CN105416514A - Lng运输船液货罐底座安装方法及液货罐底座结构 - Google Patents

Lng运输船液货罐底座安装方法及液货罐底座结构 Download PDF

Info

Publication number
CN105416514A
CN105416514A CN201510959396.7A CN201510959396A CN105416514A CN 105416514 A CN105416514 A CN 105416514A CN 201510959396 A CN201510959396 A CN 201510959396A CN 105416514 A CN105416514 A CN 105416514A
Authority
CN
China
Prior art keywords
lamination wood
liquid goods
tank
plate
liquid cargo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510959396.7A
Other languages
English (en)
Inventor
刘伟
肖建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COSCO (DALIAN) SHIPYARD Co Ltd
Original Assignee
COSCO (DALIAN) SHIPYARD Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COSCO (DALIAN) SHIPYARD Co Ltd filed Critical COSCO (DALIAN) SHIPYARD Co Ltd
Priority to CN201510959396.7A priority Critical patent/CN105416514A/zh
Publication of CN105416514A publication Critical patent/CN105416514A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

本发明公开了一种LNG运输船液货罐底座安装方法及液货罐底座结构,包括主支撑板、加强肘板、上部加强环、下部垫板支撑、上层粘结剂、层压木、不锈钢带、下层粘结剂和插入板,所述加强肘板安装在主支撑板上,上部加强环固定在罐体上,所述下部垫板支撑焊接在主支撑板下部平直边上,插入板与下部垫板支撑焊接连接,所述层压木粘贴在液货鞍座上,所述不锈钢带拧到层压木上,上层粘结剂和下层粘结剂分别安装在层压木的上下两端。本发明LNG运输船液货罐底座安装方法及液货罐底座结构,底座与罐体组成有机整体,方便罐体储存、吊运和安装,在安装过程中,避免了罐体和船体之间的热工作业流程,大大降低了施工风险,提高施工效率。

