CN103775127A - Method for comprehensively treating gas in low-air-permeability high-gas-content coal seam group - Google Patents
Method for comprehensively treating gas in low-air-permeability high-gas-content coal seam group Download PDFInfo
- Publication number
- CN103775127A CN103775127A CN201310752165.XA CN201310752165A CN103775127A CN 103775127 A CN103775127 A CN 103775127A CN 201310752165 A CN201310752165 A CN 201310752165A CN 103775127 A CN103775127 A CN 103775127A
- Authority
- CN
- China
- Prior art keywords
- gas
- drill site
- coal
- extraction
- seam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The invention provides a method for comprehensively treating gas in a low-air-permeability high-gas-content coal seam group and belongs to a coal mine gas treatment method. The method for comprehensively treating gas is based on the pressure relief gas emission law when an upper protective seam is extracted under the condition of the low-air-permeability high-gas-content close-distance coal seam group and a coal and gas simultaneous extraction system of the upper protective seam is established. The method comprises the steps of protective seam gas extraction and protected seam gas extraction. Protective seam gas extraction comprises the steps of protective seam gas extraction, roof high-position drilling site and drilling gas extraction and gas extraction of a reserved-tunnel wall laid-pipe goaf. Protected seam gas extraction is seam gas pre-extraction. Thus, safe and efficient recovery of the upper protective seam under the condition of the low-air-permeability high-gas-content close-distance coal seam group is achieved. The method for extraction is simple, stable, reliable and remarkable in social and economic benefit and has great significance in the improvement in safety and reliability of coal mine gas disaster prevention measures, the coal extraction environment and the safety condition and efficiency of a working face.
Description
Technical field
The present invention relates to a kind of coal mine gas control method, specifically a kind of low-permeable high gas layer group topping Comprehensive Gas Control method.
Background technology
In recent years, coal bed gas extraction technology has obtained develop rapidly, and exploits successful combination with topping, has formed topping exploitation and protected seam pressure relief gas pumping mining technology.Mining Practice for many years proves; topping exploitation and protected seam release art are one of effective, the most most economical regional measures of control coal and Gas Outburst; this technology not only can be avoided state long-term and dangerous seam with potential point-blank encounter, and has improved the safety and reliability of control coal and Gas Outburst measure.For this reason, coal supervision department by different laws and regulations, is decided to be by topping exploitation and protected seam pressure relief gas pumping mining technology the mandatory first-selected protrusion-dispelling technology that current dangerous seam with potential group exploits by priority.Along with the development of colliery fully mechanized coal winning technology, the advance of the face is accelerated, gas emission sharply increases, and gas has become the key factor of some mine safety high-efficiency mining of restriction. and gas is a kind of gas with strong greenhouse effect, and greenhouse effect are about CO
221 times, a large amount of discharges will cause serious environmental problem, still, gas is again a kind of clean, the energy efficiently, on calorific value, gas and conventional gas are suitable, every 1000m
3pure gas is equivalent to the standard coal of 1t fuel oil or 1.25t. China highly gassy mine ton coal gas bearing capacity average out to 6~10m
3, gas resources is abundant, and powerful drive mash gas resource both can improve the utilization rate of resource, can improve again the safety of coal mining, and was conducive to improve global atmosphere environment.Therefore, the how high fiery colliery gas resources of safe and efficient extraction, realizes coal and gas safety is efficiently adopted altogether, is target and the direction of domestic and international many scholar's research.
Summary of the invention
Technical problem: in order to overcome deficiency of the prior art; the invention provides a kind of productivity effect, safety and reliability is good, can realize the method for a kind of low-permeable high gas layer group topping Comprehensive Gas Control of adopting altogether of the high gas coal seam group with near interval of ground gas permeability pressure-relief outburst-prevention, topping and protected seam coal and gas.
Technical scheme: object of the present invention is achieved through the following technical solutions: based on gas pressure relief Emission Law when upper topping exploitation under the high gas coal seam group with near interval of low-permeable condition, on structure, topping coal and gas are adopted system altogether, and the described system of adopting altogether comprises: topping and protected seam gas pumping; Topping gas pumping comprises this coal bed gas extraction of topping, the high-order drilling holes at the drilling yard gas pumping of top board, stays lane body of wall pipe laying goaf gas extraction, and described protected seam gas pumping is that coal-bed gas is taken out in advance; Concrete method is as follows:
One, this coal bed gas extraction of topping is arranged
1) parallel boring form gas pumping is arranged
Return airway is adopted side and is started to arrange No. 1 boring from 900m, boring vertical working is arranged, the spacing of wells is 9m, until protection coal column 50m place, Ju great lane finishes, take the elevation angle as+1 ° is upwards drilled, drilling depth is 80m, and determine according to on-the-spot geological conditions at the elevation angle of holing in work progress, and elevation angle angular range is at 0~90 °;
2) drill site fan drilling form gas pumping is arranged
, adopt side and transportation lane and adopt side and arrange a drill site every 50m inward to open-off cut at the 900m place of return airway, each drill site is arranged 8 borings; Return airway is adopted the boring open height 1.2m of side, and with+1 ° of angle, along drilling in coal, hole depth is 80m; Dip angle of hole and perforate inclination angle are according to seam inclination, actual in work progress, and Field Force changes adjustment bore angle according to coal seam and guarantees that drilling construction is in coal seam;
Two, the high-order drilling holes at the drilling yard gas pumping of top board is arranged
In transportation lane, utilize existing, apart from fissure zone boring in one group of the each construction of nearest two drill sites of work plane, 5 borings of constructing altogether in drill site, be fan-shaped layout, No. 1~No. 5 boring arranges from left to right successively, the whole hole horizontal spacing of holing is 15m, and according to fissure zone development height analysis result, the fissure zone whole hole of holing is set by 8~10 times of mining height 13~16m; The dark 3m of drill site, spacing of wells 0.6m, boring is at the intersection opening of top board and tunnel coal side.
The aperture of boring is 50mm, and sealing of hole, reaming length are 9m, and sealing of hole adopts the polyethylene pipe of the flanged dish of 50mm, cementing; Be connected with main line and adopt Sunken wire tube, valve and tailrace are installed in main line threeway place, to extraction observational record, adjust extraction parameter and discharging water;
Three, stay lane body of wall pipe laying goaf gas extraction to arrange
In the obturation of transportation Xiang Liu lane, reserve one 4 writing brushes at interval of 9m, and connect with flange Sunken wire tube, stretch out body of wall 0.5m, in the work progress of Liu lane, each 4 writing brushes arrange a gate valve and are connected with non-ф 320 releasing pipes of adopting side in peephole and tunnel, and non-gob side entry retaining side ф 320 releasing pipes of adopting are received to rear portion, work plane goaf and realized goaf gas extraction;
Goaf pipe laying extraction, by the direct extraction goaf gas of installation pipeline, reduces goaf gas as far as possible and flows into work plane; Generally, goaf pipe laying diameter 75mm~100mm, one end length being in exploiting field can be according to in-situ determination; Tube wall is installed with aperture and wraps with husky net, prevents from stopping up in extraction process; This pipe should be tried one's best near top, coal seam, in the higher place of gas density;
Four, protected seam coal-bed gas is taken out layout in advance
Traverse 77m place to cutting eye, the right side in tunnel layout topping gas pumping drill site in protected seam return aircourse apart from two; No. 1 drill site traverses 77m place in distance two, with No. 2 drill site spacing 50m, arranges 9 borings; No. 2 each drill site spacing of drill site to 7 drill site 50m, arrange 5 holes at No. 2 each drill sites of drill site to 7 drill site; No. 7 each drill site spacing of drill site to 9 drill site 40m, No. 9 drill site to 10 drill site spacing 69m, arrange 4 borings at No. 8 drill sites, and No. 9 drill site is arranged 5 borings, and No. 10 drill site is arranged 6 borings; No. 10 each drill site spacing of drill site to 26 drill site 50m, arrange 5 borings at each drill site;
Boring target bearing is 359 °, and each drill site open interior spacing is that 1m left and right, the spacing of wells are 10m, and the single hole degree of depth is 340m, and bore angle and opening inclination angle will change and adjust according to seam inclination, actual drill site; Boring aperture is 96mm, and sealing of hole, reaming length are 9m, and counter bore diameter is 150mm, and hole sealing tube adopts 4 cun of pvc pipes, No. 425 cementings.
Beneficial effect: owing to having adopted such scheme; determine the method that low-permeable high gas layer group topping comprehensive gas is placed; and according to gas pressure relief Emission Law when upper topping exploitation under the high gas coal seam group with near interval of low-permeable condition; build upper topping coal and gas and adopted altogether system, realized pressure-relief outburst-prevention, topping and protected seam coal and the gas safety of the high gas coal seam group with near interval of low-permeable and efficiently adopt altogether.Solve the problem that the high gas coal seam group with near interval of gas permeability pressure-relief outburst-prevention, topping and protected seam coal and gas safety are efficiently adopted altogether; this exploitation method is simple; reliable and stable; Social benefit and economic benefit is remarkable; for the safety and reliability that improves the measure of control coal mine gas disaster; improve safe condition and the efficiency of coal mining environment, raising work plane, significant.
Accompanying drawing explanation
Fig. 1 is that topping coal of the present invention and gas are adopted system figure altogether.
Fig. 2 is this coal bed gas extraction of topping arrangement diagram of the present invention.
Fig. 3 is the high-order drilling holes at the drilling yard gas pumping of top board of the present invention arrangement diagram.
Fig. 4 is the lane body of wall pipe laying goaf gas extraction arrangement diagram that stays of the present invention.
Fig. 5 is that protected seam coal-bed gas of the present invention is taken out plane of arrangement figure in advance.
Fig. 6 is that protected seam coal-bed gas of the present invention is taken out layout sectional view in advance.
In figure, 1, return airway; 2, transportation lane; 3, open-off cut; 4, parallel boring; 5, drill site fan drilling; 6, this coal seam drill site of topping; 7, the high-order drill site of top board; 8, the high-order drilling holes at the drilling yard of top board; 9, topping work plane; 10, gob side entry retaining filling wall; 11, stay lane body of wall pipe laying; 12, gob side entry retaining; 13, protected seam return airway; 14, protected seam km directional drilling; 15, protected seam is taken out drill site in advance.
The specific embodiment
1~Fig. 6 describes the concrete implementation step of the present invention by reference to the accompanying drawings:
Embodiment 1: based on gas pressure relief Emission Law when upper topping exploitation under the high gas coal seam group with near interval of Sha Qu ore deposit low-permeable condition, built upper topping coal and gas and adopted altogether system, mainly comprised topping and protected seam gas pumping.Topping gas pumping comprises this coal bed gas extraction of topping, the high-order drilling holes at the drilling yard gas pumping of top board, stays lane body of wall pipe laying goaf gas extraction, secondly protected seam is carried out to coal-bed gas and takes out in advance.Concrete grammar is as follows:
One, this coal bed gas extraction of topping is arranged
1) parallel boring form gas pumping
22201 assistant conveyance lanes 1 are adopted side and are started to arrange No. 1 boring 4 from 900m, 4 vertical workings of holing are arranged, 4 spacing of holing are 9m, until protection coal column 50m place, Ju great lane finishes, take the elevation angle as+1 ° is upwards drilled, boring 4 degree of depth are 80m, determine according to on-the-spot geological conditions at 4 elevations angle of holing in work progress, elevation angle angular range is at 0~90 °, guarantees that the elevation angle deslagging of upwards drilling is easy, ponding not in hole; The total construction number of boring 4 is 81, and total footage is 6480m.
2) drill site fan drilling form gas pumping is arranged
At 22201 assistant conveyance lane 1(900m inward to open-off cut) adopt side and 22201 machine rails unifications lane 2 and adopt side and arrange a drill site 6 every 50m, arrange altogether 38 drill sites 6, each drill site 6 is arranged 8 borings 5, construct altogether 304 of this coal bed drillings of machine rail unification lane 2 and assistant conveyance lane 1 drill site 6, total footage is 24320m.
The boring 4 open height 1.2m of side are adopted in assistant conveyance lane 1, and with+1 ° of angle, along drilling in coal, hole depth is 80m.Hole 4 inclination angles and perforate inclination angle according to seam inclination, actual in work progress, and Field Force can change suitably adjustment boring (4) angle according to coal seam and guarantee that drilling construction is in coal seam.
Two, the high-order drilling holes at the drilling yard gas pumping of top board is arranged
In 22201 machine rail unification lanes 2, utilize existing, apart from two nearest drill sites 7 of work plane, hole 8 at machine rail unification lane 2 left side 25 drill sites (1450m) and 24 drill sites (1400m) fissure zone on a group of respectively constructing, interior 5 borings of constructing altogether of drill site 7, be fan-shaped layout, No. 1~No. 5 boring 8 arranges from left to right successively, and boring 8 whole hole horizontal spacing are 15m, according to fissure zone development height analysis result, the fissure zone whole hole of holing is designed by 8~10 times of mining heights (13~16m).The dark 3m of drill site 7, spacing of wells 0.6m, boring 8 is at the intersection opening (can suitably adjust according to site specific) of top board and tunnel coal side.
Boring 8 constructions adopt ZYG-150 type rig, and aperture is 50mm, and sealing of hole, reaming length are 9m, and sealing of hole adopts the polyethylene pipe of the flanged dish of 50mm, cementing.Be connected with main line and adopt Sunken wire tube, valve and tailrace are installed in main line threeway place, to extraction observational record, adjust extraction parameter and discharging water.
Three, stay lane body of wall pipe laying goaf gas extraction
Stay in 12 obturations 10 of lane at interval of reserved one 4 writing brushes of 9m 22201, and connect with flange Sunken wire tube, stretch out body of wall 0.5m, in 12 work progresss of Liu lane, each 4 writing brushes arrange a gate valve and are connected with non-ф 320 releasing pipes of adopting side in peephole and tunnel, and non-gob side entry retaining side ф 320 releasing pipes of adopting are received to 22201 rear portions, work plane goaf and realized goaf gas extraction.
Pipe laying 11 extractions in goaf, by the direct extraction goaf gas of installation pipeline, reduce goaf gas as far as possible and flow into work plane.Generally, goaf pipe laying diameter 75mm~100mm, one end length being in exploiting field can be according to in-situ determination.Tube wall is installed with aperture and wraps with husky net, prevents blockage phenomenon in extraction process.This pipe should be tried one's best near top, coal seam, in the higher place of gas density.
Five, protected seam carries out coal-bed gas and takes out in advance
Traverse 77m place to cutting eye in 24208 assistant conveyance lanes 13 distances two, the right side in tunnel offers 1526 of topping extraction drill sites.No. 1 drill site traverses 77m place in distance two, with No. 2 drill site spacing 50m, arranges 9 borings.No. 2 each drill site spacing of drill site to 7 drill site 50m, arrange 5 holes at No. 2 each drill sites of drill site to 7 drill site.No. 7 each drill site spacing of drill site to 9 drill site 40m, No. 9 drill site to 10 drill site spacing 69m, arrange 4 borings at No. 8 drill sites, and No. 9 drill site is arranged 5 borings, and No. 10 drill site is arranged 6 borings.No. 10 each drill site spacing of drill site to 26 drill site 50m, arrange 5 borings at each drill site.
14 target bearings of holing are 359 °, and each drill site 15 open interior spacing are that 1m left and right, boring 14 spacing are 10m, and the single hole degree of depth is 340m, and boring 14 angles and opening inclination angle will change and adjust according to seam inclination, actual drill site.14 apertures of holing are 96mm, and sealing of hole, reaming length are 9m, and counter bore diameter is 150mm, and hole sealing tube adopts 4 cun of pvc pipes, No. 425 cementings.
Claims (1)
1. a low-permeable high gas layer group topping Comprehensive Gas Control method, it is characterized in that: based on gas pressure relief Emission Law when upper topping exploitation under the high gas coal seam group with near interval of low-permeable condition, on structure, topping coal and gas are adopted system altogether, and the described system of adopting altogether comprises: topping and protected seam gas pumping; Described topping gas pumping comprises this coal bed gas extraction of topping, the high-order drilling holes at the drilling yard gas pumping of top board, stays lane body of wall pipe laying goaf gas extraction, and described protected seam gas pumping is that coal-bed gas is taken out in advance; Concrete method is as follows:
One, this coal bed gas extraction of topping is arranged
1) parallel boring form gas pumping is arranged
Return airway is adopted side and is started to arrange No. 1 boring from 900m, boring vertical working is arranged, the spacing of wells is 9m, until protection coal column 50m place, Ju great lane finishes, take the elevation angle as+1 ° is upwards drilled, drilling depth is 80m, and in work progress, determine according to on-the-spot geological conditions at boring (4) elevation angle, and elevation angle angular range is at 0~90 °;
2) drill site fan drilling form gas pumping is arranged
, adopt side and transportation lane and adopt side and arrange a drill site every 50m inward to open-off cut at the 900m place of return airway, each drill site is arranged 8 borings; Return airway is adopted the boring open height 1.2m of side, and with+1 ° of angle, along drilling in coal, hole depth is 80m; The boring elevation angle and the perforate elevation angle are according to seam inclination, actual in work progress, and Field Force changes adjustment bore angle according to coal seam and guarantees that drilling construction is in coal seam;
Two, the high-order drilling holes at the drilling yard gas pumping of top board is arranged
In transportation lane, utilize existing, apart from fissure zone boring in one group of the each construction of nearest two drill sites of work plane, 5 borings of constructing altogether in drill site, be fan-shaped layout, No. 1~No. 5 boring arranges from left to right successively, the whole hole horizontal spacing of holing is 15m, and according to fissure zone development height analysis result, the fissure zone whole hole of holing is set by 8~10 times of mining height 13~16m; The dark 3m of drill site, spacing of wells 0.6m, boring is at the intersection opening of top board and tunnel coal side;
The aperture of boring is 50mm, and sealing of hole, reaming length are 9m, and sealing of hole adopts the polyethylene pipe of the flanged dish of 50mm, cementing; Be connected with main line and adopt Sunken wire tube, valve and tailrace are installed in main line threeway place, to extraction observational record, adjust extraction parameter and discharging water;
Three, stay lane body of wall pipe laying goaf gas extraction to arrange
In the obturation of transportation Xiang Liu lane, reserve one 4 writing brushes at interval of 9m, and connect with flange Sunken wire tube, stretch out body of wall 0.5m, in the work progress of Liu lane, each 4 writing brushes arrange a gate valve and are connected with non-ф 320 releasing pipes of adopting side in peephole and tunnel, and non-gob side entry retaining side ф 320 releasing pipes of adopting are received to rear portion, work plane goaf and realized goaf gas extraction;
Goaf pipe laying extraction, by the direct extraction goaf gas of installation pipeline, reduces goaf gas as far as possible and flows into work plane; Generally, goaf pipe laying diameter 75mm~100mm, one end length being in exploiting field can be according to in-situ determination; Tube wall is installed with aperture and wraps with husky net, prevents from stopping up in extraction process; This pipe should be tried one's best near top, coal seam, in the higher place of gas density;
Four, protected seam coal-bed gas is taken out layout in advance
Traverse 77m place to cutting eye, the right side in tunnel layout topping gas pumping drill site at protected seam return airway apart from two; No. 1 drill site traverses 77m place in distance two, with No. 2 drill site spacing 50m, arranges 9 borings; No. 2 each drill site spacing of drill site to 7 drill site 50m, arrange 5 holes at No. 2 each drill sites of drill site to 7 drill site; No. 7 each drill site spacing of drill site to 9 drill site 40m, No. 9 drill site to 10 drill site spacing 69m, arrange 4 borings at No. 8 drill sites, and No. 9 drill site is arranged 5 borings, and No. 10 drill site is arranged 6 borings; No. 10 each drill site spacing of drill site to 26 drill site 50m, arrange 5 borings at each drill site;
Boring target bearing is 359 °, and each drill site open interior spacing is that 1m left and right, the spacing of wells are 10m, and the single hole degree of depth is 340m, and bore angle and opening inclination angle will change and adjust according to seam inclination, actual drill site; Boring aperture is 96mm, and sealing of hole, reaming length are 9m, and counter bore diameter is 150mm, and hole sealing tube adopts 4 cun of pvc pipes, No. 425 cementings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310752165.XA CN103775127B (en) | 2013-12-31 | 2013-12-31 | A kind of low-permeable high gas layer group topping Comprehensive Gas Control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310752165.XA CN103775127B (en) | 2013-12-31 | 2013-12-31 | A kind of low-permeable high gas layer group topping Comprehensive Gas Control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103775127A true CN103775127A (en) | 2014-05-07 |
CN103775127B CN103775127B (en) | 2015-09-23 |
Family
ID=50567821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310752165.XA Active CN103775127B (en) | 2013-12-31 | 2013-12-31 | A kind of low-permeable high gas layer group topping Comprehensive Gas Control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103775127B (en) |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104389636A (en) * | 2014-10-11 | 2015-03-04 | 中煤科工集团重庆研究院有限公司 | Rock cross-cut coal uncovering high-pressure water jet reaming pressure relief and outburst prevention effect evaluation method |
CN104806291A (en) * | 2015-03-18 | 2015-07-29 | 中煤科工集团重庆研究院有限公司 | Method for verifying near-distance outburst coal seam tunneling working face combined area |
CN104975868A (en) * | 2015-06-13 | 2015-10-14 | 山西晋城无烟煤矿业集团有限责任公司 | Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling |
CN105507903A (en) * | 2015-12-15 | 2016-04-20 | 中国矿业大学 | Coal-rock simultaneous production protecting seam and protected seam collaborative mining method |
CN106014474A (en) * | 2016-05-17 | 2016-10-12 | 陕西正通煤业有限责任公司 | Three-hole combined construction method meeting requirements of downhole pressure releasing, water draining and prospecting and gas drainage |
CN106014475A (en) * | 2016-07-05 | 2016-10-12 | 安徽理工大学 | High-gas coal bed group dip orientation drilling cluster and gas extracting method |
CN106321140A (en) * | 2016-08-31 | 2017-01-11 | 辽宁工程技术大学 | Arrangement method of extra-thick seam gas pre-extraction drill holes |
CN107083988A (en) * | 2017-06-27 | 2017-08-22 | 中国矿业大学(北京) | Mining induced fissure band gas pumping technical method based on km directional drilling |
CN107246886A (en) * | 2017-07-11 | 2017-10-13 | 中国矿业大学 | Ore deposit pressure signal real-time visual demodulating system and demodulation method based on Fibre Optical Sensor |
CN108194126A (en) * | 2017-12-19 | 2018-06-22 | 大同煤矿集团有限责任公司 | High Position Drilling gas channel transformation dredging method |
CN109236354A (en) * | 2018-10-23 | 2019-01-18 | 煤科集团沈阳研究院有限公司 | A kind of face formula pumping method based on gob side entry retaining gas control |
CN109339856A (en) * | 2018-11-29 | 2019-02-15 | 陕西陕煤铜川矿业有限公司 | A kind of method that face gas is administered |
CN109441526A (en) * | 2019-01-11 | 2019-03-08 | 淮南矿业(集团)有限责任公司 | A kind of protected seam gas pumping method |
CN109944630A (en) * | 2019-05-15 | 2019-06-28 | 河南理工大学 | A kind of low-permeable thin seam working surface gas pumping method |
CN110685744A (en) * | 2019-11-18 | 2020-01-14 | 内蒙古上海庙矿业有限责任公司 | Arrangement mode of water detection and drainage hole series |
CN111042791A (en) * | 2019-12-29 | 2020-04-21 | 山西晋城无烟煤矿业集团有限责任公司 | Combined coal and coal bed gas co-production method for upper and lower wells of low-permeability coal bed group |
CN111485948A (en) * | 2020-04-10 | 2020-08-04 | 兖矿新疆矿业有限公司硫磺沟煤矿 | Large-dip-angle high-gas coal seam adjacent goaf disaster cooperative prevention and control method |
CN111608722A (en) * | 2020-06-03 | 2020-09-01 | 贵州盘江精煤股份有限公司 | Gas cooperative control method in pressure relief gas extraction process |
CN112922665A (en) * | 2021-01-19 | 2021-06-08 | 库车县科兴煤炭实业有限责任公司 | Construction method for treating abnormal gas emission in low-gas mine goaf by high-level drainage |
CN113236348A (en) * | 2021-06-30 | 2021-08-10 | 平顶山市安泰华矿用安全设备制造有限公司 | Coal seam slit gas treatment outburst prevention process |
CN113446051A (en) * | 2021-07-30 | 2021-09-28 | 太原理工大学 | Goaf ultrahigh-position drill hole gas extraction method under roof cutting and roadway retaining process |
CN114017095A (en) * | 2021-11-04 | 2022-02-08 | 中原工学院 | Gas spraying treatment device for upper corners of coal mines |
CN115288638A (en) * | 2022-06-30 | 2022-11-04 | 河南理工大学 | Method for extracting slope-adjusting gas from staggered working face mined by non-uniform sinking protective layer |
WO2022242056A1 (en) * | 2021-05-21 | 2022-11-24 | 安徽理工大学 | Method for implementing continuous extraction of gas by high-position drilling in working face stoping process |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1534164A (en) * | 2003-03-28 | 2004-10-06 | 淮南矿业(集团)有限责任公司 | Low premeability high gas soft thick coal layer remote pressure relief gas exhausting method |
RU2332574C1 (en) * | 2006-12-18 | 2008-08-27 | Государственное образовательное учреждение высшего профессионального образования "Московский государственный горный университет" (МГГУ) | Mine underground storage in permafrost rocks |
CN101382073A (en) * | 2007-09-29 | 2009-03-11 | 永城煤电集团有限责任公司 | 'Three-soft' low permeability high gas coal seam rapidly digging method |
CN101644166A (en) * | 2009-07-14 | 2010-02-10 | 中国矿业大学 | Method for extracting gas from high gas low permeability coal seam by punching, slotting, pressure releasing, and permeability increasing |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1448078A1 (en) * | 1987-03-25 | 1988-12-30 | Московский Горный Институт | Method of degassing a coal-rock mass portion |
-
2013
- 2013-12-31 CN CN201310752165.XA patent/CN103775127B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1534164A (en) * | 2003-03-28 | 2004-10-06 | 淮南矿业(集团)有限责任公司 | Low premeability high gas soft thick coal layer remote pressure relief gas exhausting method |
RU2332574C1 (en) * | 2006-12-18 | 2008-08-27 | Государственное образовательное учреждение высшего профессионального образования "Московский государственный горный университет" (МГГУ) | Mine underground storage in permafrost rocks |
CN101382073A (en) * | 2007-09-29 | 2009-03-11 | 永城煤电集团有限责任公司 | 'Three-soft' low permeability high gas coal seam rapidly digging method |
CN101644166A (en) * | 2009-07-14 | 2010-02-10 | 中国矿业大学 | Method for extracting gas from high gas low permeability coal seam by punching, slotting, pressure releasing, and permeability increasing |
Non-Patent Citations (1)
Title |
---|
刘建高等: "高瓦斯煤层群薄煤层保护层开采卸压效果分析", 《煤矿安全》, vol. 44, no. 10, 20 October 2013 (2013-10-20), pages 192 - 195 * |
Cited By (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104389636B (en) * | 2014-10-11 | 2017-01-25 | 中煤科工集团重庆研究院有限公司 | Rock cross-cut coal uncovering high-pressure water jet reaming pressure relief and outburst prevention effect evaluation method |
CN104389636A (en) * | 2014-10-11 | 2015-03-04 | 中煤科工集团重庆研究院有限公司 | Rock cross-cut coal uncovering high-pressure water jet reaming pressure relief and outburst prevention effect evaluation method |
CN104806291A (en) * | 2015-03-18 | 2015-07-29 | 中煤科工集团重庆研究院有限公司 | Method for verifying near-distance outburst coal seam tunneling working face combined area |
CN104975868A (en) * | 2015-06-13 | 2015-10-14 | 山西晋城无烟煤矿业集团有限责任公司 | Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling |
CN105507903A (en) * | 2015-12-15 | 2016-04-20 | 中国矿业大学 | Coal-rock simultaneous production protecting seam and protected seam collaborative mining method |
CN105507903B (en) * | 2015-12-15 | 2018-01-02 | 中国矿业大学 | Adopt protective layer cooperates with recovery method to a kind of coal petrography with protected seam together |
CN106014474B (en) * | 2016-05-17 | 2018-06-01 | 陕西正通煤业有限责任公司 | Meet underground release, leting speeper, gas drainage under suction three holes and use construction method |
CN106014474A (en) * | 2016-05-17 | 2016-10-12 | 陕西正通煤业有限责任公司 | Three-hole combined construction method meeting requirements of downhole pressure releasing, water draining and prospecting and gas drainage |
CN106014475A (en) * | 2016-07-05 | 2016-10-12 | 安徽理工大学 | High-gas coal bed group dip orientation drilling cluster and gas extracting method |
CN106321140A (en) * | 2016-08-31 | 2017-01-11 | 辽宁工程技术大学 | Arrangement method of extra-thick seam gas pre-extraction drill holes |
CN106321140B (en) * | 2016-08-31 | 2019-02-01 | 辽宁工程技术大学 | A kind of method for arranging of super high seam gas pre-drainage drilling |
CN107083988A (en) * | 2017-06-27 | 2017-08-22 | 中国矿业大学(北京) | Mining induced fissure band gas pumping technical method based on km directional drilling |
CN107083988B (en) * | 2017-06-27 | 2019-10-25 | 中国矿业大学(北京) | Mining induced fissure band gas drainage technical method based on km directional drilling |
CN107246886A (en) * | 2017-07-11 | 2017-10-13 | 中国矿业大学 | Ore deposit pressure signal real-time visual demodulating system and demodulation method based on Fibre Optical Sensor |
CN108194126A (en) * | 2017-12-19 | 2018-06-22 | 大同煤矿集团有限责任公司 | High Position Drilling gas channel transformation dredging method |
CN109236354A (en) * | 2018-10-23 | 2019-01-18 | 煤科集团沈阳研究院有限公司 | A kind of face formula pumping method based on gob side entry retaining gas control |
CN109339856A (en) * | 2018-11-29 | 2019-02-15 | 陕西陕煤铜川矿业有限公司 | A kind of method that face gas is administered |
CN109441526A (en) * | 2019-01-11 | 2019-03-08 | 淮南矿业(集团)有限责任公司 | A kind of protected seam gas pumping method |
CN109944630B (en) * | 2019-05-15 | 2020-08-25 | 河南理工大学 | Low-permeability thin coal seam working face gas extraction method |
CN109944630A (en) * | 2019-05-15 | 2019-06-28 | 河南理工大学 | A kind of low-permeable thin seam working surface gas pumping method |
CN110685744A (en) * | 2019-11-18 | 2020-01-14 | 内蒙古上海庙矿业有限责任公司 | Arrangement mode of water detection and drainage hole series |
CN111042791B (en) * | 2019-12-29 | 2021-08-27 | 山西晋城无烟煤矿业集团有限责任公司 | Combined coal and coal bed gas co-production method for upper and lower wells of low-permeability coal bed group |
CN111042791A (en) * | 2019-12-29 | 2020-04-21 | 山西晋城无烟煤矿业集团有限责任公司 | Combined coal and coal bed gas co-production method for upper and lower wells of low-permeability coal bed group |
CN111485948B (en) * | 2020-04-10 | 2021-09-17 | 兖矿新疆矿业有限公司硫磺沟煤矿 | Large-dip-angle high-gas coal seam adjacent goaf disaster cooperative prevention and control method |
CN111485948A (en) * | 2020-04-10 | 2020-08-04 | 兖矿新疆矿业有限公司硫磺沟煤矿 | Large-dip-angle high-gas coal seam adjacent goaf disaster cooperative prevention and control method |
CN111608722A (en) * | 2020-06-03 | 2020-09-01 | 贵州盘江精煤股份有限公司 | Gas cooperative control method in pressure relief gas extraction process |
CN112922665A (en) * | 2021-01-19 | 2021-06-08 | 库车县科兴煤炭实业有限责任公司 | Construction method for treating abnormal gas emission in low-gas mine goaf by high-level drainage |
WO2022242056A1 (en) * | 2021-05-21 | 2022-11-24 | 安徽理工大学 | Method for implementing continuous extraction of gas by high-position drilling in working face stoping process |
CN113236348A (en) * | 2021-06-30 | 2021-08-10 | 平顶山市安泰华矿用安全设备制造有限公司 | Coal seam slit gas treatment outburst prevention process |
CN113446051A (en) * | 2021-07-30 | 2021-09-28 | 太原理工大学 | Goaf ultrahigh-position drill hole gas extraction method under roof cutting and roadway retaining process |
CN113446051B (en) * | 2021-07-30 | 2022-07-29 | 太原理工大学 | Goaf ultrahigh-position drill hole gas extraction method under roof cutting and entry retaining process |
CN114017095A (en) * | 2021-11-04 | 2022-02-08 | 中原工学院 | Gas spraying treatment device for upper corners of coal mines |
CN114017095B (en) * | 2021-11-04 | 2024-04-12 | 中原工学院 | Gas spraying treatment device for upper corners of coal mine |
CN115288638A (en) * | 2022-06-30 | 2022-11-04 | 河南理工大学 | Method for extracting slope-adjusting gas from staggered working face mined by non-uniform sinking protective layer |
CN115288638B (en) * | 2022-06-30 | 2023-05-30 | 河南理工大学 | Inclination adjustment gas extraction method for mining staggered-layer working face of non-uniform sinking protection layer |
Also Published As
Publication number | Publication date |
---|---|
CN103775127B (en) | 2015-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103775127B (en) | A kind of low-permeable high gas layer group topping Comprehensive Gas Control method | |
CN102226413B (en) | Gas extraction method of cross hole drilling area of gas discharge laneway | |
CN100554642C (en) | A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining | |
CN102979498B (en) | Coal bed gas multi-branch horizontal well system | |
CN103924945B (en) | The high-pressure slip-casting technique of rich water weathering fissures rock stratum under the Moderate and Thick Unconsolidated Formation of colliery | |
CN103867229B (en) | A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining | |
CN104712358A (en) | Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief | |
CN100560937C (en) | A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method | |
CN102392678A (en) | Gas drainage method combining surface and underground fracturing and permeability improvement | |
CN104975868A (en) | Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling | |
CN111140279B (en) | Method for preventing and treating old empty water on thick coal seam under condition of repeated mining caused by small kiln damage to layering | |
CN104314610A (en) | Outburst eliminating method for coal roadway stripe region | |
CN102337919A (en) | Four-period-five-purpose hole-drilling high-efficiency gas extracting process | |
CN105804788A (en) | Method for managing coalbed gas roadway | |
CN102877857B (en) | Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions | |
CN109611146B (en) | Separation layer water drainage grouting method | |
CN103016047A (en) | Method of draining gas in gob through long drill hole in roof trend on fully mechanized caving face | |
CN105804754A (en) | Coal uncovering method for mining shaft with coal seam as main water-bearing layer | |
CN104047629A (en) | Method for extracting gas close to lower coal layer through directional drilling in thin coal seam fully-mechanized coal mining gob-side entry | |
CN205638458U (en) | Accelerate construction structures of broken system construction speed of underground swift current | |
CN112302704A (en) | Coal face fissure zone gas extraction method | |
CN106014345B (en) | A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed | |
US11649701B2 (en) | Multi-level cross mining areas surface well pattern deployment method | |
CN104121036B (en) | A kind of linkage for being communicated with the groundwater reservoir in upper and lower coal seam and method of attachment | |
CN106337687A (en) | Convenient segmented support method for mine slant chute |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |