CN105002832B - 利用吊机的撑脚调整吊带的方法 - Google Patents
利用吊机的撑脚调整吊带的方法 Download PDFInfo
- Publication number
- CN105002832B CN105002832B CN201510437251.0A CN201510437251A CN105002832B CN 105002832 B CN105002832 B CN 105002832B CN 201510437251 A CN201510437251 A CN 201510437251A CN 105002832 B CN105002832 B CN 105002832B
- Authority
- CN
- China
- Prior art keywords
- suspender belt
- spike
- wheel machine
- loop wheel
- recessed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Road Paving Machines (AREA)
Abstract
本发明涉及一种利用吊机的撑脚调整吊带的方法,具体步骤是:使用汽车吊撑脚做动力,用等边角钢做撑垫,用脚手管做吊带位置的移动装置,开动撑脚的油缸压住吊带的凸或凹出部分,从而实现吊带校正。用本发明的简易方法能把所有弯曲的吊带都调整到设计要求,也为压扁锚的螺旋筋开创了一个很好的方法。
Description
技术领域
本发明涉及一种高速公路施工中的菱形挂篮的连接底模悬挂的吊带,尤其是一种吊带平直度的校正方法。
背景技术
德黑兰北部高速公路一期工程中的6#桥是整条公路最为关键工程,桥址位于伊朗北部山区的9度地震区。为减轻桥梁自重,进一步提高该桥结构抗震性能,经多方案比较。设计采用3跨波形钢腹板预应力混凝土连续梁桥。该桥面宽2×13.1m,左右幅桥梁净距2m,桥长319m,其跨径布置为83+153+83=319m。箱梁0#块高8.8m,梁底宽6.5m,悬臂跳出3.5米。考虑钢腹板吊装等因素,桥梁施工选用菱形挂篮。(见图1,2)挂篮依靠吊带连接底模悬挂系统、顶模悬挂系统承受混凝土的重量及施工荷载。
伊朗6#桥的吊带长度分为:17.48m、9.66m、9.23m、m2.98、2.5m五种类型;其宽度为150㎜、厚度为16㎜。
挂篮的前横梁11中、前横梁11边吊带10长均为17.48m;后横梁中吊带长2.5m,后横梁边吊带长9.66m;滑梁12前吊带10长9.23m;滑梁12后吊带10长2.98m。
挂篮为不规则超大构件,不能装进集装箱。在国内加工后散件打包运输。首先通过汽车陆运到达上海港口、装船后海运到达伊朗港口、再通过汽车陆运到施工工地。
挂篮其他构件整体性能好。但是对于厚度仅为16mm、长度9m以上及17.480m吊带运输到伊朗6#桥工地。几经周折、加上堆放不注意,难免造成弯曲。而吊带是挂篮承重载荷的连接件。如果不校正,不但难以安装,还影响挂篮的安全使用。为此挂篮安装前必须将吊带校正。但是在工地上要把弯曲的、而且这么长的吊带校正到设计位置,确实难度不小。
发明内容
本发明是要解决吊带平直度的校正的技术问题,而提供一种利用吊机的撑脚调整吊带的方法。
为实现上述目的,本发明采用的技术方案是:一种利用吊机的撑脚调整吊带的方法,具体步骤是:使用汽车吊撑脚做动力,用等边角钢做撑垫,用脚手管做吊带位置的移动装置,开动撑脚的油缸压住吊带的凸或凹出部分,从而实现吊带校正。
对于向上凸出的吊带校正过程为:
(1)根据吊带向上凸出的程度,用二根角钢放在吊带下面,二角钢之间距离为70㎝,
(2)吊带平整部位下面放置脚手管做前后移动,
(3)用汽车吊的撑脚底盘对准凸出部分高点,压下把吊带压平,来回二次,并持荷30秒。
对于向下凹的吊带部位校正过程:
(1)把单根角钢放在吊带凹下正中部位;
(2)把二根脚手管放在向上翘起部位,二个钢管间距在70㎝以内;
(3)用一根角钢横放在二根钢管上;
(4)用汽车吊机的撑脚向下压,压平为止。
本发明的有益效果是:
用本发明的简易方法能把所有弯曲的吊带都调整到设计要求,也为压扁锚的螺旋筋开创了一个很好的方法。
附图说明
图1是挂篮依靠吊带连接底模悬挂系统示意图;
图2是图1的侧视图;
图3是向上凸出的吊带校正过程示意图;
图4是向下凹的吊带部位调整过程示意图。
具体实施方式
如图3,4所示,一种利用吊机的撑脚调整吊带的方法,具体步骤是:使用25吨的汽车吊撑脚做动力,通过撑脚的油缸开动压住吊带的凸出部分,用L100×100的等边角钢做撑垫,用的脚手管做吊带位置的移动装置,从而实现吊带校正。
如图3所示,对于向上凸出的吊带校正过程为:
(1)首先把凹凸不平的吊带1一块一块放在平整的水泥地7上,用25吨汽车吊--顺吊带并排停放;
(2)根据吊带1向上凸出的程度,把二根长度为1m左右、型号为L100×100×10的等边角钢2放在吊带1下面,二等边角钢2之间距离约70㎝,(视弯曲的长度而定),吊带1平整部位放置的脚手管3做前后移动;
(3)用汽车吊的撑脚底盘4(厚度20mm),油缸5,对准吊带1的凸出部分高点,压到约5吨的力,就可以把吊带1压平,来回二次,持荷30秒就可以了。
如图4所示,对于向下凹的吊带部位校正过程:
(1)把单根等边角钢2放在吊带1凹下正中部位;
(2)把二个的脚手管3放在向上翘起部位,二个脚手管3间距在70㎝以内;
(3)用一根长度1m的等边角钢2横放在二根脚手管3上;
(4)用汽车吊机的撑脚向下压,压平为止。
Claims (3)
1.一种利用吊机的撑脚调整吊带的方法,其特征在于,具体步骤是:使用汽车吊撑脚做动力,用等边角钢做撑垫,用脚手管做吊带位置的移动装置,开动撑脚的油缸压住吊带的凸或凹出部分,从而实现吊带校正。
2.根据权利要求1所述的利用吊机的撑脚调整吊带的方法,其特征在于:对于向上凸出的吊带校正过程为:
(1)根据吊带向上凸出的程度,用二根角钢放在吊带下面,二角钢之间距离为70㎝;
(2)吊带平整部位下面放置脚手管做前后移动;
(3)用汽车吊的撑脚底盘对准凸出部分高点,压下把吊带压平,来回二次,并持荷30秒。
3.根据权利要求1所述的利用吊机的撑脚调整吊带的方法,其特征在于:对于向下凹的吊带部位校正过程:
(1)把单根角钢放在吊带凹下正中部位;
(2)把二根脚手管放在向上翘起部位,二个钢管间距在70㎝以内;
(3)用一根角钢横放在二根钢管上;
(4)用汽车吊机的撑脚向下压,压平为止。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510437251.0A CN105002832B (zh) | 2015-07-23 | 2015-07-23 | 利用吊机的撑脚调整吊带的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510437251.0A CN105002832B (zh) | 2015-07-23 | 2015-07-23 | 利用吊机的撑脚调整吊带的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105002832A CN105002832A (zh) | 2015-10-28 |
CN105002832B true CN105002832B (zh) | 2016-08-24 |
Family
ID=54375676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510437251.0A Active CN105002832B (zh) | 2015-07-23 | 2015-07-23 | 利用吊机的撑脚调整吊带的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105002832B (zh) |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2528113C3 (de) * | 1975-06-24 | 1978-06-01 | Philipp Holzmann Ag, 6000 Frankfurt | Verfahren zum Herstellen einer Spannbetonbrücke oder dergleichen Tragwerk mit aus vorgefertigten Überbauabschnitten zusammengesetztem Überbau, Anordnung zum Durchführen dieses Verfahrens und Abstandstück zum Durchführen des Verfahrens bzw. für die Anordnung |
JP2892954B2 (ja) * | 1994-12-19 | 1999-05-17 | 防衛庁技術研究本部長 | 応急橋の橋節折り畳み装置 |
CN2486597Y (zh) * | 2001-08-06 | 2002-04-17 | 湖南省公路桥梁建设总公司 | 一种建筑用施工挂篮 |
CN201065513Y (zh) * | 2007-06-06 | 2008-05-28 | 宏润建设集团股份有限公司 | 贝雷桁架型挂篮 |
CN202393340U (zh) * | 2011-11-25 | 2012-08-22 | 铜陵市明诚铸造有限责任公司 | 一种钢筋校正工具 |
CN202725691U (zh) * | 2012-07-19 | 2013-02-13 | 张家港华东锅炉有限公司 | 单支鳍片换热管旁弯校正装置 |
CN102912738B (zh) * | 2012-11-07 | 2014-12-03 | 北京市公路桥梁建设集团有限公司 | 挂篮整体预压装置 |
-
2015
- 2015-07-23 CN CN201510437251.0A patent/CN105002832B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105002832A (zh) | 2015-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106192776A (zh) | 一种大跨连续钢桁梁柔性拱桥悬臂拼装施工工艺 | |
CN203821720U (zh) | 一种高空大型屋面板安装工具车 | |
CN201874583U (zh) | 一种盾构机始发装置 | |
CN105002832B (zh) | 利用吊机的撑脚调整吊带的方法 | |
CN204212024U (zh) | 一种拼接式钢筋混凝土预制路面 | |
CN204982685U (zh) | 吊带校正装置 | |
CN205077498U (zh) | 钢板桩支护内部h型钢围檩组合托板 | |
CN202482772U (zh) | 铁路桥梁防落梁挡块安装系统 | |
CN103969063A (zh) | 一种手拉葫芦负荷试验台 | |
CN204726453U (zh) | 一种斜井巷箕斗阻车装置 | |
CN208884948U (zh) | 一种操作平台 | |
CN209536813U (zh) | 预制梁吊装稳定支架 | |
CN209922708U (zh) | 一种吊装钢筋网的夹具 | |
CN205663231U (zh) | 滑道高度可调的滑动式安全网 | |
CN207347936U (zh) | 一种满堂支架错位套搭结构 | |
CN204751892U (zh) | 一种轧机减速机专用吊具 | |
CN205186238U (zh) | 一种精密钢管收纳运输车 | |
CN205313022U (zh) | 核电设备通用运输与翻转支架 | |
CN205132919U (zh) | 一种起吊钢板的辅助装置 | |
CN207860287U (zh) | Pc构件运输车辆的运输架定位挡边装置 | |
CN205418512U (zh) | T型槽钢管固定基座 | |
CN205687501U (zh) | 多人操作施工悬吊平台 | |
CN204629071U (zh) | 一种截面改进的钢材 | |
CN203462397U (zh) | 隧道栈桥 | |
CN205116748U (zh) | 用于钢结构滑移的柱脚装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |