CN105826946B - 大规模光伏接入的配电网动态无功优化方法 - Google Patents

大规模光伏接入的配电网动态无功优化方法 Download PDF

Info

Publication number
CN105826946B
CN105826946B CN201610300308.7A CN201610300308A CN105826946B CN 105826946 B CN105826946 B CN 105826946B CN 201610300308 A CN201610300308 A CN 201610300308A CN 105826946 B CN105826946 B CN 105826946B
Authority
CN
China
Prior art keywords
mrow
msub
mtd
mtr
photovoltaic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610300308.7A
Other languages
English (en)
Other versions
CN105826946A (zh
Inventor
王鹤
李国庆
陈蓉
于华楠
王振浩
辛业春
李卫国
姜涛
李雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Electric Power University
Original Assignee
Northeast Dianli University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Dianli University filed Critical Northeast Dianli University
Priority to CN201610300308.7A priority Critical patent/CN105826946B/zh
Publication of CN105826946A publication Critical patent/CN105826946A/zh
Application granted granted Critical
Publication of CN105826946B publication Critical patent/CN105826946B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/385
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明是一种大规模光伏接入的配电网动态无功优化方法,其特点是,充分利用光伏无功控制和馈线自动调压器,以使得网络损耗最小和分接头调节次数最少,具体包括:确定以网络损耗和分接头调节次数为目标的多目标数学模型μ,分别确定以分接头调节次数为目标和以网络损耗为目标的函数;确定光伏无功控制策略;确定负荷需求曲线;采用改进的粒子群算法进行优化求解,最终得到满意度最大时各时段光伏无功输出、分接头档位设置和各光伏接入点的电压情况。具有科学合理,适用性强,效果佳等优点,有利于接入配电网络的设备安全经济运行。

Description

大规模光伏接入的配电网动态无功优化方法
技术领域
本发明涉及大规模光伏接入的配电网动态无功优化方法,具体涉及一种光伏无功控制和馈线自动调压器(SVR)档位设置问题。
背景技术
发展新能源发电是我国保障能源安全、应对气候变化、实现减排承诺的重要举措。我国自2006年实施《可再生能源法》以来,新能源发电技术迅猛发展,以光伏为主的绿色可再生能源受到青睐。规划到2020年,我国光伏发电并网装机容量将达到50GW。而目前我国建设分布式光伏发电系统采用“自发自用,余量上网,电网调节”方式,在大规模光伏接入配电网后,将给电压的有效控制与管理带来严重的影响。
近年来,国内外在相关领域开展了一些研究工作,对电网的动态无功优化主要是通过投切电容器或者改变变压器分接头,以网络损耗最小或者变压器分接头动作次数最少进行单目标无功优化来实现。迄今未见有关将分布式光伏无功控制方法与配电网的优化运行有效结合以及同时对多个目标进行优化分析的文献报道和实际应用。
发明内容
本发明构思基于在大规模光伏接入配电网后,会造成节点电压波动,在发生越限情况下,为了使电压在额定的范围内,减小电压波动,馈线自动调压器(SVR)需持续动作,进而会造成设备使用寿命降低,设备投资费用增加,而且,损耗的增加不利于网络经济运行。
本发明所要解决的问题是,提供一种科学合理,适用性强,效果佳,利于接入配电网络设备安全经济运行的大规模光伏接入的配电网动态无功优化方法。
解决其问题采用的技术方案是一种大规模光伏接入的配电网动态无功优化方法,其特征是,充分利用光伏无功控制和馈线自动调压器,以使得网络损耗最小和分接头调节次数最少,具体包括下述步骤:
步骤1:确定以网络损耗和分接头调节次数为目标的多目标数学模型μ,分别确定以分接头调节次数为目标和以网络损耗为目标的函数:
式(1)和(2)中:N为总的时刻数;Ntr为SVR的个数;Tapt,T为第T个馈线自动调压器在t时刻的档位;Ploss,t为t时刻系统的网络损耗;
选用降半直线形作为各目标的隶属度函数,对各目标进行评价:
式(3)和式(4)中:Plmin为以网络损耗最小为目标时的值;Kmin为以分接头调节次数最少为目标时的值;δ1为网络损耗可接受的伸缩值;δ2为分接头调节次数可接受的伸缩值;
根据各目标的相对重要性确定权重系数,按式(5)采用加权求和法把多目标转化为单目标:
μmax=k1μ(K)+k2μ(P) (5)
式(5)中:μ(K)是分接头调节次数隶属度函数;μ(P)是网络损耗隶属度函数;k1、k2为各部分的权重系数,且满足k1+k2=1;
步骤2:确定光伏无功控制策略
获得光伏出力的分段曲线,以小时为单位将预测到的光伏出力曲线划分为24段,并通过积分中值定理认为每段的功率是恒定的,光伏按最大功率跟踪点(MPPT)发出有功功率,各个时段的无功容量由当时分布式光伏的有功出力与并网逆变器的容量所确定;
当逆变器的有功出力低于额定容量时,剩余容量用来向电网提供无功支撑,调节并网点的电压,按式(6)采用基于并网点电压幅值U的Q(U)控制策略,控制光伏逆变器无功的输出:
式中:Qmax为光伏的最大无功输出;U为节点电压;
步骤3:确定负荷需求曲线,将预测到的负荷需求曲线分为24段,并用积分中值定理处理认为每段的值是恒定不变的,假设各个负荷点的变化规律是相同的;
步骤4:采用改进的粒子群算法进行优化求解,最终得到满意度最大时各时段光伏无功输出、分接头设置和各光伏接入点的电压情况。
本发明提供的技术方案具有的优异效果是:
本发明是大规模光伏接入的配电网动态无功优化方法,综合考虑了光伏无功控制能力和SVR的档位设置,以使得网络损耗和分接头调节次数最小,把光伏无功控制策略和整个系统优化运行有效结合,为含分布式光伏的配电网无功调度提供了理论依据和技术支持;在一定程度上解决了大规模分布式光伏接入配电网引起SVR频繁动作,加速设备老化等问题,具有科学合理,适用性强,效果佳,有利于接入配电网络的设备安全经济运行。
附图说明
图1是本发明的大规模光伏接入的配电网动态无功优化方法流程图;
图2是改进的IEEE33节点配电网示意图;
图3是光伏出力曲线示意图;
图4是负荷的有功需求变化规律图;
图5是负荷的无功需求变化规律图;
图6是各时段光伏无功输出曲线示意图;
图7是分接头档位设置曲线示意图;
图8是优化前各光伏接入点的电压曲线示意;
图9是优化后各光伏接入点的电压曲线示意。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
如图1所示,本发明的一种大规模光伏接入的配电网动态无功优化方法,以含光伏的IEEE33节点配电网为例进行分析,如图2所示,选取的基准容量为500kVA,基准电压为12.66kV。
本发明的一种大规模光伏接入的配电网动态无功优化方法,充分利用光伏无功控制和馈线自动调压器,以使得网络损耗最小和分接头调节次数最少,具体包括下述步骤:
步骤1:确定以网络损耗和分接头调节次数为目标的多目标数学模型μ
分别确定以分接头调节次数为目标和以网络损耗为目标的函数:
式(1)和(2)中:N为总的时刻数;Ntr为SVR的个数;Tapt,T为第T个馈线自动调压器在t时刻的档位;Ploss,t为t时刻系统的网络损耗。
选用降半直线形作为各目标的隶属度函数,对各目标进行评价:
式(3)(4)中:Plmin为以网络损耗最小为目标时的值,Kmin为以分接头调节次数最少为目标时的值,如表1所示;δ1为网络损耗可接受的伸缩值,δ1=0.6144;δ2为分接头调节次数可接受的伸缩值,δ2=20。
表1
根据各目标的相对重要性确定权重系数,按式(5)采用加权求和法把多目标转化为单目标:
μmax=k1μ(K)+k2μ(P) (5)
式(5)中:μ(K)是分接头调节次数隶属度函数;μ(P)是网络损耗隶属度函数;k1、k2为各部分的权重系数,且满足k1+k2=1,选取k1=0.6,k2=0.4。
步骤2:确定光伏无功控制策略
获得光伏出力的分段曲线。以小时为单位将预测到的光伏出力曲线划分为24段,并通过积分中值定理认为每段的功率是恒定的,如图3所示。光伏按最大功率跟踪点(MPPT)发出有功功率,各个时段的无功容量由当时分布式光伏的有功出力与并网逆变器的容量所确定,光伏逆变器的容量为400kVA(0.8pu),功率因数在超前0.95-滞后0.95范围内可调。
当逆变器的有功出力低于额定容量时,剩余容量可用来向电网提供无功支撑,调节并网点的电压,按式(6)采用基于并网点电压幅值U的Q(U)控制策略,控制光伏逆变器无功的输出:
式中:Qmax为光伏的最大无功输出;U为节点电压,其中U1=0.9,U2=0.95,U3=1.02,U4=1.05。
步骤3:确定负荷需求曲线,将预测到的负荷需求曲线分为24段,并用积分中值定理处理认为每段的值是恒定不变的,假设各个负荷点的变化规律是相同的,如图4、图5所示;
步骤4:采用改进的粒子群算法进行优化求解,算法初始参数设置:种群规模N=50,最大迭代次数Tmax=60,惯性权重wstart=0.9,wend=0.4。最终得到满意度最大时各时段光伏无功输出、分接头档位设置,分别如图6、图7所示;
为了说明此优化方法与不优化时的区别,将优化前后的电压进行了对比说明,如图8、图9所示。
本发明提供的方法在考虑24h内光伏出力和负荷需求变化的基础上,同时兼顾了网络损耗最小和分接头调节次数最少,获得了光伏无功输出情况和分接头设置情况。
本发明的大规模光伏接入的配电网动态无功优化方法,综合考虑了光伏无功控制能力和SVR的档位设置,以使得网络损耗和分接头调节次数最小,把光伏无功控制策略和整个系统优化运行有效结合,为含分布式光伏的配电网无功调度提供了理论依据和技术支持;在一定程度上解决了大规模分布式光伏接入配电网引起SVR频繁动作,加速设备老化等问题,具有科学合理,适用性强,效果佳,有利于接入配电网络的设备安全经济运行。

Claims (1)

1.一种大规模光伏接入的配电网动态无功优化方法,其特征是,充分利用光伏无功控制和馈线自动调压器(SVR),以使得网络损耗最小和分接头调节次数最少,具体包括下述步骤:
步骤1:确定以网络损耗和分接头调节次数为目标的多目标数学模型μ,分别确定以分接头调节次数为目标和以网络损耗为目标的函数,
<mrow> <msub> <mi>f</mi> <mn>1</mn> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>2</mn> </mrow> <mi>N</mi> </munderover> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>T</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mrow> <mi>t</mi> <mi>r</mi> </mrow> </msub> </munderover> <mo>|</mo> <msub> <mi>Tap</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>T</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>Tap</mi> <mrow> <mi>t</mi> <mo>-</mo> <mn>1</mn> <mo>,</mo> <mi>T</mi> </mrow> </msub> <mo>|</mo> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>f</mi> <mn>2</mn> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msub> <mi>P</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>s</mi> <mi>s</mi> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
式(1)和(2)中:N为总的时刻数,Ntr为馈线自动调压器(SVR)的个数,Tapt,T为第T个馈线自动调压器(SVR)在t时刻的档位,Ploss,t为t时刻系统的网络损耗;
选用降半直线形作为各目标的隶属度函数,对各目标进行评价:
<mrow> <mi>&amp;mu;</mi> <mrow> <mo>(</mo> <mi>P</mi> <mo>)</mo> </mrow> <mo>=</mo> <mo>{</mo> <mtable> <mtr> <mtd> <mn>1</mn> </mtd> <mtd> <mrow> <mi>P</mi> <mo>&lt;</mo> <msub> <mi>P</mi> <mrow> <mn>1</mn> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>(</mo> <msub> <mi>P</mi> <mrow> <mi>l</mi> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>&amp;delta;</mi> <mn>1</mn> </msub> <mo>-</mo> <mi>P</mi> <mo>)</mo> <mo>/</mo> <msub> <mi>&amp;delta;</mi> <mn>1</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>P</mi> <mrow> <mn>1</mn> <mi>min</mi> </mrow> </msub> <mo>&lt;</mo> <mi>P</mi> <mo>&amp;le;</mo> <msub> <mi>P</mi> <mrow> <mn>1</mn> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>&amp;delta;</mi> <mn>1</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mn>0</mn> </mtd> <mtd> <mrow> <mi>P</mi> <mo>&gt;</mo> <msub> <mi>P</mi> <mrow> <mn>1</mn> <mi>min</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>&amp;delta;</mi> <mn>1</mn> </msub> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <mi>&amp;mu;</mi> <mrow> <mo>(</mo> <mi>K</mi> <mo>)</mo> </mrow> <mo>=</mo> <mo>{</mo> <mtable> <mtr> <mtd> <mn>1</mn> </mtd> <mtd> <mrow> <mi>K</mi> <mo>&lt;</mo> <msub> <mi>K</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>(</mo> <msub> <mi>K</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>&amp;delta;</mi> <mn>2</mn> </msub> <mo>-</mo> <mi>K</mi> <mo>)</mo> <mo>/</mo> <msub> <mi>&amp;delta;</mi> <mn>2</mn> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>K</mi> <mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>&lt;</mo> <mi>K</mi> <mo>&amp;le;</mo> <msub> <mi>K</mi> <mi>min</mi> </msub> <mo>+</mo> <msub> <mi>&amp;delta;</mi> <mn>2</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mn>0</mn> </mtd> <mtd> <mrow> <mi>K</mi> <mo>&gt;</mo> <msub> <mi>K</mi> <mi>min</mi> </msub> <mo>+</mo> <msub> <mi>&amp;delta;</mi> <mn>2</mn> </msub> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>4</mn> <mo>)</mo> </mrow> </mrow>
式(3)和式(4)中:Plmin为以网络损耗最小为目标时的值,Kmin为以分接头调节次数最少为目标时的值,δ1为网络损耗可接受的伸缩值,δ2为分接头调节次数可接受的伸缩值;
根据各目标的相对重要性确定权重系数,按式(5)采用加权求和法把多目标转化为单目标:
μmax=k1μ(K)+k2μ(P) (5)
式(5)中:μ(K)是分接头调节次数隶属度函数,μ(P)是网络损耗隶属度函数,k1、k2为各部分的权重系数,且满足k1+k2=1;
步骤2:确定光伏无功控制策略
获得光伏出力的分段曲线,以小时为单位将预测到的光伏出力曲线划分为24段,并通过积分中值定理认为每段的功率是恒定的,光伏按最大功率跟踪点(MPPT)发出有功功率,各个时段的无功容量由当时分布式光伏的有功出力与并网逆变器的容量所确定;
当逆变器的有功出力低于额定容量时,剩余容量用来向电网提供无功支撑,调节并网点的电压,按式(6)采用基于并网点电压幅值U的Q(U)控制策略,控制光伏逆变器无功的输出:
<mrow> <mi>Q</mi> <mo>=</mo> <mo>{</mo> <mtable> <mtr> <mtd> <msub> <mi>Q</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> </mtd> <mtd> <mrow> <mi>U</mi> <mo>&lt;</mo> <msub> <mi>U</mi> <mn>1</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mfrac> <mrow> <mi>U</mi> <mo>-</mo> <msub> <mi>U</mi> <mn>1</mn> </msub> </mrow> <mrow> <msub> <mi>U</mi> <mn>1</mn> </msub> <mo>-</mo> <msub> <mi>U</mi> <mn>2</mn> </msub> </mrow> </mfrac> <msub> <mi>Q</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>Q</mi> <mi>max</mi> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>U</mi> <mn>1</mn> </msub> <mo>&lt;</mo> <mi>U</mi> <mo>&lt;</mo> <msub> <mi>U</mi> <mn>2</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mn>0</mn> </mtd> <mtd> <mrow> <msub> <mi>U</mi> <mn>2</mn> </msub> <mo>&lt;</mo> <mi>U</mi> <mo>&lt;</mo> <msub> <mi>U</mi> <mn>3</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mfrac> <mrow> <mi>U</mi> <mo>-</mo> <msub> <mi>U</mi> <mn>3</mn> </msub> </mrow> <mrow> <msub> <mi>U</mi> <mn>3</mn> </msub> <mo>-</mo> <msub> <mi>U</mi> <mn>4</mn> </msub> </mrow> </mfrac> <msub> <mi>Q</mi> <mi>max</mi> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>U</mi> <mn>3</mn> </msub> <mo>&lt;</mo> <mi>U</mi> <mo>&lt;</mo> <msub> <mi>U</mi> <mn>4</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>-</mo> <msub> <mi>Q</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> </mrow> </mtd> <mtd> <mrow> <msub> <mi>U</mi> <mn>4</mn> </msub> <mo>&lt;</mo> <mi>U</mi> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>6</mn> <mo>)</mo> </mrow> </mrow>
式中:Qmax为光伏的最大无功输出;U为节点电压;取U1=0.9,U2=0.95,U3=1.02,U4=1.05;
步骤3:确定负荷需求曲线,将预测到的负荷需求曲线分为24段,并用积分中值定理处理认为每段的值是恒定不变的,假设各个负荷点的变化规律是相同的;
步骤4:采用改进的粒子群算法进行优化求解,最终得到满意度最大时各时段光伏无功输出、分接头设置和各光伏接入点的电压情况。
CN201610300308.7A 2016-05-09 2016-05-09 大规模光伏接入的配电网动态无功优化方法 Expired - Fee Related CN105826946B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610300308.7A CN105826946B (zh) 2016-05-09 2016-05-09 大规模光伏接入的配电网动态无功优化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610300308.7A CN105826946B (zh) 2016-05-09 2016-05-09 大规模光伏接入的配电网动态无功优化方法

Publications (2)

Publication Number Publication Date
CN105826946A CN105826946A (zh) 2016-08-03
CN105826946B true CN105826946B (zh) 2018-04-10

Family

ID=56529075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610300308.7A Expired - Fee Related CN105826946B (zh) 2016-05-09 2016-05-09 大规模光伏接入的配电网动态无功优化方法

Country Status (1)

Country Link
CN (1) CN105826946B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108321810B (zh) * 2018-02-12 2021-03-30 华南理工大学 抑制光伏并网点电压波动的配网多时间尺度无功控制方法
CN109672184B (zh) * 2018-12-12 2022-03-11 国网江西省电力有限公司电力科学研究院 一种含光伏的配电网电压控制方法和系统
CN111697615A (zh) * 2019-03-15 2020-09-22 新奥数能科技有限公司 确定弃风消纳及档位调节次数的方法及装置
CN112633565B (zh) * 2020-12-15 2023-07-25 西安理工大学 一种光伏功率集合区间预测方法
CN116722608B (zh) * 2023-04-28 2024-06-25 国网河北省电力有限公司电力科学研究院 一种基于光伏逆变器的无功功率补偿系统

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103490433A (zh) * 2013-09-30 2014-01-01 国家电网公司 一种配电网无功优化方法
CN104617585A (zh) * 2015-02-13 2015-05-13 东南大学 无功补偿配置方法
CN105117560B (zh) * 2015-09-15 2018-11-23 云南电网有限责任公司昆明供电局 一种中压配电线路理论线损计算方法
CN105262112B (zh) * 2015-11-18 2019-02-15 国家电网公司 风电场集群式静止型无功补偿装置控制方法
CN105321003B (zh) * 2015-12-04 2019-08-06 东北电力大学 一种含vsc-hvdc的交直流系统多目标潮流优化方法

Also Published As

Publication number Publication date
CN105826946A (zh) 2016-08-03

Similar Documents

Publication Publication Date Title
CN105826946B (zh) 大规模光伏接入的配电网动态无功优化方法
CN109787282B (zh) 一种规模化储能参与新能源场站无功协调控制方法和系统
CN105406518B (zh) 储能参与电网二次调频的agc控制方法及控制系统
CN107947231B (zh) 一种面向配电网优化运行的混合储能系统控制方法
WO2018196433A1 (zh) 多类型储能多级控制方法
CN108092324B (zh) 一种风电参与调峰调频的agc控制系统和控制方法
CN105591391B (zh) 一种风光储联合发电站无功电压控制方法
CN109103924B (zh) 基于柔性分析的可再生能源消纳能力关键因素的分析方法
CN110829408B (zh) 基于发电成本约束的计及储能电力系统的多域调度方法
CN104134994B (zh) 一种利用agc进行稳定断面潮流越限的校正控制方法
CN107994618B (zh) 配电网级光储集群的有功功率调度方法和配电网测控设备
CN106602613A (zh) 一种省地两级调度断面协调控制方法
CN112838603B (zh) 一种风光储抽多源能源agc协调互补控制方法和装置
CN112072711A (zh) 基于动态优先级的配电网灵活性优化调度方法
CN107069830A (zh) 提高风电消纳能力的方法及装置
CN104037805A (zh) 一种计及电网安全约束的光伏电站可发电裕度分配方法
CN108711868A (zh) 一种计及孤岛运行电压安全的配电网无功优化规划方法
CN104269855B (zh) 一种适应多种能源接入的站点无功电压快速调节方法
CN103617455A (zh) 基于虚拟机组子群的网厂两级负荷优化调度方法
CN108539757B (zh) 配电网光储集群的无功功率调度方法
CN115102239A (zh) 一种考虑soc均衡的储能电站一次调频控制方法及系统
CN107895956A (zh) 一种计及荷电状态的多点分布式储能系统集控调频方法
Wu et al. Optimized capacity configuration of an integrated power system of wind, photovoltaic and energy storage device based on improved particle swarm optimizer
CN107482657A (zh) 风电爬坡率实时平抑方法和系统
CN105610200A (zh) 一种基于同步协调控制的火电厂全功率控制方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

CF01 Termination of patent right due to non-payment of annual fee