node that summarize in step 4 are bound with RFID chip;
Step 6:According to the information of setting, patrolman patrols to danger source according to the time, in addition, being assigned to according to oneself
Inspection point, get RFID chip, and RFID chip is fixed on corresponding place;
Step 7:The patrolman's hand held tape NFC function and mobile phone for installing building safety control system APP periodically carries out inspection, band
The NFC function and mobile phone for installing construction site safety control system APP is wirelessly connected and protects with construction site safety control system
Hold communication;
Step 8:Patrolman takes pictures to the place for security risk occur, selects on the safety control system APP of construction site
Rectification people is selected, region is rectified and improved the time limit, and rectification requires, and is submitted, and data are uploaded construction site security control system automatically by system APP
System, and remind rectification people to rectify and improve by APP;
Step 9:After rectification people receives the rectification hidden danger of APP push, corresponding worker is arranged to rectify and improve, after rectification is completed
It takes pictures, rectification is carried out on APP and completes confirmation, data are uploaded construction site safety control system automatically by system APP, and are passed through
APP reminds scrutineer to check;
Step 10:Scrutineer checks the place entirely completed, and confirmation check is closed on system APP if rectifying and improving qualification
Lattice repeat step 8,9,10 if unqualified.
The present invention is convenient for prevention hidden danger:Inspection is periodically carried out, the place cleaning in time of security risk will be present, it is ensured that building
Site safety construction;Improve working efficiency:Site administrator carries out the upload of problem in mobile phone terminal, rectifies and improves, check, and data are certainly
Dynamic circulation, the conventional operation that compares mode, efficiency have greatly improved;Convenient for recording data:All data are stored in service
On device, each step can be checked, safety problem is decomposed, corresponding person liable, where work it is not in place can be timely
It checks, is accurate to people;Convenient for data analysis:All safety problems are subjected to Macro or mass analysis, extract problem area, problem class
Type, responsible person concerned find emphasis accurately in the security control of next stage, and emphasis prevents, the examination to administrative staff and teams and groups
Data supporting is provided.
Technology contents and technical characteristic of the invention have revealed that as above, however those skilled in the art still can base
Various replacements and modification without departing substantially from spirit of that invention are made in announcement of the invention, therefore, the scope of the present invention should not
It is limited to the revealed content of above-mentioned case, and should be comprising various without departing substantially from replacement and modification of the invention, and be present patent application
Claim is covered.
Claims (1)
1. a kind of construction site method of controlling security, it is characterised in that:Include the following steps:
Step:1:The design drawing of temporary facility before being gone into operation according to architectural engineering, using area deploying software draw construction site
The Ground arrangement model of different construction stages is threedimensional model;
Step 2:According to project implementation program, Task-decomposing is carried out to construction project using WBS and task duration, creates project
Milestone node, in conjunction with the project working condition chart of Ground arrangement modelling different phase, including the basement construction stage,
Upper structure construction stage, secondary structure construction stage, decorations construction stage, electromechanical installation stage;
Step 33:It is right in conjunction with different phase construction site condition of construction according to construction site project security control relevant criterion
The major hazard source in each stage is summarized, and according to the three-dimensional place placement model of three-dimensional different phase, draws security personnel's day
The route of normal inspection;
Step 4:To step 3 summarize major hazard source category out establishment the scope of examination, determine major hazard source inspection people,
It period, inspection content, determines people, the period of security inspection, information is uploaded to construction site safety control system;
Step 5:The major hazard source and inspection route key node that summarize in step 4 are bound with RFID chip;
Step 6:According to the information of setting, patrolman patrols to danger source according to the time, in addition, being assigned to according to oneself
Inspection point, get RFID chip, and RFID chip is fixed on corresponding place;
Step 7:The patrolman's hand held tape NFC function and mobile phone for installing building safety control system APP periodically carries out inspection, band
The NFC function and mobile phone for installing construction site safety control system APP is wirelessly connected and protects with construction site safety control system
Hold communication;
Step 8:Patrolman takes pictures to the place for security risk occur, selects on the safety control system APP of construction site
Rectification people is selected, region is rectified and improved the time limit, and rectification requires, and is submitted, and data are uploaded construction site security control system automatically by system APP
System, and remind rectification people to rectify and improve by APP;
