CN108385602B - It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method - Google Patents

It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method Download PDF

Info

Publication number
CN108385602B
CN108385602B CN201810201603.6A CN201810201603A CN108385602B CN 108385602 B CN108385602 B CN 108385602B CN 201810201603 A CN201810201603 A CN 201810201603A CN 108385602 B CN108385602 B CN 108385602B
Authority
CN
China
Prior art keywords
markstone
partly
plate
bank slope
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810201603.6A
Other languages
Chinese (zh)
Other versions
CN108385602A (en
Inventor
秦鹏
毛前
周建芬
胡建永
谢锋
陈晓东
郑安心
程春梅
徐蔚
王海波
李海涛
秦植海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201810201603.6A priority Critical patent/CN108385602B/en
Publication of CN108385602A publication Critical patent/CN108385602A/en
Application granted granted Critical
Publication of CN108385602B publication Critical patent/CN108385602B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • E02B1/02Hydraulic models
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/123Flexible prefabricated covering elements, e.g. mats, strips mainly consisting of stone, concrete or similar stony material

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Electromagnetic Pumps, Or The Like (AREA)

Abstract

The present invention provides a kind of slope protection effect of energy dissipation experimental rigs of partly layinging of markstone, by glass flume, bottom cushion block one, bottom cushion block two, water pipe, pipeline pump, flap gate, hinged shaft, cross bar slot, bank slope plate, cross bar, pedestal, partly laying of markstone, shaft, vertical plate, short axle hole, cant board, short axle, pulling plate, connecting plate, crossbeam, lead screw, runner, support, positive stop, backstop, lead screw hole composition, use slope protection effect of energy dissipation test device of partly layinging of markstone of the invention, lower experimentation cost can be used, it completes partly to laying of markstone and be tested with bank slope plate at the energy dissipating of various angles, obtain the image data of a large amount of effect of energy dissipation tests, it is preferred that going out, effect of energy dissipation is best partly to laying of markstone and bank slope plate angle, Practical Project is instructed to use;The present apparatus is applicable not only to partly bury block stone, is equally applicable to partly bury concrete block, partly buries and turn round the various energy-dissipating materials such as king's word.

Description

It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method
Technical field
The invention belongs to hydraulic engineering technical field, specifically a kind of partly laying of markstone and makes slope protection effect of energy dissipation experimental rig Use method.
Background technique
With the development of national economy, land usable land resource day is becoming tight, and constrains local warp to a certain extent The development of Ji, the Tidal Flat Resources that coastal area possesses are abundant, want soil, exploitation Tidal Flat Resources to ocean, it has also become alleviate soil The inevitable choice of resource anxiety;Tidal Flat Reclamation is firstly the need of construction sea wall, and sea wall needs stronger capacity of anti-storm, to prevent Only during typhoon stormy waves get over after dike to the extensive erosion for soil of holding one's breath after dike or billow rush to sea wall on dykes and dams property and Facility damages, therefore sea wall meets extra large slope surface must build medicining wave structure, and the now widely used concrete for having cementing material fills Building block stone, cemented rock structure turn round king's block etc., have the concrete of cementing material to fill building block stone, cemented rock structure, due to building stones four Zhou Jun fills cementing material (concrete or mortar), and volume accounting of the cementing material in masonry is generally 40%~60%, although knot Structure globality is preferable, but cementing material dosage is big, the at high cost and unrestrained performance that disappears is poor, and wind and wave resistance impact capacity is not high;Applicant's needle Have developed Chinese patent to such case: 106638627 A of CN a kind of half fills the stone facing structure of concrete, CN 106930299 A kind of concrete of A half fills block stone construction method, and cementing material dosage is greatly reduced, reduces cost, substantially increase bank slope Wind and wave resistance impact capacity, however since its engineer application time is short, experience is insufficient, half fills that concrete stone-laying is much with slope surface angle to be Preferably, half filling concrete stone-laying and the much effect of energy dissipation best values of slope surface angle must do further further investigation.
Summary of the invention
In order to solve the above technical problems existing in the prior art, the present invention provides a kind of slope protection energy dissipating effects of partly layinging of markstone Fruit experimental rig, by glass flume, bottom cushion block one, bottom cushion block two, water pipe, pipeline pump, flap gate, hinged shaft, cross bar slot, Bank slope plate cross bar, pedestal, partly layings of markstone, shaft, vertical plate, short axle hole, cant board, short axle, pulling plate, connecting plate, crossbeam, lead screw, turns Wheel, support, positive stop, backstop, lead screw hole composition, it is characterised in that: the bottom cushion block one, bottom cushion block two are solid respectively It is scheduled on glass flume bottom plate, water pipe one end is connected to glass flume and is fixedly installed with glass flume, and the water pipe other end is in glass Glass sink back upper place is fixedly installed pipeline pump above water pipe;Flap gate is hinged by hinged shaft and bottom cushion block two;Bath of glass Slot side opens up cross bar slot, and cross bar can be placed in cross bar slot, and bank slope plate two sides and glass flume two sidewalls are fixedly installed.
Further, the pedestal and partly to laying of markstone by concreting be an entirety, shaft and pedestal are fixedly installed Together;Vertical plate and shaft are fixedly installed, and vertical plate top opens up short axle hole, and pulling plate is hinged by short axle and vertical plate;Cant board is logical It crosses connecting plate and bank slope plate is fixedly installed;Crossbeam both ends are fixedly installed respectively at pulling plate upper end;Lead screw sequentially passes through on support Lead screw hole and crossbeam, positive stop and backstop are located at front side and the rear side of crossbeam;Positive stop, backstop runner and lead screw are solid Fixed setting, support are fixed on bank slope plate;Six row pedestals are set on bank slope plate, are arranged nine on odd-numbered line pedestal from top to bottom It is a partly laying of markstone, setting eight and half is laying of markstone on even number line pedestal.
Further, it partly layings of markstone the application method of slope protection effect of energy dissipation experimental rig, comprising the following steps:
The first step, by cant board, crossbeam, partly laying of markstone, whole components such as support are mounted on bank slope plate, record partly laying of markstone with Bank slope plate angle;
Second step fixes bank slope plate by the practical bank slope gradient of engineering design requirements;
Third step lifts flap gate, and cross bar is put into cross bar slot, and flap gate top leans against on cross bar;
4th step fills water at glass flume rear portion, is filled in glass flume front high together with bottom cushion block;
5th step lifts cross bar, and flap gate turns over before hinged shaft, and wave is formed in glass guide channel;
6th step shoots with video-corder the image that wave passes through bank slope plate process in Transverse to the flow direction with video camera;
7th step, lifts flap gate, and cross bar is put into cross bar slot, and flap gate top leans against on cross bar;
8th step opens pipeline pump, and the water of glass flume front is pumped into glass flume rear portion, until glass flume front Until water is high together with bottom cushion block;
9th step repeats the 5th step to the 8th step, acquires test of many times image;
Tenth step is partly laying of markstone and the first the angle off-test of bank slope plate;
11st step, rotating wheel are partly laying of markstone and are changed with bank slope plate angle by lead screw, pulling plate driving;
12nd step repeats the 5th step to the 8th step, acquires test of many times image, partly layings of markstone and second of angle of bank slope plate Off-test;
13rd step, and so on, the available test image data partly laying of markstone with the various angles of bank slope plate;
14th step, comprehensive analysis total Test image data are found out best partly the layinging of markstone of effect of energy dissipation and are pressed from both sides with bank slope plate Angle instructs Practical Project to use.
The invention has the advantages that lower experimentation cost can be used, completion is partly laying of markstone with bank slope plate into various angles Energy dissipating test, obtain the image data of a large amount of effect of energy dissipation test, therefrom can be optimized effect of energy dissipation it is best partly laying of markstone with Bank slope plate angle, instructs Practical Project to use;Partly layinging of markstone in the present apparatus cover partly bury block stone partly bury concrete block, partly bury turn round king The various energy dissipating block materials such as word.
Detailed description of the invention
Fig. 1 is slope protection effect of energy dissipation test device test of partly layinging of markstone, schematic diagram when wave passes through Slope protection plate;
Fig. 2 is the ready schematic diagram of the device;
Fig. 3 be the device partly laying of markstone inclination angle change after ready schematic diagram;
Relation schematic diagram that Fig. 4 is the device pedestal and odd number is partly laying of markstone;
Fig. 5 be the device pedestal, odd number partly laying of markstone, the components relation schematic diagram such as cant board;
Fig. 6 be the device pedestal, even number partly laying of markstone, the components relation schematic diagram such as cant board;
Fig. 7 is each component relation schematic diagram of the device;
Fig. 8 is each component of the device and bank slope plate relation schematic diagram;
Fig. 9 is that A-A section is intended to;
Figure 10 is the device seat schematic diagram.
The present invention will be further explained below with reference to the attached drawings.
As Figure 1-10 shows, slope protection effect of energy dissipation experimental rig of partly layinging of markstone of the invention, by glass flume 1, bottom cushion block One 2, bottom cushion block 23, water pipe 4, pipeline pump 5, flap gate 6, hinged shaft 7, cross bar slot 8, bank slope plate 9, cross bar 10, pedestal 11, It partly layings of markstone 12, shaft 13, vertical plate 14, short axle hole 15, cant board 16, short axle 17, pulling plate 18, connecting plate 19, crossbeam 20, lead screw 21, runner 22, support 24, positive stop 25, backstop 26, lead screw hole 27 form, the bottom cushion block 1, bottom cushion block 23 It is separately fixed on 1 bottom plate of glass flume, 4 one end of water pipe is connected to glass flume 1 and is fixedly installed with glass flume 1, water pipe 4 The other end is fixedly installed pipeline pump 5 in 1 back upper place of glass flume, water pipe 4 above;Flap gate 6 passes through hinged shaft 7 and bottom Cushion block 23 is hinged;1 side of glass flume opens up cross bar slot 8, and cross bar 10 can be placed in cross bar slot 8,9 two sides of bank slope plate and glass The fixed setting of 1 two sidewalls of glass sink.
The pedestal 11 and partly to laying of markstone 12 by concreting be an entirety, shaft 13 is fixed at pedestal 11 Together;Vertical plate 14 and shaft 13 are fixedly installed, and 14 top of vertical plate opens up short axle hole 15, and pulling plate 18 is cut with scissors by short axle 17 and vertical plate 14 It connects;Cant board 16 is fixedly installed by connecting plate 19 and bank slope plate 9;20 both ends of crossbeam are fixedly installed respectively at pulling plate 18;Lead screw 21 sequentially pass through lead screw hole 27 and crossbeam 20 on support 24, positive stop 25 and backstop 26 be located at crossbeam 20 front side and Rear side;Positive stop 25,26 runner 22 of backstop are fixedly installed with lead screw 21, and support 24 is fixed on bank slope plate 9;Bank slope plate Six row pedestals 11 are set on 9, and setting nine and half layings of markstone and is arranged eight on 12, even number line pedestal 11 on odd-numbered line pedestal 11 from top to bottom It is a partly to laying of markstone 12.
Slope protection effect of energy dissipation experimental rig of partly layinging of markstone uses according to the following steps:
The first step, by cant board, crossbeam, partly laying of markstone, whole components such as support are mounted on bank slope plate, record partly laying of markstone with Bank slope plate angle;
Second step fixes bank slope plate by the practical bank slope gradient of engineering design requirements;
Third step lifts flap gate, and cross bar is put into cross bar slot, and flap gate top leans against on cross bar;
4th step fills water at glass flume rear portion, is filled in glass flume front high together with bottom cushion block;
5th step lifts cross bar, and flap gate turns over before hinged shaft, and wave is formed in glass guide channel;
6th step shoots with video-corder the image that wave passes through bank slope plate process in Transverse to the flow direction with video camera;
7th step, lifts flap gate, and cross bar is put into cross bar slot, and flap gate top leans against on cross bar;
8th step opens pipeline pump, and the water of glass flume front is pumped into glass flume rear portion, until glass flume front Until water is high together with bottom cushion block;
9th step repeats the 5th step to the 8th step, acquires test of many times image;
Tenth step is partly laying of markstone and the first the angle off-test of bank slope plate;
11st step, rotating wheel are partly laying of markstone and are changed with bank slope plate angle by lead screw, pulling plate driving;
12nd step repeats the 5th step to the 8th step, acquires test of many times image, partly layings of markstone and second of angle of bank slope plate Off-test;
13rd step, and so on, the available test image data partly laying of markstone with the various angles of bank slope plate;
14th step, comprehensive analysis total Test image data are found out best partly the layinging of markstone of effect of energy dissipation and are pressed from both sides with bank slope plate Angle instructs Practical Project to use.

Claims (2)

  1. The slope protection effect of energy dissipation experimental rig 1. one kind is partly laying of markstone, by glass flume (1), bottom cushion block one (2), bottom cushion block two (3), water pipe (4), pipeline pump (5), flap gate (6), hinged shaft (7), cross bar slot (8), bank slope plate (9), cross bar (10), pedestal (11), it partly layings of markstone (12), shaft (13), vertical plate (14), short axle hole (15), cant board (16), short axle (17), pulling plate (18), connect Fishplate bar (19), crossbeam (20), lead screw (21), runner (22), support (24), positive stop (25), backstop (26), lead screw hole (27) Composition, it is characterised in that: the bottom cushion block one (2), bottom cushion block two (3) are separately fixed on glass flume (1) bottom plate, Water pipe (4) one end is connected to glass flume (1) and is fixedly installed with glass flume (1), and water pipe (4) other end is in glass flume (1) back upper place, water pipe (4) are fixedly installed pipeline pump (5) above;Flap gate (6) passes through hinged shaft (7) and bottom cushion block two (3) hinged;Glass flume (1) side opens up cross bar slot (8), and cross bar (10) is placed in cross bar slot (8), bank slope plate (9) two sides It is fixedly installed with glass flume (1) two sidewalls;The pedestal (11) and partly laying of markstone (12) by concreting be an entirety, Shaft (13) and pedestal (11) are fixedly installed together;Vertical plate (14) and shaft (13) are fixedly installed, and vertical plate (14) top opens up Short axle hole (15), pulling plate (18) are hinged by short axle (17) and vertical plate (14);Cant board (16) passes through connecting plate (19) and bank slope Plate (9) fixed setting;Crossbeam (20) both ends are fixedly installed with pulling plate (18) upper end respectively;Lead screw (21) sequentially passes through support (24) On lead screw hole (27) and crossbeam (20), positive stop (25) and backstop (26) be located at front side and the rear side of crossbeam (20); Positive stop (25), backstop (26), runner (22) and lead screw (21) are fixedly installed, and support (24) is fixed at bank slope plate (9) On;Six row pedestals (11) are set on bank slope plate (9), and setting nine and half layings of markstone (12), is even on odd-numbered line pedestal (11) from top to bottom (12) are laying of markstone in setting eight and half on several rows of pedestals (11).
  2. 2. a kind of application method using slope protection effect of energy dissipation experimental rig of partly layinging of markstone as described in claim 1, feature exist In: include the following steps;
    The first step, by cant board (16), crossbeam (20), partly laying of markstone (12), the whole components of support (24) are mounted on bank slope plate (9) On, record partly laying of markstone (12) and bank slope plate (9) angle;
    Second step fixes bank slope plate (9) by the practical bank slope gradient of engineering design requirements;
    Third step lifts flap gate (6), is put into cross bar slot (8) cross bar (10), and flap gate (6) top leans against cross bar (10) on;
    4th step fills water at glass flume (1) rear portion, is filled in glass flume (1) front same with bottom cushion block one (2) It is high;
    5th step lifts cross bar (10), and flap gate (6) turns over before hinged shaft (7), and wave is formed in glass guide channel;
    6th step shoots with video-corder the image that wave passes through bank slope plate (9) process in Transverse to the flow direction with video camera;
    7th step lifts flap gate (6), is put into cross bar slot (8) cross bar (10), and flap gate (6) top leans against cross bar (10) on;
    8th step is opened pipeline pump (5), the water of glass flume (1) front is pumped into glass flume (1) rear portion, until glass flume (1) until the water of front is with bottom cushion block one (2) with height;
    9th step repeats the 5th step to the 8th step, acquires test of many times image;
    Tenth step, partly laying of markstone (12) and bank slope plate (9) the first angle off-test;
    11st step, rotating wheel (22) drive partly laying of markstone (12) and bank slope plate (9) angle by lead screw (21), pulling plate (18) Change;
    12nd step, repeat the 5th step to the 8th step, acquire test of many times image, partly laying of markstone (12) with second of bank slope plate (9) Angle off-test;
    13rd step, and so on, the test image data of available partly laying of markstone (12) and bank slope plate (9) various angles;
    14th step, comprehensive analysis total Test image data find out effect of energy dissipation best partly laying of markstone (12) and bank slope plate (9) Angle instructs Practical Project to use.
CN201810201603.6A 2018-03-12 2018-03-12 It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method Active CN108385602B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810201603.6A CN108385602B (en) 2018-03-12 2018-03-12 It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810201603.6A CN108385602B (en) 2018-03-12 2018-03-12 It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method

Publications (2)

Publication Number Publication Date
CN108385602A CN108385602A (en) 2018-08-10
CN108385602B true CN108385602B (en) 2019-10-29

Family

ID=63067500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810201603.6A Active CN108385602B (en) 2018-03-12 2018-03-12 It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method

Country Status (1)

Country Link
CN (1) CN108385602B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510167A (en) * 2016-02-03 2016-04-20 山东大学 Water erosion characteristic testing device and method for geotextile slope protection
CN105756011A (en) * 2016-04-22 2016-07-13 浙江省水利河口研究院 Tidal bore tide head generating device for indoor physical model experiments
CN106596897A (en) * 2017-01-18 2017-04-26 河海大学 Test device and method for measuring slope fixation effects and water absorption performances of reinforced plant soil
CN107326857A (en) * 2017-05-18 2017-11-07 中山大学 The wave absorption model and experimental system of multiple continuous slope climbing type wave absorption plates of variable-angle

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10180547B2 (en) * 2012-02-23 2019-01-15 Taiwan Semiconductor Manufacturing Company, Ltd. Optical bench on substrate

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510167A (en) * 2016-02-03 2016-04-20 山东大学 Water erosion characteristic testing device and method for geotextile slope protection
CN105756011A (en) * 2016-04-22 2016-07-13 浙江省水利河口研究院 Tidal bore tide head generating device for indoor physical model experiments
CN106596897A (en) * 2017-01-18 2017-04-26 河海大学 Test device and method for measuring slope fixation effects and water absorption performances of reinforced plant soil
CN107326857A (en) * 2017-05-18 2017-11-07 中山大学 The wave absorption model and experimental system of multiple continuous slope climbing type wave absorption plates of variable-angle

Also Published As

Publication number Publication date
CN108385602A (en) 2018-08-10

Similar Documents

Publication Publication Date Title
WO2022021586A1 (en) Water tank test system for simulating multi-field coupling effect of offshore structure
Batmaz Cindere dam–107 m high roller compacted hardfill dam (RCHD) in Turkey
Ng et al. A case study of hydraulic fracturing using finite element methods
Liam Finn et al. Response of seafloor to ocean waves
Petaccia et al. The collapse of the Sella Zerbino gravity dam
CN108385602B (en) It partly layings of markstone slope protection effect of energy dissipation experimental rig and application method
CN117494478A (en) Calculation method for simulating over-roof dam break flow and break evolution process of core dam
CN100359102C (en) Permeable soil keeping wall and its use
CN103938590A (en) Tide sand protection dike
Rashiddel et al. Seismic analysis of segmental shallow tunnels adjacent to building foundations under soil liquefaction and its mitigation
CN113958324B (en) Method for grouting and reinforcing deep drilling of roadway bottom plate
CN100543250C (en) A kind of composite shock insulation layer
CN105507210A (en) Small-angle and long-slope-surface steel panel assembly type steel structured dam
CN221235980U (en) Flood control dykes and dams that prevent soil and stone from collapsing
Grindheim et al. Full-scale pullout tests of rock anchors in limestone testing rock mass uplift failure
CN205276220U (en) Long domatic steel panel assemble formula steel of low -angle constructs dam
CN220058019U (en) Anti-slide pile structure
Roth et al. Analyzing the seismic performance of wharves, part 2: SSI analysis with non-linear, effective-stress soil models
Jahed Orang Experimental Evaluation of Helical Piles for Underpinning Shallow Foundations on Soils Susceptible to Liquefaction using Shake Table Tests
Wieland et al. Potentially Active Faults In The Foundations Of Large Dams Part II: Design Aspects Of Dams To Resist Fault Movements
CN108398234B (en) Damaged tire slope protection effect of energy dissipation test device and test method
CN207846465U (en) A kind of water and soil conservation wall
Orang Experimental Evaluation of Helical Piles for Underpinning Shallow Foundations on Soils Susceptible to Liquefaction using Shake Table Tests
Bruce et al. Sealing cracks in concrete dams to provide structural stability
CN203462468U (en) Large-diameter anti-floating anchor applied under geological condition of abundant underground water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant