CN107421577B - Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition - Google Patents

Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition Download PDF

Info

Publication number
CN107421577B
CN107421577B CN201710818587.0A CN201710818587A CN107421577B CN 107421577 B CN107421577 B CN 107421577B CN 201710818587 A CN201710818587 A CN 201710818587A CN 107421577 B CN107421577 B CN 107421577B
Authority
CN
China
Prior art keywords
test
water
bioretention
area
rainfall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710818587.0A
Other languages
Chinese (zh)
Other versions
CN107421577A (en
Inventor
顾盛
杨飞凯
崔咏军
傅大放
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dongnan Sponge Facility Performance Assessment Co ltd
KUNSHAN CONSTRUCT ENGINEERING QUALITY TESTING CENTER
Southeast University
Original Assignee
Jiangsu Dongnan Sponge Facility Performance Assessment Co ltd
KUNSHAN CONSTRUCT ENGINEERING QUALITY TESTING CENTER
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Dongnan Sponge Facility Performance Assessment Co ltd, KUNSHAN CONSTRUCT ENGINEERING QUALITY TESTING CENTER, Southeast University filed Critical Jiangsu Dongnan Sponge Facility Performance Assessment Co ltd
Priority to CN201710818587.0A priority Critical patent/CN107421577B/en
Publication of CN107421577A publication Critical patent/CN107421577A/en
Application granted granted Critical
Publication of CN107421577B publication Critical patent/CN107421577B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses a test device for simulating comprehensive effectiveness of a biological detention pond under natural rainfall conditions, which comprises a test bed and a test barrel placement area, wherein the test bed is of a double-layer bed surface structure and comprises a water seepage plate and a water collection plate, the water collection plate is arranged below the water seepage plate, a plurality of water seepage holes are further formed in the surface of the water seepage plate, an outer baffle plate is arranged on the periphery of the water seepage plate and matched with the outer baffle plate to form a confluence space, a movable separation assembly is arranged in the confluence space, the movable separation assembly separates the confluence space into a water collection area and a drainage area, a plurality of confluence drainage openings are formed in one side of the outer baffle plate corresponding to the water collection area, one side of the confluence drainage openings is provided with the test barrel placement area, and an artificial rainfall assembly is arranged above the test barrel placement area and the water seepage plate. The invention can be used for simulating the comprehensive efficiency of the biological detention pond under the natural rainfall condition, carrying out quantitative analysis, providing basis for the establishment of the sponge city construction scheme, and has the advantages of low preparation cost, convenient installation and disassembly, strong operability and wide application range.

Description

一种模拟自然降雨条件下生物滞留池综合效能的试验装置A test device for the comprehensive efficiency of bioretention ponds under simulated natural rainfall conditions

技术领域technical field

本发明涉及海绵城市建设技术领域,具体涉及一种模拟自然降雨条件下生物滞留池综合效能的试验装置。The invention relates to the technical field of sponge city construction, in particular to a test device for simulating the comprehensive efficiency of biological retention ponds under natural rainfall conditions.

背景技术Background technique

海绵城市是一种全新的城市建设理念,其遵循生态优先的原则,将自然途径与人工措施相结合,在确保城市排水防涝安全的前提下,建设自然积存、自然渗透、自然净化的海绵城市,最大限度地实现雨水在城市区域的积存、促进雨水资源的利用和生态环境保护。生物滞留池是海绵城市建设中用于处理径流雨水,错峰缓排的一项关键技术。我国对于生物滞留池的研究起步较晚,照搬国外的研究成果存在适应性不足,成本过高等诸多问题,我们迫切需要进行生物滞留池的相关本土化研究,然而现有的用于生物滞留池综合效能研究的试验装置存在诸多缺陷。Sponge city is a brand-new urban construction concept. It follows the principle of ecological priority, combines natural approaches with artificial measures, and builds a sponge city with natural accumulation, natural infiltration, and natural purification under the premise of ensuring the safety of urban drainage and waterlogging. , to maximize the accumulation of rainwater in urban areas, promote the utilization of rainwater resources and the protection of the ecological environment. Bioretention ponds are a key technology for treating runoff rainwater and staggering peak discharge in the construction of sponge cities. The research on bioretention tanks in my country started relatively late, and there are many problems such as insufficient adaptability and high cost when copying foreign research results. We urgently need to carry out relevant localization research on bioretention tanks. There are many deficiencies in the experimental device for efficacy research.

现有的埋地式试验装置是模拟现场在路边绿化带设置生物滞留试验池,并在道路上用分隔条划分汇水区,由于生物滞留试验池加上配套的汇水区域面积较大,使用人工降雨装置很难覆盖整个试验区,只有天然降雨时才能进行试验,而实际降雨可控性差,试验精度不足,试验效率低;池体埋入地下,后期对植物根系生长的观测以及填料取样分析难度大,同时汇水面积与滞留池表面积比值一旦确定,后期很难再改变,灵活性不足;再则,对于已经建成的埋地式生物滞留试验池来说,更换填料也极其不便,开展对照试验难度大。The existing buried test device is to set up a bioretention test pool in the roadside green belt on the simulated site, and divide the catchment area with a divider on the road. Because the area of the bioretention test pool and the matching catchment area is relatively large, It is difficult to cover the entire test area with artificial rainfall devices, and the test can only be carried out during natural rainfall, but the controllability of actual rainfall is poor, the test accuracy is insufficient, and the test efficiency is low; the pool is buried in the ground, and the observation of plant root growth and sampling of fillers in the later stage The analysis is difficult, and at the same time, once the ratio of the catchment area to the surface area of the retention tank is determined, it is difficult to change it later, and the flexibility is insufficient; moreover, for the buried bioretention test tanks that have been built, it is extremely inconvenient to replace the filler. Controlled trials are difficult.

现有的地上式试验装置是在地面上设置生物滞留试验桶并配以模拟降雨装置,并未设置实际的汇水区,模拟降雨装置是通过增压装置和人工控制阀门的开启度来控制降雨的大小,而模拟汇水区产生的径流则是按照一定汇水面积以及径流系数计算出单位时间内的径流量,然后折算成降雨量,通过喷淋装置直接进入生物滞留池,喷淋雨强并不是实际降雨强度,且实际情况下降雨开始后存在一定的产流时间和汇水时间,导致试验模拟的降雨径流过程线与实际情况存在较大的差异;极少数试验装置设置有汇水板(槽),但是其面积仍然是确定值,且没有考虑汇水区的下渗因素,操作性有限。The existing above-ground test device is to set up a bioretention test tank on the ground and equipped with a simulated rainfall device, without setting up an actual catchment area. The simulated rainfall device controls the rainfall by means of a pressurization device and the opening degree of the manual control valve. The size of the runoff in the simulated catchment area is based on a certain catchment area and runoff coefficient to calculate the runoff per unit time, and then convert it into rainfall, and directly enter the bioretention pond through the sprinkler device. It is not the actual rainfall intensity, and there is a certain runoff time and water collection time after the rain starts in the actual situation, resulting in a large difference between the simulated rainfall runoff process line and the actual situation; very few test devices are equipped with catchment plates (trough), but its area is still a definite value, and the infiltration factor of the catchment area is not considered, so its operability is limited.