Step 9:After rectification people receives the rectification hidden danger of APP push, corresponding worker is arranged to rectify and improve, after rectification is completed
It takes pictures, rectification is carried out on APP and completes confirmation, data are uploaded construction site safety control system automatically by system APP, and are passed through
APP reminds scrutineer to check;
Step 10:Scrutineer checks the place entirely completed, and confirmation check is closed on system APP if rectifying and improving qualification
Lattice repeat step 8,9,10 if unqualified.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810722549.XA CN108921515A (en) | 2018-07-04 | 2018-07-04 | A kind of construction site method of controlling security |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810722549.XA CN108921515A (en) | 2018-07-04 | 2018-07-04 | A kind of construction site method of controlling security |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108921515A true CN108921515A (en) | 2018-11-30 |
Family
ID=64424432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810722549.XA Pending CN108921515A (en) | 2018-07-04 | 2018-07-04 | A kind of construction site method of controlling security |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108921515A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109902942A (en) * | 2019-02-01 | 2019-06-18 | 广东美的物业管理股份有限公司 | Change management method, device and storage medium on a kind of cell house decoration inspection line |
CN112633530A (en) * | 2020-12-24 | 2021-04-09 | 深圳市兴海物联科技有限公司 | House decoration inspection management method and inspection management system |
CN113988577A (en) * | 2021-10-25 | 2022-01-28 | 天台县人民医院 | Whole-hospital ward round system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103903077A (en) * | 2012-12-27 | 2014-07-02 | 上海建工七建集团有限公司 | Danger source supervision system and method |
CN104573971A (en) * | 2015-01-22 | 2015-04-29 | 山东烟台鑫泰黄金矿业有限责任公司 | Metal mine underground safety digital management system based on radio frequency and WIFI technology |
CN107818198A (en) * | 2017-09-27 | 2018-03-20 | 中建三局基础设施工程有限公司 | A kind of science of bridge building management platform based on BIM technology |
-
2018
- 2018-07-04 CN CN201810722549.XA patent/CN108921515A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103903077A (en) * | 2012-12-27 | 2014-07-02 | 上海建工七建集团有限公司 | Danger source supervision system and method |
CN104573971A (en) * | 2015-01-22 | 2015-04-29 | 山东烟台鑫泰黄金矿业有限责任公司 | Metal mine underground safety digital management system based on radio frequency and WIFI technology |
CN107818198A (en) * | 2017-09-27 | 2018-03-20 | 中建三局基础设施工程有限公司 | A kind of science of bridge building management platform based on BIM technology |
Non-Patent Citations (3)
Title |
---|
刘力: "BIM技术在政府投资项目管理中的应用探索", 《工程造价管理》 * |
维护部: "基于手机NFC的智能巡检系统解决方案", 《百度文库》 * |
陈庆臻 等: "基于BIM技术的建筑工程质量远程检验系统研究", 《质量管理》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109902942A (en) * | 2019-02-01 | 2019-06-18 | 广东美的物业管理股份有限公司 | Change management method, device and storage medium on a kind of cell house decoration inspection line |
CN112633530A (en) * | 2020-12-24 | 2021-04-09 | 深圳市兴海物联科技有限公司 | House decoration inspection management method and inspection management system |
CN113988577A (en) * | 2021-10-25 | 2022-01-28 | 天台县人民医院 | Whole-hospital ward round system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108921515A (en) | A kind of construction site method of controlling security | |
US9164663B1 (en) | Monitoring and reporting system for an electric power distribution and/or collection system | |
WO2019095910A1 (en) | Daily patrol working method and system in substation | |
CN102360459B (en) | Safety monitoring system for underground operating personnel | |
CN107358410A (en) | A kind of employee work attendance method based on mobile terminal, apparatus and system | |
KR101815960B1 (en) | Intelligent system for managing facilities on based Internet of Things | |
CN104346839B (en) | A kind of employee's electronic attendance system based on LAN | |
CN109279465A (en) | Elevator reports control system and elevator report control method | |
CN108960513B (en) | Intelligent identification and monitoring system for major hazard source of construction project | |
CN113961998A (en) | Building construction management system and management method for BIM | |
KR20220133620A (en) | Construction site safty control system using video analysis technology | |
CN107734458A (en) | A kind of residential property personnel management methods and system | |
CN109242113A (en) | A kind of station operation process recording method based on wearable device | |
Purnomo et al. | Analysis of Implementation Safety and Health Occupational Management System in Kertosono General Hospital | |
CN104200298A (en) | Middle and small-sized enterprise operation management system software | |
CN106127452A (en) | A kind of method and device of intelligently setting attendance checking calendar | |
CN108681980A (en) | Interactive repair reporting system based on APP and method | |
CN104715313A (en) | Dispatching management system and method | |
CN107705053A (en) | A kind of estate management operation automatic monitoring method and system | |
CN112288262A (en) | City management flat automatic dispatching method based on supervision grid and business grid | |
CN105049462A (en) | Monitoring center cooperative work subsystem based on Geographic Information System (GIS) and working method thereof | |
CN102156948B (en) | System for electronically recognizing power line towers and automatically positioning on-pole workers | |
KR20170086584A (en) | Facility management system | |
CN109218968A (en) | A kind of employee's localization method and its system | |
CN109242426A (en) | A kind of field personnel management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |
|
RJ01 | Rejection of invention patent application after publication |