CN109296395A - The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head - Google Patents

The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head Download PDF

Info

Publication number
CN109296395A
CN109296395A CN201811294907.8A CN201811294907A CN109296395A CN 109296395 A CN109296395 A CN 109296395A CN 201811294907 A CN201811294907 A CN 201811294907A CN 109296395 A CN109296395 A CN 109296395A
Authority
CN
China
Prior art keywords
water
fully
mechanized mining
mining working
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811294907.8A
Other languages
Chinese (zh)
Inventor
张剑
王平虎
李凤珍
张镇
颜立新
李建波
郝登云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINNENG GROUP Co Ltd
Tiandi Science and Technology Co Ltd
Original Assignee
JINNENG GROUP Co Ltd
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINNENG GROUP Co Ltd, Tiandi Science and Technology Co Ltd filed Critical JINNENG GROUP Co Ltd
Priority to CN201811294907.8A priority Critical patent/CN109296395A/en
Publication of CN109296395A publication Critical patent/CN109296395A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

The present invention relates to coal mining technology fields, provide a kind of outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head.Drilling drills along direct rimrock layer to main roof strata direction from bottom to top close to coal column side in tunnel;Pressure break, high pressure water is injected into hole to direct rimrock layer direction along main roof strata using water injection pipe, the water outlet of the water injection pipe, which first rests on, fills the water setting time in main roof strata, then it moves down setting spacing and fills the water setting time, setting spacing is moved down again and fills the water setting time, until main roof strata and the lamination of direct rimrock are split.Intercommunicating pore is drilled in direct rimrock layer and main roof strata, hole is located proximate to coal column, the interval injection high pressure water into hole, successively main roof strata and the lamination of direct rimrock are split and be caving by the pressure of high pressure water, the space of fully-mechanized mining working air return lane is filled up, so that gas is dispersed drift, realizes the effect for reducing gas density.

Description

The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head
Technical field
The present invention relates to coal mining technology fields, more particularly to a kind of outstanding top gas exceeding limit control of fully-mechanized mining working faces end head Method processed.
Background technique
The U-shaped long-armed fully-mechanized mining working spontaneous caving method management top plate of ventilation is currently that China's coal-mine coal mining is mainly selected Coal winning technology.The generally existing outstanding top span length of two heading head region top plate of China's coal-mine coal working face is difficult to sufficiently collapse in time Since the instantaneous inbreak of large span thick-layer top plate may cause fully-mechanized mining working various types of peace occurs for the engineering roadblock fallen Full hazardous accidents, air return lane gas at upper corner often occur especially for highly gassy mine fully-mechanized mining working seriously transfinites and restricts The Prevention Techniques problem such as Safety of Coal Mine Production.
The U-shaped ventilation fully-mechanized mining working of long-wall mining manages top plate using spontaneous caving method, above and below two lane of coal working face End top plate leads to not sufficiently be caving along coal column lateral wall due to being limited by entity coal rock layer, causes two heading head of working face It hangs top and closely knit goaf can not be filled, and then cause fully-mechanized mining working return aircourse upper corner gas exceeding limit calamity frequent occurrence Evil, the safe working that threaten working face is seriously restricted especially for highly gassy mine.Corner on fully-mechanized mining working air return lane end The essential reason of angle gas exceeding limit is to be easy to migrate upwards much smaller than atmospheric density due to gas density to gather upper corner sky Between region, but essence be due to after working face mining air return lane end regions top plate fail in time be sufficiently caving it is backfilled enclosed mined out Area provides Space, Place so finally migrating to gather for gas.
Existing method is using explosive blasting or hydraulic fracture technology, to control the outstanding top of two heading crown plate of coal working face Too long engineering roadblock is to keep its abundant inbreak filling coal mining empty by cutting off the direct rimrock layer of two heading head region of working face Between, lane space is occupied using the direct rimrock layer of inbreak, and gas is forced to reach its concentration of reduction without migration accumulation place, but Underground coal mine practice have shown that, be difficult to guarantee its nature by self weight is real only by being intended to split direct rimrock layer it being made to wait for that working face is pushed through It is sufficiently caving and closely knit closure goaf, fully-mechanized mining working air return lane gas at upper corner is still frequently present of asking of seriously transfiniting Topic.
Summary of the invention
(1) technical problems to be solved
It is existing comprehensive to solve the object of the present invention is to provide a kind of outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head The problem of outstanding top gas of mining working faces end head seriously transfinites.
(2) technical solution
In order to solve the above technical problem, the present invention provides a kind of outstanding top gas exceeding limit controlling parties of fully-mechanized mining working faces end head Method includes the following steps:
Drilling drills along direct rimrock layer to main roof strata direction from bottom to top close to coal column side in tunnel;
Pressure break injects high pressure water, the water injection pipe into hole to direct rimrock layer direction along main roof strata using water injection pipe Water outlet first rest on and fill the water setting time in main roof strata, then move down setting spacing and fill the water setting time, then It is secondary to move down setting spacing and fill the water setting time, until main roof strata and the lamination of direct rimrock are split.
Wherein, it in the drill process, drills from bottom to top along direct rimrock layer to main roof strata inclination set angle.
Wherein, the set angle is 30-50 °.
Wherein, in the drill process, interval is moved towards along tunnel and is drilled with multiple holes.
Wherein, the spacing in two neighboring hole is 8~10m.
Wherein, in the drill process, hole is 0~1m at a distance from coal column.
Wherein, in the fracturing step, the water inlet end of the water injection pipe is connect with high pressure water-injection pump, and the water injection pipe goes out Water end (W.E.) is equipped with hole packer.
Wherein, in the fracturing step, spacing is set as 3~5m.
Wherein, in the fracturing step, high pressure water is injected into hole, after high-pressure water pressure is stablized, continues injection setting The high pressure water of time, setting time are 25-35 minutes.
(3) beneficial effect
The outstanding top gas exceeding limit control method of a kind of fully-mechanized mining working faces end head provided by the invention, in direct rimrock layer and old top Intercommunicating pore is drilled in rock stratum, hole is located proximate to coal column, and the interval injection high pressure water into hole successively will by the pressure of high pressure water Main roof strata and the lamination of direct rimrock are split and are caving, and the space of fully-mechanized mining working air return lane is filled up, and gas is made to disperse drift, real Now reduce the effect of gas density.
Detailed description of the invention
Fig. 1 is the construction schematic diagram of the embodiment of the present invention;
Fig. 2 is the construction effect figure of the embodiment of the present invention.
In figure, 1: direct rimrock layer;2: main roof strata;3: coal column;4: tunnel;5: hole.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
In addition, in the description of the present invention, unless otherwise indicated, " multiple ", " more ", " multiple groups " be meant that two or Two or more, " several ", " several ", " several groups " are meant that one or more.
As shown in Figure 1, the embodiment of the present invention provides a kind of outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head, including Following steps:
Drilling drills along direct rimrock layer 1 to 2 direction of main roof strata from bottom to top close to 3 side of coal column in tunnel 4;
Pressure break injects high pressure water into hole to direct 1 direction of rimrock layer along main roof strata 2 using water injection pipe, water injection pipe Water outlet, which first rests on, fills the water setting time in main roof strata 2, then move down setting spacing and fill the water setting time, again It moves down setting spacing and fills the water setting time, until main roof strata 2 and direct 1 pressure break of rimrock layer.
Further, it in drill process, constructs in tunnel 4, at 3 0~1m of side of coal column, with drilling machine edge from bottom to top Direct rimrock layer 1 drills to 2 direction of main roof strata, and drilling machine is convenient in the tunnel of narrow space 4 along inclination set angle drilling Operating device, set angle is 30-50 °, specifically, drilling machine round end is contacted with direct rimrock layer 1, drilling machine inclination successively exists Direct rimrock layer 1 and 2 internal drilling of main roof strata, hole 5 are integrated connection and are obliquely installed.
Wherein, interval being moved towards along tunnel 4 and being drilled with multiple holes 5, the spacing in two neighboring hole 5 is 8~10m, and the depth in hole 5 is 30~50m, can be according to the physical length in tunnel and number, spacing and the depth of rock stratum constituent structure providing holes 5.
Further, in fracturing step, water injection pipe is set, the water inlet end of water injection pipe is connect with high pressure water-injection pump, is infused in hole 5 The water outlet of water pipe is equipped with hole packer, and high pressure water is injected into hole to direct 1 direction of rimrock layer along main roof strata 2, high pressure water Pressure is 10~50MPa, and the water outlet of water injection pipe, which first rests on, fills the water setting time in main roof strata 2, then moves down and sets Fixed spacing sets spacing as 3~4m, after high-pressure water pressure is stablized, continues the high pressure water for injecting setting time, setting time is 25-35 minutes, setting spacing was moved down again and fills the water setting time, until main roof strata 2 and direct 1 pressure break of rimrock layer, Specifically, injecting high pressure water to 5 bottom of hole, i.e. 2 part of main roof strata by water injection pipe, after high-pressure water pressure is stablized, continue to infuse Enter the high pressure water of setting time, stop water filling, move down 3~5m, continue to fill the water, is successively filled to water filling in hole 5 and completes.
Wherein, hole packer expands under the pressure effect for flowing through high pressure water herein, and the hole packer after expansion and hole 5 seal Cooperation, prevents high pressure water by the gap side leakage between hole packer and hole 5, influences fracturing effect, after stopping water filling, hole packer is extensive Shape is restored, hole packer is moved easily.
As shown in Fig. 2, successively drill according to above method step, and to each hole hydraulic fracturing, make direct rimrock layer and old The inbreak of rimrock layer and enrich and fill up lane space, and then prevent gas density from transfiniting.
In one example, drilling machine selects ZDY1200S drilling machine, bit diameter 56mm, drill pipe diameter 42mm, in distance At the 0.5m of coal column side drill, boring direction be along direct rimrock layer to main roof strata from bottom to top, tilt angle be 50 °, along 8 holes are arranged in the interval of moving towards in tunnel, and the spacing in two neighboring hole is 9m, and the depth in hole is 40m;
The water outlet of water injection pipe is fixedly connected with hole packer, and is arranged in hole, protrudes into the hole bottom in main roof strata, fills the water The water inlet end of pipe is fixedly connected with high pressure water-injection pump, opens high pressure water-injection pump and fills the water to bottom hole, and hole packer forced expansion is realized with hole Sealing continues injection high pressure water 30 minutes after high-pressure water pressure is stablized, and closes high pressure water-injection pump, and hole packer restores to the original state, edge Main roof strata moves down 3m to direct rimrock layer direction, repeats above-mentioned water-filling method, until completing interval note to entire hole Water completes the hydraulic fracturing step in a hole, successively carries out hydraulic fracturing to all holes.
The outstanding top gas exceeding limit control method of a kind of fully-mechanized mining working faces end head provided by the invention, in direct rimrock layer and old top Intercommunicating pore is drilled in rock stratum, hole is located proximate to coal column, and the interval injection high pressure water into hole successively will by the pressure of high pressure water Main roof strata and the lamination of direct rimrock are split and are caving, and the space of fully-mechanized mining working air return lane is filled up, and gas is made to disperse drift, real Now reduce the effect of gas density.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head, which comprises the steps of:
Drilling drills along direct rimrock layer to main roof strata direction from bottom to top close to coal column side in tunnel;
Pressure break injects high pressure water into hole to direct rimrock layer direction along main roof strata using water injection pipe, and the water injection pipe goes out Water end (W.E.), which first rests on, fills the water setting time in main roof strata, then moves down setting spacing and fills the water setting time, again to Lower mobile setting spacing simultaneously fills the water setting time, until main roof strata and the lamination of direct rimrock are split.
2. the outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head as described in claim 1, which is characterized in that the drilling In step, drill from bottom to top along direct rimrock layer to main roof strata inclination set angle.
3. the outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head as claimed in claim 2, which is characterized in that the setting Angle is 30-50 °.
4. the outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head as described in claim 1, which is characterized in that the drilling In step, interval is moved towards along tunnel and is drilled with multiple holes.
5. the outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head as claimed in claim 4, which is characterized in that two neighboring The spacing in hole is 8~10m.
6. the outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head as described in claim 1, which is characterized in that the drilling In step, hole is 0~1m at a distance from coal column.
7. the outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head as described in claim 1, which is characterized in that the pressure break In step, the water inlet end of the water injection pipe is connect with high pressure water-injection pump, and the water outlet of the water injection pipe is equipped with hole packer.
8. the outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head as described in claim 1, which is characterized in that the pressure break In step, spacing is set as 3~5m.
9. the outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head as claimed in claim 8, which is characterized in that the pressure break In step, high pressure water is injected into hole, after high-pressure water pressure is stablized, continues the high pressure water for injecting setting time, setting time It is 25-35 minutes.
CN201811294907.8A 2018-11-01 2018-11-01 The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head Pending CN109296395A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811294907.8A CN109296395A (en) 2018-11-01 2018-11-01 The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811294907.8A CN109296395A (en) 2018-11-01 2018-11-01 The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head