Description

LNG运输船液货罐底座安装方法及液货罐底座结构
技术领域
本发明涉及一种LNG运输船液货罐底座安装方法及液货罐底座结构。
背景技术
在以往的LNG运输船液货罐底座与主船体内底板直接焊接相连,货罐在预制和运输过程中,需要增加临时基座,待整体合拢时,将货罐从临时基座吊起安装到内底板底座的层压木上,这种设计主要缺点如下:货罐的预制和安装需要额外设置临时基座,浪费材料;安装精度差,现场吊装困难;接口面在底座顶面,人员施工环境恶劣,需要额外搭设脚手架,增加施工难度。
发明内容
本发明的目的是提供一种LNG运输船液货罐底座安装方法及液货罐底座结构。
本发明为实现上述目的所采用的技术方案是:一种LNG运输船液货罐底座安装方法,其特征在于,包括以下步骤:
A、在液货罐平直部分前后方向分别设置两个基座;
B、将上部加强环预先焊接在罐体上,确定限位挡板在船体上的位置,在船体合拢前完成与鞍座的连接安装,以双体罐中心向下辐射145°,沿着罐体确定主支撑板的形状,将下部垫板支撑焊接在主支撑板下部平直边上,将主支撑板分成24等份,划线后安装加强肘板,将插入板与下部垫板支撑焊接连接,将层压木粘贴在液货鞍座上,同时将不锈钢带拧到层压木上并覆盖其表面,将主支撑板、加强肘板、下部垫板支撑、上层粘结剂、层压木、不锈钢带和插入板组成一个单元,将此单元沿着罐体上的上部加强环的位置焊接,与罐体组成统一整体;
C、进行试吊装,在船体鞍座里放入油灰球,通过油灰球确定基座和层压木之间的距离,将液货罐放入到船体鞍座内,将吊钩处于零负载,检查液货罐的位置,液货罐通过层压木进行支撑;
D、将液货罐吊起一定的高度,测量油灰球的厚度并做上标记,统计环氧的数量,根据计算结果在船体鞍座内填充环氧粘结剂,完成液货罐的吊装连接。
所述步骤A中两个基座为一个固定式基座和一个滑动式基座。
本发明的另一目的是提供一种LNG运输船液货罐底座结构。
本发明为实现上述目的所采用的技术方案是:一种LNG运输船液货罐底座安装方法的液货罐底座结构,包括主支撑板、加强肘板、上部加强环、下部垫板支撑、上层粘结剂、层压木、不锈钢带、下层粘结剂和插入板,所述加强肘板安装在主支撑板上,所述上部加强环固定在罐体上,所述下部垫板支撑焊接在主支撑板下部平直边上,所述插入板与下部垫板支撑焊接连接,所述层压木粘贴在液货鞍座上,所述不锈钢带拧到层压木上,所述上层粘结剂和下层粘结剂分别安装在层压木的上下两端。
所述层压木包括上层层压木和下层层压木。
本发明一种LNG运输船液货罐底座安装方法及液货罐底座结构,以往的钢结构底座预先与主船体焊接,需要温度场分析校核,通过实际项目的经验累积,发现常规的船舶用板很难满足超低温要求,一般做法都是加高层压木的阻隔,但会给整船的布置带来较大影响,底座与罐体组成有机整体,方便罐体储存、吊运和安装,在安装过程中,避免了罐体和船体之间的热工作业流程,大大降低了施工风险,提高施工效率。
附图说明
图1是本发明一种LNG运输船液货罐底座安装方法及液货罐底座结构的整体结构示意图。
图2是图1的A-A剖视图。
图3是图1的B-B剖视图。
图中:1、主支撑板;2、加强肘板;3、上部加强环;4、下部垫板支撑;5、上层粘结剂;6、层压木;7、不锈钢带;8、下层粘结剂;9、限位挡板;10、插入板;11、上层层压木;12、下层层压木。
具体实施方式
如图1至图3所示,LNG运输船液货罐底座安装方法具体包括以下步骤,A、在液货罐平直部分前后方向分别设置两个基座,一个固定式,一个滑动式;B、将上部加强环3预先焊接在罐体上,确定限位挡板9在船体上的位置,在船体合拢前完成与鞍座的连接安装,以双体罐中心向下辐射145°,沿着罐体确定主支撑板1的形状,将下部垫板支撑4焊接在主支撑板1下部平直边上,将主支撑板分成24等份,划线后安装加强肘板,将插入板10与下部垫板支撑4焊接连接,将层压木6粘贴在液货鞍座上,同时将不锈钢带7拧到层压木上并覆盖其表面,将主支撑板1、加强肘板2、下部垫板支撑4、上层粘结剂5、层压木6、不锈钢带7和插入板10组成一个单元,将此单元沿着罐体上的上部加强环的位置焊接,与罐体组成统一整体;C、进行试吊装,里约1m间隔放入一系列的油灰球(?60mm),油灰球上应覆盖塑料布。油灰球被用来确认基座和承压木之间的距离,将液罐放入到船体鞍座内,并将吊钩处于零负载,检查液罐的位置,此时液罐是由承压术来进行支承,检查底部横向支撑的位置并测量面板的水平距离,误差为+/-5mm;D、将液货罐吊起1.5米的高度,测量油灰球的厚度并做上标记,统计环氧的数量,根据计算结果在船体鞍座内填充环氧粘结剂,完成液货罐的吊装连接。
LNG运输船液液货罐底座结构,包括主支撑板1、加强肘板2、上部加强环3、下部垫板支撑4、上层粘结剂5、层压木6、不锈钢带7、下层粘结剂8和插入板10,加强肘板2安装在主支撑板1上,上部加强环3固定在罐体上,下部垫板支撑4焊接在主支撑板1下部平直边上,插入板10与下部垫板支撑4焊接连接,层压木6粘贴在液货鞍座上,不锈钢带拧到层压木上,上层粘结剂5和下层粘结剂8分别安装在层压木6的上下两端,层压木包括上层层压木11和下层层压木12,以往的钢结构底座预先与主船体焊接,需要温度场分析校核,通过实际项目的经验累积,发现常规的船舶用板很难满足超低温要求,一般做法都是加高层压木的阻隔,但会给整船的布置带来较大影响,底座与罐体组成有机整体,方便罐体储存、吊运和安装,在安装过程中,避免了罐体和船体之间的热工作业流程,大大降低了施工风险,提高施工效率。

Claims (4)

1.一种LNG运输船液货罐底座安装方法,其特征在于,包括以下步骤:
在液货罐平直部分前后方向分别设置两个基座;
将上部加强环预先焊接在罐体上,确定限位挡板在船体上的位置,在船体
合拢前完成与鞍座的连接安装,以双体罐中心向下辐射145°,沿着罐体确定主支撑板的形状,将下部垫板支撑焊接在主支撑板下部平直边上,将主支撑板分成24等份,划线后安装加强肘板,将插入板与下部垫板支撑焊接连接,将层压木粘贴在液货鞍座上,同时将不锈钢带拧到层压木上并覆盖其表面,将主支撑板、加强肘板、下部垫板支撑、上层粘结剂、层压木、不锈钢带和插入板组成一个单元,将此单元沿着罐体上的上部加强环的位置焊接,与罐体组成统一整体;
进行试吊装,在船体鞍座里放入油灰球,通过油灰球确定基座和层压木之
间的距离,将液货罐放入到船体鞍座内,将吊钩处于零负载,检查液货罐的位置,液货罐通过层压木进行支撑;
将液货罐吊起一定的高度,测量油灰球的厚度并做上标记,统计环氧的数
量,根据计算结果在船体鞍座内填充环氧粘结剂,完成液货罐的吊装连接。
2.根据权利要求1所述的一种LNG运输船液货罐底座安装方法,其特征在于:所述步骤A中两个基座为一个固定式基座和一个滑动式基座。
3.一种用于权利要求1所述的LNG运输船液货罐底座安装方法的液货罐底座结构,其特征在于:包括主支撑板、加强肘板、上部加强环、下部垫板支撑、上层粘结剂、层压木、不锈钢带、下层粘结剂和插入板,所述加强肘板安装在主支撑板上,所述上部加强环固定在罐体上,所述下部垫板支撑焊接在主支撑板下部平直边上,所述插入板与下部垫板支撑焊接连接,所述层压木粘贴在液货鞍座上,所述不锈钢带拧到层压木上,所述上层粘结剂和下层粘结剂分别安装在层压木的上下两端。
4.根据权利要求3所述的一种LNG运输船液货罐底座安装方法,其特征在于:所述层压木包括上层层压木和下层层压木。
CN201510959396.7A 2015-12-21 2015-12-21 Lng运输船液货罐底座安装方法及液货罐底座结构 Pending CN105416514A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510959396.7A CN105416514A (zh) 2015-12-21 2015-12-21 Lng运输船液货罐底座安装方法及液货罐底座结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510959396.7A CN105416514A (zh) 2015-12-21 2015-12-21 Lng运输船液货罐底座安装方法及液货罐底座结构

Publications (1)

Publication Number Publication Date
CN105416514A true CN105416514A (zh) 2016-03-23

Family

ID=55495159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510959396.7A Pending CN105416514A (zh) 2015-12-21 2015-12-21 Lng运输船液货罐底座安装方法及液货罐底座结构

Country Status (1)

Country Link
CN (1) CN105416514A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106741656A (zh) * 2017-01-24 2017-05-31 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) 一种船用低温液罐支撑装置
CN107499462A (zh) * 2017-08-29 2017-12-22 广州文冲船厂有限责任公司 一种货罐侧壁与船舱的安装方法
CN107696364A (zh) * 2016-08-09 2018-02-16 启东丰顺船舶重工有限公司 一种液化气运输船液罐鞍座环氧浇注工艺
CN108082392A (zh) * 2017-12-18 2018-05-29 湖北海洋工程装备研究院有限公司 一种货船独立货罐安装方法
CN109703702A (zh) * 2019-01-28 2019-05-03 太平洋海洋工程(舟山)有限公司 一种船载液化天然气储罐安装结构及安装工艺
CN113602417A (zh) * 2021-09-10 2021-11-05 上海外高桥造船有限公司 独立液罐支撑装置
CN113772283A (zh) * 2021-11-11 2021-12-10 山东三星机械制造有限公司 用于在海上运输海油的罐体结构

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3600464B2 (ja) * 1998-12-28 2004-12-15 三菱重工業株式会社 舶載タンクの支持構造
JP4071205B2 (ja) * 2004-03-02 2008-04-02 株式会社新来島どっく 独立タンク据付架台
CN101321662A (zh) * 2005-12-01 2008-12-10 塔格海底天然气工程有限公司 用于在船只中支承贮存箱的装置
CN102923250A (zh) * 2012-06-27 2013-02-13 武汉一冶钢结构有限责任公司 船载液货罐鞍座采用层压木进行加固的安装方法
CN102958798A (zh) * 2010-12-13 2013-03-06 三菱重工业株式会社 独立储罐的支承结构
CN104709438A (zh) * 2013-12-12 2015-06-17 江南造船(集团)有限责任公司 独立液舱支承结构
CN204688363U (zh) * 2015-06-09 2015-10-07 江南造船(集团)有限责任公司 C型独立双圆筒液罐的支承系统

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3600464B2 (ja) * 1998-12-28 2004-12-15 三菱重工業株式会社 舶載タンクの支持構造
JP4071205B2 (ja) * 2004-03-02 2008-04-02 株式会社新来島どっく 独立タンク据付架台
CN101321662A (zh) * 2005-12-01 2008-12-10 塔格海底天然气工程有限公司 用于在船只中支承贮存箱的装置
CN102958798A (zh) * 2010-12-13 2013-03-06 三菱重工业株式会社 独立储罐的支承结构
CN102923250A (zh) * 2012-06-27 2013-02-13 武汉一冶钢结构有限责任公司 船载液货罐鞍座采用层压木进行加固的安装方法
CN104709438A (zh) * 2013-12-12 2015-06-17 江南造船(集团)有限责任公司 独立液舱支承结构
CN204688363U (zh) * 2015-06-09 2015-10-07 江南造船(集团)有限责任公司 C型独立双圆筒液罐的支承系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
庄科挺等: "C型LNG液罐与船体的连接结构研究", 《船舶设计通讯》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107696364A (zh) * 2016-08-09 2018-02-16 启东丰顺船舶重工有限公司 一种液化气运输船液罐鞍座环氧浇注工艺
CN106741656A (zh) * 2017-01-24 2017-05-31 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) 一种船用低温液罐支撑装置
CN106741656B (zh) * 2017-01-24 2018-04-24 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) 一种船用低温液罐支撑装置
CN107499462A (zh) * 2017-08-29 2017-12-22 广州文冲船厂有限责任公司 一种货罐侧壁与船舱的安装方法
CN107499462B (zh) * 2017-08-29 2019-06-14 广州文冲船厂有限责任公司 一种货罐侧壁与船舱的安装方法
CN108082392A (zh) * 2017-12-18 2018-05-29 湖北海洋工程装备研究院有限公司 一种货船独立货罐安装方法
CN109703702A (zh) * 2019-01-28 2019-05-03 太平洋海洋工程(舟山)有限公司 一种船载液化天然气储罐安装结构及安装工艺
CN113602417A (zh) * 2021-09-10 2021-11-05 上海外高桥造船有限公司 独立液罐支撑装置
CN113772283A (zh) * 2021-11-11 2021-12-10 山东三星机械制造有限公司 用于在海上运输海油的罐体结构
CN113772283B (zh) * 2021-11-11 2022-03-15 山东三星机械制造有限公司 用于在海上运输海油的罐体结构

Similar Documents

Publication Publication Date Title
CN105416514A (zh) Lng运输船液货罐底座安装方法及液货罐底座结构
CN102442408B (zh) 用于液货舱与船内底间的垂向支撑结构及其安装方法
CN101301952B (zh) 一种罐式集装箱
CN109703702B (zh) 一种船载液化天然气储罐安装结构及安装工艺
CN201580535U (zh) 一种用于化学品船的液货泵的安装结构
CN105523140B (zh) 一种c 型液货舱与船体内底间的支撑结构及其安装方法
CN108189960B (zh) 一种舵机基座安装方法
CN202464087U (zh) 一种液货舱双层底结构
CN102923250A (zh) 船载液货罐鞍座采用层压木进行加固的安装方法
CN206485539U (zh) 张力腿平台分段预制运输称重多用垫墩
CN105692468A (zh) 大型网壳式拱顶整体提升吊装机构及其使用方法
CN103711491A (zh) 用于竖井混凝土衬砌施工的设备及其施工方法
CN102328727A (zh) 深水铺管起重船的重型海洋工程起重机底座的分段方法
CN104828758A (zh) 一种火电机组引风机结构支架整体移位装置及移位方法
JP2015010359A (ja) 円筒型タンクの構築方法
CN202213886U (zh) 一种大型金属容器
CN103552654B (zh) 一种船舶上层建筑组合式通用支撑胎架
KR101465621B1 (ko) 유조선의 액화 가스연료 탱크용 플랫폼
CN109625161A (zh) 一种化学品船集管区单元的建造方法
CN105292378A (zh) 液化气船单元管架无余量对接的建造方法
CN205440772U (zh) Lng运输船液货罐底座结构
CN105781205A (zh) 一种重型塔器设备分段吊装空中组对的就位导向装置
CN102633198B (zh) 适用于大风地区的储罐吊装施工方法
CN101332861B (zh) 一种液化天然气船用泵塔底板的制造和安装方法
CN205045278U (zh) 一种可整体吊装的球罐

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160323