CN206545257U - A kind of novel greening band water storage structure - Google Patents

A kind of novel greening band water storage structure Download PDF

Info

Publication number
CN206545257U
CN206545257U CN201720168813.0U CN201720168813U CN206545257U CN 206545257 U CN206545257 U CN 206545257U CN 201720168813 U CN201720168813 U CN 201720168813U CN 206545257 U CN206545257 U CN 206545257U
Authority
CN
China
Prior art keywords
water storage
storage structure
band water
reinforced concrete
structure according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720168813.0U
Other languages
Chinese (zh)
Inventor
吕全苗
涂雄伟
张连科
张少康
王远鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201720168813.0U priority Critical patent/CN206545257U/en
Application granted granted Critical
Publication of CN206545257U publication Critical patent/CN206545257U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型属于市政绿化工程领域,特别涉及一种新型绿化带蓄水结构,包括绿化带下方的蓄水池,防渗土工布满铺于蓄水池内表面和整个绿化带中;所述蓄水池顶部设置钢筋混凝土盖板,钢筋混凝土盖板上表面设置反滤土工布;所述蓄水池顶面高程处通有排水管,排水管出口通向市政排水管道;所述绿化带内预埋喷淋管道。本实用新型可以储存绿化带内多余的水分,干旱期可以利用喷淋装置将蓄水池内的水实现二次利用,具有节能环保的作用。

The utility model belongs to the field of municipal greening engineering, and particularly relates to a novel green belt water storage structure, which includes a water storage tank under the green belt, and anti-seepage geotextiles are fully paved on the inner surface of the water storage tank and in the entire green belt; the water storage A reinforced concrete cover plate is set on the top of the pool, and an anti-filter geotextile is set on the surface of the reinforced concrete cover plate; there is a drainage pipe at the elevation of the top surface of the reservoir, and the outlet of the drainage pipe leads to the municipal drainage pipe; the pre-buried in the green belt sprinkler pipes. The utility model can store excess water in the green belt, and the water in the water storage pool can be reused by using the spray device in the drought period, and has the function of energy saving and environmental protection.

Description

一种新型绿化带蓄水结构A new green belt water storage structure

技术领域technical field

本实用新型属于市政绿化工程领域,特别涉及一种绿化带蓄水结构。The utility model belongs to the field of municipal greening engineering, in particular to a green belt water storage structure.

背景技术Background technique

近年来,全球平均气温逐步升高,导致极端天气越来越多,比如强降雨频率比以往增大,因此,城市排水管网系统的压力日益突出。目前,我国大多数城市中的中央绿化带或者机非分隔带常设计为略高于道路表面高程,绿化带仅起到城市绿化的效果,不具备收集雨水、加快路面排水的功能,造成市政排水管网排水压力大,降雨较大时容易出现城市积水的现象,对城市交通造成严重影响。In recent years, the global average temperature has gradually increased, leading to more and more extreme weather, such as the frequency of heavy rainfall has increased than before. Therefore, the pressure on urban drainage pipe network systems has become increasingly prominent. At present, the central green belt or the machine-non-separation belt in most cities in my country is often designed to be slightly higher than the road surface elevation. The green belt only plays the role of urban greening, and does not have the function of collecting rainwater and accelerating road drainage, resulting in municipal drainage. The drainage pressure of the pipe network is high, and the phenomenon of urban water accumulation is prone to occur when the rainfall is heavy, which has a serious impact on urban traffic.

针对传统绿化带的设计缺陷,名称为《一种绿化带排水结构》、公布号为CN105178208A的专利申请公开了一种加快道路表面排水速度的方法,即先将雨水引入绿化带内,在绿化带内设置透水方管,透水方管通向市政排水管道内。该方法对加快道路排水速度起到了一定的效果,但该方法具有耐久性差的不足,透水方管采用透水混凝土结构,透水混凝土容易产生堵塞现象,道路上的垃圾容易进入排水管,堵塞排水通道,失去排水效果;名称为《下沉式绿化带及其施工方法》、公布号为CN106069296A的专利申请公开了一种具有蓄水效果的绿化带结构,在绿化带底部设置蓄水池,并设置了带有中央处理器、红外线人体感应模块、语音提示模块、变色模块、GSM远程模块的控制器。按照该方法施工时,工程造价远高于传统的施工方式,控制系统后期维修费用较高,施工复杂,同时该方法未在绿化带底部做防水层,雨水容易渗入道路结构层内,浸泡道路结构,产生裂缝,进而减少道路的使用年限。Aiming at the design defects of traditional green belts, a patent application titled "A Green Belt Drainage Structure" and publication number CN105178208A discloses a method for accelerating the drainage speed of the road surface, that is, firstly introduce rainwater into the green belt, A permeable square pipe is arranged inside, and the permeable square pipe leads to the municipal drainage pipe. This method has a certain effect on speeding up the road drainage, but this method has the disadvantage of poor durability. The permeable square pipe adopts a permeable concrete structure, and the permeable concrete is prone to clogging. Lose the drainage effect; the name is "sinking type green belt and construction method thereof", and the patent application with publication number CN106069296A discloses a kind of green belt structure with water storage effect, a water storage pool is set at the bottom of the green belt, and a A controller with a central processing unit, an infrared human body sensing module, a voice prompt module, a color changing module, and a GSM remote module. When constructing according to this method, the project cost is much higher than the traditional construction method, the later maintenance cost of the control system is high, and the construction is complicated. At the same time, this method does not make a waterproof layer at the bottom of the green belt, and the rainwater is easy to seep into the road structure layer and soak the road structure. , resulting in cracks, thereby reducing the service life of the road.

发明内容Contents of the invention

本实用新型要解决的问题是克服背景技术的不足,提供一种能够提高雨水利用率、降低工程造价及后期维修费用的新型绿化带蓄水结构。The problem to be solved by the utility model is to overcome the deficiency of the background technology and provide a new green belt water storage structure that can improve the rainwater utilization rate, reduce the engineering cost and the later maintenance cost.

本实用新型是通过以下技术方案来实现:一种新型绿化带蓄水结构,包括绿化带下方的蓄水池,防渗土工布满铺于蓄水池内表面和整个绿化带中;所述蓄水池顶部设置钢筋混凝土盖板,钢筋混凝土盖板上表面设置反滤土工布;所述蓄水池顶面高程处通有排水管,排水管出口通向市政排水管道;所述绿化带内预埋喷淋管道,喷淋管道底部设置在蓄水池底部,喷淋管道穿过钢筋混凝土盖板。The utility model is realized through the following technical proposals: a novel green belt water storage structure, including a water storage tank below the green belt, and anti-seepage geotextiles are fully paved on the inner surface of the water storage tank and in the entire green belt; the water storage A reinforced concrete cover plate is set on the top of the pool, and an anti-filter geotextile is set on the surface of the reinforced concrete cover plate; there is a drainpipe at the elevation of the top surface of the reservoir, and the outlet of the drainpipe leads to the municipal drainage pipe; the pre-buried in the green belt The spray pipe, the bottom of the spray pipe is arranged at the bottom of the reservoir, and the spray pipe passes through the reinforced concrete cover plate.

进一步的,所述钢筋混凝土盖板采用透水混凝土浇筑或/和钢筋混凝土盖板上预留透水孔。Further, the reinforced concrete cover plate is poured with permeable concrete or/and water permeable holes are reserved on the reinforced concrete cover plate.

进一步的,所述绿化带内的种植土顶面高程低于沥青面层表面高程。Further, the elevation of the top surface of the planting soil in the green belt is lower than the elevation of the asphalt surface layer.

进一步的,所述蓄水池采用砌体结构或者混凝土结构。Further, the reservoir adopts a masonry structure or a concrete structure.

进一步的,所述防渗土工布上端固定在路缘石后背混凝土上。Further, the upper end of the anti-seepage geotextile is fixed on the back concrete of the curb.

进一步的,所述路缘石每隔一段距离设置一个门洞路缘石。Further, the curb stones are arranged with a door opening curb stone at intervals.

进一步的,所述排水管预埋在道路基层或者土基中。Further, the drainage pipe is pre-buried in the road base or soil foundation.

进一步的,所述排水管设置向下的坡度。Further, the drainpipe is provided with a downward slope.

进一步的,所述排水管在道路基层或土基内采用砂砾或碎石屑进行回填。Further, the drainage pipe is backfilled with gravel or crushed stone chips in the road base or soil foundation.

优选的,所述排水管为PVC管。Preferably, the drain pipe is a PVC pipe.

本实用新型的有益效果:The beneficial effects of the utility model:

1、在整个绿化带内满铺防渗土工布,同时在蓄水池底部也铺设防渗土工布,可以阻止绿化带内的水下渗,防止水对道路结构层产生浸泡,起到延长道路使用年限的效果;1. Spread anti-seepage geotextiles all over the green belt, and lay anti-seepage geotextiles at the bottom of the reservoir at the same time, which can prevent the water from seepage in the green belt, prevent water from soaking the road structure, and extend the road The effect of age;

2、在绿化带底部设置蓄水池,可以对绿化带多余的水进行收集与储存,同时喷淋系统的设置实现了雨水的二次利用,具有节能环保的效果,提高雨水的利用率;2. Set up a reservoir at the bottom of the green belt, which can collect and store excess water in the green belt. At the same time, the setting of the sprinkler system realizes the secondary utilization of rainwater, which has the effect of energy saving and environmental protection, and improves the utilization rate of rainwater;

3、反滤土工布的设置可以防止绿化带内的种植土对钢筋混凝土盖板的透水效果产生影响,保证了水能够顺利通过钢筋混凝土盖板渗入蓄水池内;3. The setting of the anti-filter geotextile can prevent the planting soil in the green belt from affecting the water permeability of the reinforced concrete cover, and ensure that the water can pass through the reinforced concrete cover and infiltrate into the reservoir;

4、排水管的设置可以保证蓄水池内多余的水及时排入市政排水管网中,防止绿化带内存在积水。4. The setting of the drainage pipe can ensure that the excess water in the reservoir is discharged into the municipal drainage pipe network in time to prevent water accumulation in the green belt.

附图说明Description of drawings

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为本实用新型钢筋混凝土盖板俯视示意图。Fig. 2 is a top view schematic diagram of the reinforced concrete cover plate of the utility model.

图3为本实用新型钢筋混凝土盖板纵截面结构示意图。Fig. 3 is a structural schematic diagram of the longitudinal section of the reinforced concrete cover plate of the utility model.

图4为本实用新型门洞路缘石结构示意图。Fig. 4 is a schematic diagram of the structure of the curb stone in the door opening of the present invention.

图中,1蓄水池,2防渗土工布,3反滤土工布,4钢筋混凝土盖板,5排水管,6喷淋管道,7砂砾,8土基,9道路基层,10沥青面层,11路缘石,12透水孔,13钢筋,14路缘石后背混凝土,15门洞路缘石。In the figure, 1 reservoir, 2 anti-seepage geotextile, 3 filter geotextile, 4 reinforced concrete cover, 5 drainage pipe, 6 sprinkler pipe, 7 gravel, 8 soil foundation, 9 road base, 10 asphalt surface , 11 curb stones, 12 permeable holes, 13 steel bars, 14 curb stone back concrete, 15 door opening curb stones.

具体实施方式detailed description

下面结合附图对本实用新型作进一步说明,但不作为对本实用新型的限定。本实施例包括蓄水池1,蓄水池1设置在绿化带的下方,本实施例绿化带内的种植土顶面高程低于沥青面层10表面高程,本实施例蓄水池1为长方体状,蓄水池1可以采用砌体结构,也可以采用混凝土结构,将防渗土工布2满铺于蓄水池1内表面和整个绿化带中,防渗土工布2上端固定在路缘石后背混凝土14上,本实施例中路缘石11每隔一段距离设置一个门洞路缘石15,门洞路缘石15可以使路面雨水通过门洞流入绿化带内。防渗土工布2的设置可以阻止绿化带内和蓄水池1内的水下渗,防止水对道路结构层产生浸泡,起到延长道路使用年限的效果。The utility model will be further described below in conjunction with the accompanying drawings, but not as a limitation of the utility model. This embodiment includes a reservoir 1, and the reservoir 1 is arranged below the green belt. The elevation of the top surface of the planting soil in the green belt of this embodiment is lower than the surface elevation of the asphalt surface layer 10. The reservoir 1 of this embodiment is a cuboid shape, the reservoir 1 can adopt a masonry structure or a concrete structure, spread the anti-seepage geotextile 2 on the inner surface of the reservoir 1 and the entire green belt, and fix the upper end of the anti-seepage geotextile 2 behind the curb On the back concrete 14, in the present embodiment, the curb stone 11 is provided with a door opening curb stone 15 at intervals, and the door opening curb stone 15 can make the road rainwater flow into the green belt through the door opening. The setting of the anti-seepage geotextile 2 can prevent the water seepage in the green belt and the reservoir 1, prevent water from soaking the road structure layer, and prolong the service life of the road.

在蓄水池1顶部设置钢筋混凝土盖板4,钢筋混凝土盖板4的钢筋13设置在钢筋混凝土盖板4的底部,如附图3所示。所述钢筋混凝土盖板4采用透水混凝土浇筑或者在钢筋混凝土盖板4上预留透水孔12,又或是钢筋混凝土盖板4采用透水混凝土浇筑且同时在钢筋混凝土盖板4上预留透水孔12,本实施例优先采用第二种方案,透水孔12的结构示意图如附图2所示。在钢筋混凝土盖板4上表面设置反滤土工布3,反滤土工布3的设置可以防止钢筋混凝土盖板4透水孔12发生堵塞现象,充分发挥钢筋混凝土盖板4的透水效果。A reinforced concrete cover plate 4 is arranged on the top of the reservoir 1, and the steel bar 13 of the reinforced concrete cover plate 4 is arranged at the bottom of the reinforced concrete cover plate 4, as shown in FIG. 3 . The reinforced concrete cover plate 4 is poured with permeable concrete or a permeable hole 12 is reserved on the reinforced concrete cover plate 4, or the reinforced concrete cover plate 4 is poured with permeable concrete and at the same time a permeable hole is reserved on the reinforced concrete cover plate 4 12. In this embodiment, the second solution is preferred, and the schematic diagram of the structure of the permeable hole 12 is shown in Figure 2. The anti-filter geotextile 3 is arranged on the upper surface of the reinforced concrete cover 4, and the setting of the anti-filter geotextile 3 can prevent the clogging of the permeable holes 12 of the reinforced concrete cover 4, and give full play to the permeable effect of the reinforced concrete cover 4.

在蓄水池1顶面高程处设有排水管5,排水管5嵌入蓄水池1墙体中与蓄水池1内部相通,排水管5出口通向市政排水管道。排水管5预埋在道路基层9或者土基8中,且排水管5设置向下的坡度,有利于排水,具体坡度根据实际情况设定,排水管5在道路基层9或土基8内采用砂砾7或碎石屑进行回填。本实施例优选的排水管5为PVC管。A drainpipe 5 is provided at the top elevation of the reservoir 1, and the drainpipe 5 is embedded in the wall of the reservoir 1 to communicate with the inside of the reservoir 1, and the outlet of the drainpipe 5 leads to a municipal drainage pipe. The drainage pipe 5 is pre-buried in the road base 9 or the soil foundation 8, and the drainage pipe 5 is provided with a downward slope to facilitate drainage. The specific slope is set according to the actual situation. The drainage pipe 5 is used in the road base 9 or the soil foundation 8. Gravel 7 or crushed stone chips for backfilling. The preferred drainage pipe 5 in this embodiment is a PVC pipe.

在绿化带内预埋喷淋管道6,喷淋管道6底部设置在蓄水池1底部,喷淋管道6穿过钢筋混凝土盖板4,本实施例喷淋管道6穿过钢筋混凝土盖板4的透水孔12。Pre-buried spray pipe 6 in the green belt, the bottom of spray pipe 6 is set at the bottom of reservoir 1, spray pipe 6 passes through reinforced concrete cover plate 4, and in this embodiment, spray pipe 6 passes through reinforced concrete cover plate 4 The permeable hole 12.

