CN105803947A - 一种现浇箱梁门式满堂支架整体横移体系及横移方法 - Google Patents
一种现浇箱梁门式满堂支架整体横移体系及横移方法 Download PDFInfo
- Publication number
- CN105803947A CN105803947A CN201610315022.6A CN201610315022A CN105803947A CN 105803947 A CN105803947 A CN 105803947A CN 201610315022 A CN201610315022 A CN 201610315022A CN 105803947 A CN105803947 A CN 105803947A
- Authority
- CN
- China
- Prior art keywords
- support
- portal
- load
- box girder
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
一种现浇箱梁门式满堂支架整体横移体系及横移方法,包括门式满堂支架,所述门式满堂支架的门架两端立柱的底部之间安装有横梁,是门式支架下横梁;立柱的底部安装有可调底托;在门式支架下横梁底部设有纵向贯穿整列门架的承重梁,承重梁与门式支架下横梁固定连接;承重梁底部安装有千斤顶和钢轮;门式满堂支架的一侧通过钢丝绳与固定在门式满堂支架之外的牵引设备连接;牵引设备为手拉葫芦,手拉葫芦固定在门式满堂支架之外的临时锚固点处。本发明在传统的满堂支架下方安装钢轮能使已安装好的门式满堂支架重复利用,可以免除一次支架拆除与搭设,能够加快施工进程,节约材料;本发明安装方便、操作简单可广泛应用于箱梁施工领域。
Description
技术领域
本发明涉及建筑施工领域,尤其涉及一种现浇箱梁门式满堂支架整体横移体系及横移方法。
背景技术
满堂支架法现浇预应力混凝土连续箱梁是桥梁工程中一种较为常见的施工方法。近年来,随着国内铁路、公路交通基础设施建设的高速发展,采用满堂支架施工设计的桥梁也越来越多,大大推进了满堂支架的应用进程,满堂支架适用于高度低于20m桥梁上部结构现浇箱梁施工,具有周转次数多,周转时间短,不需要大型吊装设备,使用辅助设备少等优点,特别适用于多跨现浇梁施工,既保证了工程质量,又能加快施工进度,具有良好的经济效益。
满堂支架法是采取按一定间隔,密布搭设,起支撑作用的脚手架的施工方法。对于多跨分幅桥梁,为留出足够的施工空间,通常是左右幅箱梁都是错开进行施工,即单跨(或一联)的左右幅箱梁都要进行一次支架的搭设与拆除,大量的门架、交叉拉杆、钢管、扣件需要进行垂直运输,费工费时。此外,在拆除过程中,常常将材料直接抛掷到地面,损耗较大。特别是支架的搭设与拆除均是高空作业,全部靠人工进行,高支架施工安全风险特别大。
发明内容
本发明提供一种现浇箱梁门式满堂支架整体横移体系及横移方法,以解决现有技术中存在的现浇箱梁满堂支架的搭设和拆除的工作重复、繁杂、费工费时且支架损耗大等缺点。
为实现上述目的,本发明采取以下技术方案:
一种现浇箱梁门式满堂支架整体横移体系,包括门式满堂支架,其特征在于:所述门式满堂支架的门架两端立柱的底部之间安装有横梁,是门式支架下横梁;所述立柱的底部安装有可调底托;在所述门式支架下横梁底部设有纵向贯穿整列门架的承重梁,所述承重梁与门式支架下横梁固定连接;所述承重梁底部安装有千斤顶和钢轮;所述门式满堂支架的一侧通过钢丝绳与固定在门式满堂支架之外的牵引设备连接。
进一步优选地,所述牵引设备为手拉葫芦,所述手拉葫芦固定在门式满堂支架之外的临时锚固点处,所述手拉葫芦通过钢丝绳和门式满堂支架连接;所述钢丝绳固定绑扎在门式满堂支架的承重梁或立柱上。
进一步地,所述门式满堂支架中,每列门架底下设有1-3根纵向贯穿的承重梁。
进一步地,所述承重梁底部的钢轮中,靠近牵引设备一侧的首个钢轮为万向钢轮,其余钢轮为定向轮。
进一步地,所述钢轮通过滚轮支架和钢垫板与承重梁固定,所述滚轮支架通过焊接或螺栓连接的方式与其顶部的钢垫板紧固,所述钢垫板设于承重梁的底部,通过紧固螺栓和承重梁连接,所述钢轮直径为23cm~24cm,承载力为2t,所述钢轮的轮体覆盖有外包胶。
此外,所述门式支架下横梁通过U型固定环与承重梁固定,所述U型固定环通过焊接或螺栓连接的方式和承重梁固定。
更加优选地,所述承重梁(4)是双拼100mm工字钢。
一种应用上述现浇箱梁门式满堂支架整体横移体系进行的横移方法,其特征在于,包括以下步骤:
步骤一、解除门式满堂支架与已浇箱梁之间的约束:在半幅已浇箱梁完成预应力施工后,进行落架,解除门式满堂支架和已浇箱梁的约束;
步骤二、第一次体系转换:通过千斤顶中转,上缩可调底托,将门式满堂支架的自重由可调底托转移到钢轮;
步骤三、支架整体横移:启动牵引设备,将门式满堂支架通过牵引设备移到另一幅待施工箱梁位置;
步骤四、第二次体系转换:通过千斤顶中转,下放可调底托,使门式满堂支架荷载由钢轮重新转移到可调底托上;
步骤五:对门式满堂支架进行整体检查,至此,整个门式满堂支架移动完毕,对门式满堂支架各连接点进行质检后调整顶托至设计标高,进行另一幅待施工箱梁的浇筑。
进一步优选地,所述步骤二包括以下步骤,
步骤1、安装承重梁:在每个所述门式满堂支架的门式支架下横梁下方安装承重梁,所述承重梁由U型固定环固定在门式支架下横梁上;
步骤2、安装钢轮:所述钢轮通过滚轮支架和钢垫板焊接在一起,所述钢垫板通过紧固螺栓和承重梁紧固在一起;
步骤3、进行第一次体系转换:采用千斤顶,逐排上调可调底托使之悬空,把支撑受力点转移到钢轮上,检查有没有高差比较大的钢轮,对于悬空的钢轮进行调整,使钢轮整体受力均匀;
更加优选地,所述步骤三包括以下步骤,
步骤1、场地障碍清除:清除场地人员及杂物,保证横移顺利;
步骤2、安装牵引系统:所述牵引系统一端通过钢丝绳绑在门式满堂支架上,一端通过手拉葫芦绑在临时锚固点上;
步骤3、横移门式满堂支架:匀速移动钢丝绳,将门式满堂支架通过牵引系统移到另一幅待施工箱梁位置,所述钢丝绳通过人工或电力牵动,牵引速度为6~8m/h。
本发明发明的有益效果是:
1、本发明在传统的满堂支架下方安装钢轮能使已安装好的门式满堂支架重复利用,可以免除一次支架拆除与搭设,能够加快施工进程,节约材料。
2、本发明安装方便、操作简单可广泛应用于箱梁施工领域。
附图说明
图1是本发明一种现浇箱梁门式满堂支架整体横移体系横移前的整体结构示意图;
图2是本发明一种现浇箱梁门式满堂支架整体横移体系横移过程中的整体结构示意图;
图3是图2的俯视图;
图4是本发明所涉及的门式满堂支架与承重梁连接的节点结构示意图;
图5是本发明所涉及的钢轮的结构示意图;
图6是本发明所涉及的牵引系统的结构示意图。
附图中,各标号所代表的部件列表如下:1-门式满堂支架;2-门式支架下横梁;3-U型固定环;4-承重梁;5-可调底托;6-千斤顶;7-万向钢轮;8-定向轮;9-临时锚固点;10-手拉葫芦;11-钢丝绳;12-滚轮支架;13-钢垫板;14-紧固螺栓;15-外包胶;16-已浇箱梁。
具体实施方式
为使本发明实现的技术手段、创新特征、达成目的与功效易于明白了解,下面结合附图对本发明进一步说明。
在此记载的实施例为本发明的特定的具体实施方式,用于说明本发明的构思,均是解释性和示例性的,不应解释为对本发明实施方式及本发明范围的限制。除在此记载的实施例外,本领域技术人员还能够基于本申请权利要求书和说明书所公开的内容采用显而易见的其它技术方案,这些技术方案包括采用对在此记载的实施例的做出任何显而易见的替换和修改的技术方案。
本发明提供一种现浇箱梁门式满堂支架整体横移体系,如图1~6所示,一种现浇箱梁门式满堂支架整体横移体系,包括门式满堂支架1,门式满堂支架1的门架两端立柱的底部之间安装有横梁,是门式支架下横梁2;门式支架下横梁2通过U型固定环3与承重梁4固定,U型固定环3通过焊接或螺栓连接的方式和承重梁4固定;立柱的底部安装有可调底托5;在门式支架下横梁2底部设有纵向贯穿整列门架的承重梁4,门式满堂支架1中,每列门架底下设有1-3根纵向贯穿的承重梁4,承重梁4是双拼100mm工字钢,承重梁4与门式支架下横梁2固定连接;门式满堂支架1的一侧通过钢丝绳11与固定在门式满堂支架1之外的牵引设备连接,牵引设备为手拉葫芦10,手拉葫芦10固定在门式满堂支架1之外的临时锚固点9处,手拉葫芦10通过钢丝绳11和门式满堂支架1连接,钢丝绳1固定绑扎在门式满堂支架1的承重梁4或立柱上,承重梁4底部安装有千斤顶6和钢轮,承重梁4底部的钢轮中,靠近牵引设备一侧的首个钢轮为万向钢轮7,其余钢轮为定向轮8。钢轮通过滚轮支架12和钢垫板13与承重梁14固定,滚轮支架12通过焊接或螺栓连接的方式与其顶部的钢垫板13紧固,钢垫板13设于承重梁14的底部,通过紧固螺栓14和承重梁4连接,钢轮直径为23cm~24cm,承载力为2t,钢轮的轮体覆盖有外包胶15。
本发明还提供一种应用上述的现浇箱梁门式满堂支架整体横移体系进行的横移方法,具体包括以下步骤:
步骤一、解除门式满堂支架1与已浇箱梁16之间的约束:在半幅已浇箱梁15完成预应力施工后,进行落架,解除门式满堂支架1和已浇箱梁16的约束;
步骤二、第一次体系转换:通过千斤顶6中转,上缩可调底托5,将门式满堂支架1的自重由可调底托5转移到钢轮,具体包括以下步骤:
步骤1、安装承重梁4:在每个门式满堂支架1的门式支架下横梁2下方安装承重梁4,承重梁4由U型固定环3固定在门式支架下横梁2上;
步骤2、安装钢轮:钢轮通过滚轮支架12和钢垫板13焊接在一起,钢垫板13通过紧固螺栓14和承重梁4紧固在一起;
步骤3、进行第一次体系转换:采用千斤顶6,逐排上调可调底托5使之悬空,把支撑受力点转移到钢轮上,检查有没有高差比较大的钢轮,对于悬空的钢轮进行调整,使钢轮整体受力均匀;
步骤三、支架整体横移:启动牵引设备,将门式满堂支架1通过牵引设备移到另一幅待施工箱梁位置,具体包括以下步骤:
步骤1、场地障碍清除:清除场地人员及杂物,保证横移顺利;
步骤2、安装牵引系统:牵引系统一端通过钢丝绳11绑在门式满堂支架1上,一端通过手拉葫芦10绑在临时锚固点9上;
步骤3、横移门式满堂支架1:匀速移动钢丝绳11,将门式满堂支架1通过牵引系统移到另一幅待施工箱梁位置,钢丝绳11通过人工或电力牵动,牵引速度为6~8m/h。
步骤四、第二次体系转换:通过千斤顶6中转,下放可调底托5,使门式满堂支架1荷载由钢轮重新转移到可调底托5上;
步骤五:对门式满堂支架1进行整体检查,至此,整个门式满堂支架1移动完毕,对门式满堂支架1各连接点进行质检后调整顶托至设计标高,进行另一幅待施工箱梁的浇筑。
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (10)
1.一种现浇箱梁门式满堂支架整体横移体系,包括门式满堂支架(1),其特征在于:所述门式满堂支架(1)的门架两端立柱的底部之间安装有横梁,为门式支架下横梁(2);所述立柱的底部安装有可调底托(5);在所述门式支架下横梁(2)底部设有纵向贯穿整列门架的承重梁(4),所述承重梁(4)与门式支架下横梁(2)固定连接;所述承重梁(4)底部安装有千斤顶(6)和钢轮;所述门式满堂支架(1)的一侧通过钢丝绳(11)与固定在门式满堂支架(1)之外的牵引设备连接。
2.如权利要求1所述的一种现浇箱梁门式满堂支架整体横移体系,其特征在于:所述牵引设备为手拉葫芦(10),所述手拉葫芦(10)固定在门式满堂支架(1)之外的临时锚固点(9)处,所述手拉葫芦(10)通过钢丝绳(11)和门式满堂支架(1)连接;所述钢丝绳(11)固定绑扎在门式满堂支架(1)的承重梁(4)或立柱上。
3.如权利要求1所述的一种现浇箱梁门式满堂支架整体横移体系,其特征在于:所述门式满堂支架(1)中,每列门架底下设有1-3根纵向贯穿的承重梁(4)。
4.如权利要求1所述的一种现浇箱梁门式满堂支架整体横移体系,其特征在于:所述承重梁(4)底部的钢轮中,靠近牵引设备一侧的首个钢轮为万向钢轮(7),其余钢轮为定向轮(8)。
5.如权利要求1所述的一种现浇箱梁门式满堂支架整体横移体系,其特征在于:所述钢轮通过滚轮支架(12)和钢垫板(13)与承重梁(14)固定,所述滚轮支架(12)通过焊接或螺栓连接的方式与其顶部的钢垫板(13)紧固,所述钢垫板(13)设于承重梁(14)的底部,通过紧固螺栓(14)和承重梁(4)连接,所述钢轮直径为23cm~24cm,承载力为2t,所述钢轮的轮体覆盖有外包胶(15)。
6.如权利要求1所述的一种现浇箱梁门式满堂支架整体横移体系,其特征在于:所述门式支架下横梁(2)通过U型固定环(3)与承重梁(4)固定,所述U型固定环(3)通过焊接或螺栓连接的方式和承重梁(4)固定。
7.如权利要求1所述的一种现浇箱梁门式满堂支架整体横移体系,其特征在于:所述承重梁(4)是双拼100mm工字钢。
8.一种应用上述权利要求1~7任一项所述的现浇箱梁门式满堂支架整体横移体系进行的横移方法,其特征在于,包括以下步骤:
步骤一、解除门式满堂支架(1)与已浇箱梁(16)之间的约束:在半幅已浇箱梁(15)完成预应力施工后,进行落架,解除门式满堂支架(1)和已浇箱梁(16)的约束;
步骤二、第一次体系转换:通过千斤顶(6)中转,上缩可调底托(5),将门式满堂支架(1)的自重由可调底托(5)转移到钢轮;
步骤三、支架整体横移:启动牵引设备,将门式满堂支架(1)通过牵引设备移到另一幅待施工箱梁位置;
步骤四、第二次体系转换:通过千斤顶(6)中转,下放可调底托(5),使门式满堂支架(1)荷载由钢轮重新转移到可调底托(5)上;
步骤五:对门式满堂支架(1)进行整体检查,至此,整个门式满堂支架(1)移动完毕,对门式满堂支架(1)各连接点进行质检后调整顶托至设计标高,进行另一幅待施工箱梁的浇筑。
9.如权利要求8所述的利用现浇箱梁门式满堂支架整体横移体系横移的方法,其特征在于:所述步骤二包括以下步骤,
步骤1、安装承重梁(4):在每个所述门式满堂支架(1)的门式支架下横梁(2)下方安装承重梁(4),所述承重梁(4)由U型固定环(3)固定在门式支架下横梁(2)上;
步骤2、安装钢轮:所述钢轮通过滚轮支架(12)和钢垫板(13)焊接在一起,所述钢垫板(13)通过紧固螺栓(14)和承重梁(4)紧固在一起;
步骤3、进行第一次体系转换:采用千斤顶(6),逐排上调可调底托(5)使之悬空,把支撑受力点转移到钢轮上,检查有没有高差比较大的钢轮,对于悬空的钢轮进行调整,使钢轮整体受力均匀。
10.如权利要求6所述的利用现浇箱梁门式满堂支架整体横移体系横移的方法,其特征在于:所述步骤三包括以下步骤,
步骤1、场地障碍清除:清除场地人员及杂物,保证横移顺利;
步骤2、安装牵引系统:所述牵引系统一端通过钢丝绳(11)绑在门式满堂支架(1)上,一端通过手拉葫芦(10)绑在临时锚固点(9)上;
步骤3、横移门式满堂支架(1):匀速移动钢丝绳(11),将门式满堂支架(1)通过牵引系统移到另一幅待施工箱梁位置,所述钢丝绳(11)通过人工或电力牵动,牵引速度为6~8m/h。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610315022.6A CN105803947B (zh) | 2016-05-13 | 2016-05-13 | 一种现浇箱梁门式满堂支架整体横移体系及横移方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610315022.6A CN105803947B (zh) | 2016-05-13 | 2016-05-13 | 一种现浇箱梁门式满堂支架整体横移体系及横移方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105803947A true CN105803947A (zh) | 2016-07-27 |
CN105803947B CN105803947B (zh) | 2018-01-02 |
Family
ID=56455904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610315022.6A Expired - Fee Related CN105803947B (zh) | 2016-05-13 | 2016-05-13 | 一种现浇箱梁门式满堂支架整体横移体系及横移方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105803947B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106320179A (zh) * | 2016-08-24 | 2017-01-11 | 广西长长路桥建设有限公司 | 一种预应力混凝土连续箱梁整体横移现浇支架施工工法 |
CN106836807A (zh) * | 2017-01-25 | 2017-06-13 | 北京市市政六建设工程有限公司 | 一种可快速拼装和移动的模块化支架的使用方法 |
CN107142967A (zh) * | 2017-06-15 | 2017-09-08 | 中铁十六局集团第三工程有限公司 | 一种水域隧道支模结构及内模支架整体滑移结构 |
CN107327307A (zh) * | 2017-06-15 | 2017-11-07 | 中铁十六局集团第三工程有限公司 | 一种内模钢管支架整体滑移方法及结构 |
CN108867418A (zh) * | 2018-07-23 | 2018-11-23 | 重庆建工市政交通工程有限责任公司 | 一种可移动单元支撑架及用于箱型结构的施工方法 |
CN111255236A (zh) * | 2020-03-16 | 2020-06-09 | 中铁七局集团郑州工程有限公司 | 现浇梁满堂支架整体移动方法 |
CN111927496A (zh) * | 2020-07-15 | 2020-11-13 | 中交第一航务工程局有限公司 | 一种支架及模板系统整体快速转移体系及施工方法 |
CN113565305A (zh) * | 2021-07-30 | 2021-10-29 | 中铁一局集团厦门建设工程有限公司 | 一种盘扣式满堂支架整体滑移结构及其施工方法 |
CN113605236A (zh) * | 2021-04-19 | 2021-11-05 | 中建五局土木工程有限公司 | 一种盘扣式支架系统及模板系统的整体移动方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1636503A1 (ru) * | 1988-02-12 | 1991-03-23 | Государственный проектный и проектно-конструкторский институт по проектированию строительства мостов | Способ монтажа пролетного строени моста |
CN101713170A (zh) * | 2009-10-27 | 2010-05-26 | 中国第一冶金建设有限责任公司 | 桥梁边跨合龙段施工落地钢管柱支架整体滑移装置及方法 |
CN202000644U (zh) * | 2011-03-09 | 2011-10-05 | 葛洲坝集团第五工程有限公司 | 移动式承重支架平台 |
CN202220327U (zh) * | 2011-07-20 | 2012-05-16 | 中铁十四局集团有限公司 | 满堂支架现浇箱梁边腹板移动滑车 |
CN203050066U (zh) * | 2012-12-28 | 2013-07-10 | 中国化学工程第六建设有限公司 | 一种可移动的满堂支撑架 |
CN205604089U (zh) * | 2016-05-13 | 2016-09-28 | 浙江大学城市学院 | 一种现浇箱梁门式满堂支架整体横移体系 |
-
2016
- 2016-05-13 CN CN201610315022.6A patent/CN105803947B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1636503A1 (ru) * | 1988-02-12 | 1991-03-23 | Государственный проектный и проектно-конструкторский институт по проектированию строительства мостов | Способ монтажа пролетного строени моста |
CN101713170A (zh) * | 2009-10-27 | 2010-05-26 | 中国第一冶金建设有限责任公司 | 桥梁边跨合龙段施工落地钢管柱支架整体滑移装置及方法 |
CN202000644U (zh) * | 2011-03-09 | 2011-10-05 | 葛洲坝集团第五工程有限公司 | 移动式承重支架平台 |
CN202220327U (zh) * | 2011-07-20 | 2012-05-16 | 中铁十四局集团有限公司 | 满堂支架现浇箱梁边腹板移动滑车 |
CN203050066U (zh) * | 2012-12-28 | 2013-07-10 | 中国化学工程第六建设有限公司 | 一种可移动的满堂支撑架 |
CN205604089U (zh) * | 2016-05-13 | 2016-09-28 | 浙江大学城市学院 | 一种现浇箱梁门式满堂支架整体横移体系 |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106320179A (zh) * | 2016-08-24 | 2017-01-11 | 广西长长路桥建设有限公司 | 一种预应力混凝土连续箱梁整体横移现浇支架施工工法 |
CN106836807A (zh) * | 2017-01-25 | 2017-06-13 | 北京市市政六建设工程有限公司 | 一种可快速拼装和移动的模块化支架的使用方法 |
CN107142967A (zh) * | 2017-06-15 | 2017-09-08 | 中铁十六局集团第三工程有限公司 | 一种水域隧道支模结构及内模支架整体滑移结构 |
CN107327307A (zh) * | 2017-06-15 | 2017-11-07 | 中铁十六局集团第三工程有限公司 | 一种内模钢管支架整体滑移方法及结构 |
CN107327307B (zh) * | 2017-06-15 | 2019-11-08 | 中铁十六局集团第三工程有限公司 | 一种内模钢管支架整体滑移方法及结构 |
CN108867418A (zh) * | 2018-07-23 | 2018-11-23 | 重庆建工市政交通工程有限责任公司 | 一种可移动单元支撑架及用于箱型结构的施工方法 |
CN111255236A (zh) * | 2020-03-16 | 2020-06-09 | 中铁七局集团郑州工程有限公司 | 现浇梁满堂支架整体移动方法 |
CN111927496A (zh) * | 2020-07-15 | 2020-11-13 | 中交第一航务工程局有限公司 | 一种支架及模板系统整体快速转移体系及施工方法 |
CN113605236A (zh) * | 2021-04-19 | 2021-11-05 | 中建五局土木工程有限公司 | 一种盘扣式支架系统及模板系统的整体移动方法 |
CN113605236B (zh) * | 2021-04-19 | 2023-03-10 | 中建五局土木工程有限公司 | 一种盘扣式支架系统及模板系统的整体移动方法 |
CN113565305A (zh) * | 2021-07-30 | 2021-10-29 | 中铁一局集团厦门建设工程有限公司 | 一种盘扣式满堂支架整体滑移结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105803947B (zh) | 2018-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105803947B (zh) | 一种现浇箱梁门式满堂支架整体横移体系及横移方法 | |
US11634877B2 (en) | Method for removal of temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor | |
CN101781878B (zh) | 独塔无背索斜拉桥主塔整体提升模板及其提升施工方法 | |
CN103452311B (zh) | 一种型钢悬挑结构支撑架的搭设方法 | |
KR20140084107A (ko) | 셀프-런칭 이동식 비계공법 | |
WO2022142193A1 (zh) | 大跨度薄壁混凝土声屏障浇筑台车的施工方法 | |
CN102653938B (zh) | 下行式移动模架海上拆除施工工法 | |
CN106592962A (zh) | 一种大高差、大跨度劲性骨架外包混凝土模板施工方法及施工设备 | |
CN110468713B (zh) | 一种兼作墩柱模板及预应力支撑的两用装置及其施工方法 | |
CN103147582A (zh) | 高空悬挑模架的施工方法 | |
CN107201719B (zh) | 高架桥防撞墙模板吊装转运机及防撞墙施工方法 | |
JP5890060B1 (ja) | 架設桁を用いた橋梁の解体工法 | |
CN211420881U (zh) | 钢混叠合梁悬挑翼板混凝土施工用移动模架 | |
CN107401125B (zh) | 一种移动台车的行走装置及使用方法 | |
CN205116025U (zh) | 自平衡式砼箱梁及t梁桥悬臂翼缘二次浇筑吊架装置 | |
CN205604089U (zh) | 一种现浇箱梁门式满堂支架整体横移体系 | |
CN103993739B (zh) | 造粒塔喷淋层劲性梁的施工方法 | |
CN213836318U (zh) | 一种桥面湿接缝吊模结构 | |
CN112030777B (zh) | 一种下行式移动模架支撑托架跨越式转运施工方法 | |
CN210766417U (zh) | 一种桥梁侧位跨墩提梁支架装置 | |
CN105507160B (zh) | 现浇箱梁移动式贝雷梁操作平台施工方法 | |
CN116853963B (zh) | 一种斜拉桥主梁的吊装装置及吊装方法 | |
CN204386135U (zh) | 移动式挂篮 | |
CN110700112A (zh) | 钢混叠合梁悬挑翼板混凝土施工用移动模架及施工方法 | |
CN110331672A (zh) | 桥梁侧位跨墩提梁支架装置及其简易快速施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180102 Termination date: 20180513 |