CN2486597Y - 一种建筑用施工挂篮 - Google Patents
一种建筑用施工挂篮 Download PDFInfo
- Publication number
- CN2486597Y CN2486597Y CN 01249412 CN01249412U CN2486597Y CN 2486597 Y CN2486597 Y CN 2486597Y CN 01249412 CN01249412 CN 01249412 CN 01249412 U CN01249412 U CN 01249412U CN 2486597 Y CN2486597 Y CN 2486597Y
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- longitudinal beam
- cable
- longeron
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种建筑用施工挂篮,,该挂篮包括索塔、纵梁、拉索、横梁,后锚,底篮。索塔与纵梁垂直固接,该挂篮索塔顶部与纵梁两端的连接采用斜拉索联接,联接处为联接铰,斜拉索用锚具锁定在联接铰上,组成一种可以施加预应力的斜拉承重结构。空载时可以用千斤顶通过拉紧斜拉索对纵梁预增加正弯矩,斜拉索受力逐渐增加,纵梁内预加正弯矩逐渐减小,当纵梁承受最大负荷时,纵梁内的弯矩为零,剪力为零,仅承受最大的轴压力,使得纵梁截面尺寸大为减小,大幅度地减轻了挂篮的重量,挂篮的成本大为减小,其承重结构与承载能力的比值小于0.1。消除了制做、装配误差等引起的非弹性沉降,该挂篮适用于桥梁及其它悬浇工程施工。
Description
技术领域:
本实用新型涉及建筑施工领域,具体指一种建筑用施工挂篮。
背景技术:
目前,桥梁建筑中,对于跨径大的桥梁,设计上对挂篮的重量提出了特殊的要求,要求自重轻,沉降小,以往的挂篮为了承受较大的施工荷载,通常要增加纵梁截面以增强纵梁的抗弯能力,这样也使挂篮的重量大幅度增加,挂篮的制作成本也大为增加;挂篮各部分接触不紧密,加载时会产生过大的由于制做、装配误差等引起的非弹性沉降,不能满足施工的要求。
技术内容:
本实用新型的目的在于提供一种自重轻,承载能力大,沉降小,成本低的建筑施工用挂篮。
本实用新型的目的是这样来实现的,该挂篮包括索塔、纵梁、拉索,横梁,后锚,底篮。纵梁和索塔垂直固结,索塔顶与纵梁两端用斜拉索相联,联接处为联接铰,联接铰由转轴和轴套组成,轴套分别与索塔顶和纵梁两端固接,转轴可以在轴套内自由旋转,斜拉索通过锚具锚固在转轴上。
由于该挂篮索塔顶部与纵梁两端的连接采用斜拉索铰接,纵梁、索塔、斜拉索组成一种可以施加预应力的斜拉承重结构。故在空载时可以用千斤顶收紧斜拉索对纵梁预加一正弯矩,其大小等于不加预应力时最大负荷状况下纵梁内的负弯矩,此时即为空载预应力状态。当挂篮逐级加载时,斜拉索受力逐渐增加,纵梁内预加正弯矩逐渐减小,当纵梁承受最大负荷时,纵梁内的弯矩为零,剪力为零,仅承受最大的轴向压力,此时即为最大负荷状态。在纵梁截面尺寸设计时,通常起控制作用的是最大负荷时纵梁内弯矩、轴力、剪力的合力,而该承重结构在最大负荷时纵梁内仅有轴力而没有弯矩和剪力,故合力大大减小,通常小于三者合力的50%,因而由其控制的纵梁截面尺寸也大为减小,使得制造挂篮的成本大为减小,从而大幅度地减轻了挂篮的重量,其承重结构与承载能力的比值小于0.1。并减小了挂篮自重对悬臂结构根部的弯矩,因而悬臂结构在施工过程中用以抵抗挂篮自重弯矩的钢筋和预应力钢筋也将减少,这将大大减少工程造价,并扩展了设计空间。同时由于预应力作用,使得挂篮各部分在空载时就接触紧密,最大限度地消除了制做、装配误差等引起的非弹性沉降,故挂篮在承受负荷时仅会产生弹性沉降,总沉降量还不到非预应力挂篮的40%。悬臂结构在施工时,为了防止混凝土开裂,对挂篮的沉降要求很高,该挂篮正好成功地解决了这一技术问题。另外由于联接处为联接铰,索塔与纵梁发生微小变形时,联接铰可避免斜拉索受剪。该挂篮各部分均采用装配式,故易于装拆,缩短了施工周期。
附图说明:图1为挂篮结构示意图
图2为挂篮加预用力过程示意图
图3为联接铰结构示意图
具体实施方式:
参考图1、图2,图3,该挂篮包括索塔2、纵梁1、拉索3、底篮8,纵梁1和索塔2垂直固结,索塔顶与纵梁1两端用斜拉索3相联,联接处为联接铰13,联接铰13由转轴15和轴套14组成,轴套14分别与索塔顶和纵梁1两端固接,转轴15可以在轴套14内自由旋转,斜拉索3通过锚具4锚固在转轴15上,并在任何工作状态只承受轴向力。挂篮通过后锚5固在已浇筑的混凝土10上,使挂篮在悬浇新的混凝土9时维持刚体平衡。几片纵梁1通过横梁6联接起来共同受力。纵梁1、索塔2、斜拉索3、联接铰13、后锚5以及横梁6合称为挂篮的承重结构。底篮8是悬浇新混凝土时的底部托架,它通过吊索7将新混凝土9的重量传递给挂篮的承重结构和已浇筑的混凝土。悬浇新混凝土9前,用千斤顶通过斜拉索3对纵梁1加预用力,此时即为纵梁1空载预应力状态11,当挂篮逐级加载时,斜拉索3受力逐渐增加,纵梁1内预加正弯矩逐渐减小,当纵梁1承受最大负荷时,纵梁1内的弯矩为零,剪力为零,仅承受最大的轴向压力,此时即为纵梁1最大负荷状态12。
Claims (1)
1,一种建筑用施工挂篮,包括索塔、纵梁、横梁、后锚、拉索、底篮,其特征在于:纵梁(1)和索塔(2)垂直固结,索塔顶与纵梁(1)两端用斜拉索(3)相联,联接处为联接铰(13),联接铰(13)由转轴(15)和轴套(14)组成,轴套(14)分别与索塔顶和纵梁(1)两端固接,转轴(15)可以在轴套(14)内自由旋转,斜拉索(3)通过锚具(4)锚固在转轴(15)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01249412 CN2486597Y (zh) | 2001-08-06 | 2001-08-06 | 一种建筑用施工挂篮 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01249412 CN2486597Y (zh) | 2001-08-06 | 2001-08-06 | 一种建筑用施工挂篮 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2486597Y true CN2486597Y (zh) | 2002-04-17 |
Family
ID=33659818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 01249412 Expired - Fee Related CN2486597Y (zh) | 2001-08-06 | 2001-08-06 | 一种建筑用施工挂篮 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2486597Y (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102094392A (zh) * | 2011-03-03 | 2011-06-15 | 中铁四局集团第一工程有限公司 | 桥梁施工中的下承式挂篮及其应用 |
CN104480859A (zh) * | 2014-10-21 | 2015-04-01 | 中铁建大桥工程局集团第五工程有限公司 | 一种挂篮整体走行试验方法 |
CN105002832A (zh) * | 2015-07-23 | 2015-10-28 | 上海外经集团控股有限公司 | 利用吊机的撑脚调整吊带的方法 |
CN112064520A (zh) * | 2020-09-16 | 2020-12-11 | 四川川交路桥有限责任公司 | 轻便型预应力无轨道式施工挂篮 |
CN112942132A (zh) * | 2021-04-01 | 2021-06-11 | 中交二航局第二工程有限公司 | 前支点复合式挂篮及其移位方法 |
-
2001
- 2001-08-06 CN CN 01249412 patent/CN2486597Y/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102094392A (zh) * | 2011-03-03 | 2011-06-15 | 中铁四局集团第一工程有限公司 | 桥梁施工中的下承式挂篮及其应用 |
CN102094392B (zh) * | 2011-03-03 | 2012-05-02 | 中铁四局集团第一工程有限公司 | 桥梁施工中的下承式挂篮及其应用 |
CN104480859A (zh) * | 2014-10-21 | 2015-04-01 | 中铁建大桥工程局集团第五工程有限公司 | 一种挂篮整体走行试验方法 |
CN105002832A (zh) * | 2015-07-23 | 2015-10-28 | 上海外经集团控股有限公司 | 利用吊机的撑脚调整吊带的方法 |
CN112064520A (zh) * | 2020-09-16 | 2020-12-11 | 四川川交路桥有限责任公司 | 轻便型预应力无轨道式施工挂篮 |
CN112942132A (zh) * | 2021-04-01 | 2021-06-11 | 中交二航局第二工程有限公司 | 前支点复合式挂篮及其移位方法 |
CN112942132B (zh) * | 2021-04-01 | 2022-11-22 | 中交二航局第二工程有限公司 | 前支点复合式挂篮及其移位方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201301179Y (zh) | 履带起重机自拆装装置 | |
CN201250384Y (zh) | 一种挂篮 | |
CN208055880U (zh) | 一种架桥机主梁提升架 | |
CN2486597Y (zh) | 一种建筑用施工挂篮 | |
CN101672015B (zh) | 多锚杆液压锚固装置 | |
CN101633483B (zh) | 一种钢结构网架整体提升装置 | |
CN202063653U (zh) | 一种起重机及其臂架 | |
CN109629450B (zh) | 钢箱梁悬臂拼装横向线形匹配调整装置、系统及方法 | |
CN211664569U (zh) | 一种通用型缆载起重机 | |
CN215593681U (zh) | 一种内置式钢绞线-撑杆斜拉桥索塔锚固结构 | |
CN211142855U (zh) | 一种便捷起吊的桥梁加固辅助装置 | |
CN113047171A (zh) | 一种内置式钢绞线-撑杆斜拉桥索塔锚固结构 | |
CN201502037U (zh) | 分离式多锚杆液压锚固装置 | |
CN202989786U (zh) | 旧桥体外预应力加固结构 | |
CN111137786A (zh) | 一种通用型缆载起重机及其适应不同悬索桥的方法 | |
CN218346941U (zh) | 一种便于安装的金属梁加强结构 | |
CN108910729B (zh) | 一种改善预应力起重臂塔机受力的装置及方法 | |
CN201169486Y (zh) | 一种铰接组合抱杆 | |
CN220434329U (zh) | 一种超大截面钢桅杆安装用临时钢支撑 | |
CN217678622U (zh) | 钢拱桥整体提升用塔顶载荷分布结构 | |
CN215714643U (zh) | 钢结构塔柱竖转施工加固系统 | |
CN87208770U (zh) | 带悬索撑杆的伸缩吊臂 | |
CN221500307U (zh) | 一种偏心构件吊装系统 | |
CN213771042U (zh) | 一种起重机钩柄装配 | |
CN217579809U (zh) | 连续梁装配式托架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |