CN100560937C - A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method - Google Patents

A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method Download PDF

Info

Publication number
CN100560937C
CN100560937C CNB200710020737XA CN200710020737A CN100560937C CN 100560937 C CN100560937 C CN 100560937C CN B200710020737X A CNB200710020737X A CN B200710020737XA CN 200710020737 A CN200710020737 A CN 200710020737A CN 100560937 C CN100560937 C CN 100560937C
Authority
CN
China
Prior art keywords
coal
mining
local
reduce
work plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB200710020737XA
Other languages
Chinese (zh)
Other versions
CN101021154A (en
Inventor
张东升
马立强
刘玉德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CNB200710020737XA priority Critical patent/CN100560937C/en
Publication of CN101021154A publication Critical patent/CN101021154A/en
Application granted granted Critical
Publication of CN100560937C publication Critical patent/CN100560937C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of shallow buried coal seam longwall face water retaining mining method is particularly useful for the safety in production and the fwaater resources protection of shallow buried coal seam, determines the exploitation work plane according to coal geology metrical information data; Adopt the large scale coal wall of face length more than 200m as far as possible; Work plane adopts the above high-intensity hydraulic support of 8000kN to support; The corollary equipment of selecting for use suitable coal wall to advance fast, and adopt cycle operation, assurance coal wall day fltting speed is more than 15m; Partial stowage or the local mining height that reduces in 10~50m scope near the open-off cut zone to reduce the mining overburden through crack, make basement rock that whole changing of the relative positions formula not take place and destroy; And near first weighting zone, old top in 10~50m scope, local reduce mining height or in its corresponding face of land influence basin local slip casting make overlying strata form comparatively stable masonry girder construction to reduce the migration space of overlying strata, strengthen the mining overburden resistance effect.This method fwaater resources protection is effective, can keep the safety in production, cuts the waste, environmental protection, coal recovery rate height.

Description

A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method
Technical field
Patent of the present invention relates to a kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method; the raising, particularly bedrock thickness of protection, improvement of the ecological environment and coal recovery rate of safety in production, mine water resource that is particularly useful for shallow buried coal seam is at the shallow buried coal seam of mining height more than 10 times.
Background technology
The refreshing mansion in China western part-Dong wins the coalfield and is located in south, the northern Inner Mongol, Shaanxi, and proved reserves reach 2,236 hundred million tons, account for 1/3 of national proved reserves, belong to one of eight big coalfields, the world, are first hundred million tons of coal production bases of China.Because the coalfield is located in the black plain desert edge of hair, on to cover unconsolidated formation thickness bigger, be 0~76.33m, average 32m, and have a large amount of diving to exist covers basal water on most of regional coal seam, mining area and belongs to this type of.Shallow embedding coal field development and regional economy sustainable development must be finished under the ecological environmental condition in continuous upgrading area, and this will carry out planting trees and grass, greening mining area energetically, check winds and fix drifting sand, and reduce soil erosion, are that graceful natural environment is built in coal field development.The construction of this environment be unable to do without water, does not have water, and life can't be survived, lack of water, and the coalfield can't be developed, and the contradiction of water conservation and coal mining is very outstanding.For so world-class big coalfield, it is particularly precious that water seems.Enough water resources are only arranged, could promote the sustainable and healthy development of coal field development and regional economy, harmonious co-existence between man and nature.
Most of coal seam, Shen Dong mining area belong to buried depth at 200m with interior shallow buried coal seam, shallow overburden, thin basement rock, on to cover thick loose aeolian accumulation sand bed be that the typical case in its coal seam composes and deposits feature, its basement rock top is generally by weathering simultaneously, the general 5~8m of severely-weathered band; The weak general thick 20m of weathered zone.In the shallow buried coal seam recovery process, no matter be the normal water burst of mine, still be that the people that purpose is carried out is sewer drainage and adopts the natural drainage of the water guide crack of formation to the coal measures aquifer with the control mine water disaster, the capital influences to some extent or destroys the aquifer, cause the significant wastage of surface water and groundwater resources, some water resources shortage mining area underground water in China western arid and semi-arid area are further run off and pollution, and groundwater level descends serious, and the desertification problem is serious day by day.Simultaneously, security incidents such as the routed sand of the routed water of top board have all taken place in many collieries in exploitation shallow buried coal seam process, normally safety in production of influence, and the anti-routed coal mining problem of water conservation is to develop the typical difficult problem that the western shallow buried coal seam of China faces always.At the typical shallow buried coal seam (bedrock thickness be generally less than 50m) of mining height below 10 times, general at present employing house pillar type coal mining method or shortwall are exploited, and goaf top plate is collapsed fall for bedrock thickness.As long as stay the coal column of the establishing unstability that do not collapse under pressure, water resource just can not run off.But at the shallow buried coal seam (bedrock thickness generally greater than 50m) of mining height more than 10 times, if still adopt above-mentioned coal-mining method, then the coal resources waste is very serious for bedrock thickness, and this is an on-the-spot anxious big problem to be solved.
Summary of the invention
At the problem that exists in the prior art, the purpose of this invention is to provide a kind of safety in production, cut the waste, environmental protection, thin basic rock shallow buried coal seam longwall face water retaining exploitation method that coal recovery rate is high.
For achieving the above object, water retaining mining method of the present invention is:
A. determine the exploitation work plane according to coal geology metrical information data;
B. adopt the large scale coal wall of work plane tilt length more than 200m, it moves towards to advance length big as far as possible in the scope of haulage device and geological conditions permission, and is not less than tilt length as far as possible;
C. work plane adopts the high-intensity hydraulic support of support force more than 8000kN to support, and step occurs to prevent face roof, forms the gushing water passage;
D. select for use to be fit to the corollary equipment that the coal wall advances fast, and adopt cycle operation, assurance coal wall day fltting speed is more than 15m;
E. in time adopt the Local treatment measure, partial stowage or the local mining height that reduces in 10~50m scope near the open-off cut zone to reduce the mining overburden through crack, make basement rock that whole changing of the relative positions formula not take place and destroy; And near first weighting zone, old top in 10~50m scope, local reduce mining height or in its corresponding face of land influence basin local slip casting make overlying strata form comparatively stable masonry girder construction to reduce the migration space of overlying strata, strengthen the mining overburden resistance effect.
Adopt said method, the maximum dynamic deformation value that can make the mining overburden activity is less than the static deformation value, and maximum dynamic deformation value will reduce with the increase of face propulsion speed.The large scale face propulsion speed is fast more, overlying strata sink mild more, its globality is strong more, water guide cranny development degree is more little, just equal to have delayed the disrumpent feelings of basement rock comparatively speaking, prolonged its stable time that blocks water, can effectively prevent the extraction space and on cover the communication of mining overburden conduit pipe between the loose aquifer water body.Simultaneously, under the quick propulsioning condition of work plane, horizon d integral body cuts, the loose aeolian accumulation layer of sand in top can not form self mechanical structure, sink with roof is synchronously whole, cover under the effect of unconsolidated formation selfweight stress, its original structural fracture and adopt the crack and can be compacted faster and make up last, lose the effect of storage water guide, become water barrier.This method fwaater resources protection is effective, can keep the safety in production, cuts the waste, environmental protection, coal recovery rate height.
The specific embodiment
Thin basic rock shallow buried coal seam longwall face water retaining exploitation method of the present invention, the information that provides according to geological survey at first, analyze the hydrogeological parameter of overlying strata, determine the scope of coal wall exploitation and need the timely key area that adopts Local treatment, to reduce phreatic loss.Select high-intensity hydraulic support for use, guarantee in broadwall that enough support setting loads can be controlled to shear disrumpent feelingsly at first to begin, step occurs, form the gushing water passage to prevent face roof by goaf side.According to the long-term experience with mining in the coal wall, in the coal wall, guarantee stent support power more than 8000kN, can prevent effectively that face roof from step occurring and sinking or the landing unstability.Select for use to be fit to the heavy corollary equipment of high-power and high-reliability that fast pick is adopted soon, to reach the requirement that work plane advances fast.The overhaul life of work plane capital equipment is longer than the service time of a work plane, is not needing well servicing during the working face mining, to reach the requirement that work plane advances fast.Adopt regular " three or eight " or " four or six " cycle operation, be coal cutting, move frame, pushing and sliding, the coal-winning machine front roll cuts the top coal, back roll cuts ground coal, the termination feed of cutting sth. askew, the endless form of two-way coal cutting day is advanced more than 20 cuttves, cut deeply more than 0.8m, make coal wall day fltting speed more than 15m.Use the work plane technology of moving fast, realize fast guaranteeing that by tomography the large scale work plane advances fast.In time adopt the Local treatment measure, because near the open-off cut be area of stress concentration, the top board basement rock generally will take place to shear disrumpent feelings in the open-off cut side, near open-off cut, carry out partial stowage or reduce mining height, to improve the stress state of local top board, reduce the dynamic pressure destructiveness, reduce the overlying strata through crack, make basement rock that whole changing of the relative positions formula not take place and destroy, make and adopt water guide cranny development height and be reduced.According to production practices, partial stowage or the local mining height that reduces can effectively reduce and adopt water guide cranny development height in open-off cut near zone 10~50m scope.Near first weighting zone, old top in 10~50m scope, local reduce mining height or in its corresponding face of land influence basin local slip casting to reduce the migration space of overlying strata, suitably reduce mining height to reduce the migration space on basic top, helping the crack that disrumpent feelings sillar turns round in the opposite direction by work plane one side is extruded, and the extruding closing motion of this end check seam is effectively to prevent the top board infiltration or the water of bursting, and help basic top and form comparatively stable structure, thereby thin basement rock destructiveness is reduced, effectively strengthen the mining overburden resistance effect.Local slip casting in the bottom influences scope of the corresponding aquifer of Qi Laoding first weighting can effectively prevent communication aquifer, water guide crack, and the influence basin size can be determined by the fracturation angle.After work plane is adopted, coal seam goaf overlying rock absciss layer is disrumpent feelings, the rock stratum is in migration process, have vertically downward and around the work to the central horizontal migration both direction component of force that moves, its make a concerted effort with around component can form ring work plane goaf be bordering on two groups of vertical fine cracks with its trend, based on the crack around the ring work plane goaf.The tilt length of work plane is big more, it is more little to adopt the boundary effect that rock mass influences by the work plane both sides, and the rock stratum is partial to generally more based on the integral body migration, and resistance effect is good more, facts have proved that after face length reaches 200m the boundary effect of work plane mining overburden is no longer obvious.From this viewpoint, the tilt length of work plane advances length big more with moving towards, and helps water-retaining production more, so will adopt the large scale coal wall.