本实施例的施工过程简单介绍如下:首先道路基层9施工完成后,在排水管5位置按照计算高程对基层进行开挖,排水管5铺设完成后使用砂砾7进行回填并夯实;道路基层9施工结束后铺设路缘石11,路缘石11每隔一段距离设置一个门洞路缘石15;沥青面层10施工完后进行绿化带土方开挖,并按照设计尺寸将蓄水池1开挖砌筑完成,然后在绿化带内和蓄水池1内铺设防渗土工布2,防渗土工布2顶部固定在路缘石后背混凝土14上,排水管5刚好位于蓄水池1顶部嵌入蓄水池1墙体中,然后将预制好的钢筋混凝土盖板4放置在蓄水池1的顶部,钢筋混凝土盖板4上预留透水孔12,钢筋混凝土盖板4安装完成后在顶部铺设一层反滤土工布3,最后进行种植土的回填以及绿化植物种植施工,种植土回填时,种植土上表面高程要低于沥青面层10顶面高程。The construction process of this embodiment is briefly introduced as follows: first, after the construction of the road base 9 is completed, the base is excavated at the position of the drain pipe 5 according to the calculated elevation, and after the laying of the drain pipe 5 is completed, the gravel 7 is used for backfilling and compaction; the construction of the road base 9 Lay curb stones 11 after completion, and curb stones 11 are provided with a doorway curb stone 15 at intervals; after the asphalt surface layer 10 is constructed, the green belt earthwork is excavated, and the reservoir 1 is excavated and masonry completed according to the design size. Then lay the anti-seepage geotextile 2 in the green belt and the reservoir 1, the top of the anti-seepage geotextile 2 is fixed on the back concrete 14 of the curb, and the drain pipe 5 is just positioned at the top of the reservoir 1 and embedded in the wall of the reservoir 1 body, and then the prefabricated reinforced concrete cover 4 is placed on the top of the reservoir 1, and the reinforced concrete cover 4 is reserved with permeable holes 12. After the reinforced concrete cover 4 is installed, a layer of anti-filter geotechnical engineering is laid on the top Cloth 3. Finally, backfill the planting soil and plant green plants. When the planting soil is backfilled, the elevation of the upper surface of the planting soil should be lower than the elevation of the top surface of the asphalt surface layer 10.

以上所述的实施例,只是本实用新型较优选的具体实施方式的一种,本领域的技术人员在本发明技术方案范围内进行的通常变化和替换都应包含在本实用新型的保护范围内。The above-mentioned embodiment is only a kind of preferred embodiment of the present utility model, and the usual changes and replacements carried out by those skilled in the art within the scope of the technical solutions of the present invention should be included in the protection scope of the present utility model .

Claims (10)

1. the cistern below a kind of novel greening band water storage structure, including greenbelt(1), it is characterised in that:Anti-seepage geotextile (2)Completely it is laid on cistern(1)In inner surface and whole greenbelt;The cistern(1)Top sets reinforced concrete cover plate (4), reinforced concrete cover plate(4)Upper surface sets anti-filter geotextiles(3);The cistern(1)Draining is connected with elevation of top surface Pipe(5), drainpipe(5)Municipal drainage pipeline is led in outlet;Pre-buried spray piping in the greenbelt(6), spray piping(6)Bottom Portion is arranged on cistern(1)Bottom, spray piping(6)Through reinforced concrete cover plate(4).
2. novel greening band water storage structure according to claim 1, it is characterised in that:The reinforced concrete cover plate(4) Poured using pervious concrete or/and reinforced concrete cover plate(4)Upper reserved permeable hole(12).
3. novel greening band water storage structure according to claim 1, it is characterised in that:Planting soil top in the greenbelt Face elevation is less than asphalt surface course(10)Surface elevation.
4. novel greening band water storage structure according to claim 1, it is characterised in that:The cistern(1)Using masonry Structure or concrete structure.
5. novel greening band water storage structure according to claim 1, it is characterised in that:The anti-seepage geotextile(2)Upper end It is fixed on kerbstone back concrete(14)On.
6. novel greening band water storage structure according to claim 5, it is characterised in that:The kerbstone(11)Every one section Distance sets a door opening curb crossdrift(15).
7. the novel greening band water storage structure according to claim any one of 1-6, it is characterised in that:The drainpipe(5) It is embedded in roadbase(9)Or soil matrix(8)In.
8. novel greening band water storage structure according to claim 7, it is characterised in that:The drainpipe(5)Set downward The gradient.
9. novel greening band water storage structure according to claim 8, it is characterised in that:The drainpipe(5)In Road Base Layer(9)Or soil matrix(8)Interior use gravel(7)Or stone fragment is backfilled.
10. novel greening band water storage structure according to claim 9, it is characterised in that:The drainpipe(5)For pvc pipe.
CN201720168813.0U 2017-02-24 2017-02-24 A kind of novel greening band water storage structure Expired - Fee Related CN206545257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720168813.0U CN206545257U (en) 2017-02-24 2017-02-24 A kind of novel greening band water storage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720168813.0U CN206545257U (en) 2017-02-24 2017-02-24 A kind of novel greening band water storage structure