另外,现有的试验装置大多无法同时进行多组试验,比如研究同一场降雨事件下,不同过滤层填料、不同汇水面积或不同植物类型对系统综合效能的影响,特别是研究降雨间歇期对系统综合效能影响的试验中,必须保证两场相邻降雨事件的降雨强度与降雨时间的同频性,使得待试验生物滞留桶(池) 在降雨间歇期中面对完全相同的外界条件,而现有装置操作起来难度较大。In addition, most of the existing test devices are unable to carry out multiple sets of tests at the same time, such as studying the effects of different filter layer fillers, different water catchment areas or different plant types on the overall performance of the system under the same rainfall event, especially to study the impact of rainfall intervals on In the test of the influence of system comprehensive efficiency, it is necessary to ensure that the rainfall intensity and rainfall time of two adjacent rainfall events are at the same frequency, so that the bioretention barrel (pool) to be tested faces exactly the same external conditions during the rainfall interval, while the current There are devices that are difficult to operate.

再则,实际工程中的路面两侧生物滞留池可能位于汇水区的两侧也可能位于汇水区的中间位置,生物滞留池与汇水区的相对位置不同,汇水区的产汇流特征也不同,对系统的综合效能也会产生影响。现有装置亦无法模拟不同汇流特征下生物滞留池的综合效能。Furthermore, in actual engineering, the bioretention ponds on both sides of the road surface may be located on both sides of the catchment area or in the middle of the catchment area. It is also different, and it will also have an impact on the overall performance of the system. Existing devices are also unable to simulate the comprehensive performance of bioretention tanks under different confluence characteristics.

发明内容Contents of the invention

本发明的目的在于克服现有技术存在的以上问题,提供一种模拟自然降雨条件下生物滞留池综合效能的试验装置,本发明可以用于模拟自然降雨条件下生物滞留池的综合效能,进行定量分析,为海绵城市建设方案的制定提供依据,且制备成本低廉,安装、拆卸方便,可操作性强,应用面广。The purpose of the present invention is to overcome the above problems existing in the prior art, and to provide a test device for the comprehensive performance of bioretention ponds under simulated natural rainfall conditions. The present invention can be used to simulate the comprehensive performance of bioretention ponds under natural rainfall conditions, and quantitative The analysis provides a basis for the formulation of the sponge city construction plan, and the preparation cost is low, the installation and disassembly are convenient, the operability is strong, and the application is wide.

为实现上述技术目的,达到上述技术效果,本发明通过以下技术方案实现:In order to achieve the above-mentioned technical purpose and achieve the above-mentioned technical effect, the present invention is realized through the following technical solutions:

一种模拟自然降雨条件下生物滞留池综合效能的试验装置,包括试验床、试验桶放置区和检测控制系统;A test device for simulating the comprehensive efficiency of bioretention tanks under natural rainfall conditions, including a test bed, a test bucket placement area and a detection and control system;

所述试验床为双层床面结构,所述双层床面结构包括渗水板和集水板,所述集水板设置在渗水板下方,所述渗水板表面还设置有若干渗水孔,所述渗水板的周边设置有外挡板并与外挡板配合形成汇流空间,所述试验桶放置区设置在外挡板一侧的外部,所述汇流空间内设置有活动分隔组件,所述活动分隔组件将汇流空间分隔为汇水区和排水区,所述外挡板位于汇水区和试验桶放置区之间的第一侧挡边上设置有若干具有开闭功能的汇流排水口,所述集水板上还设置有下渗排水口,所述下渗排水口上设置有下渗流量计;The test bed is a double-layer bed surface structure. The double-layer bed surface structure includes a water seepage plate and a water collection plate. The periphery of the seepage plate is provided with an outer baffle and cooperates with the outer baffle to form a confluence space. The test barrel placement area is set outside one side of the outer baffle, and a movable partition assembly is arranged in the confluence space. The movable partition The component divides the confluence space into a water catchment area and a drainage area. The outer baffle is located on the first side wall between the water catchment area and the test bucket placement area. Several confluence drains with opening and closing functions are provided. The water collecting plate is also provided with an infiltration outlet, and an infiltration flowmeter is arranged on the infiltration outlet;

所述试验桶放置区内设置有生物滞留试验桶,所述试验桶放置区与试验床上方设置有人工降雨组件,所述人工降雨组件上设置有进水流量计;A bioretention test barrel is provided in the test barrel placement area, an artificial rainfall assembly is arranged above the test barrel placement area and the test bed, and an inflow flow meter is arranged on the artificial rainfall assembly;

所述检测控制系统包括电脑、雨量控制仪、流量记录仪,所述进水流量计、下渗流量计与流量记录仪连接。The detection and control system includes a computer, a rainfall controller, and a flow recorder, and the inflow flowmeter and the infiltration flowmeter are connected to the flow recorder.

进一步的,所述渗水板表面均匀分隔为若干汇水单元,每个汇水单元上均设置有渗水孔,所述渗水孔内设置有软塞。Further, the surface of the water seepage plate is evenly divided into several water catchment units, each water catchment unit is provided with a water seepage hole, and a soft plug is arranged in the water seepage hole.

进一步的,所述外挡板位于第一侧挡边两侧的第二侧挡边和第三侧挡边上均设置有若干排水孔,所述排水孔靠近相邻汇水单元的夹角处设置,所述排水孔内也设置有软塞。Further, the outer baffle is provided with a number of drain holes on the second side rib and the third side rib on both sides of the first side rib, and the drain holes are close to the corners of adjacent water collection units Set, a soft plug is also arranged in the drain hole.

进一步的,所述活动分隔组件包括若干定位分隔柱和若干分隔插板,所述定位分隔柱外表面上均匀设置有四个第一卡槽,所述第一卡槽朝向相对应的外挡板内壁设置,所述第一卡槽相对应的外挡板内壁上还设置有第二卡槽,所述分隔插板设置在第一卡槽与第二卡槽之间或者设置在相邻两个定位分隔柱之间的第一卡槽之间。Further, the movable partition assembly includes several positioning partition columns and several partition inserts, four first slots are uniformly arranged on the outer surface of the positioning partition columns, and the first slots face the corresponding outer baffles The inner wall is set, and the inner wall of the outer baffle corresponding to the first card slot is also provided with a second card slot. The partition board is arranged between the first card slot and the second card slot or between two adjacent card slots. Position the dividers between the first card slots between the posts.

进一步的,所述第一卡槽底部和第二卡槽底部与渗水板之间均设置有避让流道。Further, escape channels are provided between the bottoms of the first and second clamping grooves and the seepage plate.

进一步的,所述人工降雨组件包括机架、喷淋装置、输水管道和增压装置,所述喷淋装置固定在机架上,检测控制系统中的雨量控制仪与增压装置连接,增压装置通过输水管道与喷淋装置连接,所述输水管道上设置有进水流量计。Further, the artificial rainfall assembly includes a frame, a sprinkler, a water pipeline and a booster, the sprinkler is fixed on the frame, and the rainfall controller in the detection and control system is connected to the booster to increase the The pressure device is connected with the spraying device through a water delivery pipeline, and a water inlet flow meter is arranged on the water delivery pipeline.

进一步的,所述渗水板与集水板均设置在支撑框架上,所述支撑框架底部设置有可调支脚。Further, both the seepage plate and the water collection plate are set on the support frame, and the bottom of the support frame is provided with adjustable feet.

