CN106596897A - Test device and method for measuring slope fixation effects and water absorption performances of reinforced plant soil - Google Patents

Test device and method for measuring slope fixation effects and water absorption performances of reinforced plant soil Download PDF

Info

Publication number
CN106596897A
CN106596897A CN201710033309.4A CN201710033309A CN106596897A CN 106596897 A CN106596897 A CN 106596897A CN 201710033309 A CN201710033309 A CN 201710033309A CN 106596897 A CN106596897 A CN 106596897A
Authority
CN
China
Prior art keywords
water
slope
soil
plant soil
reinforcement plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710033309.4A
Other languages
Chinese (zh)
Other versions
CN106596897B (en
Inventor
谭慧明
陈福茂
陈佳
李相志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201710033309.4A priority Critical patent/CN106596897B/en
Publication of CN106596897A publication Critical patent/CN106596897A/en
Application granted granted Critical
Publication of CN106596897B publication Critical patent/CN106596897B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/0098Plants or trees

Abstract

The invention discloses a test device for measuring slope fixation effects and water absorption performances of reinforced plant soil. The test device comprises a slope frame of which the slope angle is adjustable, reinforced plant soil is arranged on the slope of the slope frame, a simulated rainfall device is arranged above the reinforced plant soil, a water tank is arranged in the upstream of the reinforced plant soil, a water collection tank is arranged in the downstream of the reinforced plant soil, one end of the water collection tank is opened, and a water metering container is arranged at the opening of the water collection tank. The invention also discloses an operation method of the test device. The test device simulates the processes of water absorbing, scouring and draining on the protection slope of the reinforced plant soil during the processes of rainfall and sheetflood. By measuring the mud content, shear strength and water content of the soil samples in different time periods and comparing mechanical properties of the reinforced plant soil protection slope soil samples in the first, middle and last three stages of rainfall and sheetflood, reinforced plant soil protection slope fixation effects and water absorption performances can be accurately determined.

Description

Determine the experimental rig and method of the solid slope effect of reinforcement plant soil and water absorbing properties
Technical field
The present invention relates to a kind of determine the solid slope effect of reinforcement plant soil and the experimental rig and method of water absorbing properties, belong to and add Muscle plant soil mechanics characteristic detection field.
Background technology
Sponge city is that instantly China is pushed to solve the new construction mode of Urban Storm Flood management problemses, with ecocity, Low-carbon (LC) city is closely connected, and complements each other.So-called sponge city, is a kind of statement of image, refers to that city can be as sponge one Sample, adapting to environmental change and reply natural calamity etc. aspect has good " elasticity ", water suction when rainy, retaining, infiltration, only Water, by the water for storing " release " and is used when needing.The concept in sponge city has advanced and validity with thought, has Beneficial to the transformation and development that promote China's Urban Storm Flood management mode, city hydro-ecological safety is ensured, promote the profit of rainwater resource With and ecological environmental protection.
Bank protection is urban construction, excavates building form common when river course and navigation channel, and at present conventional concrete slab is made For bank protection mask, although comparatively robust, but its water penetration is poor, and in precipitation, cross flow, current fully enter water channel along bank protection, Exacerbate water level rising.With the implementation of sponge the idea of the city, concrete revetment has not met the demand for meeting urban development.
Reinforcement plant soil bank protection is a kind of novel ecological slope protection form fast-developing in the last few years, and it passes through geotextile In combination with grass planting, the effect of the solid soil of root system of the solid grass of geotextile erosion control and grass is played, with certain firm side slope energy Power, and low cost, are easy to implement, the effect also beautified the environment.Additionally, relative to traditional concrete revetment, reinforcement Plant soil bank protection has certain water sorption, slow down the pressure of the water channel that drains off floodwaters, and this exactly builds sponge city and wants what is obtained Effect.At present for the antiscour of this Novel slope protection corrodes solid slope effect and permeable, soaking effect not yet sets up evaluation side Method.
The content of the invention
In order to solve above-mentioned technical problem, the invention provides a kind of determine the solid slope effect of reinforcement plant soil and water absorbing properties Experimental rig and method.
In order to achieve the above object, the technical solution adopted in the present invention is:
Determine the experimental rig of the solid slope effect of reinforcement plant soil and water absorbing properties, including the adjustable slope frame of bevel angle, institute State and reinforcement plant soil is provided with slope frame inclined-plane, the reinforcement plant soil top is provided with rainfall simulator, the reinforcement The upstream of plant soil is provided with water tank, and the downstream of the reinforcement plant soil is provided with water leg, the one end open of the water leg, The amount of being provided with water receptacle at the opening of the water leg.
Some air levels are set in the slope frame.
The slope frame includes the adjustable tilted rack of bevel angle and level frame, the upper side edge institute on the tilted rack inclined-plane It is connected with a side of level frame in side, the base of the tilted rack and level frame is in the same plane, the level Upper side edge of the top of support higher than tilted rack inclined-plane.
The reinforcement plant soil is arranged on slope frame inclined-plane by the incubator being adapted to, and in the incubator soil is placed with Earth and the geotechnique's pad being arranged in soil, the root of reinforcement plant is through geotechnique's pad growth, the incubator and reinforcement plant The height of soil is no more than the drop between horizontal top of support and tilted rack inclined-plane upper side edge.
Tilted rack inclined-plane both sides are provided with water fender.
The water tank is hinged with horizontal top of support, and the width of the water tank is not more than the spacing between the water fender of both sides.
The one side of water leg is connected with the lower side place side on tilted rack inclined-plane, and the opening of water leg is not higher than inclined-plane The lower side on frame inclined-plane.
Water leg in the open side edges of slope frame away from being provided with riser
The method of operating of the solid slope effect of reinforcement plant soil and the experimental rig of water absorbing properties is determined, including,
Step 1, under suitable condition in incubator cultivate reinforcement plant;
Step 2, after the completion of reinforcement plant growth, takes at random N part soil samples, measurement moisture content w and shear strength K;
Step 3, places slope frame, and adjustment position makes air level be located at center;
Step 4, incubator is placed in slope frame, according to remaining all parts of the structure setting of the experimental rig;
Step 5, is simulated well pumping test and cross flow test;
Simulated precipitation test detailed process be:
S11, after the certain precipitation height h of setting and precipitation intensity W1, opens rainfall simulator, every a cycle t1, uses Amount water receptacle measurement water yield Q, takes at random N part soil samples, measures moisture content w, shearing strength K, water outlet clay content N and water outlet intensity W3;
When measure water outlet intensity W3 tend to be steady and it is close with precipitation active strength W2 when, close rainfall simulator, continue every Every a cycle t1, consumption water receptacle measurement water yield Q takes at random N part soil samples, measures moisture content w, shearing strength K, water outlet and contains Mud amount N and water outlet intensity W3, stop after threshold value of water outlet intensity W3 less than setting;
S12, the inside culture for more renewing has the incubator of reinforcement plant, adjustment surface slope, precipitation intensity W1 and precipitation height The step of h, repetition S11;
S13, repairing experiment data draw respectively aqueous under different surface slopes, different precipitation intensity W1, different precipitation height h Rate w, shearing strength K, clay content N and the time dependent curve of water outlet intensity W3;
Simulation cross flow test process be:
S21, adds a certain amount of water in water tank, is disposably finished down within a period of time;
S22, after pouring terminates, every a cycle t2, consumption water receptacle measurement water flow Q, takes at random N part soil samples, measures Moisture content w, shearing strength K, water outlet clay content N and water outlet intensity W3, stop after the threshold value of water flow Q settings;
S23, the inside culture for more renewing has the incubator of reinforcement plant, adjustment surface slope and water volume in water tank, repeats the step of S21 Suddenly;
S23, repairing experiment data, draw respectively moisture content w under surface slope and water volume in water tank, shearing strength K, clay content N and The time dependent curve of water outlet intensity W3.
The beneficial effect that the present invention is reached:Invention emulates during precipitation, cross flow reinforcement plant soil bank protection Absorb water, wash away, drainage procedure, by measuring different periods soil sample clay content, shear strength and moisture content, reinforcement plant soil is protected Slope three phases soil sample soil mechanical properties before, during and after precipitation and cross flow are contrasted, so as to imitate to reinforcement plant soil bank protection Gu Po Fruit and water absorbing properties have accurately judgement.
Description of the drawings
Fig. 1 is the structural representation of apparatus of the present invention.
Fig. 2 is the structural representation of slope frame.
Fig. 3 is the profile of reinforcement plant soil.
Fig. 4 is water leg sectional drawing.
Fig. 5 is rainfall simulator structural representation.
Specific embodiment
Below in conjunction with the accompanying drawings the invention will be further described.Following examples are only used for clearly illustrating the present invention Technical scheme, and can not be limited the scope of the invention with this.
As shown in figure 1, the experimental rig of the solid slope effect of reinforcement plant soil and water absorbing properties is determined, including bevel angle is adjustable The slope frame 1 of section, is provided with reinforcement plant soil 3 on the inclined-plane of slope frame 1, the top of reinforcement plant soil 3 is provided with rainfall simulator 5, the upstream of reinforcement plant soil 3 is provided with water tank 6, and the downstream of reinforcement plant soil 3 is provided with water leg 4, and one end of water leg 4 is opened Mouthful, the amount of being provided with water receptacle at the opening of water leg 4.
As shown in Fig. 2 slope frame 1 includes the adjustable tilted rack 8 of bevel angle and level frame 9, the inclined-plane of tilted rack 8 it is upper Side place side is connected with a side of level frame 9, and the base of tilted rack 8 and level frame 9 is in the same plane, level Upper side edge of the top surface of frame 9 higher than the inclined-plane of tilted rack 8.
Tilted rack 8 and level frame 9 are common support bodys, and wherein level frame structure can have various, can be as in figure Cuboid, or the levelling bench being connected with tilted rack 8 by connecting rod, no matter be as long as which kind of structure ensures its top surface Level;The structure of tilted rack 8 can also have various, can as the rectangular prismatoid that is spliced by some rod members in figure with And the inclined-plane being arranged on the oblique waist of rectangular prismatoid, rod member includes that bottom level vertical pole 12, bottom level cross bar, top horizontal are horizontal Bar, top brace 10 and montant 11, by top brace 10, sliding, montant 11 are sliding on bottom level vertical pole 12 on montant 11 In-migration adjustable inclined surface apparatus angle, or the ramp platform supported by two ends elevating lever, by the liter of one end elevating lever Falling tone section bevel angle, either that structure, only need inclined-plane can adjust, and the excursion of bevel angle is 1:2~1:4.
Place for the ease of slope frame 1, some air levels are set in slope frame 1, be mainly disposed in horizontal bars.For Leaking in precipitation, cross flow process of the test water is reduced, the inclined-plane both sides of tilted rack 8 are provided with water fender 7, water fender 7 Depending on height is according to actual conditions, general range is 15cm ~ 20cm, and water fender 7 is filled with inclined-plane gap with glass cement.
Reinforcement plant soil 3 is arranged on the inclined-plane of slope frame 1 by the incubator 2 of adaptation, be placed with soil in incubator 2 with And the geotechnological pad 14 being arranged in soil, the root of reinforcement plant 13 grows through geotechnological pad 14, incubator 2 and reinforcement plant soil 3 height is no more than the drop between the top surface of level frame 9 and the inclined-plane upper side edge of tilted rack 8.Incubator 2 is near water leg 4 Side is inclined-plane, and slope range is 1:1~1:2, using wire netting and geotextiles, wire netting is located at outside facade the material on the inclined-plane Side, it is ensured that the intensity of the facade, geotextiles are located in facade and survey, it is ensured that the water penetration of the facade, and prevent soil particle to be lost in;Training The bottom surface of foster case 2 and the other three facade adopt poly (methyl methacrylate) plate, and gap is filled with glass cement between each facade.Reinforcement plant soil 3 with Incubator 2 arranges the thick geotechnological pads 14 of 2cm ~ 2.5cm, reinforcement plant with high, its profile such as Fig. 3 in soil 3cm ~ 4cm depths 13 can only select average height not little because being affected by factors such as external environments not reaching test requirements document in developmental process in test Tested in the reinforcement plant 13 of 10cm.
Water leg 4 is as shown in figure 4, be semicircle water leg 4, the one side of water leg 4 and the lower side on the inclined-plane of tilted rack 8 Place side connects, and gap is filled with glass cement, and the opening of water leg 4 is not higher than the lower side on the inclined-plane of tilted rack 8, water leg 4 Radius meets displacement and is not less than the effective water yield of 1.1 ~ 1.2 times of maximums;To reduce the outer of in precipitation, cross flow process of the test water Let out, water leg 4 is provided with riser 14 in the open side edges away from slope frame 1, highly not less than 30cm.
As shown in figure 5, rainfall simulator 5 is some shower nozzles fixed by fixing axle, circular jetting is used here Head, is distributed in the surrounding of slope frame 1, and shower nozzle place plane is 5 DEG C ~ 10 DEG C with fixing axle angle(Counterclockwise for just), shower nozzle center On the facade of inclined-plane diagonal place, Rainfall height is 50cm ~ 80cm, and precipitation intensity W1 is not less than 4mm/h, effective rainfall face Product is not less than 1m2, rainfall coefficient of uniformity is not less than 0.8.
The volume of water tank 6 is not less than 40L, and water tank 6 is hinged with horizontal top of support, and the width of water tank 6 is not more than both sides water fender 7 Between spacing, water tank 6 can around hinge be rotated by 90 °, after being rotated by 90 ° and water fender 7 will have the lap of 3cm ~ 5cm, to subtract Water leaks during few pouring.
The method of operating of above-mentioned experimental rig, the operation is carried out indoors, is comprised the following steps:
Step 1, cultivates in incubator 2 reinforcement plant 13 under suitable condition.
Step 2, after the completion of reinforcement plant 13 grows, selecting the height of reinforcement plant 13 and being not less than the incubator 2 of 10cm is carried out Test, takes at random N part soil samples, and N typically takes three, measures moisture content w and shear strength K.
Step 3, places slope frame 1, slope frame 1 will be seated in and had abundant water resources, and the flat area of physical features, adjustment position makes Air level is located at center.
Step 4, incubator 2 is placed in slope frame 1, can be connected both by C-type clamp, checks again for air level, Then according to remaining all parts of the structure setting of the experimental rig, and water fender 7 and inclined-plane, incubator 2 and slope are checked Joint seal situation at frame 1, slope frame 1 and water leg 4, is dripped using dropper at gap, after water percolating capacity is less than 10%, is used Watering can sprinkling water leg 4, water fender 7, until tiny current can be formed.
Step 5, is simulated well pumping test and cross flow test.
Simulated precipitation test detailed process be:
S11, after the certain precipitation height h of setting and precipitation intensity W1, opens rainfall simulator 5, every a cycle t1, uses Amount water receptacle measurement water yield Q, takes at random N part soil samples, measures moisture content w, shearing strength K, water outlet clay content N and water outlet intensity W3;
Tend to be steady and close with precipitation active strength W2 when water outlet intensity W3 is measured(When the difference of W2 and W3 is in default scope When interior, both are regarded as close)When, rainfall simulator 5 is closed, continue every a cycle t1, consumption water receptacle is measured Water yield Q, takes at random N part soil samples, measures moisture content w, shearing strength K, water outlet clay content N and water outlet intensity W3, until water outlet it is strong Degree W3 is less than stopping after the threshold value of setting.
Above-mentioned amount water receptacle volume is not less than 1L;Precipitation intensity W1 refers to the available intensity of spray irrigation of rainfall simulator 5; Precipitation active strength W2 refers to that precipitation drops to the actual rainfall intensity in incubator 2;Water outlet intensity W3 refers to going out in unit area Discharge;T1 takes 1/6-1/8 cycle in precipitation, and cycle in precipitation is 30min-120min, threshold value can according to circumstances depending on, here for 0.1mm/h。
S12, the inside culture for more renewing has the incubator 2 of reinforcement plant 13, adjustment surface slope, precipitation intensity W1 and drop The step of water height h, repetition S11.Because experimental design variable is more, the duration is longer, when incubator 2 is changed every time Ensure that air level is located at center.
S13, repairing experiment data, under different surface slopes, different precipitation intensity W1, different precipitation height h are drawn respectively Moisture content w, shearing strength K, clay content N and the time dependent curve of water outlet intensity W3, inquire into reinforcement plant soil 3 and make in precipitation Solid slope effect and water absorbing properties with.
Simulation cross flow test process be:
S21, adds a certain amount of water in water tank 6, is disposably finished down within a period of time;The pouring time is usually set to 5s ~ 8s.
S22, after pouring terminates, every a cycle t2, consumption water receptacle measurement water flow Q, takes at random N part soil samples, Moisture content w, shearing strength K, water outlet clay content N and water outlet intensity W3 are measured, is stopped after the threshold value of water flow Q settings.
T2 takes 3min ~ 5min, threshold value can according to circumstances depending on, be here 10ml/h.
S23, the inside culture for more renewing has the incubator 2 of reinforcement plant 12, adjustment surface slope and the water yield of water tank 6, weight The step of multiple S21.Because experimental design variable is more, the duration is longer, and when incubator 2 is changed level is ensured every time Bubble is located at center.
S23, repairing experiment data draw respectively moisture content w, shearing strength K under surface slope and the water yield of water tank 6, containing mud Amount N and the time dependent curve of water outlet intensity W3, inquire into solid slope effect and water imbibition of the reinforcement plant soil 3 under cross flow effect Energy.
The present invention can simulate during precipitation, cross flow the water suction of the bank protection of reinforcement plant soil 3, wash away, drainage procedure, lead to Cross measurement different periods soil sample clay content, shear strength and moisture content, to the bank protection of reinforcement plant soil 3 before precipitation and cross flow, in, Afterwards three phases soil sample soil mechanical properties are contrasted, so as to have accurately to the solid slope effect of the bank protection of reinforcement plant soil 3 and water absorbing properties Judgement.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, on the premise of without departing from the technology of the present invention principle, some improvement and deformation can also be made, these improve and deform Also should be regarded as protection scope of the present invention.

Claims (9)

1. the experimental rig of the solid slope effect of reinforcement plant soil and water absorbing properties is determined, it is characterised in that:It is adjustable including bevel angle The slope frame of section, is provided with reinforcement plant soil on the slope frame inclined-plane, the reinforcement plant soil top is provided with simulated rainfall Device, the upstream of the reinforcement plant soil is provided with water tank, and the downstream of the reinforcement plant soil is provided with water leg, described to catchment The one end open of groove, the amount of being provided with water receptacle at the opening of the water leg.
2. according to claim 1 to determine the experimental rig that reinforcement plant soil consolidates slope effect and water absorbing properties, its feature exists In:Some air levels are set in the slope frame.
3. it is according to claim 1 and 2 to determine the experimental rig that reinforcement plant soil consolidates slope effect and water absorbing properties, its feature It is:The slope frame includes the adjustable tilted rack of bevel angle and level frame, and the upper side edge on the tilted rack inclined-plane is located Side is connected with a side of level frame, and the base of the tilted rack and level frame is in the same plane, the level frame Upper side edge of the top surface higher than tilted rack inclined-plane.
4. according to claim 3 to determine the experimental rig that reinforcement plant soil consolidates slope effect and water absorbing properties, its feature exists In:The reinforcement plant soil by be adapted to incubator be arranged on slope frame inclined-plane, soil is placed with the incubator with And the geotechnique's pad being arranged in soil, the root of reinforcement plant is through geotechnique's pad growth, the incubator and reinforcement plant soil Height is no more than the drop between horizontal top of support and tilted rack inclined-plane upper side edge.
5. according to claim 3 to determine the experimental rig that reinforcement plant soil consolidates slope effect and water absorbing properties, its feature exists In:Tilted rack inclined-plane both sides are provided with water fender.
6. according to claim 5 to determine the experimental rig that reinforcement plant soil consolidates slope effect and water absorbing properties, its feature exists In:The water tank is hinged with horizontal top of support, and the width of the water tank is not more than the spacing between the water fender of both sides.
7. according to claim 3 to determine the experimental rig that reinforcement plant soil consolidates slope effect and water absorbing properties, its feature exists In:The one side of water leg is connected with the lower side place side on tilted rack inclined-plane, and it is oblique that the opening of water leg is not higher than tilted rack The lower side in face.
8. according to claim 7 to determine the experimental rig that reinforcement plant soil consolidates slope effect and water absorbing properties, its feature exists In:Water leg in the open side edges of slope frame away from being provided with riser.
9. the method for operating of the solid slope effect of reinforcement plant soil and the experimental rig of water absorbing properties is determined, it is characterised in that:Including,
Step 1, under suitable condition in incubator cultivate reinforcement plant;
Step 2, after the completion of reinforcement plant growth, takes at random N part soil samples, measurement moisture content w and shear strength K;
Step 3, places slope frame, and adjustment position makes air level be located at center;
Step 4, incubator is placed in slope frame, according to remaining all parts of the structure setting of the experimental rig;
Step 5, is simulated well pumping test and cross flow test;
Simulated precipitation test detailed process be:
S11, after the certain precipitation height h of setting and precipitation intensity W1, opens rainfall simulator, every a cycle t1, uses Amount water receptacle measurement water yield Q, takes at random N part soil samples, measures moisture content w, shearing strength K, water outlet clay content N and water outlet intensity W3;
When measure water outlet intensity W3 tend to be steady and it is close with precipitation active strength W2 when, close rainfall simulator, continue every Every a cycle t1, consumption water receptacle measurement water yield Q takes at random N part soil samples, measures moisture content w, shearing strength K, water outlet and contains Mud amount N and water outlet intensity W3, stop after threshold value of water outlet intensity W3 less than setting;
S12, the inside culture for more renewing has the incubator of reinforcement plant, adjustment surface slope, precipitation intensity W1 and precipitation height The step of h, repetition S11;
S13, repairing experiment data draw respectively aqueous under different surface slopes, different precipitation intensity W1, different precipitation height h Rate w, shearing strength K, clay content N and the time dependent curve of water outlet intensity W3;
Simulation cross flow test process be:
S21, adds a certain amount of water in water tank, is disposably finished down within a period of time;
S22, after pouring terminates, every a cycle t2, consumption water receptacle measurement water flow Q, takes at random N part soil samples, measures Moisture content w, shearing strength K, water outlet clay content N and water outlet intensity W3, stop after the threshold value of water flow Q settings;
S23, the inside culture for more renewing has the incubator of reinforcement plant, adjustment surface slope and water volume in water tank, repeats the step of S21 Suddenly;
S23, repairing experiment data, draw respectively moisture content w under surface slope and water volume in water tank, shearing strength K, clay content N and The time dependent curve of water outlet intensity W3.
CN201710033309.4A 2017-01-18 2017-01-18 Measurement reinforcement plant soil consolidates the experimental rig and method of slope effect and water absorbing properties Active CN106596897B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710033309.4A CN106596897B (en) 2017-01-18 2017-01-18 Measurement reinforcement plant soil consolidates the experimental rig and method of slope effect and water absorbing properties

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710033309.4A CN106596897B (en) 2017-01-18 2017-01-18 Measurement reinforcement plant soil consolidates the experimental rig and method of slope effect and water absorbing properties

Publications (2)

Publication Number Publication Date
CN106596897A true CN106596897A (en) 2017-04-26
CN106596897B CN106596897B (en) 2019-04-26

Family

ID=58585866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710033309.4A Active CN106596897B (en) 2017-01-18 2017-01-18 Measurement reinforcement plant soil consolidates the experimental rig and method of slope effect and water absorbing properties

Country Status (1)

Country Link
CN (1) CN106596897B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107421577A (en) * 2017-09-12 2017-12-01 昆山市建设工程质量检测中心 The experimental rig of biological delaying basin comprehensive effectiveness under the conditions of a kind of simulation natural precipitation
CN108385602A (en) * 2018-03-12 2018-08-10 浙江水利水电学院 It partly layings of markstone bank protection effect of energy dissipation experimental rig and application method
CN109459364A (en) * 2018-10-30 2019-03-12 河海大学 A kind of experimental rig and method for reinforcing calcareous coarse-grained soil based on MICP
CN110286027A (en) * 2019-05-30 2019-09-27 青岛农业大学 Consider that the riverbank soil body of red building root system influence washes away the quantization method of parameter
CN112683935A (en) * 2020-12-09 2021-04-20 山东大学 Plant root water absorption process test device and method suitable for CT scanning
CN113804860A (en) * 2021-09-18 2021-12-17 四川大学 Test model and test method for combined water storage and water retention maintenance of vegetation plate groove on stony desertification side slope

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102590475A (en) * 2012-02-08 2012-07-18 黄河水利委员会黄河水利科学研究院 Fine simulation test device and fine simulation test method for slope water erosion
CN103472205A (en) * 2013-09-03 2013-12-25 中国长江三峡集团公司 Slope water-soil loss experiment device and method under combined extreme meteorological conditions
US20140318258A1 (en) * 2013-04-29 2014-10-30 Korea Institute Of Geoscience And Mineral Resources (Kigam) Apparatus for soil box experiment applying vibration
WO2016027291A1 (en) * 2014-08-21 2016-02-25 日本電気株式会社 Slope monitoring system, device for slope safety analysis, method, and program
CN105424912A (en) * 2015-12-22 2016-03-23 贵州师范大学 Movable slope-varying-type steel trough for simulating soil leakage status in karst region
CN105910873A (en) * 2016-07-07 2016-08-31 河海大学 Preparation method of undisturbed sample for laboratory test of mechanical properties of reinforced plant soil
CN205538953U (en) * 2015-12-25 2016-08-31 中国科学院、水利部成都山地灾害与环境研究所 Coombe ditch head falls analogue test device of bank height to influence of headward erosion speed

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102590475A (en) * 2012-02-08 2012-07-18 黄河水利委员会黄河水利科学研究院 Fine simulation test device and fine simulation test method for slope water erosion
US20140318258A1 (en) * 2013-04-29 2014-10-30 Korea Institute Of Geoscience And Mineral Resources (Kigam) Apparatus for soil box experiment applying vibration
CN103472205A (en) * 2013-09-03 2013-12-25 中国长江三峡集团公司 Slope water-soil loss experiment device and method under combined extreme meteorological conditions
WO2016027291A1 (en) * 2014-08-21 2016-02-25 日本電気株式会社 Slope monitoring system, device for slope safety analysis, method, and program
CN105424912A (en) * 2015-12-22 2016-03-23 贵州师范大学 Movable slope-varying-type steel trough for simulating soil leakage status in karst region
CN205538953U (en) * 2015-12-25 2016-08-31 中国科学院、水利部成都山地灾害与环境研究所 Coombe ditch head falls analogue test device of bank height to influence of headward erosion speed
CN105910873A (en) * 2016-07-07 2016-08-31 河海大学 Preparation method of undisturbed sample for laboratory test of mechanical properties of reinforced plant soil

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107421577A (en) * 2017-09-12 2017-12-01 昆山市建设工程质量检测中心 The experimental rig of biological delaying basin comprehensive effectiveness under the conditions of a kind of simulation natural precipitation
CN107421577B (en) * 2017-09-12 2023-07-11 昆山市建设工程质量检测中心 Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition
CN108385602A (en) * 2018-03-12 2018-08-10 浙江水利水电学院 It partly layings of markstone bank protection effect of energy dissipation experimental rig and application method
CN108385602B (en) * 2018-03-12 2019-10-29 浙江水利水电学院 It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method
CN109459364A (en) * 2018-10-30 2019-03-12 河海大学 A kind of experimental rig and method for reinforcing calcareous coarse-grained soil based on MICP
CN109459364B (en) * 2018-10-30 2021-04-09 河海大学 Test device and method for reinforcing calcareous coarse-grained soil based on MICP
CN110286027A (en) * 2019-05-30 2019-09-27 青岛农业大学 Consider that the riverbank soil body of red building root system influence washes away the quantization method of parameter
CN112683935A (en) * 2020-12-09 2021-04-20 山东大学 Plant root water absorption process test device and method suitable for CT scanning
CN112683935B (en) * 2020-12-09 2021-12-10 山东大学 Plant root water absorption process test device and method suitable for CT scanning
CN113804860A (en) * 2021-09-18 2021-12-17 四川大学 Test model and test method for combined water storage and water retention maintenance of vegetation plate groove on stony desertification side slope

Also Published As

Publication number Publication date
CN106596897B (en) 2019-04-26

Similar Documents

Publication Publication Date Title
CN106596897B (en) Measurement reinforcement plant soil consolidates the experimental rig and method of slope effect and water absorbing properties
CN106290800B (en) A kind of soil-slope water resistant stream erosiveness simulation experiment method and device
CN104596736B (en) A kind of rainfall flooding simulation system and method
CN105911231A (en) Urban underlying surface rainfall runoff infiltration simulation experiment system
CN104878767A (en) Construction method for carrying out plant-growing concrete and plastic stone combined ecological landscape protection on rocky side slope
CN104404920B (en) A kind of trapezoidal ecological frame irrigation canals and ditches
CN113174973B (en) Soft rock side slope ecological protection structure and construction method thereof
CN105891037A (en) Slope scouring simulation test device
CN105926692A (en) Raining simulation device for slope washing test
CN112663760A (en) LID measure-based urban rainwater runoff regulation and control method
CN207228292U (en) One kind omits water system in printing slowly after first catchmenting
CN205786561U (en) Experimental system for simulating is oozed under city underlying surface rainfall runoff
CN205665130U (en) Concrete bank protection stability against sliding and anti rainwash experimental apparatus
CN205691473U (en) Concrete sash block bank protection performance testing device
CN205691447U (en) The simulation antiskid of concrete sash block bank protection and anti-rain drop erosion test device
CN110646590A (en) Water and soil loss measurement-based water and soil conservation scheme determination method and system
CN206545257U (en) A kind of novel greening band water storage structure
NL2028968B1 (en) Anti-seepage soft pit for purifying sewage using mud-mixed clay in karst mountain areas and construction method thereof
CN105137042A (en) Method and device for determining construction position of water storage project on Karst slope
CN109612538A (en) A kind of closed drainage amount test method
CN214657144U (en) Novel ecological bank protection suitable for northwest loess plateau area
CN205557473U (en) Remote control type floodwall dam gate
Kakuturu et al. Runoff curve numbers for simulated highway slopes under different slope, soil-turf, and rainfall conditions
CN208701602U (en) A kind of formula ecological bank protection structure
CN203034335U (en) Silty soil section highway drainage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant