CN104989404A CN201510300626.9A CN201510300626A CN104989404A CN 104989404 A CN104989404 A CN 104989404A CN 201510300626 A CN201510300626 A CN 201510300626A CN 104989404 A CN104989404 A CN 104989404A
Authority
CN
China
Prior art keywords
ore
stope
medium
rock
rock drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510300626.9A
Other languages
Chinese (zh)
Other versions
CN104989404B (en
Inventor
赵国彦
孙贵东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201510300626.9A priority Critical patent/CN104989404B/en
Publication of CN104989404A publication Critical patent/CN104989404A/en
Application granted granted Critical
Publication of CN104989404B publication Critical patent/CN104989404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a diagonal ore-break-down medium-length hole mining method for a steeply-inclined thin vein ore body. The method comprises the following steps: arranging a stope according to the strike of the ore body, dividing rooms, pillars and sections according to the inclination direction of the ore body and arranging a level haulage roadway along the vein of the ore body from the footwall of the ore body; driving ore-drawing crosscuts into the ore body from where the level haulage roadway is located; horizontally arranging an undercutting roadway along the vein and parallely driving rock-drilling prospecting rises along slant height; arranging ore drop shafts to abut against the haulage roadway; starting stoping from one side of the stope, stopping stoping when the undercutting roadway is driven to the position of the first rock-drilling prospecting rise and then driving the rock-drilling prospecting rise; allowing a medium-length hole drilling machine to gradually travels from undercutting roadway to rock-drilling prospecting rise, drilling medium-length upward blast hole, carrying out denotation and drawing ore out from the bottom ore-drawing crosscuts; and after the first rock-drilling prospecting rise reaches a certain position, continuing driving the undercutting roadway until the position of the second rock-drilling prospecting rise is arrived at, carrying out medium-length hole mining, and repeating the above-mentioned operations until stoping of the stope is completed. The diagonal ore-break-down medium-length hole mining method has the advantages of high production efficiency, great production capacity and good operation security.

Description

The pseudo-ore deposit Medium-long hole mining method that tilts in Steeply dipping narrow deposits arteries and veins
Technical field
The present invention relates to a kind of mining methods, particularly relate to the pseudo-ore deposit Medium-long hole mining method that tilts in a kind of Steeply dipping narrow deposits arteries and veins.
Background technology
Steeply dipping narrow deposits is common in the mineral deposits such as gold, tungsten and tin, according to statistics, about has coloured, the rare and precious metal ore of 1/3rd all to come from such mineral deposit.At present, Steeply dipping narrow deposits commonly uses overhand cut and fill stoping and shallow hole shrinkage method exploitation, and owing to adopting aperture rock drilling equipment, the ore deposit amount that once falls is few, and it is low that Steeply dipping narrow deposits exploits not only production capacity, and labor strength is large, and operating cost is high.According to the experience of domestic and international mining, realize the safe and efficient the economic exploitation of steep narrow veins, its effective way improves mechanization degree exactly, and the large-scale winning equipment of a large amount of use, the length improving blasting hole is measured with the ore deposit that once falls.In view of this, Longhole Mining equipment is used in Steeply dipping narrow deposits exploitation, namely adopt conventional on to segmentation Medium-long hole mining method, although the high-efficient homework of Steeply dipping narrow deposits can be realized, improve production capacity, but also exist adopt accurate engineering quantity large, the problems such as slot raise forms the explosion scope of freedom and compensation space, stope domestic demand design ramp or driving courtyard artificial haulage rock drilling equipment, labor strength is large, narrow vein medium-length hole blasting clamping action is large, explosive consumption is large need be tunneled.For the exploitation of Steeply dipping narrow deposits, due to the impact by above-mentioned factor, oper cylinler medium-length hole narrow vein mining seldom carries out always.
It is investigated and read, patent document CN 102635356 A relates to a kind of steep narrow veins many explosions scope of freedom Medium-long hole mining method, although this method adopts many explosions scope of freedom, overcome the explosion clamping action of narrow vein, but the method exists equally need tunnel slot raise formation cutting groove, need driving ramp or driving People's Bank of China equipment courtyard haulage rock drilling equipment equally at stope, labor strength is large waits deficiency.Therefore, invent a kind of being combined by the layout tilted tunnel of arteries and veins and medium-length hole blasting and carry out the exploitation method of Steeply dipping narrow deposits, filled up the blank of the safe and efficient the economic exploitation of the party's class ore body, solved the difficult problem of medium-length hole blasting in narrow vein mining.
Summary of the invention
Technical problem to be solved by this invention is separated for the exploration of lean ore body and adopts the deficiency existed during conventional mining method exploitation, propose a kind of can prospecting in mining, rock drilling apparatus of middle deep hole migration convenient, overcome Steeply dipping narrow deposits medium-length hole exploitation clamping action, form cutting groove without the need to slot raise, stoping safety is high, adopt and cut the pseudo-ore deposit Medium-long hole mining method that tilts in engineering quantity is little, back production efficiency is high, production capacity is large Steeply dipping narrow deposits arteries and veins.
In order to solve the problems of the technologies described above, in Steeply dipping narrow deposits arteries and veins provided by the invention, the pseudo-ore deposit Medium-long hole mining method that tilts, arranges stope along orebody trend, by ore body incline direction multiple openings and segmentation, on ore body hangs down height, divides the stage; From ore body lower wall 4 ~ 8m arrangement stage haulage way along the pulse; Ore removal crosscut is tunneled in ore body every 6 ~ 8m to ore body along stage haulage way position; Along the pulse level establishes the gallery that undercuts, and by slant height every 10 ~ 12m gradually parallel driving rock drilling mine locating go up a hill, communicate in stage top with filling vent level; Filling vent level communicates with upper stage haulage way; Mine chute is arranged near haulage way of upper stage side; Back production, from stope side, stops moving ahead when the gallery that undercuts is formed to first bar rock drilling mine locating uphill position, transfers driving rock drilling mine locating to and goes up a hill; In stope, namely first bar rock drilling mine locating starts mining after going up a hill and being formed; Medium-length hole rig to be gone up a hill gradually row from the gallery that undercuts to rock drilling mine locating, vertical ore body Drilling upward horizon medium-length hole explosion, collapses lower ore and use scraper ore removal from bottom ore crosscut; Go up a hill exploitation after 5 meters ~ 10 meters height until first bar rock drilling mine locating, starts again driving and to undercut gallery arrive Article 2 rock drilling mine locating uphill position, formed after rock drilling mine locating goes up a hill, use the same method and carry out Longhole Mining, until stope mining is complete; Ore is shoveled out from ore removal crosscut by scraper, to deliver near stope in drop shaft; Stope limit is exploited, limit ore removal.
Stope leaves fore-set, for reducing the poor damage of secondary, depending on ore-rock stability, and suitable adjusting stage height; Controlroof open-assembly time, prevent balkstone inbreak, accelerate explosion and ore removal speed; Continuous for guaranteeing operation, suitably supporting is carried out to the drilling drift of ore deposit section built on the sand.
Stope exploitation terminates rear employing filling method process goaf.
The described stage that divides on ore body hangs down height is: the high 40 ~ 60m in stage casing, the high 10 ~ 12m of segmentation, pillars of a house width is determined according to ore and rock stability.
Described mine chute diameter of phi 1.8m ~ Φ 2.2m and arrange 1 near 1 ~ 2, haulage way of upper stage side mineral building.
Described vertical ore body Drilling upward horizon medium-length hole explosion refer to: hit deep hole upwards borehole, aperture 70 ~ 90mm, hole depth 1m from the gallery that undercuts goes up a hill to rock drilling mine locating and does not terminate 14m not etc., big gun hole array pitch 1.8m ~ 2.2m, pitch of holes 1.8m ~ 2.2m, common rocks explosive explosion, during explosion, three artillery salvo eye once detonations or five artillery salvo eye once detonations; Detonate between two adjacent rock drilling lanes 5 ~ 20m in advance.
Adopt the pseudo-ore deposit Medium-long hole mining method that tilts in the Steeply dipping narrow deposits arteries and veins of technique scheme, its beneficial effect is:
1. adopt that to cut engineering quantity little, production technology is simple
Arrange nugget exploitation by the stage, divide segmentation from incline direction, utilize undercut tunnel, slant drilling prospects the sequencing of going up a hill and tunneling, both can prospect and control the border of ore body, dilution during minimizing back production and loss; Rock drilling equipment haulage courtyard or ramp can be cancelled again.In addition, utilize and to go up a hill the blast hole depth increased gradually to rock drilling mine locating from the tunnel that undercuts, eliminate the slot raise kerve technique required for medium-length hole blasting, save and adopt accurate engineering in a large number, it is few that accurate cutting engineering adopted by stope, and production technology is simple.
2. equipment haulage is convenient, and labor strength is little
During thin orebody mining, adopting accurate engineering quantity for reducing, tunneling courtyard in ore body of being everlasting in order to transport rock drilling apparatus of middle deep hole, but because rock drilling apparatus of middle deep hole is heavy, haulage is inconvenient especially, labor strength is large, seriously have impact on the employing of lean ore body high efficiency method, for this reason, in the arteries and veins that design employing is in tilted layout, rock drilling mine locating is gone up a hill, workman is direct mobile rock drilling equipment in undercut tunnel or rock drilling mine locating are gone up a hill, and thus haulage is convenient, and labour intensity is less.
3. clamping action is little, and boulder yield is low
Utilize vertically arranged medium-length hole borehole in rock drilling mine locating is gone up a hill to carry out stope explosion, and by the Gravitative Loads of avalanche nugget, overcome clamping action during thin orebody mining, reduce oversized fragment rate and also reduce explosive consumption.
4. operational security is high, and production capacity is large
In stope used drill and blast all undercut tunnel and rock drilling mine locating go up a hill in carry out, collapse lower ore and shovel out from the ore removal crosscut of stage casing haulage level, all personnel's equipment does not all enter goaf, and operational security is good; Adopt the mechanization such as rock drilling apparatus of middle deep hole and scraper trackless equipment, and perforating, blow out, ore removal parallel operations, production does not interfere with each other, and production capacity of mining field is large.
5. prospecting in mining, the poor damage of resource is few
Utilize rock drilling to prospect to go up a hill, Bian Caibian visits, the strict rock border, ore deposit controlled in lean ore body, and the big gun hole site of adjustment explosion and direction control dilution and the loss of stope ore.
Accompanying drawing explanation
Fig. 1 is mining methods structural representation of the present invention.
Fig. 2 is II-II sectional drawing of Fig. 1.
Fig. 3 is III-III sectional drawing of Fig. 1.
In figure: 1-filling vent level, 2-fore-set, 3-rock drilling mine locating is gone up a hill, 4-ore removal crosscut, the upper stage haulage way of 5-, 6-mine chute, 7-next stage transportation roadway, and 8-undercuts gallery.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is illustrated.
The pseudo-ore deposit Medium-long hole mining method that tilts in Steeply dipping narrow deposits arteries and veins provided by the invention, see Fig. 1, Fig. 2 and Fig. 3, its concrete steps are as follows:
1) stope is arranged along orebody trend, by ore body incline direction multiple openings and segmentation, stage casing height 46m, segmentation height 10m, pillars of a house width is determined according to ore and rock stability; At ore body lower wall 6m place arrangement stage haulage way 7 along the pulse; Tunnel in 4 to the ore body of ore removal crosscut along stage haulage way 7 every 8m; Along the pulse level establishes the gallery 8 that undercuts, and by slant height every 10m gradually parallel driving rock drilling mine locating go up a hill 3, communicate in stage top with filling vent level 1; For convenience of stope ventilation, filling vent level 1 communicates with upper stage haulage way 5; Mine chute 6 arranges 1 near 2, haulage way of upper stage 5 side mineral building, mine chute 6 diameter of phi 2m.
2) back production is from stope side, stops moving ahead, transfer driving rock drilling mine locating to and go up a hill 3 when the tunnel 8 that undercuts is tunneled and gone up a hill 3 position to first bar rock drilling mine locating; In stope, namely first bar rock drilling mine locating starts mining after going up a hill and being formed; Medium-length hole rig to be gone up a hill 3 gradually row from gallery 8 to the rock drilling mine locating that undercuts, vertical ore body Drilling upward horizon medium-length hole; Medium-length hole aperture 70mm, hole depth is prospected from 1m near the gallery 8 that undercuts to rock drilling and is not gone up a hill 10m not etc., big gun hole array pitch 2m, pitch of holes 2m; During explosion, three artillery salvo eye once detonations; When first bar rock drilling mine locating goes up a hill blasting excavation to after 5 meters ~ 10 meters height, start again driving and to undercut tunnel, to Article 2 rock drilling mine locating uphill position, formed after rock drilling prospects and go up a hill, adopt above-mentioned same method and technique to exploit; To detonate in advance between two adjacent drilling drifts five artillery salvo holes.Detonate between two adjacent rock drilling lanes 5 ~ 20m in advance.
3) utilize ore to conduct oneself with dignity and form tight-face blasting to overcome the clamping action in thin orebody mining; Ore under quick-fried is shoveled out from ore removal crosscut by scraper, is transported in neighbouring mine chute 6; Stope inner edge is exploited, scraper limit ore removal.
4) for guaranteeing job safety, stope leaves fore-set 2, fore-set height 3m; For reducing secondary poor damage, depending on ore-rock stability, can suitably the adjusting stage be highly; Controlroof open-assembly time, prevent balkstone inbreak, explosion and ore removal speed can be accelerated; Continuous for guaranteeing operation, suitably can carry out supporting to the drilling drift of ore deposit section built on the sand.
See Fig. 1, Fig. 2 and Fig. 3, utilize during back production and adopt accurate engineering driving sequencing and the special form of structure of stope, form the convenient passage of stoping operation compensation space and equipment conveying, without the need to draw cut cut groove form compensating space in blasting and equipment haulage conveniently; The rock drilling mine locating be in tilted layout is adopted to go up a hill and the big gun well format vertical with tendency, the onepull of two row or multi-row borehole, play on the one hand and control ore limits and mine locating effect, on the other hand, tight-face blasting is formed by ore deadweight, overcome the clamping action in thin orebody mining, improve demolition effect, reduce boulder yield, reduce explosive consumption.The present invention has prospecting in mining, without the need to Special Blasting kerve engineering, the distinguishing feature such as equipment migration is convenient, thin orebody mining clamping action is little, oversized fragment rate is low, production efficiency is high, production capacity is large, operational security is good.

Claims (6)

1. the pseudo-ore deposit Medium-long hole mining method that tilts in Steeply dipping narrow deposits arteries and veins, is characterized in that: arrange stope along orebody trend, by ore body incline direction multiple openings and segmentation, on ore body hangs down height, divide the stage; From ore body lower wall 4 ~ 8m arrangement stage haulage way along the pulse; Ore removal crosscut is tunneled in ore body every 6 ~ 8m to ore body along stage haulage way position; Along the pulse level establishes the gallery that undercuts, and by slant height every 10 ~ 12m gradually parallel driving rock drilling mine locating go up a hill, communicate in stage top with filling vent level; Filling vent level communicates with upper stage haulage way; Mine chute is arranged near haulage way of upper stage side; Back production, from stope side, stops moving ahead when the gallery that undercuts is formed to first bar rock drilling mine locating uphill position, transfers driving rock drilling mine locating to and goes up a hill; In stope, namely first bar rock drilling mine locating starts mining after going up a hill and being formed; Medium-length hole rig to be gone up a hill gradually row from the gallery that undercuts to rock drilling mine locating, vertical ore body Drilling upward horizon medium-length hole explosion, collapses lower ore and use scraper ore removal from bottom ore crosscut; Go up a hill exploitation after 5 meters ~ 10 meters height until first bar rock drilling mine locating, starts again driving and to undercut gallery arrive Article 2 rock drilling mine locating uphill position, formed after rock drilling mine locating goes up a hill, use the same method and carry out Longhole Mining, until stope mining is complete; Ore is shoveled out from ore removal crosscut by scraper, to deliver near stope in drop shaft; Stope limit is exploited, limit ore removal.
2. the pseudo-ore deposit Medium-long hole mining method that tilts in Steeply dipping narrow deposits arteries and veins according to claim 1, is characterized in that: stope leaves fore-set, for reducing the poor damage of secondary, depending on ore-rock stability, and suitable adjusting stage height; Controlroof open-assembly time, prevent balkstone inbreak, accelerate explosion and ore removal speed; Continuous for guaranteeing operation, suitably supporting is carried out to the drilling drift of ore deposit section built on the sand.
3. the pseudo-ore deposit Medium-long hole mining method that tilts in Steeply dipping narrow deposits arteries and veins according to claim 1 and 2, is characterized in that: stope exploitation terminates rear employing filling method process goaf.
4. the pseudo-ore deposit Medium-long hole mining method that tilts in Steeply dipping narrow deposits arteries and veins according to claim 1 and 2, is characterized in that: the described stage that divides on ore body hangs down height is: the high 40 ~ 60m in stage casing, the high 10 ~ 12m of segmentation, pillars of a house width is determined according to ore and rock stability.
5. the pseudo-ore deposit Medium-long hole mining method that tilts in Steeply dipping narrow deposits arteries and veins according to claim 1 and 2, is characterized in that: described mine chute diameter of phi 1.8m ~ Φ 2.2m and arrange 1 near 1 ~ 2, haulage way of upper stage side mineral building.
6. the pseudo-ore deposit Medium-long hole mining method that tilts in Steeply dipping narrow deposits arteries and veins according to claim 1 and 2, it is characterized in that: described vertical ore body Drilling upward horizon medium-length hole explosion refer to: hit deep hole upwards borehole, aperture 70 ~ 90mm, hole depth 1m from the gallery that undercuts goes up a hill to rock drilling mine locating and does not terminate 14m not etc., big gun hole array pitch 1.8m ~ 2.2m, pitch of holes 1.8m ~ 2.2m, common rocks explosive explosion, during explosion, three artillery salvo eye once detonations or five artillery salvo eye once detonations; Detonate between two adjacent rock drilling lanes 5 ~ 20m in advance.
CN201510300626.9A 2015-06-05 2015-06-05 It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method Active CN104989404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510300626.9A CN104989404B (en) 2015-06-05 2015-06-05 It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510300626.9A CN104989404B (en) 2015-06-05 2015-06-05 It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method

Publications (2)

Publication Number Publication Date
CN104989404A true CN104989404A (en) 2015-10-21
CN104989404B CN104989404B (en) 2018-06-05

Family

ID=54301273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510300626.9A Active CN104989404B (en) 2015-06-05 2015-06-05 It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method

Country Status (1)

Country Link
CN (1) CN104989404B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948819A (en) * 2017-05-09 2017-07-14 长春黄金研究院 A kind of shrinkage and breast method for slipping formula ore chute ore removal certainly
CN107448201A (en) * 2017-05-31 2017-12-08 陕西冶金设计研究院有限公司 A kind of steeply inclined thin is to the flat ore removal structure of middle strong vein and method
CN108266188A (en) * 2018-01-23 2018-07-10 中蓝长化工程科技有限公司 The checkerboard type recovery method of engineering puppet inclination arrangement need not be cut based on in-vein preparatory work
CN108661649A (en) * 2018-06-07 2018-10-16 大冶有色金属有限责任公司 A kind of inclined access formula non-pillar sublevel caving mining methods
CN110906817A (en) * 2019-12-17 2020-03-24 徐州天露中矿矿业科技有限公司 Strip mine composite thin layer material mining and stripping method and blasting charge robot
CN110952982A (en) * 2019-11-14 2020-04-03 西安建筑科技大学 Medium-length hole presplitting blasting mining method for steeply inclined thin-vein to extremely thin-vein ore body
CN111485881A (en) * 2020-04-07 2020-08-04 内蒙古金陶股份有限公司 Mining method of steeply inclined thin ore vein
CN111894584A (en) * 2020-07-08 2020-11-06 中南大学 Cemented filling mining method for fully-pseudo-arranged reserved roadway of slowly-inclined thin ore body
CN111997611A (en) * 2020-09-07 2020-11-27 贵州紫金矿业股份有限公司 Steeply inclined ore body inclination raise sublevel mining method
CN112377196A (en) * 2021-01-15 2021-02-19 北京科技大学 Underground mining method for steeply inclined thin ore body with broken ore body and surrounding rock
CN113446006A (en) * 2021-07-27 2021-09-28 赣州有色冶金研究所有限公司 Open stope mining method for steeply inclined vein-shaped ore body
CN114183142A (en) * 2021-12-08 2022-03-15 西北矿冶研究院 Method for mining inclined and steeply inclined thin ore body
CN114412466A (en) * 2022-01-25 2022-04-29 长沙矿山研究院有限责任公司 Conditional ore rock boundary accurate blasting method with unstable ore body stability and unstable upper disc
CN114427462A (en) * 2022-01-06 2022-05-03 紫金矿业集团股份有限公司 Medium-length hole ore-matching type mining method for steep thin ore vein
CN114483037A (en) * 2022-01-06 2022-05-13 紫金矿业集团股份有限公司 Steep dip thin ore vein up-down medium-length hole combined stepped low dilution mining method
CN114810078A (en) * 2022-04-08 2022-07-29 紫金矿业集团股份有限公司 Reconstruction method for environment of broken upper and lower plates of 360-degree annular deep hole grouting stope
CN114856563A (en) * 2022-06-02 2022-08-05 紫金矿业集团股份有限公司 Dead-weight ore-falling mining method for deep-hole pre-cracked ore in downward stage of broken ore rock
CN115680663A (en) * 2023-01-03 2023-02-03 矿冶科技集团有限公司 Mining method for steeply-inclined broken ore body
CN116335671A (en) * 2023-03-28 2023-06-27 长春工程学院 Stoping waste rock following filling mining method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094647A (en) * 2010-12-31 2011-06-15 大同煤矿集团有限责任公司 Safe and efficient fully-mechanized mining method for thin coal seam under two hard conditions
RU2448249C2 (en) * 2010-07-07 2012-04-20 Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) Underground development method of thick mineral deposits
CN102635356A (en) * 2012-04-26 2012-08-15 中南大学 Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN102720500A (en) * 2012-05-24 2012-10-10 青海山金矿业有限公司 Mechanized underground mining method for sharply inclined thin ore body
CN103089267A (en) * 2013-01-22 2013-05-08 鞍钢集团矿业公司 Thin-ore-body shallow hole shrinkage method without sill pillar
CN103410513A (en) * 2013-07-29 2013-11-27 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Mechanical stopping process for hard-to-mine ore body

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2448249C2 (en) * 2010-07-07 2012-04-20 Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) Underground development method of thick mineral deposits
CN102094647A (en) * 2010-12-31 2011-06-15 大同煤矿集团有限责任公司 Safe and efficient fully-mechanized mining method for thin coal seam under two hard conditions
CN102635356A (en) * 2012-04-26 2012-08-15 中南大学 Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN102720500A (en) * 2012-05-24 2012-10-10 青海山金矿业有限公司 Mechanized underground mining method for sharply inclined thin ore body
CN103089267A (en) * 2013-01-22 2013-05-08 鞍钢集团矿业公司 Thin-ore-body shallow hole shrinkage method without sill pillar
CN103410513A (en) * 2013-07-29 2013-11-27 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Mechanical stopping process for hard-to-mine ore body

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
夏建波等: "杨广寨急倾斜薄矿体近地表三角采场开采方法改进", 《昆明冶金高等专科学校学报》 *
李志民: "湘潭锰矿急倾斜薄矿体充填采矿方法改进的探讨", 《中国锰业》 *
罗怀长: "茶山锑矿急倾斜薄矿体开采方法的探索", 《采矿技术》 *

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948819A (en) * 2017-05-09 2017-07-14 长春黄金研究院 A kind of shrinkage and breast method for slipping formula ore chute ore removal certainly
CN107448201A (en) * 2017-05-31 2017-12-08 陕西冶金设计研究院有限公司 A kind of steeply inclined thin is to the flat ore removal structure of middle strong vein and method
CN108266188A (en) * 2018-01-23 2018-07-10 中蓝长化工程科技有限公司 The checkerboard type recovery method of engineering puppet inclination arrangement need not be cut based on in-vein preparatory work
CN108661649A (en) * 2018-06-07 2018-10-16 大冶有色金属有限责任公司 A kind of inclined access formula non-pillar sublevel caving mining methods
CN110952982B (en) * 2019-11-14 2021-03-02 西安建筑科技大学 Medium-length hole presplitting blasting mining method for steeply inclined thin-vein to extremely thin-vein ore body
CN110952982A (en) * 2019-11-14 2020-04-03 西安建筑科技大学 Medium-length hole presplitting blasting mining method for steeply inclined thin-vein to extremely thin-vein ore body
CN110906817A (en) * 2019-12-17 2020-03-24 徐州天露中矿矿业科技有限公司 Strip mine composite thin layer material mining and stripping method and blasting charge robot
CN111485881A (en) * 2020-04-07 2020-08-04 内蒙古金陶股份有限公司 Mining method of steeply inclined thin ore vein
CN111485881B (en) * 2020-04-07 2022-02-01 内蒙古金陶股份有限公司 Mining method of steeply inclined thin ore vein
CN111894584A (en) * 2020-07-08 2020-11-06 中南大学 Cemented filling mining method for fully-pseudo-arranged reserved roadway of slowly-inclined thin ore body
CN111894584B (en) * 2020-07-08 2021-06-29 中南大学 Cemented filling mining method for fully-pseudo-arranged reserved roadway of slowly-inclined thin ore body
CN111997611A (en) * 2020-09-07 2020-11-27 贵州紫金矿业股份有限公司 Steeply inclined ore body inclination raise sublevel mining method
CN112377196A (en) * 2021-01-15 2021-02-19 北京科技大学 Underground mining method for steeply inclined thin ore body with broken ore body and surrounding rock
CN112377196B (en) * 2021-01-15 2021-05-14 北京科技大学 Underground mining method for steeply inclined thin ore body with broken ore body and surrounding rock
CN113446006A (en) * 2021-07-27 2021-09-28 赣州有色冶金研究所有限公司 Open stope mining method for steeply inclined vein-shaped ore body
CN113446006B (en) * 2021-07-27 2023-08-18 赣州有色冶金研究所有限公司 Open stope mining method for steep vein-like ore body
CN114183142A (en) * 2021-12-08 2022-03-15 西北矿冶研究院 Method for mining inclined and steeply inclined thin ore body
CN114183142B (en) * 2021-12-08 2023-10-13 西北矿冶研究院 Method for mining inclined and steeply inclined thin ore body
CN114483037A (en) * 2022-01-06 2022-05-13 紫金矿业集团股份有限公司 Steep dip thin ore vein up-down medium-length hole combined stepped low dilution mining method
CN114427462B (en) * 2022-01-06 2022-11-11 紫金矿业集团股份有限公司 Medium-length hole ore-matching type mining method for steep thin ore vein
CN114483037B (en) * 2022-01-06 2022-12-16 紫金矿业集团股份有限公司 Steep dip thin ore vein up-down medium-length hole combined stepped low dilution mining method
CN114427462A (en) * 2022-01-06 2022-05-03 紫金矿业集团股份有限公司 Medium-length hole ore-matching type mining method for steep thin ore vein
CN114412466A (en) * 2022-01-25 2022-04-29 长沙矿山研究院有限责任公司 Conditional ore rock boundary accurate blasting method with unstable ore body stability and unstable upper disc
CN114810078A (en) * 2022-04-08 2022-07-29 紫金矿业集团股份有限公司 Reconstruction method for environment of broken upper and lower plates of 360-degree annular deep hole grouting stope
CN114856563A (en) * 2022-06-02 2022-08-05 紫金矿业集团股份有限公司 Dead-weight ore-falling mining method for deep-hole pre-cracked ore in downward stage of broken ore rock
CN115680663A (en) * 2023-01-03 2023-02-03 矿冶科技集团有限公司 Mining method for steeply-inclined broken ore body
CN115680663B (en) * 2023-01-03 2023-02-28 矿冶科技集团有限公司 Mining method for steeply-inclined broken ore body
CN116335671A (en) * 2023-03-28 2023-06-27 长春工程学院 Stoping waste rock following filling mining method

Also Published As

Publication number Publication date
CN104989404B (en) 2018-06-05

Similar Documents

Publication Publication Date Title
CN104989404B (en) It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method
CN108612530B (en) Mining method for hanging wall surrounding rock crushing inclined medium-thickness ore body
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN102635356B (en) Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN105952450B (en) A kind of new method of the double stope collaboration exploitations in underground mine underground
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN106121648A (en) Sublevel open stoping chassis route ore drawing subsequent filling mining method
CN108625856A (en) A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine
CN104481543B (en) Stage shrink caved stopes
CN106223956B (en) Medium-length hole courtyard mining afterwards filling method
CN103590831A (en) Novel mining method of gently-inclined thin and medium thickness ore bodies
CN107975373B (en) A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction
CN106761912A (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN102844522A (en) Underground mining
CN104481539A (en) Extruding blasting caving mining method for self-pulling slot
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN101285384B (en) Large diameter, deep borehole and non undercutting mining method
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN106194188A (en) The quick-fried power of scraper collaborative carrying puppet tilts room and pillar stoping
CN106089209A (en) Flexible isolating layer serves as the sublevel caving on false top and works in coordination with mining methods
CN109869150A (en) A kind of mine resources are segmented the full office of adopting and fill recovery method
CN106761745A (en) The outer sublevel open stope method of arteries and veins
CN103726848A (en) Mining method applicable to recovery of gentle-inclined/inclined thin ore body
CN101737051A (en) Covering layer forming method of blind ore bodies
CN105370280B (en) A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant