CN201169486Y - 一种铰接组合抱杆 - Google Patents

一种铰接组合抱杆 Download PDF

Info

Publication number
CN201169486Y
CN201169486Y CNU2007201591536U CN200720159153U CN201169486Y CN 201169486 Y CN201169486 Y CN 201169486Y CN U2007201591536 U CNU2007201591536 U CN U2007201591536U CN 200720159153 U CN200720159153 U CN 200720159153U CN 201169486 Y CN201169486 Y CN 201169486Y
Authority
CN
China
Prior art keywords
pole
holding rod
hinged
following
last
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201591536U
Other languages
English (en)
Inventor
安建强
张光辉
王洪英
邵中华
陈四杰
胡建宁
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shandong Electric Power Transmission and Substation Engineering Co
Original Assignee
Shandong Electric Power Transmission and Substation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Electric Power Transmission and Substation Engineering Co filed Critical Shandong Electric Power Transmission and Substation Engineering Co
Priority to CNU2007201591536U priority Critical patent/CN201169486Y/zh
Application granted granted Critical
Publication of CN201169486Y publication Critical patent/CN201169486Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型涉及一种起重机械,尤其是一种适用于输电线路铁塔组装用的抱杆。它包括上抱杆和下抱杆,上抱杆和下抱杆之间通过铰接装置相铰接。本实用新型结构简单,使用方便,减轻了抱杆重量,提高了抱杆利用率和施工效率。

Description

一种铰接组合抱杆
技术领域:
本实用新型涉及一种起重机械,尤其是一种适用于输电线路铁塔组装用的抱杆。
背景技术:
目前,输电线路铁塔组装主要采用内悬浮外(内)拉线抱杆方式,内悬浮外(内)拉线抱杆的结构原理为:抱杆为一根整体结构,抱杆顶部装有滑轮组,用于起吊重物、动臂变幅及旋转就位。抱杆底部装有支座,用于支撑在地面或与铁塔主材连接固定。内悬浮(内)外拉线抱杆是传统的起吊工具,但现有整体结构的抱杆存在一些缺点:抱杆属于长细构件,断面比较小,长细比较大,在铁塔组立施工中,主要承受中心压力,由于抱杆是由稳定条件控制,相同长度下,抱杆长细比越大,所需抱杆的主材截面积越大,从而抱杆的重量和成本就要大大增加。随着电力事业的发展,输电线路铁塔的高度和重量不断增加,所需要组塔抱杆的长度和起吊重量也相应增加,因此,开发一种新的起吊工具已变得十分重要。
实用新型内容:
本实用新型提供了一种铰接组合抱杆,它结构简单,使用方便,减轻了抱杆重量,提高了抱杆利用率和施工效率,解决了现有技术中存在的问题。
本实用新型为解决上述技术问题所采用的技术方案是:它包括上抱杆和下抱杆,上抱杆和下抱杆之间通过铰接装置相铰接。
为了提高施工效率,在铰接装置的外侧设有刚性连接装置,刚性连接装置的两端分别与上抱杆和下抱杆相连。
本实用新型采用上述结构的有益效果如下:
(1)、重量轻
在相同高度、相同起吊重量设计工况下,铰接组合抱杆重量(包括全部附件)比单根悬浮抱杆重量轻26%~50%。
(2)、改善了抱杆的长细比
由于上抱杆和下抱杆中间采用铰接装置铰接,在不增加抱杆截面的情况下,减少了抱杆的长细比,增加了抱杆有效吊装高度。
(3)、在铰接装置外侧设置的刚性连接装置,便于抱杆在铰接和刚性连接两个使用工况间进行互换,提高了施工效率。
(4)、由于在上抱杆和下抱杆中间采用铰接装置铰接,抱杆可倾斜角度增大,能够满足不同的吊装要求。
(5)、抱杆吊重相对较大
与现有组塔整体结构抱杆相比,相同截面情况下,铰接组合抱杆吊重最大;相同吊重情况下,铰接组合抱杆截面最小,重量最轻。
(6)、抱杆适用性强,抱杆系统组装灵活
大截面抱杆只适用于1000kV等特高压工程,利用率较低。铰接组合抱杆不仅适用于1000kV特高压工程,同时适用于紧凑型线路等常规500kV工程、750kV工程以及±800kV直流工程,提高了抱杆的利用率。
附图说明:
图1为本实用新型的结构示意图。
图2为图1中的A部放大图。
具体实施方式:
为能清楚说明本方案的技术特点,下面通过具体实施方式,并结合其附图,对本实用新型进行详细阐述。
如图中所示,本实用新型包括上抱杆1和下抱杆2,上抱杆1和下抱杆2之间通过铰接装置3相铰接。上抱杆1可通过铰接装置3沿各方向转动。为了提高施工效率,在铰接装置3的外侧设有刚性连接装置4,刚性连接装置4的两端分别与上抱杆1和下抱杆2相连。
使用时,先将刚性连接装置4松开,再将上抱杆1和下抱杆2分别通过拉线固定好,上抱杆1与地面有一定的倾斜角度。在上抱杆1上端挂装滑轮组,即可开始吊装组塔。当铁塔组装到一定高度,需要提升抱杆时,用刚性连接装置4将上抱杆1和下抱杆2连结成一个整体,将提升滑车固定在下抱杆2下部的提升滑车挂板位置,即可开始提升抱杆。这样可增加抱杆的提升高度,减少抱杆的提升次数,提高了施工效率。抱杆提升完成后,拆除刚性连接装置4,上抱杆1和下抱杆2又变成铰接状态,再分别用拉线固定好,即可开始再次吊装组塔。

Claims (2)

1、一种铰接组合抱杆,其特征在于:包括上抱杆和下抱杆,上抱杆和下抱杆之间通过铰接装置相铰接。
2、根据权利要求1所述的一种铰接组合抱杆,其特征在于:在铰接装置的外侧设有刚性连接装置,刚性连接装置的两端分别与上抱杆和下抱杆相连。
CNU2007201591536U 2007-12-27 2007-12-27 一种铰接组合抱杆 Expired - Fee Related CN201169486Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201591536U CN201169486Y (zh) 2007-12-27 2007-12-27 一种铰接组合抱杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201591536U CN201169486Y (zh) 2007-12-27 2007-12-27 一种铰接组合抱杆

Publications (1)

Publication Number Publication Date
CN201169486Y true CN201169486Y (zh) 2008-12-24

Family

ID=40208539

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201591536U Expired - Fee Related CN201169486Y (zh) 2007-12-27 2007-12-27 一种铰接组合抱杆

Country Status (1)

Country Link
CN (1) CN201169486Y (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101554973B (zh) * 2009-05-19 2011-06-22 中国石化集团第四建设公司 一种用于吊装超大型设备/构件的吊索和吊具
CN102259801A (zh) * 2011-04-28 2011-11-30 上海三一科技有限公司 桁架臂履带起重机用折叠臂架

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101554973B (zh) * 2009-05-19 2011-06-22 中国石化集团第四建设公司 一种用于吊装超大型设备/构件的吊索和吊具
CN102259801A (zh) * 2011-04-28 2011-11-30 上海三一科技有限公司 桁架臂履带起重机用折叠臂架
CN102259801B (zh) * 2011-04-28 2013-06-05 上海三一科技有限公司 桁架臂履带起重机用折叠臂架

Similar Documents

Publication Publication Date Title
CN101985917B (zh) 海上风力发电机组分体安装施工方法及其设备
CN202672832U (zh) 可旋转座地双摇臂、内/外拉线悬浮混合抱杆
CN201501737U (zh) 用于平头塔机的吊钩装置
CN103832933B (zh) 一种带有副臂的组塔塔式起重机
CN104787690A (zh) 一种具有流动水配重系统的单动臂落地抱杆
CN201298695Y (zh) 输电线路更换耐张绝缘子用出线架
CN201169486Y (zh) 一种铰接组合抱杆
CN208904202U (zh) 一种通讯铁塔全自动智能抱杆
CN201087085Y (zh) 桁架式变截面加长型副起重臂
CN208112565U (zh) 一种角度可调式太阳能电池板
CN201882821U (zh) 快速拆装独立臂头
CN201372165Y (zh) 支座式双摇臂内抱杆
CN111069441A (zh) 一种端头板与板裙旋转升降铆压组装设备
CN201828415U (zh) 起重机吊重试验的加载装置
CN201980944U (zh) 提高荷载能力的电动吊篮悬挂系统及电动吊篮登高系统
CN201694745U (zh) 新型起重机端梁
CN2488892Y (zh) 下回转自装式小车变幅塔机
CN208992740U (zh) 一种臂架专用的接触端镶嵌石墨铜制轴套
CN201605871U (zh) 一种内悬浮外拉线抱杆
CN202148985U (zh) 垂直轴风力发电机风轮结构
CN201437492U (zh) 具有柔性基础和柔性附着的输电线路铁塔组立塔式起重机
WO2020048102A1 (zh) 一种起重设备
CN201762040U (zh) 履带式配重车及履带起重机
CN215291754U (zh) 一种带有顶滑轮的辅助抱杆
CN201372168Y (zh) 桅杆起重机的杆顶滑轮装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANDONG ELECTRIC POWER TRANSMISSION + TRANSFORMAT

Effective date: 20131029

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: SHANDONG ELECTRIC POWER TRANSMISSION + TRANSFORMATION ENGINEERING CO.

Effective date: 20131029

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 250022 JINAN, SHANDONG PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131029

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Shandong Electric Power Transmission & Substation Engineering Company

Address before: Huaiyin District of Ji'nan City, Shandong province 250022 Dexing Street No. 29

Patentee before: Shandong Electric Power Transmission & Substation Engineering Company

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081224

Termination date: 20151227

EXPY Termination of patent right or utility model