CN105321003A - 一种含vsc-hvdc的交直流系统多目标潮流优化方法 - Google Patents

一种含vsc-hvdc的交直流系统多目标潮流优化方法 Download PDF

Info

Publication number
CN105321003A
CN105321003A CN201510882003.7A CN201510882003A CN105321003A CN 105321003 A CN105321003 A CN 105321003A CN 201510882003 A CN201510882003 A CN 201510882003A CN 105321003 A CN105321003 A CN 105321003A
Authority
CN
China
Prior art keywords
variable
network
power
population
optimized
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510882003.7A
Other languages
English (en)
Other versions
CN105321003B (zh
Inventor
李扬
李亚辉
李国庆
王振浩
王朝斌
辛叶春
王鹤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Electric Power Research Institute
Northeast Electric Power University
Original Assignee
Northeast Dianli University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Dianli University filed Critical Northeast Dianli University
Priority to CN201510882003.7A priority Critical patent/CN105321003B/zh
Publication of CN105321003A publication Critical patent/CN105321003A/zh
Application granted granted Critical
Publication of CN105321003B publication Critical patent/CN105321003B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特点是,包括的步骤有:建立模型,选取待优化变量、优化目标及确定约束条件;设置初始变量并给定待优化变量范围;将待优化变量作为优化过程中种群个体,采用混合编码的方式,根据待优化变量范围随机生成初始种群;采用交替迭代法,计算交直流系统潮流;求取种群中各个体对应的优化目标函数值;对种群个体进行快速非支配排序,并计算虚拟适应度,经选择、交叉和变异处理,生成子种群;采用精英策略保留父代中优良个体;判断是否满足算法终止条件,若满足条件,则转至步骤9),优化结束;否则,转至步骤4);优化过程结束,输出结果。具有方法科学,适用性强,效果佳等优点。