Publications (1)

Publication Number Publication Date
CN206545257U true CN206545257U (en) 2017-10-10

Family

ID=59995868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720168813.0U Expired - Fee Related CN206545257U (en) 2017-02-24 2017-02-24 A kind of novel greening band water storage structure

Country Status (1)

Country Link
CN (1) CN206545257U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778673A (en) * 2019-01-23 2019-05-21 平顶山市公路交通勘察设计院 Construction technology of green belt on bridge and bridge constructed by adopting the technology
CN111677046A (en) * 2020-05-13 2020-09-18 宏升塑胶(杭州)有限公司 A rainwater storage body with polypropylene winding structure wall
CN114837176A (en) * 2022-06-14 2022-08-02 中国一冶集团有限公司 A kind of fixing method of anti-seepage geotextile in separation belt

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778673A (en) * 2019-01-23 2019-05-21 平顶山市公路交通勘察设计院 Construction technology of green belt on bridge and bridge constructed by adopting the technology
CN111677046A (en) * 2020-05-13 2020-09-18 宏升塑胶(杭州)有限公司 A rainwater storage body with polypropylene winding structure wall
CN114837176A (en) * 2022-06-14 2022-08-02 中国一冶集团有限公司 A kind of fixing method of anti-seepage geotextile in separation belt

Similar Documents

Publication Publication Date Title
CN105089142B (en) Concave rainwater storage and dispatching pool for green space and decentralized rainwater storage and dispatching pool system
CN204959952U (en) Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system
CN111255011A (en) Sponge city drainage and seepage structure and rainwater collection and utilization system and its working method
CN106759825A (en) A kind of construction method of sponge urban green space water storage system
CN206752614U (en) A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system
CN211112989U (en) Intelligent water collecting and draining system applied to sponge city
CN201459905U (en) Urban rainwater drainage system
CN106192665A (en) A kind of sponge urban road rain infiltration system and construction method thereof
CN107989153A (en) A kind of novel construction method for building sponge city
CN108612173A (en) A kind of intelligent biological delay tank and its construction method
CN206545257U (en) A kind of novel greening band water storage structure
CN202544019U (en) Rain water collection system for urban green land
CN102172198A (en) Water-saving irrigation device for road greenbelt and forming method thereof
CN106638219A (en) Ramped urban road of sponge city
CN205224230U (en) LID type urban rainwater oozes and holds clean drainage closed conduit
CN207633496U (en) Integrated rainwater recycling system for sponge cities in super-large square
CN201284492Y (en) Simple and practical overhead road rainwater utilization system
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN106284587B (en) Urban road is with oozing water tank and its construction method
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
CN217460855U (en) Ecological tree pool system for intercepting rainwater surface runoff pollutants
CN211922820U (en) Drainage and seepage structure and rainwater collection and utilization system of sponge city
CN112323658B (en) Landscape ecological structure and construction method of mountain roads based on corrugated plates
CN104088352A (en) Ground rainwater comprehensive utilization structure
CN205529776U (en) Infiltration structure of waterproof road in road surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171010