Claims (1)

1. thin basic rock shallow buried coal seam longwall face water retaining exploitation method is characterized in that:
A. determine the exploitation work plane according to coal geology metrical information data;
B. adopt the large scale coal wall of work plane tilt length more than 200m, it moves towards to advance length big as far as possible in the scope of haulage device and geological conditions permission, and is not less than tilt length;
C. work plane adopts the high-intensity hydraulic support of support force more than 8000kN to support, and step occurs to prevent face roof, forms the gushing water passage;
D. select for use to be fit to the corollary equipment that the coal wall advances fast, and adopt cycle operation, assurance coal wall day fltting speed is more than 15m;
E. in time adopt the Local treatment measure, partial stowage or the local mining height that reduces in 10~50m scope near the open-off cut zone to reduce the mining overburden through crack, make basement rock that whole changing of the relative positions formula not take place and destroy; And near first weighting zone, old top in 10~50m scope, local reduce mining height or in its corresponding face of land influence basin local slip casting make overlying strata form comparatively stable masonry girder construction to reduce the migration space of overlying strata, strengthen the mining overburden resistance effect.
CNB200710020737XA 2007-03-23 2007-03-23 A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method Expired - Fee Related CN100560937C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200710020737XA CN100560937C (en) 2007-03-23 2007-03-23 A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200710020737XA CN100560937C (en) 2007-03-23 2007-03-23 A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method

Publications (2)

Publication Number Publication Date
CN101021154A CN101021154A (en) 2007-08-22
CN100560937C true CN100560937C (en) 2009-11-18

Family

ID=38709025

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200710020737XA Expired - Fee Related CN100560937C (en) 2007-03-23 2007-03-23 A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method

Country Status (1)

Country Link
CN (1) CN100560937C (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102174891B (en) * 2009-09-07 2014-04-30 中国神华能源股份有限公司 Matching method for mechanized mining equipment
CN102505943B (en) * 2011-11-21 2013-08-21 西安科技大学 Water conservation coal cutting method for small and medium-sized coal mines in waterhead area
CN102797465B (en) * 2012-09-10 2014-09-03 河南理工大学 Underground ultra-thin virtual protection layer hydraulic coal mining method
CN103195426B (en) * 2013-04-22 2015-09-16 中国矿业大学(北京) A kind of large-inclination-angle coal bed long-wall working face coal pillar-free mining method
CN103924975B (en) * 2014-04-16 2016-01-20 河北煤炭科学研究院 A kind of for the water-retaining method in coal mining process
CN103993878A (en) * 2014-05-26 2014-08-20 中国矿业大学 Water diversion fracture zone height estimating method
CN104196569B (en) * 2014-08-31 2016-06-29 河北煤炭科学研究院 The Forecasting Methodology that on filling coal mining work surface, whether water barrier is stable
CN104453903B (en) * 2014-12-01 2016-05-11 中国矿业大学 A kind of close-in seams group water retaining mining method
CN106528965B (en) * 2016-10-21 2019-06-14 重庆大学 The acquisition methods of the face end factor of stress concentration
CN106555591B (en) * 2016-10-28 2017-06-27 黑龙江科技大学 Thin and middle thick half-edge coal seam fully mechanized coal winning technology
CN107542465B (en) * 2017-07-21 2019-03-19 陕西省地质环境监测总站 A kind of shallow coal-layer water-retaining production method and its application
CN108119142B (en) * 2017-11-09 2019-05-17 中国矿业大学 - three-two subregion water-protection coal-mining methods of band of five figures

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5769504A (en) * 1996-03-11 1998-06-23 Council Of Scientific & Industrial Research Equipment for shortwall mining useful for extraction of pillars in underground coal mines
US6672674B2 (en) * 2000-09-20 2004-01-06 Dbt Gmbh Longwall mining with blasting
CN1737337A (en) * 2004-08-19 2006-02-22 神华集团有限责任公司 Water preventing method for mine in structure of thin base rock and thick loose aquifer
CN1865657A (en) * 2005-05-19 2006-11-22 兖矿集团有限公司 Comprehensive coal-mining process by using long wall mining method
CN1932240A (en) * 2006-09-21 2007-03-21 闫振东 Full-seam cutting, retreating, separate moving and full-caving comprehensive mechanized coal mining method and equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5769504A (en) * 1996-03-11 1998-06-23 Council Of Scientific & Industrial Research Equipment for shortwall mining useful for extraction of pillars in underground coal mines
US6672674B2 (en) * 2000-09-20 2004-01-06 Dbt Gmbh Longwall mining with blasting
CN1737337A (en) * 2004-08-19 2006-02-22 神华集团有限责任公司 Water preventing method for mine in structure of thin base rock and thick loose aquifer
CN1865657A (en) * 2005-05-19 2006-11-22 兖矿集团有限公司 Comprehensive coal-mining process by using long wall mining method
CN1932240A (en) * 2006-09-21 2007-03-21 闫振东 Full-seam cutting, retreating, separate moving and full-caving comprehensive mechanized coal mining method and equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
浅埋煤层"保水采煤"条带开采"围岩-煤柱群"稳定性分析. 石平五,长孙学亭,刘洋.煤炭工程,第2006年第8期. 2006 *

Also Published As

Publication number Publication date
CN101021154A (en) 2007-08-22

Similar Documents

Publication Publication Date Title
CN100560937C (en) A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method
CN110242301B (en) Two-step grouting modification water-retention coal mining method for roof aquifer
CN101070759B (en) Thin-base-rock shallow coal-layer water-retaining production suitable-condition classification method
CN109577980B (en) Underground longwall working face water-retaining coal mining method based on aquifer freezing
CN107740707B (en) Method for preventing and controlling water damage in deep high-pressure-bearing underwater thick coal seam mining
CN108194088A (en) A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion
CN104712358A (en) Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief
CN102877884B (en) The difficult to understand grey top transformation of a kind of mine based on km directional drilling technology and construction method
CN104863629A (en) Method for extracting gas from separation layer below overlying strata, draining water and grouting through combined drill hole
CN112879011B (en) Method for controlling height of water guide crack zone by hard overburden rock pre-cracking weakening under aquifer
CN102392677A (en) Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN108343418B (en) Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock
CN105626071A (en) Mining method for gently inclined thin ore body
CN104895531A (en) Single thick coal seam ground mining well extraction process
CN109441450A (en) A kind of double resource pit mining modes of lower coal water of overlying strata hydrogeologic condition disturbance
CN104564074A (en) Method for implementing water-preserved coal mining of coal mining area
CN113175325B (en) Coal and intergrown sandstone type uranium ore coordinated mining method based on key layer protection
CN106089291A (en) A kind of collaborative extraction is caving the old dead zone of formula and the method for lower coal seam coal bed gas
CN109611146B (en) Separation layer water drainage grouting method
CN112593853A (en) Construction method for coal mine waste filling and water-reducing mining
CN109162713B (en) Coal-water dual-resource mine mining method without changing overlying strata hydrogeological conditions
CN111379562B (en) Water-controlled coal mining method and device under composite water body
CN102226412A (en) Underground dark mining drilling well gas extraction method
CN112593997B (en) Method for extracting goaf gas through top plate high-position comb-shaped drilling
CN110778317A (en) Construction method for ground grouting filling drilling structure in caving zone in mining process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091118

Termination date: 20120323