CN106014474B - Meet underground release, leting speeper, gas drainage under suction three holes and use construction method - Google Patents

Meet underground release, leting speeper, gas drainage under suction three holes and use construction method Download PDF

Info

Publication number
CN106014474B
CN106014474B CN201610325116.1A CN201610325116A CN106014474B CN 106014474 B CN106014474 B CN 106014474B CN 201610325116 A CN201610325116 A CN 201610325116A CN 106014474 B CN106014474 B CN 106014474B
Authority
CN
China
Prior art keywords
hole
construction
length
casing
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610325116.1A
Other languages
Chinese (zh)
Other versions
CN106014474A (en
Inventor
刘虎
邵昌尧
梁东辉
刘伟
张子学
陈修超
何勇
牟俊康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhengtong Coal Industry Co Ltd
Original Assignee
Shaanxi Zhengtong Coal Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Zhengtong Coal Industry Co Ltd filed Critical Shaanxi Zhengtong Coal Industry Co Ltd
Priority to CN201610325116.1A priority Critical patent/CN106014474B/en
Publication of CN106014474A publication Critical patent/CN106014474A/en
Application granted granted Critical
Publication of CN106014474B publication Critical patent/CN106014474B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to technical field of coal mine, and in particular to it is a kind of meet underground release, leting speeper, gas drainage under suction three holes and use construction method.It can realize that a hole three is used, convenient and efficient.The present invention method and step be:1)Construction drill site;2)It constructs and uses hole;3)Lower two level casing;4)Lower screen casing;5)Polyurethane hole packer sealing of hole draws out methane.

Description

Meet underground release, leting speeper, gas drainage under suction three holes and use construction method
Technical field
The present invention relates to technical field of coal mine, and in particular to a kind of three holes for meeting underground release, leting speeper, gas drainage under suction And use construction method.
Background technology
In process of coal mining, bump, water, gas are 3 more prominent the Nature disasters, and working face is tunneled and returned Adopt and must comply with " driving, not release are not tunneled after first release ", " having to doubt must visit, first visit and dig afterwards, meet pick that must visit " and " first after pumping Adopt, monitoring, with wind fixed output quota " principle, release, to visit water and gas drainage under suction realized by construction drill.Current release Pressure relief vent of constructing is needed, visiting water needs spy water hole of constructing, and gas drainage under suction needs gas extraction hole of constructing, three kinds of brills of constructing respectively Hole, workload is bigger, and time-consuming, and the staff of use is relatively more.
The content of the invention
The present invention provide it is a kind of meet underground release, leting speeper, three holes of gas drainage under suction and with construction method, can realize One hole three is used, convenient and efficient.
It is existing in the prior art to solve the problems, such as, the technical scheme is that:It is a kind of meet underground release, leting speeper, Three holes of gas drainage under suction and with construction method, it is characterised in that:The method and step is:
1)Construction drill site:It constructs on the right side of digging laneway a triangle drill site;
2)It constructs and uses hole:The construction 1 and with hole on the side of drill site and parallel length of meeting head on, and be 120- with hole aperture 150mm, hole depth 100-180m, and be 6-10 ° with the angle in hole and digging laneway;
3)Lower two level casing:When hole is constructed to 20m, two level casing, the length of two level casing are set in hole Spend for 20m, a diameter of 89-146mm, to two level casing and and with slip casting between hole, make two level casing with and be condensed into one with hole It rises, continues to construct and with hole, construction arrives and with after hole depth, and with the stress distribution of hole change coal body herein, stores coal body Energy slowly discharged, achieved the purpose that release, if there is water in coal body herein, water is flowed out from and with hole, is reached The purpose of leting speeper;
4)Lower screen casing:And constructed with hole to depth, if not there are flowing out, meet the condition of gas drainage under suction, at this time Screen casing, a diameter of 50-60mm of screen casing or so can be installed to and with hole, length is in 40-60m;
5)Polyurethane hole packer sealing of hole:Screen casing is installed to and with after the 40-60m depth of hole, pair and with hole polyurethane sealing of hole, Polyurethane is uniformly applied on gunnysack, smearing while is wrapped in gunnysack on hole packer rapidly, then hole packer is sent into simultaneously It is expanded in hole, treating polyurethane that chemical reaction occurs, so as to achieve the purpose that sealing of hole, hole sealing depth 5m, sealing of hole terminates, just It can carry out coal bed gas drainage.
The drill site height is consistent with head-room, and a length of 7m of a side that drill site is communicated with tunnel, another with meeting Head parallel length is 5m, a length of 9m in another side.
Compared with prior art, advantages of the present invention is as follows:A hole three of the invention is used, convenient and efficient, is reduced and is unloaded in construction It presses hole, visit water hole, the expense on gas extraction hole, improve construction efficiency, time, manpower are saved, for coal mining preparation work.
Description of the drawings
Fig. 1 is drill site and with hole, two level casing layout drawing in the method for the present invention
Reference sign:In figure:1- drill sites, 2- and with hole, 3- two level casings.
Specific embodiment
The design is described in detail below in conjunction with the accompanying drawings:
Referring to Fig. 1:Meet underground release, leting speeper, three holes of gas drainage under suction and with construction method step be:
1)Construction drill site:It constructs on the right side of digging laneway a triangle drill site 1,1 height of drill site is consistent with head-room, bores The a length of 7m of a side that field 1 is communicated with tunnel, another with parallel length of meeting head on for 5m, a length of 9m in another side;
2)It constructs and uses hole:The construction 1 and with hole 2 on the side that 1 length of drill site is 5m, and be 120- with 2 aperture of hole 150mm, hole depth 100-180m, and be 6-10 ° with the angle of hole 2 and digging laneway;
3)Lower two level casing:When hole 2 is constructed to 20m, two level casing 3, two level casing 3 are set in hole 2 Length for 20m, a diameter of 89-146mm, to two level casing 3 and and use slip casting between hole 2, make two level casing 3 and and with hole 2 It being condensed into together, continues to construct and with hole 2, construction arrives and with after 2 depth of hole, and changes the stress distribution of coal body herein with hole 2, The energy that coal body stores is made slowly to be discharged, has achieved the purpose that release, if there is water in coal body herein, water is from and with hole 2 Outflow, has achieved the purpose that leting speeper;
4)Lower screen casing:And constructed with hole 2 to depth, if not there are flowing out, meet the condition of gas drainage under suction, at this time Screen casing, a diameter of 50-60mm of screen casing or so can be installed to and with hole 2, length is in 40-60m.
5)Polyurethane hole packer sealing of hole:Screen casing is installed to and with after the 40-60m depth of hole, pair and use polyurethane sealing with hole 2 Polyurethane is uniformly applied on gunnysack by hole, and smearing while is wrapped in gunnysack on hole packer rapidly, then hole packer is sent into And expanded in hole 2, treating polyurethane that chemical reaction occurs, so as to achieve the purpose that sealing of hole, hole sealing depth 5m, sealing of hole knot Beam, it is possible to carry out coal bed gas drainage.
Invention of the present invention can save equipment, material investment expense, only need to utilize original pressure relief vent construction equipment, material and Original spy water orifice device is not required to additional procuring equipment, material, no other inputs;
The present invention can create considerable economic benefit:Before being not used, fully mechanized workface need to meet head on leting speeper in advance, leting speeper Drill 450 yuan/m,, will according to leting speeper on the basis of " dig-unload " parallel operations are realized by the research application of the technology It asks and is designed, the requirement of leting speeper is met while release.Since the technology successful implementation, coal roadway tunneling has been completed 5052m, accumulative minimizing leting speeper drill footage 5760m.Simple construction leting speeper drilling unit price was 150 yuan/m, by 2015 It only saves leting speeper fund and has reached 150*5760=86.4 ten thousand yuan December.

Claims (1)

1. a kind of meet underground release, leting speeper, three holes of gas drainage under suction and with construction method, it is characterised in that:The side Method step is:
1)Construction drill site:It constructs on the right side of digging laneway a triangle drill site(1);
2)It constructs and uses hole:In drill site(1)1 and hole is used with constructing on the side for parallel length of meeting head on(2), and use hole(2)Aperture For 120-150mm, hole depth 100-180m, and use hole(2)Angle with digging laneway is 6-10 °;
3)Lower two level casing:It treats and uses hole(2)When construction is to 20m, to and use hole(2)Interior setting two level casing(3), two level casing (3)Length for 20m, a diameter of 89-146mm, to two level casing(3)With and use hole(2)Between slip casting, make two level casing(3) With and use hole(2)It is condensed into together, continues hole of constructing and use(2), construction to and use hole(2)After depth, and use hole(2)Change this Locate the stress distribution of coal body, the energy that coal body stores is made slowly to be discharged, has achieved the purpose that release, if having in coal body herein Water, then water from and use hole(2)Outflow, has achieved the purpose that leting speeper;
4)Lower screen casing:And use hole(2)After construction to depth, if not there are flowing out, meet the condition of gas drainage under suction, at this time may be used To and use hole(2)Screen casing is installed, a diameter of 50-60mm of screen casing, length is in 40-60m;
5)Polyurethane hole packer sealing of hole:Screen casing is installed to and with after the 40-60m depth of hole, pair and use hole(2)With polyurethane sealing of hole, Polyurethane is uniformly applied on gunnysack, smearing while is wrapped in gunnysack on hole packer rapidly, then hole packer is sent into simultaneously Use hole(2)It is interior, treat that polyurethane occurs chemical reaction and expands, so as to achieve the purpose that sealing of hole, hole sealing depth 5m, sealing of hole knot Beam, it is possible to carry out coal bed gas drainage;
The drill site(1)Height, drill site consistent with head-room(1)A side a length of 7m communicated with tunnel, another with Parallel length meet head on as 5m, a length of 9m in another side.
CN201610325116.1A 2016-05-17 2016-05-17 Meet underground release, leting speeper, gas drainage under suction three holes and use construction method Expired - Fee Related CN106014474B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610325116.1A CN106014474B (en) 2016-05-17 2016-05-17 Meet underground release, leting speeper, gas drainage under suction three holes and use construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610325116.1A CN106014474B (en) 2016-05-17 2016-05-17 Meet underground release, leting speeper, gas drainage under suction three holes and use construction method

Publications (2)

Publication Number Publication Date
CN106014474A CN106014474A (en) 2016-10-12
CN106014474B true CN106014474B (en) 2018-06-01

Family

ID=57097517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610325116.1A Expired - Fee Related CN106014474B (en) 2016-05-17 2016-05-17 Meet underground release, leting speeper, gas drainage under suction three holes and use construction method

Country Status (1)

Country Link
CN (1) CN106014474B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581231A (en) * 2009-06-16 2009-11-18 煤炭科学研究总院沈阳研究院 Gas drainage method for loosening coal body through cross layer boring and hydraulic fracture
CN102061933A (en) * 2010-12-13 2011-05-18 山西晋城无烟煤矿业集团有限责任公司 Long drilling positioning construction process
CN102587962A (en) * 2012-04-13 2012-07-18 中国矿业大学 Methods for arranging and supporting wall-expanded gas extraction drill sites
CN102720528A (en) * 2012-07-03 2012-10-10 中国矿业大学 Underground coal mine repeating pulsation hydrofracture strengthened gas extracting method
CN103362540A (en) * 2013-08-07 2013-10-23 中国矿业大学 High gas coal seam pressure relief gas extraction method
CN103362541A (en) * 2013-08-07 2013-10-23 中国矿业大学 Method for locally improving coal seam air permeability in coal seam with high gas and low air permeability
CN103775127A (en) * 2013-12-31 2014-05-07 中国矿业大学 Method for comprehensively treating gas in low-air-permeability high-gas-content coal seam group
CN104234685A (en) * 2014-07-22 2014-12-24 华北科技学院 Staggered distribution method of anti-impact pressure relief drill holes in super high seam stoping surface
CN104314610A (en) * 2014-10-11 2015-01-28 中煤科工集团重庆研究院有限公司 Coal road stripe region burst-preventing method
CN104612625A (en) * 2014-10-31 2015-05-13 河南理工大学 Hole sealing device for low-permeability coal bed gas-phase fracturing drilling
CN104653161A (en) * 2015-02-12 2015-05-27 中国矿业大学(北京) Coal mine underground pulse hydraulic slot cutting-fracturing integral anti-reflection extraction device and method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581231A (en) * 2009-06-16 2009-11-18 煤炭科学研究总院沈阳研究院 Gas drainage method for loosening coal body through cross layer boring and hydraulic fracture
CN102061933A (en) * 2010-12-13 2011-05-18 山西晋城无烟煤矿业集团有限责任公司 Long drilling positioning construction process
CN102587962A (en) * 2012-04-13 2012-07-18 中国矿业大学 Methods for arranging and supporting wall-expanded gas extraction drill sites
CN102720528A (en) * 2012-07-03 2012-10-10 中国矿业大学 Underground coal mine repeating pulsation hydrofracture strengthened gas extracting method
CN103362540A (en) * 2013-08-07 2013-10-23 中国矿业大学 High gas coal seam pressure relief gas extraction method
CN103362541A (en) * 2013-08-07 2013-10-23 中国矿业大学 Method for locally improving coal seam air permeability in coal seam with high gas and low air permeability
CN103775127A (en) * 2013-12-31 2014-05-07 中国矿业大学 Method for comprehensively treating gas in low-air-permeability high-gas-content coal seam group
CN104234685A (en) * 2014-07-22 2014-12-24 华北科技学院 Staggered distribution method of anti-impact pressure relief drill holes in super high seam stoping surface
CN104314610A (en) * 2014-10-11 2015-01-28 中煤科工集团重庆研究院有限公司 Coal road stripe region burst-preventing method
CN104612625A (en) * 2014-10-31 2015-05-13 河南理工大学 Hole sealing device for low-permeability coal bed gas-phase fracturing drilling
CN104653161A (en) * 2015-02-12 2015-05-27 中国矿业大学(北京) Coal mine underground pulse hydraulic slot cutting-fracturing integral anti-reflection extraction device and method

Also Published As

Publication number Publication date
CN106014474A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN108757000B (en) A kind of quick slot orientation fracturing system in underground based on drilling machine power and method
CN101915083B (en) Method for extracting coalbed gases from coal mines by upper and lower combination
CN108643877B (en) Coal mine underground coal seam long drilling staged fracturing permeability-increasing and gas extraction method
AU2014336858B2 (en) Method for enhanced fuel gas extraction by coal mine underground gas-liquid dual-phase alternating phase-driven fracturing of coal body
CN206722798U (en) A kind of combined type coal-bed flooding pressure break and gas pumping one hole sealing device
CN102704905A (en) Segmental hydraulic fracturing coal seam pressure releasing device and method
CN105756599A (en) Coal mine two-end gas plug and middle water seal layer penetrating drill hole sealing device and method
CN103174453A (en) Layered hydraulic fracturing method of underground coal mine multiple coal seams
CN202531151U (en) Hydraulic fracturing device for coal mine laneway pressure relief
Kurlenya et al. Stimulation of underground degassing in coal seams by hydraulic fracturing method
CN101915084B (en) Process for pumping and exploiting coal bed gas by using ground well drilling and underground hole drilling
RU2534881C1 (en) Method of preliminary degassing of coal bed
WO2019075885A1 (en) Method of reforming coal-bed gas well employing controllable shock waves in combination with surge water injection pressurization
CN101915086B (en) Coal mine underground gas borehole fracturing method
CN110671058A (en) Double-sealing single-clamping process pipe column of old horizontal well and method for realizing large-discharge transformation
CN104594870A (en) Fracturing stimulation method
CN105804786A (en) Method for layer penetrating, drilling, pressing punching and permeability improving of soft coal seam floor
CN108756804A (en) Mash gas pumping drilling hole sealing device
CN109931062A (en) The method of the double envelope single deck tape-recorder staged fracturings of tight roof horizontal well in coal mine roadway
CN207513626U (en) A kind of ground extraction coal-bed gas device
CN106014474B (en) Meet underground release, leting speeper, gas drainage under suction three holes and use construction method
CN108005629A (en) A kind of underground fracture sliding sleeve of electric control hydraulic driving
CN103541679B (en) Method for sealing underground hydraulic fracture drilled hole of coal mine in combined manner
RU2533470C2 (en) Procedure for recovery of tightness in flow strings
CN106948860B (en) The method for cooperateing with progressive draining coal seam gas with directional drilling based on U-shaped well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Hu

Inventor after: Shao Changyao

Inventor after: Liang Donghui

Inventor after: Liu Wei

Inventor after: Zhang Zixue

Inventor after: Chen Xiuchao

Inventor after: He Yong

Inventor after: Mou Junkang

Inventor before: Shao Changyao

Inventor before: Chen Xiuchao

Inventor before: He Yong

Inventor before: Zhang Zixue

Inventor before: Chen Shuai

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20190517