Publications (1)

Publication Number Publication Date
CN109296395A true CN109296395A (en) 2019-02-01

Family

ID=65145124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811294907.8A Pending CN109296395A (en) 2018-11-01 2018-11-01 The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head

Country Status (1)

Country Link
CN (1) CN109296395A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2246006C1 (en) * 2003-06-16 2005-02-10 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Method for controlling ceiling in lava during extraction of gas-bearing coal beds
CN102704936A (en) * 2012-06-13 2012-10-03 太原理工大学 Caving control method for fully mechanized mining face tip mining road way top plate
CN103470261A (en) * 2013-09-30 2013-12-25 山东科技大学 Method for roadway driving along goaf under original roadway top plate of fully mechanized top coal caving goaf
CN103953343A (en) * 2014-04-03 2014-07-30 太原理工大学 Method for controlling roof caving under condition of hardroof in coal seam
CN104712358A (en) * 2015-02-05 2015-06-17 中国矿业大学 Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief
CN107304676A (en) * 2016-04-22 2017-10-31 黑龙江龙煤鹤岗矿业有限责任公司 A kind of prevention and controls for leaving bump under coal column
CN107313777A (en) * 2017-05-09 2017-11-03 天地科技股份有限公司 The main return channel hydraulic fracturing pressure relief method of fully-mechanized mining working and device
CN207063903U (en) * 2017-08-04 2018-03-02 四川省华蓥山煤业股份有限公司绿水洞煤矿 Cloth pore structure is administered on the outstanding top of high-dipping fully-mechanized mining working upper corner
CN108643907A (en) * 2018-05-11 2018-10-12 山东科技大学 One kind being crushed direct top edge sky caving into lane without pillar mining method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2246006C1 (en) * 2003-06-16 2005-02-10 Институт угля и углехимии Сибирского отделения Российской Академии Наук (ИУУ СО РАН) Method for controlling ceiling in lava during extraction of gas-bearing coal beds
CN102704936A (en) * 2012-06-13 2012-10-03 太原理工大学 Caving control method for fully mechanized mining face tip mining road way top plate
CN103470261A (en) * 2013-09-30 2013-12-25 山东科技大学 Method for roadway driving along goaf under original roadway top plate of fully mechanized top coal caving goaf
CN103953343A (en) * 2014-04-03 2014-07-30 太原理工大学 Method for controlling roof caving under condition of hardroof in coal seam
CN104712358A (en) * 2015-02-05 2015-06-17 中国矿业大学 Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief
CN107304676A (en) * 2016-04-22 2017-10-31 黑龙江龙煤鹤岗矿业有限责任公司 A kind of prevention and controls for leaving bump under coal column
CN107313777A (en) * 2017-05-09 2017-11-03 天地科技股份有限公司 The main return channel hydraulic fracturing pressure relief method of fully-mechanized mining working and device
CN207063903U (en) * 2017-08-04 2018-03-02 四川省华蓥山煤业股份有限公司绿水洞煤矿 Cloth pore structure is administered on the outstanding top of high-dipping fully-mechanized mining working upper corner
CN108643907A (en) * 2018-05-11 2018-10-12 山东科技大学 One kind being crushed direct top edge sky caving into lane without pillar mining method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
林伯泉: "《矿井瓦斯防治技术优选——通风和应急救援》", 31 October 2008, 中国矿业大学出版社 *

Similar Documents

Publication Publication Date Title
CN110242301B (en) Two-step grouting modification water-retention coal mining method for roof aquifer
AU2017405652B2 (en) Method for stepwise construction of preferential gas migration pathway at stope in coal seam
US20240102343A1 (en) Isolated overburden grouting filling method for coal gangue underground emission reduction
CN103291325B (en) The preventing control method of Coal-mining Above Confined-water floor strata gushing water
CN103867229B (en) A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining
CN112031775B (en) Novel coal mine rock burst treatment method
CN107956509B (en) Method for preventing wind leakage by stages in roof cutting gob-side entry retaining
CN104863629A (en) Method for extracting gas from separation layer below overlying strata, draining water and grouting through combined drill hole
CN110344831B (en) Roof-cutting pressure-relief non-coal-pillar gob-side entry-forming entry retaining method
CN103924945A (en) High-pressure grouting process of water-rich weathering fracture rock formation below thick unconsolidated formation for coal mine
CN107339105B (en) A method of stop adopting line coal column in the layering residual exploiting field of paste body filling second mining super high seam
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN113187486B (en) Deep well non-coal pillar gob-side entry driving method and formed roadway
CN104100271B (en) Pre-pick is led cave filling artificial side secondary multiplexing roadside support and is become lane method
CN103899350A (en) Fully mechanized caving face supporting top coal gas extraction system
CN112267884B (en) Composite nano grouting sealing-based gob-side entry driving construction method for remaining small coal pillar
CN104763466A (en) Method for detecting active diffusion radius of covered rock separation grouting filling slurry
CN106121717A (en) A kind of driving face in coal mine caving place injecting treatment method
CN115182729A (en) Inclined coal seam small coal pillar penetrating deep cutting shallow pouring gangue blocking roadway protection technology and top cutting position determination method
CN110030013B (en) Gob-side entry retaining method for three-seam periodic roof cutting self-entry side of transition support area
CN110778317A (en) Construction method for ground grouting filling drilling structure in caving zone in mining process
CN108843390A (en) Mine absciss layer water hazard prediction method
CN108894783B (en) A kind of half-edge coal seam paste body filling coal-mining technique
CN114278372B (en) Diversion arrangement method for underground directional drilling area of huge thick water-rich layer
CN109296395A (en) The outstanding top gas exceeding limit control method of fully-mechanized mining working faces end head

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190201