CN104712358A - Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief - Google Patents

Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief Download PDF

Info

Publication number
CN104712358A
CN104712358A CN201510061277.XA CN201510061277A CN104712358A CN 104712358 A CN104712358 A CN 104712358A CN 201510061277 A CN201510061277 A CN 201510061277A CN 104712358 A CN104712358 A CN 104712358A
Authority
CN
China
Prior art keywords
pressure relief
work plane
mining
rock
high gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510061277.XA
Other languages
Chinese (zh)
Inventor
赵一鸣
张农
王磊
吴朋起
乔顺
杨林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201510061277.XA priority Critical patent/CN104712358A/en
Publication of CN104712358A publication Critical patent/CN104712358A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of a working face of first mining total rock pressure relief. When a first mining pressure relief coal seam can not be selected, the coal and rock seams are moved and broken through the working face of first mining total rock pressure relief, an upper covered coal seam with high gas and a lower covered coal seam which high gas are subjected to pressure relief and swollen, fractures of a surrounding rock mass are developed, the gas permeability is increased, the gas is subjected to desorption and transportation, and finally a top plate pressure relief annular fracture area and a bottom plate pressure relief annular fracture area are generated. To create a favorable stress environment of retained roadway surrounding rock, retained roadway mining empty side cantilever crest truncation is conducted to first advance mining drill site toward and backward the working face in a bi-directional mode, according to the top plate lithologic characters, the first advance is subjected to top plate deep hole pre-splitting and cover caving so that it is guaranteed that the top plate is sufficiently collapsed to fill a worked out section. By means of the method, the prominent problems of exhausting and mining of coal seam group pressure relief gas and safe mining when the first mining pressure relief coal seam of the coal seam group with high gas content is difficult to select are solved.

Description

The high gas layer group release mining method altogether of total rock release work plane gob side entry retaining is adopted based on head
Technical field
The present invention relates to a kind of colliery high gas layer group exploitation method, specifically one adopts total rock release work plane gob side entry retaining extraction high gas layer group gas pressure relief, to realize the method to high gas layer group safety and high efficiency by head.
Background technology
China's Main Coalfields complex geologic conditions, coal seam gas-bearing capacity is high, and permeability is low.And practice shows, once coal seam is subject to exploiting the disturbance caused, even the coal seam that permeability is very low, its permeability also will increase decades of times to hundreds of times, for gas migration and extraction create conditions.This gas pumping emphasis just determining China should adopt initiatively release extraction based on down-hole.
Be in the application for a patent for invention of 200810023383.9 at application number, inventors herein propose the technical scheme of one " high gas layer group exploits gob-side entry retaining Y-type ventilation pressure relief gas pumping mining method ".The object of this technical scheme is the effective Utilizing question of exploitation and gas in order to solve high gas layer group, adopt by head the coal rock layer that pressure released seam causes to move and the top plate pressure relief cracked district, the base plate release cracked district that produce, in gob side entry retaining, cloth is set up to top plate pressure relief cracked district mash gas pumping drilling and carries out extraction to base plate release cracked district mash gas pumping drilling to desorb free gas down respectively.Although when high gas layer group has suitable head to adopt pressure released seam, this invention can well solve the mining problem of high gas layer group, when high gas layer group does not have suitable head to adopt pressure released seam, program application difficult.Especially, when the gas of the first mining height gassy seam of pump drainage, efficiency is low, and gas exhaust is not thorough, can not reach below safety value, is easy to the serious accident such as gas explosion or coal and gas prominent occurs, there is huge potential safety hazard.Therefore under above-mentioned engineering specifications, the mining problem of high gas layer group is not well solved.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the invention provides a kind of high gas layer group release mining method altogether adopting total rock release work plane gob side entry retaining based on head, choose at need when the head of high gas layer group adopts pressure released seam, adopt total rock release work plane by head and realize safe working.
Technical scheme: for achieving the above object, the technical solution used in the present invention is:
A kind of high gas layer group release mining method altogether adopting total rock release work plane gob side entry retaining based on head, adopting pressure released seam by head causes coal rock layer to move to produce top plate pressure relief cracked district and base plate release cracked district, and in gob side entry retaining, cloth is set up to top plate pressure relief cracked district mash gas pumping drilling and carries out extraction to base plate release cracked district mash gas pumping drilling to desorb free gas down respectively; Adopting when pressure released seam cannot be chosen at head (or chooses at need, such as adjacent coal bed hangs down and does not possess mining conditions etc. apart from excessive, the projecting coal bed group of high methane), adopt total rock release work plane by head cause coal rock layer to move and destroy, on cover high gas layer and the high gas layer that underlies unloads compression swelling, enclose rock mass fracture growth, gas permeation rate increases and desorb migration, forms top plate pressure relief cracked district and base plate release cracked district.
Adopt total rock release work plane by head cause coal rock layer to move and destroy, concrete grammar is: at advanced total rock work plane excavation drill site, and arranges in drill site and meet to working face open-off cut crown drill hole and working face open-off cut crown drill hole dorsad, is out of shape to control gob side entry retaining; According to the lithologic character above covering high gas layer, caving boring is set at advanced total rock work plane, Deephole pre-splitting blasting is implemented to ensure that top board is fully caving and fills goaf to caving boring; Simultaneously construct filled wall realize gob side entry retaining in the sky side of adopting of total rock work plane.
Concrete, in described high gas layer group, the vertical distance of arbitrary neighborhood coal rock layer is 120 ~ 150m; When selecting head to adopt total rock release work plane, need to take into full account that surrounding rock structure, top board are across emitting and base plate release feature, and it is 30 ~ 90m that head adopts the vertical distance that total rock release work plane distance above covers high gas layer (above covering pre-pressure released seam), the underlie vertical distance of high gas layer (underlie pre-pressure released seam) of distance is 20 ~ 60m.
Concrete, when selecting head to adopt total rock release work plane, require: the formation hardness Protodyakonov coefficient that head adopts total rock release work plane is f≤7, work plane arrangement length is 150 ~ 250m, propelling length is 1000 ~ 2500m, and mining is highly 1.3 ~ 3.5m, work plane inclination angle≤20 °.
Beneficial effect: the high gas layer group release mining method altogether adopting total rock release work plane gob side entry retaining based on head provided by the invention, to compare prior art, there is following advantage: 1, adopt pressure released seam at head and choose at need, adopt total rock release work plane by head cause coal rock layer to move and destroy, the scope of application is wider, and the layer position of release layer is chosen also more flexible; 2, thoroughly solve and adopt pressure released seam at high gas layer cluster and choose at need, choosing and this outstanding problem of coal seam group safe working of topping; 3, this case relief range is large, by suitable mining height, can to the coal seam above covering more than 100m, and sufficient release mash gas extraction is carried out in the coal seam of below the 50m that underlies; 4, this case is on the basis analyzing gob side entry retaining surrounding rock structure motion feature, a kind of Roof Control method impelling the abundant release of gob side entry retaining is proposed, employing Advance presplitting is holed, fully loosen wall outer side main roof strata, make always to withstand on wall outer side disrumpent feelings, eliminate large span and hang top and the impact of revolution sinking on gob side entry retaining country rock, fundamentally significantly alleviate gob side entry retaining pressure from surrounding rock, optimize and stay lane regional stress field, reduce gob side entry retaining overlying rock to the action time of country rock, reach the object controlling to stay lane to be out of shape; 5, this case feasibility is strong, and technique is simple; Existing coal-winning machine, hydraulic support, drag conveyor etc. are comprehensive adopt corollary equipment can meet intensity relatively rocklet work plane carry out comprehensive mechanization back production.
Accompanying drawing explanation
Fig. 1 is gas pumping method schematic diagram of the present invention;
Fig. 2 is that the present invention cuts crown drill hole and schematic diagram is arranged in caving boring;
Fig. 3 is that the present invention cuts crown drill hole layout sectional drawing;
Fig. 4 is that sectional drawing is arranged in caving of the present invention boring;
In figure: 1-covers high gas layer, 2-head adopts release rock stratum, and 3-underlies high gas layer, 4-track lane, 5-filled wall, 6-unloads line ball, 7-break line, 8-goaf, 9-is upper to top plate pressure relief cracked district mash gas pumping drilling, to base plate release cracked district mash gas pumping drilling under 10-, 11-transportation roadway, 12-drill site, 13-is working face open-off cut crown drill hole dorsad, 14-meets to working face open-off cut crown drill hole, and 15-caving is holed, and 16-head adopts total rock release work plane.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described.
A kind of high gas layer group release mining method altogether adopting total rock release work plane gob side entry retaining based on head, adopting pressure released seam by head causes coal rock layer to move to produce top plate pressure relief cracked district and base plate release cracked district, and in gob side entry retaining, cloth is set up to top plate pressure relief cracked district mash gas pumping drilling and carries out extraction to base plate release cracked district mash gas pumping drilling to desorb free gas down respectively, head adopt pressure released seam cannot choose time, adopt total rock release work plane by head cause coal rock layer to move and destroy, on cover high gas layer and the high gas layer that underlies unloads compression swelling, enclose rock mass fracture growth, gas permeation rate increases and desorb migration, form top plate pressure relief cracked district and base plate release cracked district, be specially: adopt total rock release work plane by head and cause coal rock layer to move and destroy, concrete grammar is: at advanced total rock work plane excavation drill site, and arrange in drill site and meet to working face open-off cut crown drill hole and working face open-off cut crown drill hole dorsad, to control gob side entry retaining distortion, according to the lithologic character above covering high gas layer, caving boring is set at advanced total rock work plane, Deephole pre-splitting blasting is implemented to ensure that top board is fully caving and fills goaf to caving boring, construct filled wall to realize gob side entry retaining in the sky side of adopting of total rock work plane simultaneously.
Concrete, in described high gas layer group, the vertical distance of arbitrary neighborhood coal rock layer is 120 ~ 150m; When selecting head to adopt total rock release work plane, need to take into full account that surrounding rock structure, top board are across emitting and base plate release feature, and it is 30 ~ 90m that head adopts the vertical distance that total rock release work plane distance above covers pre-pressure released seam, the underlie vertical distance of pre-pressure released seam of distance is 20 ~ 60m.
Concrete, when selecting head to adopt total rock release work plane, require: the formation hardness Protodyakonov coefficient that head adopts total rock release work plane is f≤7, work plane arrangement length is 150 ~ 250m, propelling length is 1000 ~ 2500m, and mining is highly 1.3 ~ 3.5m, work plane inclination angle≤20 °.
Below in conjunction with embodiment, implementation process of the present invention is made further instructions.
Adopt a high gas layer group release mining method altogether for total rock release work plane gob side entry retaining based on head, in the specific implementation, comprise the steps:
(1) according to the actual composite columnar section in colliery, consider the factor such as layer position, hardness of each rock stratum, choose the rock stratum being applicable to carrying out total rock working face mining and adopt total rock release rock stratum as head;
(2) adopt the height of total rock release rock stratum, hardness, work plane arrangement length, work plane inclination angle according to head, supporting choosing is carried out to required coal-winning machine, hydraulic support, conveyer etc.;
(3) form head according to the arrangement parameter of work plane and adopt total rock release work plane;
(4) in advance of the face process, half original position is used to stay lane method to carry out gob side entry retaining along track lane;
(5) at the advanced total rock work plane excavation drill site by back production side, drill site spacing 40 ~ 60m, drill site is of a size of: wide 4 ~ 6m, dark 3 ~ 5m, high 2 ~ 3.5m; For each drill site, setting is met to working face open-off cut crown drill hole and working face open-off cut crown drill hole dorsad, meet to working face open-off cut crown drill hole and dorsad working face open-off cut crown drill hole be all no less than 2 groups, meet to working face open-off cut crown drill hole group with meet to group position, working face open-off cut crown drill hole parallel, working face open-off cut crown drill hole is with group position, working face open-off cut crown drill hole is parallel dorsad dorsad; To meet to working face open-off cut crown drill hole group and dorsad working face open-off cut crown drill hole group be referred to as and cut crown drill hole group, crown drill hole group is cut for each, often group is no less than 3 and cuts crown drill hole, and the crown drill hole of cutting often in group is arranged in one plane in fanning scattering, the level angle cutting crown drill hole is not more than 10 °, adjacent 3 ~ 4 °, level angle interval of cutting crown drill hole, the elevation angle of cutting crown drill hole is 15 ~ 25 °, adjacent 4 ~ 5 °, interval, the elevation angle of cutting crown drill hole; The vertical distance of cutting the powder charge section top height distance top board in crown drill hole is greater than 3m, and sealing of hole segment length is greater than 5m; Explosion is implemented to cutting crown drill hole at advanced total rock work plane front 10 ~ 40m;
(6) caving boring is set at advanced total rock work plane, often organize the caving spacing of wells 20 ~ 40m, often organize caving boring and have four caving borings, top cuts off hole always, a lumpiness cuts off hole and cut-out hole, two terminations to be respectively one, the diameter of each caving boring is not less than 75mm, old top cuts off hole and lumpiness cut-out hole horizontal corner is 70 ~ 90 °, termination cuts off hole horizontal corner 20 ~ 30 °, the sealed borehole length of caving boring is greater than 3 times of span length in the projection of horizontal plane, and sealed borehole length is greater than 10m;
(7) after total rock working face extraction, arrange on one to top board gas pumping drill site at interval of 20m in gob side entry retaining, to top plate pressure relief cracked district mash gas pumping drilling in the interior construction 3 of drill site, bore diameter is not less than 91mm, 50 ~ 65 °, inclination angle, aperture sealed borehole length is greater than the height of regular caving zone in mining rock stratum top board normal direction, and normal direction hole sealing depth is not less than 5 times of mining heights, extraction is covered high gas layer with gas pressure relief; Arrange to bottom gas pumping drill site at interval of 10m in gob side entry retaining, to base plate release cracked district mash gas pumping drilling under the interior construction 3 of drill site, bore diameter is not less than 91mm ,-50 ~-80 °, inclination angle, aperture sealed borehole length is not less than 15m, and extraction underlies high gas layer with gas pressure relief; In gob side entry retaining, arrange a goaf gas extraction drill site at interval of 20m, mash gas pumping drilling in construction 3 goafs in drill site, bore diameter is not less than 40mm, the gas in extraction goaf;
(8) ensure the construction of first advance drill site and boring according to the progress of back production, ensure gas pumping in gob side entry retaining according to progress simultaneously.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (4)

1. adopt the high gas layer group release mining method altogether of total rock release work plane gob side entry retaining based on head for one kind, adopting pressure released seam by head causes coal rock layer to move to produce top plate pressure relief cracked district and base plate release cracked district, and in gob side entry retaining, cloth is set up to top plate pressure relief cracked district mash gas pumping drilling and carries out extraction to base plate release cracked district mash gas pumping drilling to desorb free gas down respectively; It is characterized in that: head adopt pressure released seam cannot choose time, adopt total rock release work plane by head cause coal rock layer to move and destroy, on cover high gas layer and the high gas layer that underlies unloads compression swelling, enclose rock mass fracture growth, gas permeation rate increases and desorb migration, forms top plate pressure relief cracked district and base plate release cracked district.
2. the high gas layer group release mining method altogether adopting total rock release work plane gob side entry retaining based on head according to claim 1, it is characterized in that: adopt total rock release work plane by head and cause coal rock layer to move and destroy, concrete grammar is: at advanced total rock work plane excavation drill site, and arrange in drill site and meet to working face open-off cut crown drill hole and working face open-off cut crown drill hole dorsad, be out of shape to control gob side entry retaining; According to the lithologic character above covering high gas layer, caving boring is set at advanced total rock work plane, Deephole pre-splitting blasting is implemented to ensure that top board is fully caving and fills goaf to caving boring; Simultaneously construct filled wall realize gob side entry retaining in the sky side of adopting of total rock work plane.
3. the high gas layer group release mining method altogether adopting total rock release work plane gob side entry retaining based on head according to claim 1, it is characterized in that: in described high gas layer group, the vertical distance of arbitrary neighborhood coal rock layer is 120 ~ 150m; When selecting head to adopt total rock release work plane, need to take into full account that surrounding rock structure, top board are across emitting and base plate release feature, and it is 30 ~ 90m that head adopts the vertical distance that total rock release work plane distance above covers high gas layer, the underlie vertical distance of high gas layer of distance is 20 ~ 60m.
4. the high gas layer group release mining method altogether adopting total rock release work plane gob side entry retaining based on head according to claim 1, it is characterized in that: when selecting head to adopt total rock release work plane, require: the formation hardness Protodyakonov coefficient that head adopts total rock release work plane is f≤7, work plane arrangement length is 150 ~ 250m, propelling length is 1000 ~ 2500m, mining is highly 1.3 ~ 3.5m, work plane inclination angle≤20 °.
CN201510061277.XA 2015-02-05 2015-02-05 Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief Pending CN104712358A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510061277.XA CN104712358A (en) 2015-02-05 2015-02-05 Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510061277.XA CN104712358A (en) 2015-02-05 2015-02-05 Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief

Publications (1)

Publication Number Publication Date
CN104712358A true CN104712358A (en) 2015-06-17

Family

ID=53412038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510061277.XA Pending CN104712358A (en) 2015-02-05 2015-02-05 Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief

Country Status (1)

Country Link
CN (1) CN104712358A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105840164A (en) * 2016-03-18 2016-08-10 河南理工大学 Regional pressure release coal bed gas mining method
CN106837408A (en) * 2017-03-20 2017-06-13 中国矿业大学 A kind of coal seam stope advantage gas migration passage staged construction method
CN106948859A (en) * 2017-03-20 2017-07-14 中国矿业大学 A kind of networking advantage gas migration passage is built and gas water conservancy diversion pumping method
CN107035370A (en) * 2017-05-05 2017-08-11 太原理工大学 One kind cuts top pressure relief method for gob side entry retaining static crushing
CN107460790A (en) * 2017-07-22 2017-12-12 中铁二院工程集团有限责任公司 A kind of non-fragment orbit railway swelling rock chasm structuref and construction method
CN108204244A (en) * 2016-12-20 2018-06-26 中国矿业大学(北京) The spoil interval method of collecting coal by the means of filling
CN108301866A (en) * 2018-04-16 2018-07-20 中煤科工集团西安研究院有限公司 Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN109296395A (en) * 2018-11-01 2019-02-01 天地科技股份有限公司 The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head
CN109339854A (en) * 2018-11-01 2019-02-15 山西潞安环保能源开发股份有限公司常村煤矿 A kind of method of gob side entry goaf gas extraction
CN110454134A (en) * 2019-09-05 2019-11-15 湖南科技大学 A kind of method of underground raw coal gasification
CN111022051A (en) * 2019-12-26 2020-04-17 山东省邱集煤矿有限公司 Forced caving method for central hard top plate of working face
CN111828006A (en) * 2020-07-27 2020-10-27 重庆大学 Small coal pillar pressure relief method for interval type mechanical cutting of hard top plate
CN112031857A (en) * 2020-09-27 2020-12-04 中国矿业大学(北京) Method for reinforcing gas extraction by combining drilling, blasting and pressure relief of rock roadway of bottom plate
CN112377259A (en) * 2020-11-10 2021-02-19 煤炭科学技术研究院有限公司 Judgment method for gas trap formation and calculation method for trapped gas resource quantity
CN113027510A (en) * 2021-03-26 2021-06-25 安徽理工大学 Method for extracting pressure-relief gas by blasting permeability-increasing directional long drill hole of thick and hard roof rock layer
CN113446051A (en) * 2021-07-30 2021-09-28 太原理工大学 Goaf ultrahigh-position drill hole gas extraction method under roof cutting and roadway retaining process
CN113530543A (en) * 2021-06-04 2021-10-22 华能煤炭技术研究有限公司 Entry gate crossheading roof cutting height design method and entry gate crossheading maintenance method
CN115182729A (en) * 2022-08-02 2022-10-14 安徽理工大学 Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method
CN116291186A (en) * 2023-04-21 2023-06-23 中国科学院武汉岩土力学研究所 Deep high-ground-stress roadway surrounding rock drilling pressure relief structure and effect evaluation method thereof
CN117803443A (en) * 2023-12-21 2024-04-02 中国矿业大学 Close range coal seam mining gas control method based on roof-floor rock stratum breaking characteristics

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2246006C1 (en) * 2003-06-16 2005-02-10 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Method for controlling ceiling in lava during extraction of gas-bearing coal beds
CN101082283A (en) * 2007-06-29 2007-12-05 淮南矿业(集团)有限责任公司 Gob-side entry retaining Y-shaped ventilation goaf roof pressure relief gas extraction method
CN101251028A (en) * 2008-04-03 2008-08-27 淮南矿业(集团)有限责任公司 Method for taking out and picking high gassy seam group dislodging gob-side entry retaining Y type ventilated decompression firedamp
RU2510461C1 (en) * 2012-12-06 2014-03-27 Федеральное государственное бюджетное учреждение науки Институт угля Сибирского отделения Российской академии наук (ИУ СО РАН) Complex control method of gas emission in extraction sections at development of thick and superimposed highly gas-bearing gently sloping coal beds
CN103899348A (en) * 2014-04-23 2014-07-02 重庆市能源投资集团科技有限责任公司 Method for fast extracting gas on coalface

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2246006C1 (en) * 2003-06-16 2005-02-10 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Method for controlling ceiling in lava during extraction of gas-bearing coal beds
CN101082283A (en) * 2007-06-29 2007-12-05 淮南矿业(集团)有限责任公司 Gob-side entry retaining Y-shaped ventilation goaf roof pressure relief gas extraction method
CN101251028A (en) * 2008-04-03 2008-08-27 淮南矿业(集团)有限责任公司 Method for taking out and picking high gassy seam group dislodging gob-side entry retaining Y type ventilated decompression firedamp
RU2510461C1 (en) * 2012-12-06 2014-03-27 Федеральное государственное бюджетное учреждение науки Институт угля Сибирского отделения Российской академии наук (ИУ СО РАН) Complex control method of gas emission in extraction sections at development of thick and superimposed highly gas-bearing gently sloping coal beds
CN103899348A (en) * 2014-04-23 2014-07-02 重庆市能源投资集团科技有限责任公司 Method for fast extracting gas on coalface

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105840164B (en) * 2016-03-18 2018-07-10 河南理工大学 A kind of method of region Depressurized mining coal bed gas
CN105840164A (en) * 2016-03-18 2016-08-10 河南理工大学 Regional pressure release coal bed gas mining method
CN108204244A (en) * 2016-12-20 2018-06-26 中国矿业大学(北京) The spoil interval method of collecting coal by the means of filling
AU2017405410B2 (en) * 2017-03-20 2019-06-06 China University Of Mining And Technology Networked preferential gas migration passage construction and gas diversion drainage method
CN106837408A (en) * 2017-03-20 2017-06-13 中国矿业大学 A kind of coal seam stope advantage gas migration passage staged construction method
CN106948859A (en) * 2017-03-20 2017-07-14 中国矿业大学 A kind of networking advantage gas migration passage is built and gas water conservancy diversion pumping method
WO2018171254A1 (en) * 2017-03-20 2018-09-27 中国矿业大学 Stepped-type construction method for preferential gas migration passage of coal seam stope
WO2018171255A1 (en) * 2017-03-20 2018-09-27 中国矿业大学 Networked preferential gas migration passage construction and gas diversion drainage method
US10487656B2 (en) 2017-03-20 2019-11-26 China University Of Mining And Technology Method for constructing networked preferential gas migration pathways and diverting and extracting gas
US10472963B2 (en) 2017-03-20 2019-11-12 China University Of Mining And Technology Method for stepwise construction of preferential gas migration pathway at stope in coal seam
CN107035370A (en) * 2017-05-05 2017-08-11 太原理工大学 One kind cuts top pressure relief method for gob side entry retaining static crushing
CN107460790A (en) * 2017-07-22 2017-12-12 中铁二院工程集团有限责任公司 A kind of non-fragment orbit railway swelling rock chasm structuref and construction method
CN108301866A (en) * 2018-04-16 2018-07-20 中煤科工集团西安研究院有限公司 Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN108301866B (en) * 2018-04-16 2019-05-07 中煤科工集团西安研究院有限公司 Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN109339854A (en) * 2018-11-01 2019-02-15 山西潞安环保能源开发股份有限公司常村煤矿 A kind of method of gob side entry goaf gas extraction
CN109296395A (en) * 2018-11-01 2019-02-01 天地科技股份有限公司 The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head
CN110454134A (en) * 2019-09-05 2019-11-15 湖南科技大学 A kind of method of underground raw coal gasification
CN111022051B (en) * 2019-12-26 2021-03-16 山东省邱集煤矿有限公司 Forced caving method for central hard top plate of working face
CN111022051A (en) * 2019-12-26 2020-04-17 山东省邱集煤矿有限公司 Forced caving method for central hard top plate of working face
CN111828006A (en) * 2020-07-27 2020-10-27 重庆大学 Small coal pillar pressure relief method for interval type mechanical cutting of hard top plate
CN112031857A (en) * 2020-09-27 2020-12-04 中国矿业大学(北京) Method for reinforcing gas extraction by combining drilling, blasting and pressure relief of rock roadway of bottom plate
CN112377259A (en) * 2020-11-10 2021-02-19 煤炭科学技术研究院有限公司 Judgment method for gas trap formation and calculation method for trapped gas resource quantity
CN113027510A (en) * 2021-03-26 2021-06-25 安徽理工大学 Method for extracting pressure-relief gas by blasting permeability-increasing directional long drill hole of thick and hard roof rock layer
CN113530543A (en) * 2021-06-04 2021-10-22 华能煤炭技术研究有限公司 Entry gate crossheading roof cutting height design method and entry gate crossheading maintenance method
CN113446051A (en) * 2021-07-30 2021-09-28 太原理工大学 Goaf ultrahigh-position drill hole gas extraction method under roof cutting and roadway retaining process
CN113446051B (en) * 2021-07-30 2022-07-29 太原理工大学 Goaf ultrahigh-position drill hole gas extraction method under roof cutting and entry retaining process
CN115182729A (en) * 2022-08-02 2022-10-14 安徽理工大学 Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method
CN115182729B (en) * 2022-08-02 2023-03-21 安徽理工大学 Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method
CN116291186A (en) * 2023-04-21 2023-06-23 中国科学院武汉岩土力学研究所 Deep high-ground-stress roadway surrounding rock drilling pressure relief structure and effect evaluation method thereof
CN117803443A (en) * 2023-12-21 2024-04-02 中国矿业大学 Close range coal seam mining gas control method based on roof-floor rock stratum breaking characteristics

Similar Documents

Publication Publication Date Title
CN104712358A (en) Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief
CN104806244B (en) Filling mining method for slant middle-thick ore body
CN105626071B (en) Mining method for gently inclined thin ore body
CN102080518B (en) Method for extracting gas from coal seam roof complex branched well
CN104847355B (en) Continuous mining method for hollow ground of medium-thickness steeply inclined ore body
CN100560937C (en) A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method
CN102392678A (en) Gas drainage method combining surface and underground fracturing and permeability improvement
CN101915072B (en) Method for extracting coal bed gas in stable mining region by ground well drilling
CN104632223B (en) Mining environment reconstructing movable type pumping filling artificial ore pillar shrinkage stoping
CN109236297B (en) Coal mining method for remaining coal seam in residual mining area of cracking and filling combined ascending re-mining cutter column
CN103104259A (en) Inclination fragmentation ore body segment top board reconstruction middle-deep hole ore break down filling mining method
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN103498680B (en) Improve the method for fully mechanized coal face period of beginning mining top-coal recovery rate
CN101275469A (en) Yolk coal rock formation downward hole pumping and mining pressure relief mash gas construction method
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN109519211B (en) Method for extracting gas in mining area by using pre-extraction coal bed gas ground well
CN106499396B (en) Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method
CN108343418B (en) Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock
CN110030013B (en) Gob-side entry retaining method for three-seam periodic roof cutting self-entry side of transition support area
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well
CN103161492A (en) Gas extraction well location method based on overlying rock fracture shell
CN104074538A (en) Primary extraction working face high-level suction tunnel gas extraction method
CN105909284B (en) A kind of high working face coal wall caving prevents control method
CN104453900A (en) Filling mining method of near-horizontal ore body
CN105003269A (en) Mining method for long wall working face of ultra thick seam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150617