CN106192665A - A kind of sponge urban road rain infiltration system and construction method thereof - Google Patents

A kind of sponge urban road rain infiltration system and construction method thereof Download PDF

Info

Publication number
CN106192665A
CN106192665A CN201610564744.5A CN201610564744A CN106192665A CN 106192665 A CN106192665 A CN 106192665A CN 201610564744 A CN201610564744 A CN 201610564744A CN 106192665 A CN106192665 A CN 106192665A
Authority
CN
China
Prior art keywords
layer
mozzle
rainwater
construction
purification apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610564744.5A
Other languages
Chinese (zh)
Other versions
CN106192665B (en
Inventor
刘学应
李国标
董邑宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jing Chang Construction Co Ltd
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201610564744.5A priority Critical patent/CN106192665B/en
Publication of CN106192665A publication Critical patent/CN106192665A/en
Application granted granted Critical
Publication of CN106192665B publication Critical patent/CN106192665B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F2201/00Details, devices or methods not otherwise provided for
    • E03F2201/10Dividing the first rain flush out of the stormwater flow

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of sponge urban road rain infiltration system and construction method thereof, including rain infiltration layer, purifying layer and subsoil water collecting pipe, purifying layer is between rain infiltration layer and subsoil water collecting pipe, rain infiltration layer is followed successively by permeable brick layer from top to bottom, sponge filter course, the second conflux layer, concrete base layer and first are confluxed layer, being provided with rainwater purification apparatus in purifying layer, rainwater purification apparatus connects rain infiltration layer and subsoil water collecting pipe by mozzle.Its construction method includes: preparation of construction, subsoil water collecting pipe are laid, purifying layer is constructed and the construction of rain infiltration layer.The system availability of the present invention is strong, construction method is simple, it is possible not only to meet the construction requirement of the rain infiltration system of different road, improve the draining effect of urban road rainwater, and effectively alleviate the discharge pressure of municipal administration sewer pipe, rainwater after the most purified process can be greatly saved water resource by different degree of purifications for living it can also be used to irrigation.

Description

A kind of sponge urban road rain infiltration system and construction method thereof
Technical field
The present invention relates to a kind of sponge urban road rain infiltration system and construction method thereof.
Background technology
Increasing year by year along with waterproof ground, city in urban construction, the run-off of rainwater is also increasing year by year.This Not only increase the weight of the pressure of sewerage system, destroyed urban ecology, also waste the rainwater resource of preciousness simultaneously.
In recent years, along with taking place frequently of global warming and extreme weather, the city that some population density are bigger is caused to be produced Raw serious waterlogging, not only affects production and the life of people, and serious threat is to life safety.Rain of the prior art Water collection system can only realize, by rainwater-collecting, not to be had the effect that draining sluices, rainwater can not be carried out purified treatment simultaneously.
Summary of the invention
Present invention aim at providing a kind of sponge urban road rain infiltration for the deficiency existing for prior art System and the technical scheme of construction method thereof, be possible not only to meet the construction requirement of the rain infiltration system of different road, improve The draining effect of urban road rainwater, and can effectively alleviate the discharge pressure of municipal administration sewer pipe, the most purified process After rainwater can by different degree of purifications for life it can also be used to irrigation, be greatly saved water resource.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of sponge urban road rain infiltration system, it is characterised in that: include rain infiltration layer, purifying layer and subsoil water Collecting pipe, purifying layer is between rain infiltration layer and subsoil water collecting pipe, and rain infiltration layer is followed successively by water-permeable brick from top to bottom Layer, sponge filter course, the second conflux layer, concrete base layer and first are confluxed layer, are provided with at least three rainwater clean in purifying layer Gasifying device, rainwater purification apparatus connects rain infiltration layer and subsoil water collecting pipe, two adjacent rainwater purifications by mozzle Connected by isocon between device, isocon is provided with Unidirectional solenoid valve;By the design of permeable brick layer, can directly by Rainwater on road surface permeates the ground, and alleviates the discharge pressure of sewerage system, can effectively play the work controlled flood and drained flooded fields simultaneously With, the granule foreign in rainwater then can be filtered by sponge filter course, it is simple to rainwater penetrates into second and confluxes in layer, second The layer that confluxes can realize preliminary convergence drainage effect after confluxing, alleviates the pressure of rainwater on road surface accumulation, and second confluxes in layer Rainwater flow into first conflux layer realize secondary converge drainage, make rainwater can with dispersion flows, prevent water-retention position from excessively concentrating and Resulting in blockage, in turn result in waterlogging, the rainwater after collecting can be purified by rainwater purification apparatus in purifying layer effectively Process, in the water after preventing rainwater from the harmful substances such as the greasy dirt on road surface being brought into purification, and then affect the utilization ratio of rainwater, Rainwater after rainwater purification apparatus purifies layer by layer, for irrigating and domestic water, has been saved water resource, has been beautified environment, unidirectional Electromagnetic valve can effectively control the current size between adjacent two rainwater purification apparatus according to actual rainwater emission effect, rises To protective effect, the rainwater after purified process is discharged by subsoil water collecting pipe is unified, can together with municipal tap water also With, economize on resources.
Further, the second center confluxing layer is provided with filter well, concrete base layer is evenly arranged with limbers, oozes Well is confluxed layer by limbers connection first, and the rainwater that second confluxes in layer can be converged, carry by filter well effectively The conveying effect of high rainwater, cause after preventing rain infiltration overflow, limbers improve second conflux layer and first conflux layer it Between current balance, improve rainwater purification efficiency.
Further, in rainwater purification apparatus, it is provided with purification chamber, purifies and on the inwall in chamber, be provided with gripper shoe, purify intracavity Being disposed with the first pressuring plate, the second pressuring plate and location-plate from top to bottom, location-plate is fixedly connected on and is positioned at propping up of left side On fagging, the first pressuring plate is rotatably connected in the gripper shoe being positioned at left side, and the second pressuring plate is rotatably connected on and is positioned at right side In gripper shoe, between the first pressuring plate and the second pressuring plate, between the second pressuring plate and location-plate, it is provided with compression spring, logical Cross the first pressuring plate and the design of the second pressuring plate, can effectively control to purify the pressure of intracavity current, and then regulate current Flowing velocity, meet actual rainwater treatment needs, compression spring improve the first pressuring plate and the second pressuring plate rotation time Stability, location-plate then plays the effect that location is fixing.
Further, the end face in purification chamber and bottom surface are provided with the first pipe network interface, purify the left and right sides in chamber respectively Being provided with the second pipe network interface and the 3rd pipe network interface, the second pipe network interface is positioned at the top of the 3rd pipe network interface, passes through pipe network The design of interface, it is possible to achieve the fixing connection of rainwater purification apparatus, improves the connective stability between itself and mozzle, strengthens The draining effect of rainwater.
Further, between the first pressuring plate and the second pressuring plate, between the second pressuring plate and location-plate, location-plate and the 3rd Being provided with water permeable membrane between pipe network interface, the harmful substances such as the greasy dirt in rainwater can be filtered by water permeable membrane effectively, Prevent the rainwater generation eutrophication pollution after filtering.
The construction method of a kind of sponge urban road rain infiltration system described above, it is characterised in that include walking as follows Rapid:
1) preparation of construction
A, first according to the requirement design and construction drawing of planning, and carry out at corresponding site of road according to construction drawing and execute Work labelling, carries out site clearing to corresponding construction area, and the circle of position out position at distance construction on-the-spot 5~10m is used simultaneously In placing construction equipment;
Line layout situation below b, then inspection road, carries out foundation dredging scheme, and carries out scheme evaluation, through criticizing Carry out confiding a technological secret after standard is qualified work;
C, then construction equipment march into the arena, and are positioned over corresponding planned position;
2) subsoil water collecting pipe is laid
A, first according to subsoil water collecting pipe lay depth-set foundation ditch cutting depth, and be layered excavate, The size using excavator to be respectively 3m × 3m × 1m by length, width and height in the regional extent of labelling excavates foundation ditch, excavates a base The excavation of next foundation ditch is carried out, until the foundation ditch of the first level excavates complete in setting regions behind hole;
B, then carry out the excavation of foundation pit of the second aspect by set depth, and adjust the degree of depth that single excavates to 0.8m, dig The excavation of next foundation ditch is carried out, until the foundation ditch of the second aspect excavates complete in setting regions after digging a foundation ditch;
C, reciprocation cycle aforesaid operations, until the excavation of foundation pit of last aspect is complete, at the excavation of foundation pit of each aspect While ensure spacing between the mining position of excavator and underground utilities more than 20~30cm, and when closely underground pipelines Reduce the speed of excavator, finally manually the outer wall earth of underground utilities is cleared up with scoop, rush with water after cleaning Wash, then wipe against clean, then paint and carry out underground utilities sealing protection, and carry out wrapping process by geotextiles;
D, whole construction area excavate after, first the bottom surface to foundation ditch carry out watering cleaning, then enter with rammer compacter Row compacting processes, it is ensured that the sedimentation degree of depth of foundation ditch bottom surface is less than setting value, then enters bottom surface and the side of foundation ditch with concrete Row pours, and after the intensity in whole concreting face reaches to set requirement, installs reinforcing bar in the lower section of underground utilities, makes reinforcing bar Underground utilities are held up, and liner plank between reinforcing bar and underground utilities;
E, last on the concrete being positioned at foundation ditch bottom surface by design requirements laying subsoil water collecting pipe, and in junction Carry out encapsulation process after the welding of position, then mozzle is uniformly installed on the end face of subsoil water collecting pipe, by mozzle and ground Junction between lower water collecting pipe carries out encapsulation process, then installs locating support on mozzle, makes mozzle and underground Water collecting pipe keeps vertical;
3) purifying layer construction
A, it is respectively mounted rainwater purification apparatus, first around mozzle according to mozzle distributing position from low to high Being filled with clay, the end face making filling clay is overlapping with the bottom surface of rainwater purification apparatus, then that rainwater purification apparatus is solid Surely it is connected on mozzle, and on the end face of rainwater purification apparatus, connects mozzle, make mozzle and rainwater purification apparatus Keep vertical, then carry out the installation of next rainwater purification apparatus, be filled with clay around mozzle, make filling The end face of clay is overlapping with the bottom surface of rainwater purification apparatus, and is fixedly connected on mozzle by rainwater purification apparatus, at rainwater Connect mozzle on the end face of purifier, make mozzle keep vertical with rainwater purification apparatus;
B, then installation isocon between two adjacent rainwater purification apparatus, the installation site of isocon is according to rainwater The height and position of purifier is obliquely installed, and installs Unidirectional solenoid valve on isocon simultaneously;
C, finally by above-mentioned construction procedure, all of rainwater purification apparatus is installed, install after terminating in purifying layer Fill clay, make the degree of depth of purifying layer reach the requirement set;
4) rain infiltration layer construction
A, first at the end face casting concrete of purifying layer, make the top of mozzle maintain an equal level with concrete surface, and at water conservancy diversion Infiltration lid is installed on pipe, then pours first and conflux layer, and conflux casting concrete basic unit above layer first, simultaneously mixed It is uniformly arranged limbers on solidifying soil matrix layer;
B, then above concrete base layer, pour second and conflux layer, pour infiltration in the second center confluxing layer Well, makes the second 1/2 the maintaining an equal level of height and filter well height confluxing layer, and keeps second to conflux Ceng Cong center to both sides gradually Raise;
C, then second conflux layer end face on sponge filter course is installed, make sponge filter course be fitted in second and conflux layer End face on, and be fixed at the two ends of sponge filter course;
D, finally above sponge filter course, lay permeable brick layer.
Due to the fact that and have employed technique scheme, have the advantages that
1, by the design of permeable brick layer, directly the rainwater on road surface can be permeated the ground, alleviate sewerage system Discharge pressure, simultaneously can effectively play the effect controlled flood and drained flooded fields, sponge filter course then can be by the granule foreign in rainwater Filtering, it is simple to rainwater penetrates into second and confluxes in layer, confluxing second to realize preliminary convergence drainage work after layer confluxes With, alleviate the pressure of rainwater on road surface accumulation;
2, the second conflux rainwater in layer flows into first layer that confluxes and realizes secondary and converge drainage, makes rainwater can disperse stream Dynamic, prevent water-retention position from excessively concentrating and resulting in blockage, in turn result in waterlogging;
3, the rainwater purification apparatus in purifying layer can carry out purified treatment to the rainwater after collecting effectively, prevents rainwater The harmful substances such as the greasy dirt on road surface are brought in the water after purification, and then affect the utilization ratio of rainwater, fill through rainwater purification Put layer by layer purify after rainwater for irrigate and domestic water, saved water resource, beautified environment, Unidirectional solenoid valve can root The rainwater emission effect on border effectively controls the current size between adjacent two rainwater purification apparatus factually, plays a protective role;
4, the construction method of the present invention is simple, convenient operation, is possible not only to the rain infiltration system of satisfied different road Construction requirement, improves the draining effect of urban road rainwater, and can effectively alleviate the discharge pressure of municipal administration sewer pipe, with Time purified process after rainwater can by different degree of purifications for life it can also be used to irrigation, be greatly saved water and provide Source.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the knot of rain infiltration system in the present invention a kind of sponge urban road rain infiltration system and construction method thereof Structure schematic diagram;
Fig. 2 is the structural representation of rain infiltration layer in the present invention;
Fig. 3 is the structural representation of subsoil water collecting pipe in the present invention.
In figure: 1-rain infiltration layer;2-rainwater purification apparatus;3-subsoil water collecting pipe;4-mozzle;5-isocon;6- Unidirectional solenoid valve;The permeable brick layer of 7-;8-sponge filter course;9-second confluxes layer;10-concrete base layer;11-first confluxes layer; 12-limbers;13-filter well;14-purifies chamber;15-the first pipe network interface;16-the second pipe network interface;17-the 3rd pipe network connects Mouthful;18-gripper shoe;19-the first pressuring plate;20-the second pressuring plate;21-location-plate;22-compression spring;23-water permeable membrane.
Detailed description of the invention
As shown in Figure 1 to Figure 3, for one sponge urban road rain infiltration system of the present invention, including rain infiltration layer 1, Purifying layer and subsoil water collecting pipe 3, purifying layer between rain infiltration layer 1 and subsoil water collecting pipe 3, rain infiltration layer 1 from On be down followed successively by permeable brick layer 7, sponge filter course 8, the second conflux layer 9, concrete base layer 10 and first are confluxed layer 11, second The conflux center of layer 9 is provided with filter well 13, and concrete base layer 10 is evenly arranged with limbers 12, and filter well 13 is by logical Water hole 12 connects first and confluxes layer 11, and the rainwater that second confluxes in layer 9 can be converged by filter well 13 effectively, improves rain The conveying effect of water, cause after preventing rain infiltration overflow, limbers 12 improve second conflux layer 9 and first conflux layer 11 it Between current balance, improve rainwater purification efficiency.
It is provided with at least three rainwater purification apparatus 2 in purifying layer, is provided with purification chamber 14 in rainwater purification apparatus 2, only Change and on the inwall in chamber 14, be provided with gripper shoe 18, be disposed with the first pressuring plate 19, second in purifying chamber 14 from top to bottom and increase Pressing plate 20 and location-plate 21, location-plate 21 is fixedly connected in the gripper shoe 18 being positioned at left side, and the first pressuring plate 19 is rotationally connected In the gripper shoe 18 being positioned at left side, the second pressuring plate 20 is rotatably connected in the gripper shoe 18 being positioned at right side, the first pressuring plate 19 and second between pressuring plate 20, between the second pressuring plate 20 and location-plate 21, it is provided with compression spring 22, increases by first Pressing plate 19 and the design of the second pressuring plate 20, can effectively control to purify the pressure of current in chamber 14, and then the stream of regulation current Dynamic speed, meets the needs of actual rainwater treatment, and compression spring 22 improves the first pressuring plate 19 and rotates with the second pressuring plate 20 Time stability, location-plate 21 then plays the effect that location is fixing, purifies and is provided with the first pipe on the end face in chamber 14 and bottom surface Network interface 15, the left and right sides purifying chamber 14 is respectively arranged with the second pipe network interface 16 and the 3rd pipe network interface 17, the second pipe network Interface 16 is positioned at the top of the 3rd pipe network interface 17, by the design of pipe network interface, it is possible to achieve fixing of rainwater purification apparatus 2 Connecting, improve the connective stability between itself and mozzle 4, strengthen the draining effect of rainwater, the first pressuring plate 19 and second increases Between pressing plate 20, between the second pressuring plate 20 and location-plate 21, it is provided with between location-plate 21 and the 3rd pipe network interface 17 Moisture film 23, the harmful substances such as the greasy dirt in rainwater can be filtered by water permeable membrane 23 effectively, prevents the rainwater after filtering from sending out Raw eutrophication pollution.
Rainwater purification apparatus 2 connects rain infiltration layer 1 and subsoil water collecting pipe 3, two adjacent rainwater by mozzle 4 Connected by isocon 5 between purifier 2, isocon 5 is provided with Unidirectional solenoid valve 6;By the design of permeable brick layer 7, Directly the rainwater on road surface can be permeated the ground, alleviate the discharge pressure of sewerage system, can effectively play anti-simultaneously The effect of flood water drainage, the granule foreign in rainwater then can be filtered by sponge filter course 8, it is simple to rainwater penetrates into second and confluxes In layer 9, conflux second and preliminary convergence drainage effect after layer 9 confluxes, can be realized, alleviate the pressure of rainwater on road surface accumulation, the Two conflux rainwater in layer 9 flow into first layer 11 that confluxes and realize secondary and converge drainage, make rainwater can prevent water-retention with dispersion flows Position is excessively concentrated and is resulted in blockage, and in turn results in waterlogging, after the rainwater purification apparatus 2 in purifying layer can be effectively to collecting Rainwater carry out purified treatment, in the water after preventing rainwater from the harmful substances such as the greasy dirt on road surface being brought into purification, so impact The utilization ratio of rainwater, the rainwater after rainwater purification apparatus 2 purifies layer by layer, for irrigating and domestic water, has saved water money Source, has beautified environment, and Unidirectional solenoid valve 6 can effectively control adjacent two rainwater purifications dress according to actual rainwater emission effect Putting the current size between 2, play a protective role, the rainwater after purified process is discharged by subsoil water collecting pipe 3 is unified, can With together with municipal tap water and use, economize on resources.
The construction method of a kind of sponge urban road rain infiltration system described above, comprises the steps:
1) preparation of construction
A, first according to the requirement design and construction drawing of planning, and carry out at corresponding site of road according to construction drawing and execute Work labelling, carries out site clearing to corresponding construction area, and the circle of position out position at distance construction on-the-spot 5~10m is used simultaneously In placing construction equipment;
Line layout situation below b, then inspection road, carries out foundation dredging scheme, and carries out scheme evaluation, through criticizing Carry out confiding a technological secret after standard is qualified work;
C, then construction equipment march into the arena, and are positioned over corresponding planned position, construction equipment are carried out safety inspection simultaneously, keep away Exempt to affect whole construction progress because cannot normally work during construction;
2) subsoil water collecting pipe is laid
A, first according to subsoil water collecting pipe 3 lay depth-set foundation ditch cutting depth, and be layered excavate, The size using excavator to be respectively 3m × 3m × 1m by length, width and height in the regional extent of labelling excavates foundation ditch, excavates a base Carrying out the excavation of next foundation ditch behind hole, until the foundation ditch of the first level excavates complete in setting regions, the earth after excavation is stacked In setting regions, for the backfill of foundation ditch;
B, then carry out the excavation of foundation pit of the second aspect by set depth, and adjust the degree of depth that single excavates to 0.8m, dig The excavation of next foundation ditch is carried out, until the foundation ditch of the second aspect excavates complete in setting regions after digging a foundation ditch;
C, reciprocation cycle aforesaid operations, until the excavation of foundation pit of last aspect is complete, at the excavation of foundation pit of each aspect While ensure spacing between the mining position of excavator and underground utilities more than 20~30cm, and when closely underground pipelines Reduce the speed of excavator, finally manually the outer wall earth of underground utilities is cleared up with scoop, rush with water after cleaning Wash, then wipe against clean, then paint and carry out underground utilities sealing protection, and carry out wrapping process by geotextiles;
D, whole construction area excavate after, first the bottom surface to foundation ditch carry out watering cleaning, then enter with rammer compacter Row compacting processes, it is ensured that the sedimentation degree of depth of foundation ditch bottom surface is less than setting value, then enters bottom surface and the side of foundation ditch with concrete Row pours, and after the intensity in whole concreting face reaches to set requirement, installs reinforcing bar in the lower section of underground utilities, makes reinforcing bar Underground utilities are held up, and liner plank between reinforcing bar and underground utilities;
E, last on the concrete being positioned at foundation ditch bottom surface by design requirements laying subsoil water collecting pipe 3, and in junction Position welding after carry out encapsulation process, then mozzle 4 is uniformly installed on the end face of subsoil water collecting pipe 3, by mozzle 4 And the junction between subsoil water collecting pipe 3 carries out encapsulation process, then installs locating support on mozzle 4, makes mozzle 4 Keep vertical with subsoil water collecting pipe 3;
3) purifying layer construction
A, it is respectively mounted rainwater purification apparatus 2, first at mozzle 4 according to mozzle 4 distributing position from low to high Surrounding clay is filled with, and the end face making filling clay is overlapping with the bottom surface of rainwater purification apparatus 2, is then filled by rainwater purification Put 2 to be fixedly connected on mozzle 4, and on the end face of rainwater purification apparatus 2, connect mozzle 4, make mozzle 4 and rainwater Purifier 2 keeps vertical, then carries out the installation of next rainwater purification apparatus 2, carries out with clay around mozzle 4 Filling, the end face making filling clay is overlapping with the bottom surface of rainwater purification apparatus 2, and is fixedly connected on by rainwater purification apparatus 2 and leads In flow tube 4, the end face of rainwater purification apparatus 2 connects mozzle 4, makes mozzle 4 keep vertical with rainwater purification apparatus 2;
B, then between two adjacent rainwater purification apparatus 2 install isocon 5, the installation site of isocon 5 according to The height and position of rainwater purification apparatus 2 is obliquely installed, install Unidirectional solenoid valve 6 on isocon 5 simultaneously, and to being obliquely installed Isocon 5 is reinforced, and carries out encapsulation process in junction, makes the water after purification can be under gravity along hierarchic structure Flowing, reduces the installation of driving means, has saved the energy, reduces the pollution to rainwater;
C, finally by above-mentioned construction procedure, all of rainwater purification apparatus 2 is installed, install after terminating at purifying layer Interior filling clay, makes the degree of depth of purifying layer reach the requirement set, and the clay filled is carried out compaction treatment, after preventing construction Road surface be uneven, the construction quality that impact is overall;
4) rain infiltration layer construction
A, first at the end face casting concrete of purifying layer, make the top of mozzle 4 maintain an equal level with concrete surface, and at water conservancy diversion Infiltration lid is installed on pipe 4, then pours first and conflux layer 11, and conflux casting concrete basic unit 10 above layer 11 first, On concrete base layer 10, it is uniformly arranged limbers 12, it is ensured that can circulate in each limbers 12 simultaneously;
B, then above concrete base layer 10, pour second and conflux layer 9, pour in the second center confluxing layer 9 Filter well 13, makes the second height confluxing layer 9 maintain an equal level with the 1/2 of filter well 13 height, and keeps second to conflux layer 9 from center Gradually rise to both sides, by the design of V-shaped, can effectively make rainwater converge from both sides toward middle, it is to avoid on road Rainwater directs out flowing, the drainage effect that impact is overall, and the most beneficially rainwater focuses on, and improves the purified treatment of rainwater Effect;
C, then second conflux layer 9 end face on install sponge filter course 8, make sponge filter course 8 be fitted in the second remittance On the end face of fluid layer 9, and it is fixed at the two ends of sponge filter course 8;
D, finally above sponge filter course 8, lay permeable brick layer 7, the width laying area and construction road of water-permeable brick Spending equal, rainwater runoff coefficient on road surface, square is as shown in table 1.
Table 1 rainwater runoff coefficient on road surface, square
(1) flow rate calculation of entrance rain infiltration layer:
Qm=10-7qT(n)Au
In formula: QmEnter the flow of rain infiltration layer, m3/s;
QT (n) rainfall intensity, L/s;
The T concentration time, min, the general T=10min in road surface for not having Water storage, when bottom surface of catchmenting is the biggest 20min can be extended to;
N Designed recurrence period.
(2) seepage velocity of rainwater calculates:
Vf=KfI
I=(Is+Z)/(Is+Z/2)
In formula: VfThe seepage velocity of permeable areas, m/s;
KfThe infiltration coefficient of permeable areas, m/s;
I hydraulic gradient;
IsFirst confluxes the layer distance to subsoil water collecting pipe, m;
The water-storage depth of Z rain infiltration system, m.
(3) seepage discharge calculates:
Qs=KrAs
In formula: QsSeepage discharge, m3/s;
AsInfiltrating area, m2
These are only the specific embodiment of the present invention, but the technical characteristic of the present invention is not limited thereto.Any with this Based on bright, for realizing essentially identical technique effect, done ground simple change, equivalent or modification etc., all contain Among protection scope of the present invention.

Claims (6)

1. a sponge urban road rain infiltration system, it is characterised in that: include that rain infiltration layer, purifying layer and subsoil water converge Flow tube, described purifying layer is between described rain infiltration layer and described subsoil water collecting pipe, and described rain infiltration layer is from upper past Under be followed successively by permeable brick layer, sponge filter course, the second conflux layer, concrete base layer and first are confluxed layer, set in described purifying layer Being equipped with at least three rainwater purification apparatus, described rainwater purification apparatus connects described rain infiltration layer and described by mozzle Lower water collecting pipe, is connected by isocon between two adjacent described rainwater purification apparatus, described isocon is provided with list To electromagnetic valve.
A kind of sponge urban road rain infiltration system the most according to claim 1, it is characterised in that: described second confluxes The center of layer is provided with filter well, and described concrete base layer is evenly arranged with limbers, and described filter well is by described logical Water hole connection described first is confluxed layer.
A kind of sponge urban road rain infiltration system the most according to claim 1, it is characterised in that: described rainwater purification Being provided with purification chamber in device, the inwall in described purification chamber is provided with gripper shoe, described purification intracavity sets the most successively Being equipped with the first pressuring plate, the second pressuring plate and location-plate, described location-plate is fixedly connected in the described gripper shoe being positioned at left side, Described first pressuring plate is rotatably connected in the described gripper shoe being positioned at left side, and described second pressuring plate is rotatably connected on and is positioned at the right side In the described gripper shoe of side, between described first pressuring plate and described second pressuring plate, described second pressuring plate and described location Compression spring it is provided with between plate.
A kind of sponge urban road rain infiltration system the most according to claim 3, it is characterised in that: described purification chamber Be provided with the first pipe network interface on end face and bottom surface, the left and right sides in described purification chamber be respectively arranged with the second pipe network interface and 3rd pipe network interface, described second pipe network interface is positioned at the top of described 3rd pipe network interface.
A kind of sponge urban road rain infiltration system the most according to claim 4, it is characterised in that: described first supercharging Between plate and described second pressuring plate, between described second pressuring plate and described location-plate, described location-plate with described 3rd pipe Water permeable membrane it is provided with between network interface.
6. the construction method of a sponge urban road rain infiltration system as claimed in claim 1, it is characterised in that include Following steps:
1) preparation of construction
A, first according to planning requirement design and construction drawing, and according to construction drawing corresponding site of road carry out construction mark Note, carries out site clearing to corresponding construction area, and the circle of position out position at distance construction on-the-spot 5~10m is used for putting simultaneously Put construction equipment;
Line layout situation below b, then inspection road, carries out foundation dredging scheme, and carries out scheme evaluation, approved conjunction Carry out confiding a technological secret after lattice work;
C, then construction equipment march into the arena, and are positioned over corresponding planned position;
2) subsoil water collecting pipe is laid
A, first according to subsoil water collecting pipe lay depth-set foundation ditch cutting depth, and be layered excavate, use The size that excavator is respectively 3m × 3m × 1m by length, width and height in the regional extent of labelling excavates foundation ditch, after excavating a foundation ditch Carry out the excavation of next foundation ditch, until the foundation ditch of the first level excavates complete in setting regions;
B, then carry out the excavation of foundation pit of the second aspect by set depth, and adjust the degree of depth that single excavates to 0.8m, excavate one The excavation of next foundation ditch is carried out, until the foundation ditch of the second aspect excavates complete in setting regions after individual foundation ditch;
C, reciprocation cycle aforesaid operations, until the excavation of foundation pit of last aspect is complete, excavation of foundation pit same of each aspect Time ensure that the spacing between mining position and the underground utilities of excavator more than 20~30cm, and reduces when closely underground pipelines The speed of excavator, finally manually clears up the outer wall earth of underground utilities with scoop, is rinsed with water, so after cleaning Rear wiped clean, then paint and carry out underground utilities sealing protection, and carry out wrapping process by geotextiles;
D, whole construction area excavate after, first the bottom surface to foundation ditch carry out watering cleaning, then ram with rammer compacter Crucial point is managed, it is ensured that the sedimentation degree of depth of foundation ditch bottom surface is less than setting value, then waters bottom surface and the side of foundation ditch with concrete Build, after the intensity in whole concreting face reaches to set requirement, reinforcing bar is installed in the lower section of underground utilities, makes reinforcing bar by ground Underground pipelines holds up, and liner plank between reinforcing bar and underground utilities;
E, last on the concrete being positioned at foundation ditch bottom surface by design requirements laying subsoil water collecting pipe, and in the position of junction Carry out encapsulation process after welding, then mozzle is uniformly installed on the end face of subsoil water collecting pipe, by mozzle and subsoil water Junction between collecting pipe carries out encapsulation process, then installs locating support on mozzle, makes mozzle converge with subsoil water Flow tube keeps vertical;
3) purifying layer construction
A, it is respectively mounted rainwater purification apparatus according to mozzle distributing position from low to high, first with viscous around mozzle Soil is filled with, and the end face making filling clay is overlapping with the bottom surface of rainwater purification apparatus, then connects fixing for rainwater purification apparatus It is connected on mozzle, and on the end face of rainwater purification apparatus, connects mozzle, make mozzle keep with rainwater purification apparatus Vertically, then carry out the installation of next rainwater purification apparatus, be filled with clay around mozzle, make filling clay End face overlapping with the bottom surface of rainwater purification apparatus, and rainwater purification apparatus is fixedly connected on mozzle, at rainwater purification Connect mozzle on the end face of device, make mozzle keep vertical with rainwater purification apparatus;
B, then installation isocon between two adjacent rainwater purification apparatus, the installation site of isocon is according to rainwater purification The height and position of device is obliquely installed, and installs Unidirectional solenoid valve on isocon simultaneously;
C, finally by above-mentioned construction procedure, all of rainwater purification apparatus is installed, install and fill in purifying layer after terminating Clay, makes the degree of depth of purifying layer reach the requirement set;
4) rain infiltration layer construction
A, first at the end face casting concrete of purifying layer, make the top of mozzle maintain an equal level with concrete surface, and on mozzle Infiltration lid is installed, then pours first and conflux layer, and conflux casting concrete basic unit above layer first, simultaneously at concrete Limbers it is uniformly arranged in basic unit;
B, then above concrete base layer, pour second and conflux layer, pour filter well in the second center confluxing layer, Make the second 1/2 the maintaining an equal level of height and filter well height confluxing layer, and keep the second Ceng Cong center of confluxing gradually to rise to both sides High;
C, then second conflux layer end face on sponge filter course is installed, make sponge filter course be fitted in the second top confluxing layer On face, and it is fixed at the two ends of sponge filter course;
D, finally above sponge filter course, lay permeable brick layer.
CN201610564744.5A 2016-07-14 2016-07-14 A kind of sponge urban road rain infiltration system and its construction method Active CN106192665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610564744.5A CN106192665B (en) 2016-07-14 2016-07-14 A kind of sponge urban road rain infiltration system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610564744.5A CN106192665B (en) 2016-07-14 2016-07-14 A kind of sponge urban road rain infiltration system and its construction method

Publications (2)

Publication Number Publication Date
CN106192665A true CN106192665A (en) 2016-12-07
CN106192665B CN106192665B (en) 2019-03-08

Family

ID=57492999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610564744.5A Active CN106192665B (en) 2016-07-14 2016-07-14 A kind of sponge urban road rain infiltration system and its construction method

Country Status (1)

Country Link
CN (1) CN106192665B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759825A (en) * 2016-12-14 2017-05-31 浙江建设职业技术学院 A kind of construction method of sponge urban green space water storage system
CN107044150A (en) * 2017-03-16 2017-08-15 浙江水利水电学院 A kind of urban road rainwater penetration system and its construction method
CN107100227A (en) * 2017-04-26 2017-08-29 贵州建工集团第建筑工程有限责任公司 A kind of pergola on the city road LID biologies are detained ditch construction method
CN107237390A (en) * 2017-06-26 2017-10-10 江苏中路交通科学技术有限公司 A kind of highway curve section Quick drainage structure
CN107288032A (en) * 2017-08-10 2017-10-24 温州市华昌建设有限公司 A kind of municipal bridge drainage system and construction method
CN109565987A (en) * 2019-01-16 2019-04-05 安徽工程大学 A kind of chiltern alkaline land soil prosthetic device and its restorative procedure
CN111794455A (en) * 2020-07-16 2020-10-20 温州泰乐维工程设计有限公司 Novel water storage structure for sponge city
CN112056109A (en) * 2020-07-23 2020-12-11 浙江同济科技职业学院 A rainwater greening automatic irrigation device and its construction method
CN115341636A (en) * 2022-08-16 2022-11-15 杭州富宇泽环保科技有限公司 Rain and sewage diversion equipment based on nesting principle
CN116122091A (en) * 2023-02-02 2023-05-16 浙江振鸿建设有限公司 Sponge urban road system

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759825A (en) * 2016-12-14 2017-05-31 浙江建设职业技术学院 A kind of construction method of sponge urban green space water storage system
CN106759825B (en) * 2016-12-14 2020-04-10 浙江建设职业技术学院 Construction method of sponge urban green land water storage system
CN107044150B (en) * 2017-03-16 2019-04-26 浙江水利水电学院 A kind of urban road rainwater penetration system and its construction method
CN107044150A (en) * 2017-03-16 2017-08-15 浙江水利水电学院 A kind of urban road rainwater penetration system and its construction method
CN107100227A (en) * 2017-04-26 2017-08-29 贵州建工集团第建筑工程有限责任公司 A kind of pergola on the city road LID biologies are detained ditch construction method
CN107100227B (en) * 2017-04-26 2019-07-09 贵州建工集团第一建筑工程有限责任公司 A kind of pergola on the city road LID biology delay ditch construction method
CN107237390A (en) * 2017-06-26 2017-10-10 江苏中路交通科学技术有限公司 A kind of highway curve section Quick drainage structure
CN107288032A (en) * 2017-08-10 2017-10-24 温州市华昌建设有限公司 A kind of municipal bridge drainage system and construction method
CN109565987A (en) * 2019-01-16 2019-04-05 安徽工程大学 A kind of chiltern alkaline land soil prosthetic device and its restorative procedure
CN109565987B (en) * 2019-01-16 2021-08-27 安徽工程大学 Sandy saline-alkali soil remediation device and remediation method thereof
CN111794455A (en) * 2020-07-16 2020-10-20 温州泰乐维工程设计有限公司 Novel water storage structure for sponge city
CN112056109A (en) * 2020-07-23 2020-12-11 浙江同济科技职业学院 A rainwater greening automatic irrigation device and its construction method
CN115341636A (en) * 2022-08-16 2022-11-15 杭州富宇泽环保科技有限公司 Rain and sewage diversion equipment based on nesting principle
CN116122091A (en) * 2023-02-02 2023-05-16 浙江振鸿建设有限公司 Sponge urban road system
CN116122091B (en) * 2023-02-02 2023-09-15 浙江振鸿建设有限公司 Sponge urban road system

Also Published As

Publication number Publication date
CN106192665B (en) 2019-03-08

Similar Documents

Publication Publication Date Title
CN106192665B (en) A kind of sponge urban road rain infiltration system and its construction method
CN106759825B (en) Construction method of sponge urban green land water storage system
CN111255011A (en) Sponge city drainage and seepage structure and rainwater collection and utilization system and its working method
CN105297872A (en) LID type city rainwater closed conduit with functions of water permeating, storing, purifying and draining
CN208563522U (en) A kind of side slope riding track Rainwater collection system
CN106759781A (en) A kind of intelligent city rainwater regulating pondage system and its construction method
CN106045214A (en) Rain water system for building districts of sponge cities and construction method of rain water system
CN107989153A (en) A kind of novel construction method for building sponge city
CN108612173A (en) A kind of intelligent biological delay tank and its construction method
CN109989474A (en) A kind of construction method of rain water collecting system
CN106717413B (en) Sponge urban greening irrigation system and construction method thereof
CN103266633A (en) Seepage-proof sewage discharging and floodwater draining method for tailing reservoir in wet metallurgy
CN211112989U (en) Intelligent water collecting and draining system applied to sponge city
CN205224230U (en) LID type urban rainwater oozes and holds clean drainage closed conduit
CN106368288A (en) Shallow disc type moniliform wave type water-cutting off and drainage system for refuse dump
CN206545257U (en) A kind of novel greening band water storage structure
CN206503215U (en) A kind of ecological collection rain structure suitable for low side slope
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN113700111A (en) Construction method of rainwater permeation, drainage and reuse integrated system
CN208501715U (en) A kind of Rain Garden
CN202323906U (en) Assembly type culvert component
CN116267075A (en) A rapid desalination system before planting green plants in estuary with sand blown into embankments
CN109024147A (en) Shoal water source comprehensive cyclic utilization system and its construction method
CN109403451B (en) Large water storage system for drinking water of people and livestock in hillock-like depressions and implementation method thereof
CN111827198A (en) Construction method for central control water replacement and filling in tidal lake water environment ecological restoration

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xu Yufeng

Inventor after: Yan Mi

Inventor after: Zhou Weibo

Inventor after: Chen Chuan

Inventor before: Liu Xueying

Inventor before: Li Guobiao

Inventor before: Dong Yining

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170731

Address after: 323500, Fenghuang Road, Hongxing street, Jingning County, Zhejiang Province, 198

Applicant after: Zhejiang Jing Chang Construction Co., Ltd.

Address before: Hangzhou City, Zhejiang province 310018 Xiasha Higher Education Institutions in East Street No. 508

Applicant before: Zhejiang University of Water Resources and Electric Power

GR01 Patent grant
GR01 Patent grant