Description

一种含VSC-HVDC的交直流系统多目标潮流优化方法
技术领域
本发明涉及一种含VSC-HVDC的交直流系统多目标潮流优化方法,属于电力系统安全运行与稳定的技术领域。
背景技术
电力系统最优潮流(OptimalPowerFlow,OPF)一直是确保电力系统安全、经济运行的重要基础手段。随着交直流电网互联、电力市场化改革及大规模分布式可再生能源并网,系统运行日益逼近其稳定极限,因而传统以有功网损或发电成本最小的单一目标潮流优化,已无法满足智能电网的需要。在此背景下,多目标最优潮流(Multi-objectiveOPF,MOPF)因为能统一协调系统的经济性、安全性及环保要求等多个具有不同重要性甚至相互矛盾的目标受到了国内外研究人员的广泛关注。
同时,作为新一代直流输电技术的柔性直流输电(VoltageSourceConverterbasedHVDC,VSC-HVDC)具有有功和无功独立快速调节、不存在换相失败、易于构建多端直流系统等特点,在大规模新能源接入、新型城市电网构建等应用领域具有显著技术优势,在国内外均已得到一定的工程应用。
针对含VSC-HVDC交直流系统的OPF问题,国内外学者已进行了一些有益的探索。但目前现有方法均只针对含VSC-HVDC的交直流系统进行单一目标的潮流优化,迄今尚未见有关于此系统进行多目标潮流优化的研究报道。
发明内容
本发明计及VSC-HVDC的快速、灵活的调节能力,提出一种含VSC-HVDC的交直流系统多目标潮流优化方法,以统一协调系统运行的安全性、经济性和环保要求等多个目标间的关系。其主要思想是:首先,构建以降低发电成本、提高静态电压稳定裕度和减少污染气体排放量作为优化目标的MOPF模型;然后,采用带精英策略非支配排序遗传算法(NSGA-II)求解交直流系统MOPF;最后,得到一系列满足Pareto最优的非劣解集。
本发明的技术方案是:一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征是,它包括以下步骤:
1)建立模型,选取待优化变量、优化目标及确定约束条件;
2)设置初始变量并给定待优化变量范围;
3)将待优化变量作为优化过程中种群个体,采用混合编码的方式,根据待优化变量范围随机生成初始种群;
4)采用交替迭代法,计算交直流系统潮流;
5)求取种群中各个体对应的优化目标函数值;
6)对种群个体进行快速非支配排序,并计算虚拟适应度,经选择、交叉和变异处理,生成子种群;
7)采用精英策略保留父代中优良个体;
8)判断是否满足算法终止条件,若满足条件,则转至步骤9),优化结束;否则,转至步骤4);
9)优化过程结束,输出结果。
所述步骤1)的建立模型过程为:
(a)选取待优化变量,待优化变量为交直流系统中变量,连续变量主要包括发电机有功出力PG和机端电压VG,交流系统流入换流变压器的有功功率Ps和无功功率Qs,离散变量主要包括变压器变比KT和无功补偿容量QR,交直流系统中变量表示为x=[PG,VG,KT,QR,Ud,Id,δ,M,Ps,Qs]的形式,其中Id为直流节点的电流,δ为交流侧与直流侧的相角差,M为调制度;
(b)选取优化目标,选用降低系统的有功网损、减少污染气体排放量和提高静态电压稳定裕度作为优化目标,考虑VSC-HVDC的调节能力,协调各优化目标之间关系,优化目标函数表达式为:
min O = Σ i = 1 n V i Σ j = 1 n V j ( G i j cosθ i j + B i j sinθ i j ) + P l o s s min E = Σ i = 1 N G ( α i P G i 2 + β i P G i + γ i ) max V s m = δ min - - - ( 1 )
式(1)中,O、E和Vsm分别代表系统的有功网损、污染气体排放量和静态电压稳定裕度三个优化目标;Vi和Vj分别为节点i、j的电压幅值,Gij、Bij、θij分别为节点i、j之间的电导、电纳和相角差,Ploss为直流网络的换流站、电抗器及直流线路损耗之和;NG和n分别为发电机数和节点总数,αi、βi和γi为发电机i的污染气体排放系数,为节点i的发电机有功出力;δmin为系统收敛潮流雅克比矩阵的最小奇异值;
(c)确定约束条件,模型的约束条件包括等式约束和不等式约束两部分;等式约束条件:包含交流系统的功率平衡方程及VSC-HVDC的相关等式约束,交流网络中相关等式约束写为:
P g i - P d i - V i Σ j ∈ i V j ( G i j sinθ i j + B i j cosθ i j ) = 0 Q g i - Q d i - V i Σ j ∈ i V j ( G i j sinθ i j - B i j cosθ i j ) = 0 - - - ( 2 )
式(2)中,Pgi、Qgi、Pdi、Qdi分别为节点i的有功输入、无功输入、有功负荷、无功负荷;Gij、Bij为节点导纳阵第i行第j列元素的实部与虚部;
直流网络中相关等式约束写为:
P c = U c 2 G c - U s U c [ G c c o s ( δ s - δ c ) + B c s i n ( δ s - δ c ) ] Q c = - U c 2 B c + U s U c [ G c s i n ( δ s - δ c ) + B c c o s ( δ s - δ c ) ] Σ i = 1 n P s , i + P l o s s = 0 P dc i = 2 U dc i Σ j ≠ i Y dc i j · ( U dc i - U dc j ) - - - ( 3 )
式(3)中,Pc、Qc分别表示换流站端的有功功率和无功功率;交流侧电压直流侧电压换流站等效阻抗Zc=Gc+jBc;Ps,i表示交流网络侧在节点i的有功功率;Ploss表示直流网络中损耗;表示直流网络中节点i、j之间的导纳;表示直流网络中节点有功功率;分别表示直流网络节点i、j的电压;
不等式约束条件:包含交流系统的电压幅值、相角及线路传输功率约束,和VSC-HVDC的相关不等式约束,交流网络中相关不等式约束写为:
P G i min ≤ P G i ≤ P G i max i = 1 , ... , N G Q G i min ≤ Q G i ≤ Q G i max i = 1 , ... , N G V i min ≤ V i ≤ V i max i = 1 , ... , N T i min ≤ T i ≤ T i max i = 1 , ... , N T Q C i min ≤ Q C i ≤ Q C i max i = 1 , ... , N C - - - ( 4 )
式(4)中,N、NT、NC分别为系统所有节点数、变压器可调分接头数、无功补偿节点数;PGi、QGi分别为发电机的有功、无功出力;Ti为补偿电容器的投切组数;QCi为可调变压器的分接头位置;下标max和min分别表示变量的上、下限;
直流网络中相关不等式约束写为:
Q s = Q 0 ± r 2 - ( P s - P 0 ) 2 S 0 = - U s 2 ( 1 Z f * + Z t f * ) , r = U s I c max | Z f * Z f * + Z t f * | S 0 = - U s 2 ( 1 Z 1 * + 1 Z 2 * ) , r = U s U c m 1 Z 2 - - - ( 5 )
式(5)为直流网络中由电流电压确定的有功功率和无功功率约束范围;Ps、Qs分别为交流侧功率;各换流器PQ功率圆约束圆的圆心为S0(P0,Q0),约束圆半径为r;为电流约束上限,下限为零;Ucm时分别作为电压约束的上下限;
将交直流系统多目标最优潮流问题建模如下:
min f m ( u , x ) m = 1 , ... , M s . t . h j ( u , x ) = 0 j = 1 , ... , p g j ( u , x ) = 0 j = p + 1 , ... , q u i min ≤ u i ≤ u i max i = 1 , ... , D - - - ( 6 )
式(6)中,f=(O,E,-Vsm);h为等式约束,g为非控制变量的不等式约束;u、x分别为控制变量和状态变量构成的向量。
所述步骤2)设置的初始变量及给定待优化变量范围包括:
(d)系统母线数据,支路数据,发电机数据,负荷数据,直流网络VSC数目,直流相连母线数据,直流支路数据,VSC控制方式;
(e)待优化变量的上、下限,对于离散变量还需指定步长;
(f)种群规模pop、迭代次数gen、目标函数数目M、优化变量个数V、选择操作进制tour、交叉和变异操作过程中分配数mu和mum。
所述步骤3)中,将待优化变量作为优化过程中种群个体,采用混合编码的方式进行编码求解,其中有功、无功功率及电压变量为连续变量,采用实数编码,变压器变比和无功补偿变量为离散变量,采用整数编码,将优化变量作为种群中个体进行处理;根据待优化变量范围随机生成初始种群,即根据待优化变量上下限以及离散变量的步长,在范围内随机产生个体并形成初始种群为
所述步骤4)中,采用交替迭代法,对每次重新产生的种群计算交直流系统潮流,其中直流网络中某一节点采用定直流电压、定交流电压控制,称之为平衡节点,其余节点采用定有功功率、定无功功率控制,计算步骤如下:
(g)根据直流网络中功率关系,估计直流网络中平衡节点的功率;
(h)依据直流网络参数、直流网络平衡节点功率及交流网络自身参数,计算交流网络潮流;
(j)得到交流潮流计算结果后,计算直流网络损耗及换流站功率;
(k)由估计值及交流潮流计算结果,对直流网络潮流进行计算,得出直流网络中除平衡节点外其余节点潮流计算结果;
(l)通过直流网络潮流计算结果及节点之间关系,迭代求出直流网络中平衡节点处功率;
(m)判断是否满足终止条件,若满足条件,则转至步骤(o),计算结束;否则,转至步骤(h),并更新直流网络平衡节点功率;
(o)潮流计算过程结束,输出潮流计算结果。
所述步骤5)中,根据种群中各个体所包含的待优化变量值更新交直流系统中对应数据,依据潮流计算结果求取种群中各个体对应的优化目标函数值。
所述步骤6)中,对种群个体进行快速非支配排序,并计算虚拟适应度,经选择、交叉和变异处理,生成子种群的具体实现方式为:
(p)快速非支配排序,是经过对相关目标函数的计算得到潮流优化的非劣集解,根据非劣结果对个体进行分层处理,向Pareto最优解的方向逼近使种群进化的一种排序方法;在进化过程中,为保持种群的多样性,设计个体拥挤距离,并在选择过程中优先选择拥挤距离较大的个体;
(q)虚拟适应度在计算时,首先对种群和优化目标函数值形成的染色体进行解码,然后按多目标潮流优化的数学模型计算每个个体相应的优化目标函数值,再根据优化目标函数值进行非劣分层,计算每层个体的虚拟适应度;
(x)子代种群Di的获取需要通过对父代种群中的个体进行选择、交叉和变异处理,这一过程中,选择操作采用轮赛制选择父代算子,交叉操作采用模拟二进制交叉(simulatedbinarycrossover,SBX)算子,变异操作采用正态变异算子。
所述步骤7)中,描述的是NSGA-II算法的精英进化策略,即将父代中的优良个体直接保留到子代的策略,防止在进化过程中父代优良个体被丢弃。
所述步骤8)中,优化终止条件可以取为迭代过程是否达到预先设定的最大代数。
所述步骤9)中,输出的计算结果包括:
(y)待优化变量值对应的数值及优化目标函数值;
(z)优化目标函数值的最优解集曲线图。
本发明的含VSC-HVDC的交直流系统多目标潮流优化方法,能够计及VSC-HVDC的快速、灵活的调节能力,使系统运行的安全性、经济性和环保性均得到了提高,具有方法科学,适用性强,效果佳等优点。
附图说明
图1是含VSC-HVDC的交直流系统多目标潮流优化方法流程图;
图2是换流站等效模型图;
图3是交直流系统潮流计算流程图;
图4是实施例电力系统示意图;
图5是实施例电力系统优化结果图。
具体实施方式
下面结合附图,对优选实施例作详细说明。应该强调的是,下述说明仅仅是示例性的,而不是为了限制本发明的范围及其应用。
参见图1,本发明的一种含VSC-HVDC的交直流系统多目标潮流优化方法,包括步骤如下:
步骤1:建立模型,选取待优化变量、优化目标及确定约束条件,其过程为:
i)选取待优化变量,待优化变量为交直流系统中变量,连续变量主要包括发电机有功出力PG和机端电压VG,交流系统流入换流变压器的有功功率Ps和无功功率Qs,离散变量主要包括变压器变比KT和无功补偿容量QR,交直流系统中变量表示为x=[PG,VG,KT,QR,Ud,Id,δ,M,Ps,Qs]的形式,其中Id为直流节点的电流,δ为交流侧与直流侧的相角差,M为调制度;
ii)选取优化目标,选用降低系统的有功网损、减少污染气体排放量和提高静态电压稳定裕度作为优化目标,考虑VSC-HVDC的调节能力,协调各优化目标之间关系,优化目标函数表达式为:
min O = Σ i = 1 n V i Σ j = 1 n V j ( G i j cosθ i j + B i j sinθ i j ) + P l o s s min E = Σ i = 1 N G ( α i P G i 2 + β i P G i + γ i ) max V s m = δ min - - - ( 1 )
式(1)中,O、E和Vsm分别代表系统的有功网损、污染气体排放量和静态电压稳定裕度三个优化目标;Vi和Vj分别为节点i、j的电压幅值,Gij、Bij、θij分别为节点i、j之间的电导、电纳和相角差,Ploss为直流网络的换流站、电抗器及直流线路损耗之和;NG和n分别为发电机数和节点总数,αi、βi和γi为发电机i的污染气体排放系数,为节点i的发电机有功出力;δmin为系统收敛潮流雅克比矩阵的最小奇异值;
iii)确定约束条件,模型的约束条件包括等式约束和不等式约束两部分;等式约束条件:包含交流系统的功率平衡方程及VSC-HVDC的相关等式约束,交流网络中相关等式约束写为:
P g i - P d i - V i Σ j ∈ i V j ( G i j sinθ i j + B i j cosθ i j ) = 0 Q g i - Q d i - V i Σ j ∈ i V j ( G i j sinθ i j - B i j cosθ i j ) = 0 - - - ( 2 )
式(2)中,Pgi、Qgi、Pdi、Qdi分别为节点i的有功输入、无功输入、有功负荷、无功负荷;Gij、Bij为节点导纳阵第i行第j列元素的实部与虚部;
直流网络中相关等式约束写为:
P c = U c 2 G c - U s U c [ G c c o s ( δ s - δ c ) + B c s i n ( δ s - δ c ) ] Q c = - U c 2 B c + U s U c [ G c s i n ( δ s - δ c ) + B c c o s ( δ s - δ c ) ] Σ i = 1 n P s , i + P l o s s = 0 P dc i = 2 U dc i Σ j ≠ i Y dc i j · ( U dc i - U dc j ) - - - ( 3 )
式(3)中,Pc、Qc分别表示换流站端的有功功率和无功功率;交流侧电压直流侧电压换流站等效阻抗Zc=Gc+jBc;Ps,i表示交流网络侧在节点i的有功功率;Ploss表示直流网络中损耗;表示直流网络中节点i、j之间的导纳;表示直流网络中节点有功功率;分别表示直流网络节点i、j的电压;
不等式约束条件:包含交流系统的电压幅值、相角及线路传输功率约束,和VSC-HVDC的相关不等式约束,交流网络中相关不等式约束写为:
P G i min ≤ P G i ≤ P G i max i = 1 , ... , N G Q G i min ≤ Q G i ≤ Q G i max i = 1 , ... , N G V i min ≤ V i ≤ V i max i = 1 , ... , N T i min ≤ T i ≤ T i max i = 1 , ... , N T Q C i min ≤ Q C i ≤ Q C i max i = 1 , ... , N C - - - ( 4 )
式(4)中,N、NT、NC分别为系统所有节点数、变压器可调分接头数、无功补偿节点数;PGi、QGi分别为发电机的有功、无功出力;Ti为补偿电容器的投切组数;QCi为可调变压器的分接头位置;下标max和min分别表示变量的上、下限;
直流网络中相关不等式约束写为:
Q s = Q 0 ± r 2 - ( P s - P 0 ) 2 S 0 = - U s 2 ( 1 Z f * + Z t f * ) , r = U s I c max | Z f * Z f * + Z t f * | S 0 = - U s 2 ( 1 Z 1 * + 1 Z 2 * ) , r = U s U c m 1 Z 2 - - - ( 5 )
式(5)为直流网络中由电流电压确定的有功功率和无功功率约束范围;Ps、Qs分别为交流侧功率;各换流器PQ功率圆约束圆的圆心为S0(P0,Q0),约束圆半径为r;为电流约束上限,下限为零;Ucm时分别作为电压约束的上下限;
参照图2,Zf、Ztf分别为换流站等效模型中节点对地及对交流侧的阻抗;Z1、Z2分别为换流站等效模型中元件Zf、Ztf及Zc经Y-Δ变换后的对地阻抗值。
综上,将交直流系统多目标最优潮流问题建模如下:
min f m ( u , x ) m = 1 , ... , M s . t . h j ( u , x ) = 0 j = 1 , ... , p g j ( u , x ) = 0 j = p + 1 , ... , q u i min ≤ u i ≤ u i max i = 1 , ... , D - - - ( 6 )
式(6)中,f=(O,E,-Vsm);h为等式约束,g为非控制变量的不等式约束;u、x分别为控制变量和状态变量构成的向量。
步骤2:设置的初始变量及给定待优化变量范围,其内容包括:
i)系统母线数据,支路数据,发电机数据,负荷数据,直流网络VSC数目,直流相连母线数据,直流支路数据,VSC控制方式;
ii)待优化变量的上、下限,对于离散变量还需指定步长;
iii)种群规模pop、迭代次数gen、目标函数数目M、优化变量个数V、选择操作进制tour、交叉和变异操作过程中分配数mu和mum。
步骤3:将待优化变量作为优化过程中种群个体,采用混合编码的方式进行编码求解,其中有功、无功功率及电压变量为连续变量,采用实数编码,变压器变比和无功补偿变量为离散变量,采用整数编码,将优化变量作为种群中个体进行处理;根据待优化变量范围随机生成初始种群,即根据待优化变量上下限以及离散变量的步长,在范围内随机产生个体并形成初始种群为
步骤4:采用交替迭代法,对每次重新产生的种群计算交直流系统潮流,其中直流网络中某一节点采用定直流电压、定交流电压控制,称之为平衡节点,其余节点采用定有功功率、定无功功率控制,交直流系统潮流计算流程图如图3所示,计算步骤如下:
a)根据直流网络中功率关系,估计直流网络中平衡节点的功率;
b)依据直流网络参数、直流网络平衡节点功率及交流网络自身参数,计算交流网络潮流;
c)得到交流潮流计算结果后,计算直流网络损耗及换流站功率;
d)由估计值及交流潮流计算结果,对直流网络潮流进行计算,得出直流网络中除平衡节点外其余节点潮流计算结果;
e)通过直流网络潮流计算结果及节点之间关系,迭代求出直流网络中平衡节点处功率;
f)判断是否满足终止条件,若满足条件,则转至步骤(g),计算结束;否则,转至步骤(b),并更新直流网络平衡节点功率;
g)潮流计算过程结束,输出潮流计算结果。
步骤5:根据种群中各个体所包含的待优化变量值更新交直流系统中对应数据,依据潮流计算结果求取种群中各个体对应的优化目标函数值。
步骤6:对种群个体进行快速非支配排序,并计算虚拟适应度,经选择、交叉和变异处理,生成子种群,其具体实现方式为:
i)快速非支配排序,是经过对相关目标函数的计算得到潮流优化的非劣集解,根据非劣结果对个体进行分层处理,向Pareto最优解的方向逼近使种群进化的一种排序方法;在进化过程中,为保持种群的多样性,设计个体拥挤距离,并在选择过程中优先选择拥挤距离较大的个体;
ii)虚拟适应度在计算时,首先对种群和优化目标函数值形成的染色体进行解码,然后按多目标潮流优化的数学模型计算每个个体相应的优化目标函数值,再根据优化目标函数值进行非劣分层,计算每层个体的虚拟适应度;
iii)子代种群Di的获取需要通过对父代种群中的个体进行选择、交叉和变异处理,这一过程中,选择操作采用轮赛制选择父代算子,交叉操作采用模拟二进制交叉(simulatedbinarycrossover,SBX)算子,变异操作采用正态变异算子。
步骤7:采用精英策略保留父代中优良个体,NSGA-II算法的精英进化策略,即将父代中的优良个体直接保留到子代的策略,防止在进化过程中父代优良个体被丢弃。
步骤8:判断是否满足算法终止条件,若满足条件,则转至步骤9,优化结束;否则,转至步骤4;
优化终止条件可以取为迭代过程是否达到预先设定的最大代数。
步骤9:优化过程结束,输出的计算结果包括:
i)待优化变量值对应的数值及优化目标函数值;
ii)优化目标函数值的最优解集曲线图。
图4是经修改的IEEE14节点交直流混合系统,实施例是本发明的一种含VSC-HVDC的交直流系统多目标潮流优化方法在此系统上的具体应用。该系统包括5台发电机,18条支路,11个负荷,13-14支路修改为直流支路,直流节点参数如表1所示。设定所提最优潮流方法求解时算例的两个直流节点VSC1、VSC2的控制方式分别为定直流电压、定交流电压控制和定有功功率、定无功功率控制。基于所提最优潮流方法对此交直流系统进行优化,所得Pareto最优集在目标函数空间上的分布如图5所示,其中部分Pareto最优解见表2。
表1直流节点参数
表1中,Nbus表示VSC所在的交流母线号;R为换流器内部损耗和换流变压器损耗的等效电阻;XL为换流变压器阻抗;Ps、Qs为交流系统流入换流变压器的有功和无功功率;Ud为直流电压。
表2部分Pareto最优解
表2中数据为分别将系统有功网损、污染气体排放量和静态电压稳定裕度设为主要考虑的优化目标时所取得的可行解之一;根据图5中数据可以看出,将NSGA-II应用于多目标潮流优化时,一次运行可以得到多个Pareto最优解集,便于决策者根据实际系统要求进行选择。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求的保护范围为准。

Claims (10)

1.一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征是,它包括以下步骤:
1)建立模型,选取待优化变量、优化目标及确定约束条件;
2)设置初始变量并给定待优化变量范围;
3)将待优化变量作为优化过程中种群个体,采用混合编码的方式,根据待优化变量范围随机生成初始种群;
4)采用交替迭代法,计算交直流系统潮流;
5)求取种群中各个体对应的优化目标函数值;
6)对种群个体进行快速非支配排序,并计算虚拟适应度,经选择、交叉和变异处理,生成子种群;
7)采用精英策略保留父代中优良个体;
8)判断是否满足算法终止条件,若满足条件,则转至步骤9),优化结束;否则,转至步骤4);
9)优化过程结束,输出结果。
2.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤1)的建立模型过程为:
(a)选取待优化变量,待优化变量为交直流系统中变量,连续变量主要包括发电机有功出力PG和机端电压VG,交流系统流入换流变压器的有功功率Ps和无功功率Qs,离散变量主要包括变压器变比KT和无功补偿容量QR,交直流系统中变量表示为x=[PG,VG,KT,QR,Ud,Id,δ,M,Ps,Qs]的形式,其中Id为直流节点的电流,δ为交流侧与直流侧的相角差,M为调制度;
(b)选取优化目标,选用降低系统的有功网损、减少污染气体排放量和提高静态电压稳定裕度作为优化目标,考虑VSC-HVDC的调节能力,协调各优化目标之间关系,优化目标函数表达式为:
min O = Σ i = 1 n V i Σ j = 1 n V j ( G i j cosθ i j + B i j sinθ i j ) + P l o s s min E = Σ i = 1 N G ( α i P G i 2 + β i P G i + γ i ) max V s m = δ min - - - ( 1 )
式(1)中,O、E和Vsm分别代表系统的有功网损、污染气体排放量和静态电压稳定裕度三个优化目标;Vi和Vj分别为节点i、j的电压幅值,Gij、Bij、θij分别为节点i、j之间的电导、电纳和相角差,Ploss为直流网络的换流站、电抗器及直流线路损耗之和;NG和n分别为发电机数和节点总数,αi、βi和γi为发电机i的污染气体排放系数,为节点i的发电机有功出力;δmin为系统收敛潮流雅克比矩阵的最小奇异值;
(c)确定约束条件,模型的约束条件包括等式约束和不等式约束两部分;等式约束条件:包含交流系统的功率平衡方程及VSC-HVDC的相关等式约束;交流网络中相关等式约束写为:
P g i - P d i - V i Σ j ∈ i V j ( G i j sinθ i j + B i j cosθ i j ) = 0 Q g i - Q d i - V i Σ j ∈ i V j ( G i j sinθ i j - B i j cosθ i j ) = 0 - - - ( 2 )
式(2)中,Pgi、Qgi、Pdi、Qdi分别为节点i的有功输入、无功输入、有功负荷、无功负荷;Gij、Bij为节点导纳阵第i行第j列元素的实部与虚部;
直流网络中相关等式约束写为:
P c = U c 2 G c - U s U c [ G c c o s ( δ s - δ c ) + B c s i n ( δ s - δ c ) ] Q c = - U c 2 B c + U s U c [ G c s i n ( δ s - δ c ) + B c c o s ( δ s - δ c ) ] Σ i = 1 n P s , i + P l o s s = 0 P dc i = 2 U dc i Σ j ≠ i Y dc i j · ( U dc i - U dc j ) - - - ( 3 )
式(3)中,Pc、Qc分别表示换流站端的有功功率和无功功率;交流侧电压直流侧电压换流站等效阻抗Zc=Gc+jBc;Ps,i表示交流网络侧在节点i的有功功率;Ploss表示直流网络中损耗;表示直流网络中节点i、j之间的导纳;表示直流网络中节点有功功率;分别表示直流网络节点i、j的电压;
不等式约束条件:包含交流系统的电压幅值、相角及线路传输功率约束,和VSC-HVDC的相关不等式约束;交流网络中相关不等式约束写为:
P G i min ≤ P G i ≤ P G i m a x i = 1 , ... , N G Q G i min ≤ Q G i ≤ Q G i m a x i = 1 , ... , N G V i min ≤ V i ≤ V i m a x i = 1 , ... , N T i min ≤ T i ≤ T i m a x i = 1 , ... , N T Q C i min ≤ Q C i ≤ Q C i m a x i = 1 , ... , N C - - - ( 4 )
式(4)中,N、NT、NC分别为系统所有节点数、变压器可调分接头数、无功补偿节点数;PGi、QGi分别为发电机的有功、无功出力;Ti为补偿电容器的投切组数;QCi为可调变压器的分接头位置;下标max和min分别表示变量的上、下限;
直流网络中相关不等式约束写为:
Q s = Q 0 ± r 2 - ( P s - P 0 ) 2 S 0 = - U s 2 ( 1 Z f * + Z t f * ) , r = U s I c max | Z f * Z f * + Z t f * | S 0 = - U s 2 ( 1 Z 1 * + 1 Z 2 * ) , r = U s U c m 1 Z 2 - - - ( 5 )
式(5)为直流网络中由电流电压确定的有功功率和无功功率约束范围;Ps、Qs分别为交流侧功率;各换流器PQ功率圆约束圆的圆心为S0(P0,Q0),约束圆半径为r;为电流约束上限,下限为零;Ucm时分别作为电压约束的上下限;
综上,将交直流系统多目标最优潮流问题建模如下:
min f m ( u , x ) m = 1 , ... , M s . t . h j ( u , x ) = 0 j = 1 , ... , p g j ( u , x ) = 0 j = p + 1 , ... , q u i min ≤ u i ≤ u i max i = 1 , ... , D - - - ( 6 )
式(6)中,f=(O,E,-Vsm);h为等式约束,g为非控制变量的不等式约束;u、x分别为控制变量和状态变量构成的向量。
3.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤2)设置的初始变量及给定待优化变量范围包括:
(d)系统母线数据,支路数据,发电机数据,负荷数据,直流网络VSC数目,直流相连母线数据,直流支路数据,VSC控制方式;
(e)待优化变量的上、下限,对于离散变量还需指定步长;
(f)种群规模pop、迭代次数gen、目标函数数目M、优化变量个数V、选择操作进制tour、交叉和变异操作过程中分配数mu和mum。
4.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤3)中,将待优化变量作为优化过程中种群个体,采用混合编码的方式进行编码求解,其中有功、无功功率及电压变量为连续变量,采用实数编码,变压器变比和无功补偿变量为离散变量,采用整数编码,将优化变量作为种群中个体进行处理;根据待优化变量范围随机生成初始种群,即根据待优化变量上下限以及离散变量的步长,在范围内随机产生个体并形成初始种群为
5.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤4)中,采用交替迭代法,对每次重新产生的种群计算交直流系统潮流,其中直流网络中某一节点采用定直流电压、定交流电压控制,称之为平衡节点,其余节点采用定有功功率、定无功功率控制,计算步骤如下:
(g)根据直流网络中功率关系,估计直流网络中平衡节点的功率;
(h)依据直流网络参数、直流网络平衡节点功率及交流网络自身参数,计算交流网络潮流;
(j)得到交流潮流计算结果后,计算直流网络损耗及换流站功率;
(k)由估计值及交流潮流计算结果,对直流网络潮流进行计算,得出直流网络中除平衡节点外其余节点潮流计算结果;
(l)通过直流网络潮流计算结果及节点之间关系,迭代求出直流网络中平衡节点处功率;
(m)判断是否满足终止条件,若满足条件,则转至步骤(o),计算结束;否则,转至步骤(h),并更新直流网络平衡节点功率;
(o)潮流计算过程结束,输出潮流计算结果。
6.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤5)中,根据种群中各个体所包含的待优化变量值更新交直流系统中对应数据,依据潮流计算结果求取种群中各个体对应的优化目标函数值。
7.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤6)中,对种群个体进行快速非支配排序,并计算虚拟适应度,经选择、交叉和变异处理,生成子种群的具体实现方式为:
(p)快速非支配排序,是经过对相关目标函数的计算得到潮流优化的非劣集解,根据非劣结果对个体进行分层处理,向Pareto最优解的方向逼近使种群进化的一种排序方法;在进化过程中,为保持种群的多样性,设计个体拥挤距离,并在选择过程中优先选择拥挤距离较大的个体;
(q)虚拟适应度在计算时,首先对种群和优化目标函数值形成的染色体进行解码,然后按多目标潮流优化的数学模型计算每个个体相应的优化目标函数值,再根据优化目标函数值进行非劣分层,计算每层个体的虚拟适应度;
(x)子代种群Di的获取需要通过对父代种群中的个体进行选择、交叉和变异处理,这一过程中,选择操作采用轮赛制选择父代算子,交叉操作采用模拟二进制交叉(simulatedbinarycrossover,SBX)算子,变异操作采用正态变异算子。
8.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤7)中,描述的是NSGA-II算法的精英进化策略,即将父代中的优良个体直接保留到子代的策略,防止在进化过程中父代优良个体被丢弃。
9.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤8)中,优化终止条件取为迭代过程是否达到预先设定的最大代数。
10.根据权利要求1所述的一种含VSC-HVDC交直流系统的多目标潮流优化方法,其特征在于:所述步骤9)中,输出的计算结果包括:
(y)待优化变量值对应的数值及优化目标函数值;
(z)优化目标函数值的最优解集曲线图。
CN201510882003.7A 2015-12-04 2015-12-04 一种含vsc-hvdc的交直流系统多目标潮流优化方法 Expired - Fee Related CN105321003B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510882003.7A CN105321003B (zh) 2015-12-04 2015-12-04 一种含vsc-hvdc的交直流系统多目标潮流优化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510882003.7A CN105321003B (zh) 2015-12-04 2015-12-04 一种含vsc-hvdc的交直流系统多目标潮流优化方法

Publications (2)

Publication Number Publication Date
CN105321003A true CN105321003A (zh) 2016-02-10
CN105321003B CN105321003B (zh) 2019-08-06

Family

ID=55248350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510882003.7A Expired - Fee Related CN105321003B (zh) 2015-12-04 2015-12-04 一种含vsc-hvdc的交直流系统多目标潮流优化方法

Country Status (1)

Country Link
CN (1) CN105321003B (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105826946A (zh) * 2016-05-09 2016-08-03 东北电力大学 大规模光伏接入的配电网动态无功优化方法
CN105978016A (zh) * 2016-06-30 2016-09-28 东北电力大学 一种基于最优潮流的多端柔性直流输电系统优化控制方法
CN107611980A (zh) * 2017-10-20 2018-01-19 国网上海市电力公司 基于双端发电机等效的交直流混合潮流优化方法
CN108173278A (zh) * 2018-01-15 2018-06-15 清华大学 新能源vsg调频的直流电压控制装置、方法及优化方法
CN108879650A (zh) * 2018-06-27 2018-11-23 广东电网有限责任公司电力科学研究院 一种多端柔性直流输电系统的协调优化控制方法及装置
CN109038546A (zh) * 2018-07-10 2018-12-18 中国电力科学研究院有限公司 一种基于vsc-hvdc系统的交直流混联电网负荷恢复方法及系统
CN109193693A (zh) * 2018-10-10 2019-01-11 贵州电网有限责任公司 一种基于柔性直流系统的无功控制优化方法
CN110053521A (zh) * 2019-03-08 2019-07-26 北京交通大学 城市轨道交通牵引供电系统及车-网配合参数优化方法
CN110912177A (zh) * 2019-12-15 2020-03-24 兰州交通大学 一种多端柔性直流输电系统多目标优化设计方法
CN111463794A (zh) * 2020-04-29 2020-07-28 山东大学 一种附加对地阻抗的输配电网协同潮流控制方法及系统
CN112446533A (zh) * 2020-09-29 2021-03-05 东北电力大学 交直流混合配电网多目标规划方法
CN112531728A (zh) * 2020-12-07 2021-03-19 广东电网有限责任公司佛山供电局 一种基于改进naga-ii算法的配电网无功优化方法
CN112926785A (zh) * 2021-03-10 2021-06-08 国网吉林省电力有限公司信息通信公司 支撑电力大数据的云数据中心负载优化调度方法
CN112949195A (zh) * 2021-03-10 2021-06-11 国网吉林省电力有限公司信息通信公司 电力云数据中心多目标任务调度方法
CN115360762A (zh) * 2022-09-16 2022-11-18 东南大学溧阳研究院 交直流系统有功功率最大化消纳方法
CN116154834A (zh) * 2022-09-07 2023-05-23 东南大学溧阳研究院 一种基于多端直流系统的分层控制方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101976836A (zh) * 2010-09-30 2011-02-16 河海大学 含vsc-hvdc的交直流系统电压稳定静态分析方法
CN102545207A (zh) * 2011-12-22 2012-07-04 河海大学 基于预测-校正内点法的vsc-hvdc交直流最优潮流方法
CN102611119A (zh) * 2012-03-14 2012-07-25 华北电力大学 电力系统多目标无功优化方法
CN102820662A (zh) * 2012-08-17 2012-12-12 华北电力大学 含分布式电源的电力系统多目标无功优化方法
WO2014114107A1 (zh) * 2013-01-22 2014-07-31 国家电网公司 一种分布式电源最优潮流优化方法
KR101462349B1 (ko) * 2013-07-17 2014-11-20 서울대학교산학협력단 생산이력 히스토리 매칭의 최적화 방법
CN104866919A (zh) * 2015-05-20 2015-08-26 天津大学 基于改进nsga-ii的含风电场电网多目标规划方法
CN105119280A (zh) * 2015-08-31 2015-12-02 天津大学 基于锥优化的交直流混合结构有源配电网运行优化方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101976836A (zh) * 2010-09-30 2011-02-16 河海大学 含vsc-hvdc的交直流系统电压稳定静态分析方法
CN102545207A (zh) * 2011-12-22 2012-07-04 河海大学 基于预测-校正内点法的vsc-hvdc交直流最优潮流方法
CN102611119A (zh) * 2012-03-14 2012-07-25 华北电力大学 电力系统多目标无功优化方法
CN102820662A (zh) * 2012-08-17 2012-12-12 华北电力大学 含分布式电源的电力系统多目标无功优化方法
WO2014114107A1 (zh) * 2013-01-22 2014-07-31 国家电网公司 一种分布式电源最优潮流优化方法
KR101462349B1 (ko) * 2013-07-17 2014-11-20 서울대학교산학협력단 생산이력 히스토리 매칭의 최적화 방법
CN104866919A (zh) * 2015-05-20 2015-08-26 天津大学 基于改进nsga-ii的含风电场电网多目标规划方法
CN105119280A (zh) * 2015-08-31 2015-12-02 天津大学 基于锥优化的交直流混合结构有源配电网运行优化方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
M GHASEMI等: "Multi-objective optimal power flow considering the cost, emission, voltage deviation and power losses using multi-objective modified imperialist competitive algorithm", 《ENERGY》 *
VENKATESH P等: "Comparison and application of evolutionary programming techniques to combined economic emission dispatch with line flow constraints", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
罗斌: "基于NSGA-II的含风电场电力系统多目标调度计划研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑(月刊)》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105826946A (zh) * 2016-05-09 2016-08-03 东北电力大学 大规模光伏接入的配电网动态无功优化方法
CN105978016A (zh) * 2016-06-30 2016-09-28 东北电力大学 一种基于最优潮流的多端柔性直流输电系统优化控制方法
CN107611980A (zh) * 2017-10-20 2018-01-19 国网上海市电力公司 基于双端发电机等效的交直流混合潮流优化方法
CN108173278B (zh) * 2018-01-15 2019-12-20 清华大学 新能源vsg调频的直流电压控制装置、方法及优化方法
CN108173278A (zh) * 2018-01-15 2018-06-15 清华大学 新能源vsg调频的直流电压控制装置、方法及优化方法
CN108879650A (zh) * 2018-06-27 2018-11-23 广东电网有限责任公司电力科学研究院 一种多端柔性直流输电系统的协调优化控制方法及装置
CN108879650B (zh) * 2018-06-27 2021-09-03 广东电网有限责任公司电力科学研究院 一种多端柔性直流输电系统的协调优化控制方法及装置
CN109038546B (zh) * 2018-07-10 2021-08-06 中国电力科学研究院有限公司 一种基于vsc-hvdc系统的交直流混联电网负荷恢复方法及系统
CN109038546A (zh) * 2018-07-10 2018-12-18 中国电力科学研究院有限公司 一种基于vsc-hvdc系统的交直流混联电网负荷恢复方法及系统
CN109193693A (zh) * 2018-10-10 2019-01-11 贵州电网有限责任公司 一种基于柔性直流系统的无功控制优化方法
CN110053521A (zh) * 2019-03-08 2019-07-26 北京交通大学 城市轨道交通牵引供电系统及车-网配合参数优化方法
CN110912177A (zh) * 2019-12-15 2020-03-24 兰州交通大学 一种多端柔性直流输电系统多目标优化设计方法
CN111463794A (zh) * 2020-04-29 2020-07-28 山东大学 一种附加对地阻抗的输配电网协同潮流控制方法及系统
CN112446533A (zh) * 2020-09-29 2021-03-05 东北电力大学 交直流混合配电网多目标规划方法
CN112531728A (zh) * 2020-12-07 2021-03-19 广东电网有限责任公司佛山供电局 一种基于改进naga-ii算法的配电网无功优化方法
CN112926785A (zh) * 2021-03-10 2021-06-08 国网吉林省电力有限公司信息通信公司 支撑电力大数据的云数据中心负载优化调度方法
CN112949195A (zh) * 2021-03-10 2021-06-11 国网吉林省电力有限公司信息通信公司 电力云数据中心多目标任务调度方法
CN116154834A (zh) * 2022-09-07 2023-05-23 东南大学溧阳研究院 一种基于多端直流系统的分层控制方法
CN115360762A (zh) * 2022-09-16 2022-11-18 东南大学溧阳研究院 交直流系统有功功率最大化消纳方法

Also Published As

Publication number Publication date
CN105321003B (zh) 2019-08-06

Similar Documents

Publication Publication Date Title
CN105321003A (zh) 一种含vsc-hvdc的交直流系统多目标潮流优化方法
CN103840457B (zh) 考虑电动汽车充放电影响的配电网内dg优化配置方法
CN104037765B (zh) 基于改进遗传算法选取有源配电网供电恢复方案的方法
CN109861202B (zh) 一种柔性互联配电网动态优化调度方法及系统
CN107134799A (zh) 一种基于短路比的特高压电网换流器无功配置方法
CN107392418B (zh) 一种城市配电网网络重构方法及系统
Saonerkar et al. Optimized DG placement in radial distribution system with reconfiguration and capacitor placement using genetic algorithm
CN105488593A (zh) 一种基于遗传算法的定容分布式电源发电最优选址及容量分配方法
Syahputra Distribution network optimization based on genetic algorithm
CN103903073A (zh) 一种含分布式电源及储能的微电网优化规划方法及系统
CN108304972B (zh) 一种基于供需互动和dg运行特性的主动配电网网架规划方法
CN109598377B (zh) 一种基于故障约束的交直流混合配电网鲁棒规划方法
CN103746388A (zh) 配电网无功电压三级协调控制方法
CN105633948A (zh) 一种分布式风电、光伏发电等不确定能源接入电力系统随机模糊潮流算法
CN107887908A (zh) 基于vsc与高压配电网拓扑重构的输电网阻塞管控方法
CN105186499A (zh) 一种配电网多目标概率最优潮流模糊建模与求解方法
CN107529678A (zh) 可扩展安全稳定约束的交直流电网多目标优化控制方法
Mohseni et al. Optimal sizing of an islanded micro-grid using meta-heuristic optimization algorithms considering demand-side management
CN107093899A (zh) 考虑多种不确定性源间秩相关的交直流混联电网概率潮流分析方法
Liu et al. Small-signal analysis of DC microgrid and multi-objective optimization segmented droop control suitable for economic dispatch
CN110086195B (zh) 交直流混合配用电系统的优化方法
Li et al. Optimal power flow calculation method for AC/DC hybrid distribution network based on power router
Zhang et al. Multi-objectives OPF of AC-DC systems considering VSC-HVDC integration
CN107392350A (zh) 含分布式能源及充电站的配电网扩展规划综合优化方法
CN106340906A (zh) 基于改进遗传算法的交直流系统低压减载优化方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Yang

Inventor after: Li Yahui

Inventor after: Li Guoqing

Inventor after: Wang Zhenhao

Inventor after: Xin Yechun

Inventor after: Wang He

Inventor after: Wang Chaobin

Inventor after: Liu Ruitong

Inventor before: Li Yang

Inventor before: Li Yahui

Inventor before: Li Guoqing

Inventor before: Wang Zhenhao

Inventor before: Wang Chaobin

Inventor before: Xin Yechun

Inventor before: Wang He

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170315

Address after: Jilin City, Jilin province Changchun ship 132012 Camp Road No. 169

Applicant after: Northeast Dianli University

Applicant after: Electric Power Research Institute of State Grid Liaoning Electric Power Co., Ltd.

Address before: Jilin City, Jilin province Changchun ship 132012 Camp Road No. 169

Applicant before: Northeast Dianli University

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190806

Termination date: 20191204