CN105321003B - 一种含vsc-hvdc的交直流系统多目标潮流优化方法 - Google Patents
一种含vsc-hvdc的交直流系统多目标潮流优化方法 Download PDFInfo
- Publication number
- CN105321003B CN105321003B CN201510882003.7A CN201510882003A CN105321003B CN 105321003 B CN105321003 B CN 105321003B CN 201510882003 A CN201510882003 A CN 201510882003A CN 105321003 B CN105321003 B CN 105321003B
- Authority
- CN
- China
- Prior art keywords
- power
- variable
- network
- population
- optimization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510882003.7A CN105321003B (zh) | 2015-12-04 | 2015-12-04 | 一种含vsc-hvdc的交直流系统多目标潮流优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510882003.7A CN105321003B (zh) | 2015-12-04 | 2015-12-04 | 一种含vsc-hvdc的交直流系统多目标潮流优化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105321003A CN105321003A (zh) | 2016-02-10 |
CN105321003B true CN105321003B (zh) | 2019-08-06 |
Family
ID=55248350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510882003.7A Expired - Fee Related CN105321003B (zh) | 2015-12-04 | 2015-12-04 | 一种含vsc-hvdc的交直流系统多目标潮流优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105321003B (zh) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105826946B (zh) * | 2016-05-09 | 2018-04-10 | 东北电力大学 | 大规模光伏接入的配电网动态无功优化方法 |
CN105978016B (zh) * | 2016-06-30 | 2018-04-13 | 东北电力大学 | 一种基于最优潮流的多端柔性直流输电系统优化控制方法 |
CN107611980B (zh) * | 2017-10-20 | 2020-09-15 | 国网上海市电力公司 | 基于双端发电机等效的交直流混合潮流优化方法 |
CN108173278B (zh) * | 2018-01-15 | 2019-12-20 | 清华大学 | 新能源vsg调频的直流电压控制装置、方法及优化方法 |
CN108879650B (zh) * | 2018-06-27 | 2021-09-03 | 广东电网有限责任公司电力科学研究院 | 一种多端柔性直流输电系统的协调优化控制方法及装置 |
CN109038546B (zh) * | 2018-07-10 | 2021-08-06 | 中国电力科学研究院有限公司 | 一种基于vsc-hvdc系统的交直流混联电网负荷恢复方法及系统 |
CN109193693B (zh) * | 2018-10-10 | 2020-04-14 | 贵州电网有限责任公司 | 一种基于柔性直流系统的无功控制优化方法 |
CN110053521B (zh) * | 2019-03-08 | 2020-11-03 | 北京交通大学 | 城市轨道交通牵引供电系统及车-网配合参数优化方法 |
CN110912177A (zh) * | 2019-12-15 | 2020-03-24 | 兰州交通大学 | 一种多端柔性直流输电系统多目标优化设计方法 |
CN111463794B (zh) * | 2020-04-29 | 2021-07-30 | 山东大学 | 一种附加对地阻抗的输配电网协同潮流控制方法及系统 |
CN112446533A (zh) * | 2020-09-29 | 2021-03-05 | 东北电力大学 | 交直流混合配电网多目标规划方法 |
CN112531728A (zh) * | 2020-12-07 | 2021-03-19 | 广东电网有限责任公司佛山供电局 | 一种基于改进naga-ii算法的配电网无功优化方法 |
CN112926785A (zh) * | 2021-03-10 | 2021-06-08 | 国网吉林省电力有限公司信息通信公司 | 支撑电力大数据的云数据中心负载优化调度方法 |
CN112949195A (zh) * | 2021-03-10 | 2021-06-11 | 国网吉林省电力有限公司信息通信公司 | 电力云数据中心多目标任务调度方法 |
CN116154834A (zh) * | 2022-09-07 | 2023-05-23 | 东南大学溧阳研究院 | 一种基于多端直流系统的分层控制方法 |
CN115360762A (zh) * | 2022-09-16 | 2022-11-18 | 东南大学溧阳研究院 | 交直流系统有功功率最大化消纳方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101976836A (zh) * | 2010-09-30 | 2011-02-16 | 河海大学 | 含vsc-hvdc的交直流系统电压稳定静态分析方法 |
CN102545207A (zh) * | 2011-12-22 | 2012-07-04 | 河海大学 | 基于预测-校正内点法的vsc-hvdc交直流最优潮流方法 |
CN102611119A (zh) * | 2012-03-14 | 2012-07-25 | 华北电力大学 | 电力系统多目标无功优化方法 |
CN102820662A (zh) * | 2012-08-17 | 2012-12-12 | 华北电力大学 | 含分布式电源的电力系统多目标无功优化方法 |
CN104866919A (zh) * | 2015-05-20 | 2015-08-26 | 天津大学 | 基于改进nsga-ii的含风电场电网多目标规划方法 |
CN105119280A (zh) * | 2015-08-31 | 2015-12-02 | 天津大学 | 基于锥优化的交直流混合结构有源配电网运行优化方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103150606B (zh) * | 2013-01-22 | 2017-06-23 | 中国电力科学研究院 | 一种分布式电源最优潮流优化方法 |
KR101462349B1 (ko) * | 2013-07-17 | 2014-11-20 | 서울대학교산학협력단 | 생산이력 히스토리 매칭의 최적화 방법 |
-
2015
- 2015-12-04 CN CN201510882003.7A patent/CN105321003B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101976836A (zh) * | 2010-09-30 | 2011-02-16 | 河海大学 | 含vsc-hvdc的交直流系统电压稳定静态分析方法 |
CN102545207A (zh) * | 2011-12-22 | 2012-07-04 | 河海大学 | 基于预测-校正内点法的vsc-hvdc交直流最优潮流方法 |
CN102611119A (zh) * | 2012-03-14 | 2012-07-25 | 华北电力大学 | 电力系统多目标无功优化方法 |
CN102820662A (zh) * | 2012-08-17 | 2012-12-12 | 华北电力大学 | 含分布式电源的电力系统多目标无功优化方法 |
CN104866919A (zh) * | 2015-05-20 | 2015-08-26 | 天津大学 | 基于改进nsga-ii的含风电场电网多目标规划方法 |
CN105119280A (zh) * | 2015-08-31 | 2015-12-02 | 天津大学 | 基于锥优化的交直流混合结构有源配电网运行优化方法 |
Non-Patent Citations (3)
Title |
---|
Comparison and application of evolutionary programming techniques to combined economic emission dispatch with line flow constraints;Venkatesh P等;《IEEE Transactions on Power Systems》;20030531;第18卷(第2期);全文 |
Multi-objective optimal power flow considering the cost, emission, voltage deviation and power losses using multi-objective modified imperialist competitive algorithm;M Ghasemi等;《Energy》;20141106;第78卷;全文 |
基于NSGA-II的含风电场电力系统多目标调度计划研究;罗斌;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑(月刊)》;20131215(第S2期);全文 |
Also Published As
Publication number | Publication date |
---|---|
CN105321003A (zh) | 2016-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105321003B (zh) | 一种含vsc-hvdc的交直流系统多目标潮流优化方法 | |
CN109861202B (zh) | 一种柔性互联配电网动态优化调度方法及系统 | |
CN105449675B (zh) | 优化分布式能源接入点和接入比例的电力网络重构方法 | |
CN104037765B (zh) | 基于改进遗传算法选取有源配电网供电恢复方案的方法 | |
Cossi et al. | Planning of secondary distribution circuits through evolutionary algorithms | |
CN105488593A (zh) | 一种基于遗传算法的定容分布式电源发电最优选址及容量分配方法 | |
CN103746374A (zh) | 含多微网配电网的合环控制方法 | |
CN106374513B (zh) | 一种基于主从博弈的多微网联络线功率优化方法 | |
CN110896231B (zh) | 一种扶贫区配电网接纳分布式光伏能力计算方法及系统 | |
CN106960394A (zh) | 一种基于蒙特卡罗的交直流混联电网输电能力评估方法 | |
CN103746388A (zh) | 配电网无功电压三级协调控制方法 | |
CN107546773A (zh) | 一种基于图论的区域多微电网动态组网方法 | |
CN107529678A (zh) | 可扩展安全稳定约束的交直流电网多目标优化控制方法 | |
CN105529703B (zh) | 一种基于供电能力瓶颈分析的城市电网改造规划方法 | |
CN104484555B (zh) | 评估220kV自愈式环网最大供电能力的方法 | |
CN112446533A (zh) | 交直流混合配电网多目标规划方法 | |
CN103730900A (zh) | 电力系统多时间尺度的省地县一体化无功优化方法 | |
CN109888817B (zh) | 对光伏电站和数据中心进行位置部署和容量规划方法 | |
CN108306346A (zh) | 一种配电网无功补偿节能方法 | |
Zhang et al. | Multi-objectives OPF of AC-DC systems considering VSC-HVDC integration | |
CN104484832B (zh) | 评估220kv拉手网最大供电能力的方法 | |
CN102522765B (zh) | 基于自动微分技术的vsc-hvdc潮流计算方法 | |
CN105576653B (zh) | 一种220kV片区电网供电能力优化方法 | |
CN104143119A (zh) | 一种多尺度分层蜂窝输电网及其规划方法 | |
CN105449672A (zh) | 一种评估220kv环套环网最大供电能力的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Yang Inventor after: Li Yahui Inventor after: Li Guoqing Inventor after: Wang Zhenhao Inventor after: Xin Yechun Inventor after: Wang He Inventor after: Wang Chaobin Inventor after: Liu Ruitong Inventor before: Li Yang Inventor before: Li Yahui Inventor before: Li Guoqing Inventor before: Wang Zhenhao Inventor before: Wang Chaobin Inventor before: Xin Yechun Inventor before: Wang He |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170315 Address after: Jilin City, Jilin province Changchun ship 132012 Camp Road No. 169 Applicant after: Northeast Dianli University Applicant after: Electric Power Research Institute of State Grid Liaoning Electric Power Co., Ltd. Address before: Jilin City, Jilin province Changchun ship 132012 Camp Road No. 169 Applicant before: Northeast Dianli University |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190806 Termination date: 20191204 |