进一步的,所述生物滞留试验桶设置在滑动推车上,所述生物滞留试验桶包括透明桶体,所述透明桶体内设置有试验填料,所述试验填料表面种有植物并设有植物生长观察尺,所述透明桶体侧边上设置有溢流孔和出水孔,所述溢流孔与溢流管连接,所述溢流管上设置有溢流流量计,所述出水孔与出水管连接,所述出水管上设置有出水流量计,所述溢流流量计和出水流量计与检测控制系统中的流量记录仪连接。Further, the bioretention test barrel is set on a sliding cart, and the bioretention test barrel includes a transparent barrel body, and a test filler is arranged in the transparent barrel body, and plants are planted on the surface of the test filler and are provided with plant growth An observation ruler, an overflow hole and a water outlet hole are arranged on the side of the transparent barrel body, the overflow hole is connected with an overflow pipe, an overflow flowmeter is arranged on the overflow pipe, and the water outlet hole is connected with the outlet The outlet pipe is connected with a water outlet flowmeter, and the overflow flowmeter and the outlet water flowmeter are connected with the flow recorder in the detection and control system.

进一步的,所述透明桶体外表面包覆有黑色海绵。Further, the outer surface of the transparent barrel is covered with a black sponge.

本发明的有益效果是:The beneficial effects of the present invention are:

1、本发明采用移动式生物滞留试验桶,可以准备不同填料、不同植物类型等若干生物滞留试验桶,试验时根据试验方案将相应生物滞留试验桶移动至试验区相应位置,可操作性强,方便灵活。1. The present invention adopts mobile bioretention test barrels, which can prepare several bioretention test barrels with different fillers and different plant types. During the test, the corresponding bioretention test barrels are moved to the corresponding positions in the test area according to the test plan, and the operability is strong. Convenient and flexible.

2、活动分隔组件将渗水板分隔为面积可调节的汇水区和排水区,降雨开始后,渗水板上的产流、汇流情况接近实际情况,可以进行不同汇水区面积与生物滞留池表面积比值的试验研究,对比不同汇水面积对生物滞留系统综合效能的影响;2. The movable partition component divides the seepage plate into catchment area and drainage area with adjustable area. After the rainfall starts, the flow generation and confluence on the seepage plate are close to the actual situation, and the area of different catchment area and the surface area of bioretention tank can be adjusted. Experimental study of the ratio, comparing the influence of different catchment areas on the comprehensive performance of the bioretention system;

3、渗水板上设有若干可开闭的渗水孔,通过开闭渗水孔调节试验床的径流系数,即通过开闭渗水孔的数量控制试验床的下渗量,可以模拟不同类型汇水区生物滞留池的综合效能,确定最合适的汇水面积与生物滞留池表面积的比值;3. There are several seepage holes that can be opened and closed on the seepage plate. The runoff coefficient of the test bed can be adjusted by opening and closing the seepage holes, that is, the infiltration amount of the test bed can be controlled by opening and closing the seepage holes, and different types of catchment areas can be simulated. Comprehensive efficiency of bioretention tanks, determine the most suitable ratio of catchment area to surface area of bioretention tanks;

4、本装置可以满足多个生物滞留试验桶同时进行试验,同一降雨条件下,可以避免因为时间差而带来的外界条件的影响,这样从第一场降雨结束到下一场降雨开始之间的间歇期,生物滞留试验桶面临的外界条件完全一样,其对试验的干扰亦可忽略;4. This device can meet the requirements of multiple bioretention test barrels to conduct tests at the same time. Under the same rainfall conditions, the influence of external conditions caused by time differences can be avoided, so that the time between the end of the first rainfall and the beginning of the next rainfall During the intermittent period, the external conditions faced by the bioretention test tank are exactly the same, and its interference to the test can also be ignored;

5、生物滞留试验桶可以设在汇水区内任意一个汇流排水口相对应的位置,贴近实际情况,可以模拟不同汇流特征下系统的综合效能,操作简单,数据真实可靠。5. The bioretention test tank can be set at the corresponding position of any confluence outlet in the catchment area, which is close to the actual situation and can simulate the comprehensive performance of the system under different confluence characteristics. The operation is simple and the data is true and reliable.

上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。本发明的具体实施方式由以下实施例及其附图详细给出。The above description is only an overview of the technical solution of the present invention. In order to understand the technical means of the present invention more clearly and implement it according to the contents of the description, the preferred embodiments of the present invention and accompanying drawings are described in detail below. The specific embodiment of the present invention is given in detail by the following examples and accompanying drawings.

附图说明Description of drawings

为了更清楚地说明本发明实施例技术中的技术方案,下面将对实施例技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following will briefly introduce the accompanying drawings that need to be used in the technical description of the embodiments. Obviously, the accompanying drawings in the following description are only some implementations of the present invention For example, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.

图1是本发明的整体结构示意图;Fig. 1 is the overall structural representation of the present invention;

图2是本发明的俯视结构示意图;Fig. 2 is a top view structural representation of the present invention;

图3是本发明的渗水板与集水板结构示意图;Fig. 3 is a structural schematic diagram of a water seepage plate and a water collecting plate of the present invention;

图4是本发明的活动分隔组件结构示意图;Fig. 4 is a schematic structural diagram of the movable partition assembly of the present invention;

图5是本发明模拟单向汇流时生物滞留池综合效能试验的结构示意图;Fig. 5 is the structural representation of bioretention tank comprehensive performance test when simulating one-way confluence of the present invention;

图6是本发明模拟双向汇流时生物滞留池综合效能试验的结构示意图;Fig. 6 is the structure schematic diagram of bioretention tank comprehensive performance test when simulating two-way confluence of the present invention;

图7是本发明模拟相同汇水面积、不同生物滞留试验桶同时试验的结构示意图。Fig. 7 is a structural schematic diagram of the present invention simulating the same catchment area and different bioretention test barrels for simultaneous testing.

图8是本发明模拟不同汇水面积、相同生物滞留试验桶同时试验的结构示意图。Fig. 8 is a structural schematic diagram of the present invention simulating different catchment areas and the same bioretention test barrel for simultaneous tests.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

参照图1至图4所示,一种模拟自然降雨条件下生物滞留池综合效能的试验装置,包括试验床111、试验桶放置区5和检测控制系统112;试验床用于接收试验雨水并区分汇流至试验桶放置区,以及将部分雨水以模拟下渗的方式排出;试验桶放置区内设置有生物滞留试验桶6,以接收汇流至试验桶放置区的雨水;检测控制系统112有效监测各部分雨水流入流出的数据;Referring to Figures 1 to 4, a test device for the comprehensive performance of bioretention tanks under simulated natural rainfall conditions includes a test bed 111, a test bucket placement area 5 and a detection and control system 112; the test bed is used to receive test rainwater and distinguish Converge to the test barrel placement area, and discharge part of the rainwater by simulating infiltration; the test barrel placement area is provided with a bioretention test barrel 6 to receive the rainwater converging to the test barrel placement area; the detection and control system 112 effectively monitors each Some rainwater inflow and outflow data;

其中,试验桶放置区与试验床上方设置有人工降雨组件7,人工降雨组件能够将雨水均匀的降至试验桶放置区与试验床区域内,人工降雨组件上设置有进水流量计8,记录降雨总量。Among them, the artificial rainfall assembly 7 is arranged above the test barrel placement area and the test bed, and the artificial rainfall assembly can drop the rainwater evenly into the test barrel placement area and the test bed area. total rainfall.

上述试验床为双层床面结构,双层床面结构包括渗水板1和集水板10,集水板设置在渗水板下方,渗水板表面还设置有若干渗水孔9,渗水板表面承接的部分雨水会通过渗水孔流向集水板,其中集水板具有储水功能,可以设置挡边;渗水板的周边设置有外挡板2并与外挡板配合形成汇流空间,雨水能够在汇流空间内导向汇聚并排向指定设计位置;试验桶放置区设置在外挡板一侧的外部,汇流空间内设置有活动分隔组件3,活动分隔组件将汇流空间分隔为汇水区和排水区,排水区的雨水直接排出即可,汇水区的雨水待用;外挡板位于汇水区和试验桶放置区之间的第一侧挡边上设置有若干具有开闭功能的汇流排水口4,汇流排水口是将试验床上的雨水排入生物滞留试验桶的途径;集水板上还设置有下渗排水口11,下渗排水口上设置有下渗流量计12,通过渗水孔下落的雨水能够进行收集和测量,模拟地面下渗的情况;The above-mentioned test bed is a double-layer bed surface structure. The double-layer bed surface structure includes a water seepage plate 1 and a water collection plate 10. The water collection plate is arranged under the water seepage plate. A number of water seepage holes 9 are also arranged on the surface of the water seepage plate. Part of the rainwater will flow to the water collecting plate through the seepage hole, wherein the water collecting plate has the function of water storage, and a retaining edge can be set; the periphery of the water seepage plate is provided with an outer baffle 2 and cooperates with the outer baffle to form a confluence space, and the rainwater can flow in the confluence space The inner guide converges and arranges to the designated design position; the test barrel placement area is set outside one side of the outer baffle, and the movable partition component 3 is arranged in the confluence space, and the movable partition component divides the confluence space into a catchment area and a drainage area. The rainwater can be discharged directly, and the rainwater in the catchment area is for use; the outer baffle is located on the first side wall between the catchment area and the test barrel placement area, and several confluence drains 4 with opening and closing functions are arranged, and the confluence drainage The outlet is the way to discharge the rainwater on the test bed into the bioretention test bucket; the water collecting plate is also provided with an infiltration outlet 11, and an infiltration flow meter 12 is arranged on the infiltration outlet, so that the rainwater falling through the seepage hole can be collected and measurements to simulate ground infiltration;

检测控制系统包括电脑113、雨量控制仪114、流量记录仪,进水流量计、下渗流量计与流量记录仪连接,电脑用于接收流量记录仪收集的数据,便于使用。检测控制系统中的雨量控制仪可有效控制降雨强度、降雨历时和雨滴大小等。The detection and control system includes a computer 113, a rainfall controller 114, a flow recorder, an inflow flowmeter, an infiltration flowmeter and the flow recorder are connected, and the computer is used to receive data collected by the flow recorder, which is convenient for use. The rainfall controller in the detection and control system can effectively control the rainfall intensity, rainfall duration and raindrop size, etc.

上述的渗水板表面均匀分隔为若干汇水单元13,通过汇水单元的设置,活动分隔组件能够沿其进行分隔,分隔后能够快速的确定汇水区的面积(确定单个汇水单元的面积后,只需要乘以汇水区中汇水单元数量即可得到总面积),每个汇水单元上均设置有渗水孔9,渗水孔内设置有软塞,避免此处水流流入集水板,试验中渗水板表面的渗水孔可根据模拟地块的类型及其综合径流系数进行开闭数量调整,调整时须保证每个汇水单位内渗水孔的开闭数量一致,其中软塞可以部分凸出渗水板表面,凸部部分会对汇流雨水造成一定阻碍,以模拟路面汇流时,路面凹凸不平对雨水形成的阻碍效果。The surface of the above-mentioned seepage plate is evenly divided into several water catchment units 13, through the setting of the water catchment units, the movable partition assembly can be separated along it, and the area of the water catchment area can be quickly determined after the separation (after determining the area of a single water catchment unit , the total area can be obtained by multiplying by the number of catchment units in the catchment area), each catchment unit is provided with a seepage hole 9, and a soft plug is arranged in the seepage hole to prevent the water from flowing into the catchment plate, In the test, the number of seepage holes on the surface of the seepage plate can be adjusted according to the type of the simulated plot and its comprehensive runoff coefficient. During the adjustment, the number of opening and closing of the seepage holes in each catchment unit must be consistent, and the soft plug can be partially convex. Out of the surface of the seepage board, the convex part will hinder the confluence of rainwater to a certain extent, so as to simulate the obstruction effect of uneven road surface on rainwater when the road surface confluences.

上述外挡板位于第一侧挡边两侧的第二侧挡边和第三侧挡边上均设置有若干排水孔14,排水孔内也设置有软塞,当排水孔处于汇水区一侧时,则需要塞上软塞,阻止雨水排出,当处于排水区一侧时,软塞拔出,让落下的雨水能够顺利排出,排水孔靠近相邻汇水单元的夹角处设置,且位于第一侧挡边一侧,当被活动分隔组件隔离后,处于夹角处的排水孔能够完全排出雨水,不会存积,避免无法快速排出而溢流至汇水区内,有效减少对汇水区的干扰,并且也有效减少对渗水板的压力。The above-mentioned outer baffles are located on the second side rib and the third side rib on both sides of the first side rib. When it is on the side of the drainage area, it needs to be plugged with a soft plug to prevent the discharge of rainwater. When it is on the side of the drainage area, the soft plug should be pulled out so that the falling rainwater can be discharged smoothly. Located on the side of the first side rib, after being isolated by the movable partition component, the drainage hole at the included angle can completely discharge rainwater without accumulation, avoiding that it cannot be discharged quickly and overflows into the catchment area, effectively reducing the impact on rainwater. Disturbance of the water catchment area, and also effectively reduce the pressure on the seepage plate.

上述活动分隔组件包括若干定位分隔柱15和若干分隔插板16,定位分隔柱外表面上均匀设置有四个第一卡槽17,第一卡槽朝向相对应的外挡板内壁设置,第一卡槽相对应的外挡板内壁上还设置有第二卡槽171,分隔插板设置在第一卡槽与第二卡槽之间或者设置在相邻两个定位分隔柱之间的第一卡槽之间。其中定位分隔柱设置在相邻的四个汇水单元围绕设置的夹角处,此位置能够很好的将汇水单元均匀分隔开,在需要相邻汇水单元贯通时,则不设置分隔插板,当需要隔离时,则在相邻侧边之间的第一卡槽与第一卡槽之间或者第一卡槽与第二卡槽之间插设分隔插板即可,分隔插板底部与渗水板的夹角处可以采用密封胶或胶带进行密封处理,防止排水区的雨水流入汇水区从而影响试验的准确性。The movable partition assembly includes several positioning partition columns 15 and several partition inserts 16, four first slots 17 are uniformly arranged on the outer surface of the positioning partition columns, and the first slots are arranged towards the corresponding inner wall of the outer baffle, and the first A second card slot 171 is also provided on the inner wall of the outer baffle plate corresponding to the card slot, and the partition board is arranged between the first card slot and the second card slot or between the first two adjacent positioning partition columns. between the card slots. Among them, the positioning separation column is set at the angle between the four adjacent water catchment units. This position can well separate the water catchment units evenly. When the adjacent water catchment units need to be connected, no separation is provided. When the board needs to be isolated, a partition board can be inserted between the first card slot and the first card slot or between the first card slot and the second card slot between the adjacent sides to separate the plug-in board. The angle between the bottom of the board and the seepage board can be sealed with sealant or tape to prevent the rainwater from the drainage area from flowing into the catchment area and thus affect the accuracy of the test.

第一卡槽底部和第二卡槽底部与渗水板之间均设置有避让流道,在雨水汇流从排水孔排出时,避让流道能够避免对雨水的阻挡,快速流走,避免积蓄,对试验装置造成压力。An avoidance channel is arranged between the bottom of the first card slot and the bottom of the second card slot and the water seepage plate. When the rainwater confluence is discharged from the drain hole, the avoidance channel can avoid blocking the rainwater, flow away quickly, and avoid accumulation. The test device creates pressure.

上述结构在使用时,当需要四个汇水单元的面积,则在使用的汇流排水口周边选择四个相连的汇水单元,然后通过分隔插板插入相对应的第一卡槽与第二卡槽之间以及第一卡槽与相邻定位分隔柱相对应的第一卡槽之间,形成围挡的效果。When the above structure is in use, when the area of four catchment units is required, four connected catchment units are selected around the confluence outlet to be used, and then inserted into the corresponding first card slot and second card slot through the partition plate. Between the slots and between the first slots and the first slots corresponding to the adjacent positioning partition columns, the effect of enclosure is formed.

当需要五个汇水单元的面积,则使用的汇流排水口周边选择五个相连的汇水单元,然后通过分隔插板插入相对应的第一卡槽与第二卡槽之间以及第一卡槽与相邻定位分隔柱相对应的第一卡槽之间,形成围挡的效果;When the area of five water catchment units is required, select five connected water catchment units around the confluence outlet to be used, and then insert the corresponding first card slot and the second card slot and the first card slot through the partition plate. Between the groove and the first slot corresponding to the adjacent positioning separation column, the effect of enclosure is formed;

在上述操作时,注意的是需要连续的汇水单元分隔,最终在分隔后的汇水单元能够贯通即可,可任意搭接,操作简单可靠。In the above operation, it should be noted that continuous water collection units are required to be separated, and finally the separated water collection units can be connected, and can be overlapped arbitrarily, and the operation is simple and reliable.

人工降雨组件包括机架18、喷淋装置181、输水管道19和增压装置20,喷淋装置固定在机架上,检测控制系统中的雨量控制仪与增压装置连接,增压装置通过输水管道与喷淋装置连接,输水管道上设置有进水流量计。增压装置将雨水存储桶内的雨水抽向输水管道,并通过喷淋装置喷洒在工作区域内,喷淋装置上的喷头可通过雨量控制仪调节,以达到试验设定的降雨强度;The artificial rainfall assembly includes a frame 18, a sprinkler 181, a water delivery pipe 19 and a booster 20, the sprinkler is fixed on the frame, the rainfall controller in the detection and control system is connected to the booster, and the booster passes through The water delivery pipeline is connected with the sprinkler device, and the water delivery pipeline is provided with a water inlet flowmeter. The pressurization device pumps the rainwater in the rainwater storage tank to the water pipeline, and sprays it in the working area through the sprinkler device. The nozzle on the sprinkler device can be adjusted by the rainfall controller to achieve the rainfall intensity set in the test;

渗水板与集水板均设置在支撑框架21上,支撑框架底部设置有可调支脚,能够模拟汇流时地面的倾斜角度。Both the water seepage plate and the water collection plate are arranged on the support frame 21, and the bottom of the support frame is provided with adjustable feet, which can simulate the inclination angle of the ground during confluence.

而生物滞留试验桶设置在滑动推车22上,便于试验人员操作,生物滞留试验桶包括透明桶体,透明桶体内设置有试验填料,填料上种有植物并设有植物生长观测尺,便于记录植物生长情况,并能够通过透明桶体观察到内部填层状况和植物根系的生长情况,透明桶体侧边上设置有溢流孔24和出水孔25,溢流孔与溢流管连接,溢流管上设置有溢流流量计,出水孔与出水管连接,出水管上设置有出水流量计,溢流流量计和出水流量计与检测控制系统中的流量记录仪连接,能够实时采集和汇总信息。透明桶体外表面包覆有黑色海绵,在方便观察的同时模拟地下黑暗环境,降低光照等条件的干扰。The bioretention test tank is arranged on the sliding trolley 22, which is convenient for the test personnel to operate. The bioretention test tank includes a transparent tank body, and the test filler is arranged in the transparent tank body. Plants are planted on the filler and a plant growth observation ruler is provided for easy recording. Plant growth situation, and can observe the growth situation of inner filling layer condition and plant root system through transparent bucket body, overflow hole 24 and outlet hole 25 are arranged on the side of transparent bucket body, overflow hole is connected with overflow pipe, overflow An overflow flowmeter is set on the flow pipe, the outlet hole is connected to the outlet pipe, and an outlet flowmeter is installed on the outlet pipe. The overflow flowmeter and the outlet flowmeter are connected to the flow recorder in the detection and control system, which can collect and summarize in real time information. The outer surface of the transparent barrel is covered with black sponge, which simulates the dark underground environment while facilitating observation, and reduces the interference of light and other conditions.

下面分别用四种试验所设计的布置方式来举例说明本装置的使用方法:The following are examples of how to use the device with the layout methods designed for the four tests:

(1)模拟单向汇流时生物滞留池综合效能试验的布置方式举例:如图5 所示,生物滞留试验桶位于汇水区一侧,属于单向汇水,活动分隔组件将渗水板分隔出汇水区及排水区,试验汇水面积与生物滞留试验桶表面积之比均为8∶1;位于汇水区一侧的排水孔塞上软塞处于关闭状态,位于排水区一侧的排水孔则全部打开;与生物滞留试验桶相对应的汇流排水口处于打开状态,其余汇流排水口均关闭;渗水板表面的渗水孔全部开启,以模拟径流系数较小的路面。(1) Example of the layout of the bioretention tank comprehensive performance test when simulating one-way confluence: As shown in Figure 5, the bioretention test tank is located on the side of the catchment area, which belongs to one-way catchment, and the movable partition component separates the seepage plate In the catchment area and the drainage area, the ratio of the test catchment area to the surface area of the bioretention test tank is 8:1; Then all open; the confluence outlet corresponding to the bioretention test bucket is open, and the rest of the confluence outlet are closed; the seepage holes on the surface of the seepage plate are all opened to simulate the road surface with a small runoff coefficient.

(2)模拟双向汇流时生物滞留池综合效能试验的布置方式举例:实际工程中生物滞留池可能位于汇水区的任意位置,如图6所示的布置方式为生物滞留试验桶位于汇水区中间,为双向汇水,试验汇水面积与生物滞留试验桶表面积之比均为10∶1;渗水板表面的渗水孔部分关闭,且每个汇水单位内渗水孔的关闭数量一致,以模拟实际路面的径流系数,操作简单,大大提高了试验效率。(2) Example of the layout of the comprehensive performance test of the bioretention tank when simulating two-way confluence: in actual engineering, the bioretention tank may be located anywhere in the catchment area, as shown in Figure 6. In the middle, it is a two-way catchment, the ratio of the test catchment area to the surface area of the bioretention test tank is 10:1; the seepage holes on the surface of the seepage plate are partially closed, and the number of closed seepage holes in each catchment unit is the same, to simulate The runoff coefficient of the actual road surface is simple to operate, which greatly improves the test efficiency.

(3)相同汇水面积、不同生物滞留试验桶同时试验的布置方式举例:采用如图7所示的布置方式,试验汇水面积与生物滞留试验桶表面积之比均为4∶ 1,汇流方式均为单向汇水,可以模拟不同滞留池类型、不同填料类型或者不同植物类型对滞留池综合效能影响的试验研究。两侧底角试验桶放置区安放两个生物滞留试验桶同时进行试验,放置一个带保水层的生物滞留试验桶和一个不带保水层的生物滞留试验桶进行不同类型生物滞留池综合效能的对比试验;放置同种结构的生物滞留试验桶(带保水层或不带保水层),分别使用不同的填料进行对比试验;也可以放置同种结构、同种填料类型的生物滞留试验桶,两个桶分别种植不同的植物,进行植物筛选试验。两个生物滞留试验桶除了自身条件不同外,外界条件完全一致,对照效果良好,提高试验效率的同时,试验结果也更加准确。(3) Example of the layout of the same catchment area and different bioretention test tanks for simultaneous tests: the layout shown in Figure 7 is adopted, the ratio of the test catchment area to the surface area of the bioretention test tank is 4: 1, and the confluence method All of them are unidirectional water catchment, which can simulate the experimental research on the influence of different retention tank types, different filler types or different plant types on the overall performance of the detention tank. Two bioretention test tanks are placed in the test tank placement area on both sides of the bottom corner for simultaneous tests, and a bioretention test tank with a water-retaining layer and a bio-retention test tank without a water-retaining layer are placed to compare the comprehensive performance of different types of bioretention tanks Test; place bioretention test barrels of the same structure (with or without water-retaining layer), and use different fillers for comparative tests; you can also place bioretention test barrels of the same structure and the same type of filler, two The barrels were planted with different plants, and the plant screening test was carried out. The two bioretention test tanks have the same external conditions except their own conditions, and the control effect is good. While improving the test efficiency, the test results are also more accurate.

(4)不同汇水面积、相同生物滞留试验桶同时试验的布置方式举例:采用如图8所示的布置方式可以同时进行不同汇水区面积与生物滞留试验桶表面积之比对生物滞留池综合效能影响的试验研究,比值分别为4∶1和3∶1,两个生物滞留试验桶完全相同,试验时可直观的看出两个生物滞留试验桶的出流时间、溢流时间等水文参数上的差异,模拟效果好,误差较小,因为是同时试验可以忽略外界条件的干扰,提高了试验效率和精度。(4) Example of the layout of different water catchment areas and the same bioretention test tank for simultaneous tests: using the layout shown in Figure 8, the ratio of different water catchment areas to the surface area of the bioretention test tank can be compared at the same time. Experimental research on the effect of efficiency, the ratio is 4:1 and 3:1, the two bioretention test tanks are exactly the same, and the hydrological parameters such as outflow time and overflow time of the two bioretention test tanks can be seen intuitively during the test The simulation effect is good and the error is small, because the interference of external conditions can be ignored in the simultaneous test, which improves the test efficiency and accuracy.

在确定好试验布置方案后,采用上述装置进行有效的水文效应研究,包括以下步骤:After the test layout plan is determined, use the above-mentioned device to conduct effective hydrological effect research, including the following steps:

1、根据当地暴雨强度公式,选择相应的暴雨重现期以及降雨历时,确定模拟降雨的降雨强度及降雨总量;1. According to the local rainstorm intensity formula, select the corresponding rainstorm return period and rainfall duration, and determine the rainfall intensity and total rainfall of the simulated rainfall;

2、降雨覆盖面积为试验区总面积记为A0,渗水板总面积记为A1,用活动分隔组件进行隔离后的汇水区的面积记为A2,单个生物滞留试验桶的表面积记为A32. The rainfall coverage area is the total area of the test area as A 0 , the total area of the seepage plate as A 1 , the area of the catchment area isolated by movable partition components as A 2 , and the surface area of a single bioretention test tank as A 2 . is A3 ;

3、将待试验的生物滞留试验桶用滑动推车推至试验桶放置区处,打开相对应的汇流排水口;3. Push the bioretention test barrel to be tested to the test barrel placement area with a sliding cart, and open the corresponding confluence drain;

4、记录初始状态下进水流量计、出水流量计、溢流流量计、下渗流量计的读数分别记录为Q1、Q2、Q3、Q4,降雨开始;4. Record the readings of the inlet flowmeter, outlet flowmeter, overflow flowmeter, and infiltration flowmeter in the initial state as Q 1 , Q 2 , Q 3 , and Q 4 , and the rainfall begins;

5、降雨结束后,记录进水流量计、出水流量计、溢流流量计、下渗流量计的读数Q11、Q22、Q33、Q445. After the rainfall ends, record the readings Q 11 , Q 22 , Q 33 , and Q 44 of the inflow flowmeter, effluent flowmeter, overflow flowmeter, and infiltration flowmeter;

6、整个试验过程中总降雨量Q1’=(Q11-Q1),生物滞留试验桶出流量Q2’= (Q22-Q2),生物滞留试验桶溢流量Q3’=(Q33-Q3),总下渗量Q4’=(Q44-Q4);6. The total rainfall Q 1 '=(Q 11 -Q 1 ), the outflow of the bioretention test barrel Q 2 '= (Q 22 -Q 2 ), the overflow of the bioretention test barrel Q 3 '=( Q 33 -Q 3 ), total infiltration Q 4 '=(Q 44 -Q 4 );

试验床区域对应的降雨量Q5’=Q1’×A1/A0,整个试验过程中径流系数ψ= (Q5’-Q4’)/Q5The corresponding rainfall in the test bed area Q 5 '=Q 1 '×A 1 /A 0 , runoff coefficient ψ=(Q 5 '-Q 4 ')/Q 5 ' in the whole test process

有效降雨量=汇水区径流量+直接进入生物滞留试验桶的降雨量=Q1’× (A2/A0)×ψ+Q1’×A3/A0,记为Q6’;Effective rainfall = runoff in the catchment area + rainfall directly entering the bioretention test tank = Q 1 '× (A 2 /A 0 )×ψ+Q 1 '×A 3 /A 0 , denoted as Q 6 ';

其中流量记录仪与进水流量计、出水流量计、溢流流量计、下渗流量计连接,采集其中数据,并可以从流量记录仪中读取降雨和出流随时间变化的曲线,导入EXCEL表格中,根据曲线可以直接读出出流延迟时间t1、洪峰延迟时间t2、径流总量削减率=(Q6’-Q2’-Q3’)/(Q6’-Q3’)×100%以及洪峰削减率=(q1-q2)/q1,其中q1是降雨过程中的最大流速,q2是出流过程中的最大流速。Among them, the flow recorder is connected with the inflow flowmeter, effluent flowmeter, overflow flowmeter, and infiltration flowmeter to collect the data, and can read the curve of rainfall and outflow over time from the flow recorder, and import it into EXCEL In the table, according to the curve, the flow delay time t 1 , flood peak delay time t 2 , total runoff reduction rate=(Q 6 '-Q 2 '-Q 3 ')/(Q 6 '-Q 3 ' )×100% and flood peak reduction rate=(q 1 -q 2 )/q 1 , where q 1 is the maximum flow velocity during rainfall, and q 2 is the maximum flow velocity during outflow.

7、当需要研究过滤层填料的渗透系数时,在生物滞留试验桶上安装三个测压管,停止降雨后,待生物滞留桶中表面液位降至介质表面10cm左右时记录测压管的读数h1、h2、h3以及出流流速q,过滤层填料的渗透系数k=qL/A3h,其中q为出流流速、L为相邻测压管间距、A3为生物滞留桶的表面积,h=[(h1-h2) +(h2-h3)]/2。7. When it is necessary to study the permeability coefficient of the filter layer filler, install three piezometric tubes on the bioretention test tank. After the rain stops, record the pressure measurement tube when the surface liquid level in the bioretention tank drops to about 10cm on the surface of the medium. The readings h 1 , h 2 , h 3 and the outflow velocity q, the permeability coefficient of the filter layer packing k=qL/A 3 h, where q is the outflow velocity, L is the distance between adjacent piezometric tubes, and A 3 is the bioretention The surface area of the bucket, h=[(h 1 -h 2 ) +(h 2 -h 3 )]/2.

在确定好试验布置方案后采用上述装置进行有效的水质效应研究:After determining the test layout plan, use the above-mentioned device to conduct effective water quality effect research:

若试验采用的进水为雨水存储桶中收集的天然降雨径流,可在雨水存储桶中直接取水,出水取自生物滞留试验桶出水口,分别检测进出水的高锰酸盐指数、总氮、总磷、氨氮、硝态氮、悬浮物等指标,计算去除率;如果需要人工配水,则进水的相关指标为已知,在生物滞留试验桶出水口取水检测相关指标,计算去除率。If the influent water used in the test is the natural rainfall runoff collected in the rainwater storage tank, the water can be directly taken from the rainwater storage tank, and the effluent is taken from the outlet of the bioretention test tank, and the permanganate index, total nitrogen, and Total phosphorus, ammonia nitrogen, nitrate nitrogen, suspended solids and other indicators are used to calculate the removal rate; if manual water distribution is required, the relevant indicators of the influent water are known, and the relevant indicators are tested at the outlet of the bioretention test tank to calculate the removal rate.

对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (7)

1.一种模拟自然降雨条件下生物滞留池综合效能的试验装置,其特征在于:包括试验床、试验桶放置区和检测控制系统;1. A test device for the comprehensive efficiency of bioretention ponds under simulated natural rainfall conditions, characterized in that: it includes a test bed, a test barrel placement area and a detection and control system; 所述试验床为双层床面结构,所述双层床面结构包括渗水板和集水板,所述集水板设置在渗水板下方,所述渗水板表面还设置有若干渗水孔,所述渗水板的周边设置有外挡板并与外挡板配合形成汇流空间,所述试验桶放置区设置在外挡板一侧的外部,所述汇流空间内设置有活动分隔组件,所述活动分隔组件将汇流空间分隔为汇水区和排水区,所述外挡板位于汇水区和试验桶放置区之间的第一侧挡边上设置有若干具有开闭功能的汇流排水口,所述集水板上还设置有下渗排水口,所述下渗排水口上设置有下渗流量计;The test bed is a double-layer bed surface structure. The double-layer bed surface structure includes a water seepage plate and a water collection plate. The periphery of the seepage plate is provided with an outer baffle and cooperates with the outer baffle to form a confluence space. The test barrel placement area is set outside one side of the outer baffle, and a movable partition assembly is arranged in the confluence space. The movable partition The component divides the confluence space into a water catchment area and a drainage area. The outer baffle is located on the first side wall between the water catchment area and the test bucket placement area. Several confluence drains with opening and closing functions are provided. The water collecting plate is also provided with an infiltration outlet, and an infiltration flowmeter is arranged on the infiltration outlet; 所述试验桶放置区内设置有生物滞留试验桶,所述试验桶放置区与试验床上方设置有人工降雨组件,所述人工降雨组件上设置有进水流量计;A bioretention test barrel is provided in the test barrel placement area, an artificial rainfall assembly is arranged above the test barrel placement area and the test bed, and an inflow flow meter is arranged on the artificial rainfall assembly; 所述检测控制系统包括电脑、雨量控制仪、流量记录仪,所述进水流量计、下渗流量计与流量记录仪连接;The detection and control system includes a computer, a rainfall controller, and a flow recorder, and the inflow flowmeter and the infiltration flowmeter are connected to the flow recorder; 所述渗水板表面均匀分隔为若干汇水单元,每个汇水单元上均设置有渗水孔,所述渗水孔内设置有软塞;The surface of the water seepage plate is evenly divided into several water catchment units, each water catchment unit is provided with a water seepage hole, and a soft plug is arranged in the water seepage hole; 所述外挡板位于第一侧挡边两侧的第二侧挡边和第三侧挡边上均设置有若干排水孔,所述排水孔靠近相邻汇水单元的夹角处设置,所述排水孔内也设置有软塞。The outer baffle is provided with a number of drain holes on the second side rib and the third side rib on both sides of the first side rib, and the drain holes are set near the angles of adjacent water collection units, so A soft plug is also arranged in the drain hole. 2.根据权利要求1所述的一种模拟自然降雨条件下生物滞留池综合效能的试验装置,其特征在于:所述活动分隔组件包括若干定位分隔柱和若干分隔插板,所述定位分隔柱外表面上均匀设置有四个第一卡槽,所述第一卡槽朝向相对应的外挡板内壁设置,所述第一卡槽相对应的外挡板内壁上还设置有第二卡槽,所述分隔插板设置在第一卡槽与第二卡槽之间或者设置在相邻两个定位分隔柱之间的第一卡槽之间。2. The test device for the comprehensive efficiency of bioretention tanks under a simulated natural rainfall condition according to claim 1, wherein the movable partition assembly includes several positioning partition columns and several partition inserts, and the positioning partition columns Four first card slots are evenly arranged on the outer surface, and the first card slots are set towards the corresponding inner wall of the outer baffle, and the second card slots are also provided on the inner wall of the outer baffle corresponding to the first card slots , the partition board is arranged between the first card slot and the second card slot or between the first card slots between two adjacent positioning and partition columns. 3.根据权利要求2所述的一种模拟自然降雨条件下生物滞留池综合效能的试验装置,其特征在于:所述第一卡槽底部和第二卡槽底部与渗水板之间均设置有避让流道。3. The test device for the comprehensive performance of bioretention tanks under a simulated natural rainfall condition according to claim 2, characterized in that: between the bottom of the first slot, the bottom of the second slot and the water seepage plate Avoid runners. 4.根据权利要求1所述的一种模拟自然降雨条件下生物滞留池综合效能的试验装置,其特征在于:所述人工降雨组件包括机架、喷淋装置、输水管道和增压装置,所述喷淋装置固定在机架上,检测控制系统中的雨量控制仪与增压装置连接,增压装置通过输水管道与喷淋装置连接,所述输水管道上设置有进水流量计。4. The test device for the comprehensive performance of bioretention tanks under a kind of simulated natural rainfall condition according to claim 1, characterized in that: the artificial rainfall assembly comprises a frame, a spraying device, a water pipeline and a pressurizing device, The spraying device is fixed on the frame, the rainfall controller in the detection and control system is connected to the booster device, and the booster device is connected to the spraying device through a water delivery pipeline, and the water delivery pipeline is provided with a water inlet flowmeter . 5.根据权利要求1所述的一种模拟自然降雨条件下生物滞留池综合效能的试验装置,其特征在于:所述渗水板与集水板均设置在支撑框架上,所述支撑框架底部设置有可调支脚。5. A test device for the comprehensive performance of bioretention ponds under simulated natural rainfall conditions according to claim 1, characterized in that: the seepage plate and the water collection plate are both arranged on the supporting frame, and the bottom of the supporting frame is arranged With adjustable feet. 6.根据权利要求1所述的一种模拟自然降雨条件下生物滞留池综合效能的试验装置,其特征在于:所述生物滞留试验桶设置在滑动推车上,所述生物滞留试验桶包括透明桶体,所述透明桶体内设置有试验填料,所述试验填料表面种有植物并设有植物生长观察尺,所述透明桶体侧边上设置有溢流孔和出水孔,所述溢流孔与溢流管连接,所述溢流管上设置有溢流流量计,所述出水孔与出水管连接,所述出水管上设置有出水流量计,所述溢流流量计和出水流量计与检测控制系统中的流量记录仪连接。6. The test device for the comprehensive performance of a bioretention tank under a simulated natural rainfall condition according to claim 1, characterized in that: the bioretention test bucket is arranged on a sliding cart, and the bioretention test bucket includes a transparent Barrel, the transparent barrel is provided with test filler, the surface of the test filler is planted with plants and is provided with a plant growth observation ruler, overflow holes and water outlet holes are arranged on the side of the transparent barrel, the overflow The hole is connected with an overflow pipe, the overflow pipe is provided with an overflow flowmeter, the water outlet hole is connected with the outlet pipe, the outlet pipe is provided with an outlet flowmeter, and the overflow flowmeter and the outlet flowmeter Connect with the flow recorder in the detection control system. 7.根据权利要求6所述的一种模拟自然降雨条件下生物滞留池综合效能的试验装置,其特征在于:所述透明桶体外表面包覆有黑色海绵。7. A test device for comprehensive performance of bioretention ponds under simulated natural rainfall conditions according to claim 6, characterized in that: the outer surface of the transparent barrel is coated with black sponge.
CN201710818587.0A 2017-09-12 2017-09-12 Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition Active CN107421577B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710818587.0A CN107421577B (en) 2017-09-12 2017-09-12 Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710818587.0A CN107421577B (en) 2017-09-12 2017-09-12 Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition

Publications (2)

Publication Number Publication Date
CN107421577A CN107421577A (en) 2017-12-01
CN107421577B true CN107421577B (en) 2023-07-11

Family

ID=60433134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710818587.0A Active CN107421577B (en) 2017-09-12 2017-09-12 Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition

Country Status (1)

Country Link
CN (1) CN107421577B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108956414A (en) * 2018-04-25 2018-12-07 长安大学 A kind of sponge urban biology is detained facility model experimental rig and method
CN110093967B (en) * 2019-04-24 2021-04-06 华南理工大学 A system for road rainwater runoff control and its effect monitoring method
CN110208163B (en) * 2019-07-02 2020-12-11 浙江路之友工程机械有限公司 Bituminous paving rivers flow experimental apparatus
CN110235647A (en) * 2019-07-19 2019-09-17 南京农业大学 A special groove type test bucket for plants and crops
CN114839102B (en) * 2022-04-25 2024-10-22 昆明理工大学 Method for measuring water retention of garden herbaceous plants

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005033632A2 (en) * 2003-09-29 2005-04-14 Ch2M Hill, Inc. Method and system for water flow analysis
CN205426738U (en) * 2015-12-19 2016-08-03 长安大学 OGFC rainfall simulation's device and water permeability tester
CN105911231A (en) * 2016-07-01 2016-08-31 中水珠江规划勘测设计有限公司 Urban underlying surface rainfall runoff infiltration simulation experiment system
CN106370791A (en) * 2016-10-31 2017-02-01 浙江大学 Testing device for detecting closure and peak regulating effects of green roof
CN106596897A (en) * 2017-01-18 2017-04-26 河海大学 Test device and method for measuring slope fixation effects and water absorption performances of reinforced plant soil

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009129406A1 (en) * 2008-04-16 2009-10-22 Integrated Land Management, Inc. Bioretention system and method
US9043163B2 (en) * 2010-08-06 2015-05-26 The Regents Of The University Of California Systems and methods for analyzing building operations sensor data

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005033632A2 (en) * 2003-09-29 2005-04-14 Ch2M Hill, Inc. Method and system for water flow analysis
CN205426738U (en) * 2015-12-19 2016-08-03 长安大学 OGFC rainfall simulation's device and water permeability tester
CN105911231A (en) * 2016-07-01 2016-08-31 中水珠江规划勘测设计有限公司 Urban underlying surface rainfall runoff infiltration simulation experiment system
CN106370791A (en) * 2016-10-31 2017-02-01 浙江大学 Testing device for detecting closure and peak regulating effects of green roof
CN106596897A (en) * 2017-01-18 2017-04-26 河海大学 Test device and method for measuring slope fixation effects and water absorption performances of reinforced plant soil

Also Published As

Publication number Publication date
CN107421577A (en) 2017-12-01

Similar Documents

Publication Publication Date Title
CN107421577B (en) Test device for simulating comprehensive efficiency of biological detention pond under natural rainfall condition
Tholin et al. Hydrology of urban runoff
CN107402041B (en) A test device for testing the operating efficiency of bioretention facilities
CN102608288B (en) Experimental device for roughness and erosion quantity of slope surface and using method of experimental device
CN205102879U (en) Weir of simultaneous observation hillside surface runoff and interflow
CN101241120A (en) Integrated device for in-situ monitoring of farmland underground leaching and surface runoff
CN106932556A (en) Permafrost active layer water sport and ground ice frozen-thaw process tracer and method
CN107059764A (en) The experimental facilities of simulated flow silt fluvial process
CN207488287U (en) A kind of test platform for being used to simulate rain flood process
CN206768725U (en) Self-circulation type river develops experimental system
CN109000731B (en) The experimental rig and method that research inlet for stom water chocking-up degree influences water discharged amount
CN207317837U (en) The experimental rig of biological delaying basin comprehensive effectiveness under the conditions of a kind of simulation natural precipitation
CN201096766Y (en) Shunt device for observing 9 holes in soil erosion ground flow cell
CN204374202U (en) A kind of device measuring rainfall on slope land-discharge series process and run-off
CN110093967A (en) A kind of system and its effect monitoring method for road rain water diameter flow control
CN107034839B (en) Self-circulation river evolution experimental system
CN210713121U (en) Runoff plot device for karst region
CN205280581U (en) System for survey forest litter influences contribution rate to surface runoff element content
CN201196640Y (en) Farmland underground eluviation and surface runoff in situ monitoring integration apparatus
CN106645636B (en) It is a kind of for monitoring the device and test method of agricultural surface runoff
CN211926964U (en) Automatic dynamic monitoring system for surface runoff and interflow of field natural slope
CN108760979A (en) A kind of the roof greening backwater system safety testing device and test method on flat roof
CN207317838U (en) It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency
CN105735418B (en) A kind of underground hidden pipe formula seepage flow system
CN204495413U (en) Agricultural run-off draining original position metering monitor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant