CN104594870A - Fracturing production increasing method - Google Patents

Fracturing production increasing method Download PDF

Info

Publication number
CN104594870A
CN104594870A CN201410797617.0A CN201410797617A CN104594870A CN 104594870 A CN104594870 A CN 104594870A CN 201410797617 A CN201410797617 A CN 201410797617A CN 104594870 A CN104594870 A CN 104594870A
Authority
CN
China
Prior art keywords
crack
proppant
old
fracturing
increasing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410797617.0A
Other languages
Chinese (zh)
Other versions
CN104594870B (en
Inventor
达引朋
慕立俊
赵振峰
李宪文
卜向前
庞鹏
李向平
李转红
吕宝强
苏良银
刘兴银
杜春龙
唐思睿
郭亮
马红星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201410797617.0A priority Critical patent/CN104594870B/en
Publication of CN104594870A publication Critical patent/CN104594870A/en
Application granted granted Critical
Publication of CN104594870B publication Critical patent/CN104594870B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a fracturing production increasing method, which comprises the following steps: step one, putting a fracturing pipe column into a stratum where old cracks are located, performing hydraulic fracturing on a perforation section of the stratum, and opening the old cracks; step two, using a propping agent, a sand plug and a temporary plugging agent to shield and temporarily plug the old cracks to form main cracks and branch cracks; thirdly, throwing a ball to knock off a sliding sleeve restrictor on the fracturing string; and fourthly, propping the branch cracks by using slickwater to carry the propping agent, and propping the main cracks by using the base fluid and the cross-linking fluid to carry the propping agent respectively. The fracturing production increasing method provided by the invention is a fracturing production increasing method for improving the recovery ratio of an old oil field by replacing an encryption well, realizes the utilization and excavation of residual oil in the lateral direction of an old fracture, increases the recoverable reserve, increases the modification volume of a reservoir and improves the recovery ratio of the reservoir of the old oil field.

Description

A kind of fracturing yield increasing method
Technical field
The invention belongs to petroleum production engineering technical field, be specifically related to the fracturing yield increasing method that a kind of alternative infill well improves old filed recovery ratio.
Background technology
In recent years, along with the progress of fracturing technique, domestic a large amount of low permeability reservoir, compact reservoir obtain effective exploitation, but along with the prolongation of oil development time, affect by factors such as operation fracturing artificial slit, reservoir heterogeneities, the remaining oil around old man-made fracture is plucked out of in a large number, and the remaining oil of its crack side direction is difficult to employ, cause oil well well yield to decline, a large amount of remaining oil is trapped in reservoir.
The method employing reservoir remaining oil at present both at home and abroad is mainly passed through reservoir residual oil analysis and Analysis results of numerical simulation, on the basis of old well pattern, rearrange infill well, by reducing single well-controlled reservoir, reach and improve injection-production relation, improve remaining oil producing degree, increase the object of recoverable reserves.
Mainly there is following problem in the above-mentioned existing method realizing hyposmosis old filed raising recovery ratio: on the basis of old well pattern, rearranges infill well, change old well pattern form and specification, simultaneously because oil field enters mid-later development phase, oil water relation is complicated, there is the risk of infill well water breakthrough or water outlet.
Summary of the invention
The object of this invention is to provide a kind of fracturing yield increasing method, avoid existing on the basis of old well pattern, rearrange infill well water breakthrough that infill well brings or go out water problem, utilizing and open old crack, around old crack, form new major fracture and a crack, improve the recovery ratio of reservoir.
For this reason, the invention provides a kind of fracturing yield increasing method, comprise the steps:
Step one, will enter under fracturing string in the stratum at place, old crack, and the perforated interval of formation carries out fracturing, opens old crack;
Step 2, utilizes proppant, sand plug, diverting agent to carry out shielding to old crack stifled temporarily, forms major fracture and a crack; Add in old crack and, according to mass fraction shielding is carried out to old crack stifled temporarily than being the mixture that 5:2:1 forms, and old crack being pressed off formation major fracture and a crack by proppant, sand plug, diverting agent;
Step 3, the sliding sleeve throttling device on fracturing string is destroyed in pitching;
Step 4, utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture; Proppant and slippery water are added a crack according to mass fraction than the mixture formed for 1:8, support a crack, proppant, base fluid are respectively added major fracture according to mass fraction than the mixture formed for 1:3 than the mixture formed for 1:5 and proppant, base fluid according to mass fraction simultaneously, support major fracture.
The particle diameter of the proppant in described step 2 is 8 order ~ 16 orders, and diverting agent is CDD-3 oil-soluble crack diverting agent, and particle diameter is 3mm ~ 6mm.
In described step 4, the particle diameter of the proppant that slippery water carries is 40 order ~ 70 orders, and the particle diameter of the proppant that base fluid, crosslinked fluid carry is 20 order ~ 40 orders.
Described slippery water adopts EM-30 type slippery water.
Described base fluid adopts CJ2-6 type base fluid.
Described crosslinked fluid adopts JL-13 type crosslinked fluid.
The sliding sleeve throttling device of described step 3 adopts HT-J-CQ sliding sleeve throttling device.
Beneficial effect of the present invention: this fracturing yield increasing method provided by the invention, concrete, it is the fracturing yield increasing method that alternative infill well improves old filed recovery ratio, achieve employing and taping the latent power of old crack side direction remaining oil, add recoverable reserves, too increase the transformation volume of reservoir simultaneously, improve the reservoir recovery ratio of old filed.
Below with reference to accompanying drawing, the present invention is described in further details.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of fracturing string.
Description of reference numerals: 1, fracturing string; 2, packer; 3, sliding sleeve throttling device.
Detailed description of the invention
embodiment 1:
A kind of fracturing yield increasing method, comprises the steps:
Step one, entered in the stratum at place, old crack for 1 time by fracturing string, and the perforated interval of formation carries out fracturing, opens old crack;
Step 2, utilizes proppant, sand plug, diverting agent to carry out shielding to old crack stifled temporarily, forms major fracture and a crack; Add in old crack and, according to mass fraction shielding is carried out to old crack stifled temporarily than being the mixture that 5:2:1 forms, and old crack being pressed off formation major fracture and a crack by proppant, sand plug, diverting agent;
Step 3, the sliding sleeve throttling device 3 on fracturing string 1 is destroyed in pitching;
Step 4, utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture; Proppant and slippery water are added a crack according to mass fraction than the mixture formed for 1:8, support a crack, proppant, base fluid are respectively added major fracture according to mass fraction than the mixture formed for 1:3 than the mixture formed for 1:5 and proppant, base fluid according to mass fraction simultaneously, support major fracture.
Before this fracturing yield increasing method of enforcement, need the flow string first tripping out former well, and sting wash clean, then drift size gauge tool drifting is used, namely use drift size gauge tool drifting to the artificial bottom of a well of well in operation, guarantee that described well in operation pit shaft is clean, like this, whether standard is met by the internal diameter of drift size gauge tool Inspection well, if well in operation has distortion or blocking, then check the biggest size of element that distortion or the well in operation after blocking can pass through, if the biggest size of element that can pass through does not meet pressure break requirement, then first well workover implements pressure break again; Then well-flushing, adopts the active water with reservoir compatibility, returns well-flushing to former pit shaft, returns out flushing fluid content of impurities and is less than 0.2% for qualified, and again tag in fact; Engineering log, casing pressure test, carry out engineering log to full well section, if sleeve pipe is without breakage, then adopts casing pressure test drilling tool to carry out pressure testing to full casing, after pressure testing is qualified to 30MPa, trip out tubing string, carry out lower step measure, if the unsuccessful stopping construction of pressure testing, selects well again, until select well success; According to step one to step 4 pressing crack construction; Closing well, open flow.
Concrete, as shown in Figure 1, fracturing string 1 in step one is connected with packer 2 and sliding sleeve throttling device 3, wherein, sliding sleeve throttling device 3 is selected is furnished with the sliding sleeve throttling device 3 that ∮ 22mm directly chews son, K344-98 packer 2 selected by packer 2, K344 series packer 2 supports the use with sliding sleeve throttling device 3, and K344 series packer 2 in the course of the work, without the need to mechanical movement, therefore preferably K344 series packer 2, as the packer 2 in the present invention, utilizes above-mentioned fracturing string 1 to realize implementing oil jacket with noting fracturing to the perforated interval on stratum, place, old crack;
Step 2, adds and, according to mass fraction is carried out shielding to old crack stifled temporarily than being the mixture that 5:2:1 forms, and old crack being pressed off formation major fracture and a crack by proppant, sand plug, diverting agent in old crack; Namely proppant, sand plug, diverting agent is utilized to carry out shielding to old crack stifled temporarily, impel old crack to stitch interior static pressure to improve, realization presses off the new crack of side direction, form major fracture and a crack, and make major fracture and a fracture extension, wherein, shielding is stifled temporarily to be referred to because solid phase particles in mud can not be eliminated, formation positive differential pressure is inevitable, the infringement blocking objective reality of formation.So people's imagination utilizes solid phase particle to the blocking mechanism of oil reservoir pore throat and rule, artificially when opening oil reservoir, quick on the oil reservoir borehole wall, shallow-layer, effectively formation one infringement blocking strips, reaching with this stops mud to damage the continuation of oil reservoir, eliminate the impact of soak time, and eliminate the object of the infringement of cement paste.As approach of technology innovation, invent temporary shielding method ,barrier building temporary seal incores.The permeability of infringement band reduces with the increase of temperature and pressure, because infringement band is very thin, so by perforating methods causing two of formation damage factors that cannot eliminate: positive differential pressure and solid phase particles, convert the necessary condition and favorable factor that realize this technology to, thus fundamentally (in mechanism) solves this domestic and international unsolved technical barrier always.The effect of this infringement band is equivalent to " mask tape " that stop infringement further, therefore this technology is called the Shielding Temporary Plugging Technology of modification drilling fluid;
The sliding sleeve throttling device 3 on fracturing string 1 is destroyed in pitching in step 3, it should be noted that, the mode of destroying sliding sleeve throttling device 3 is accurately that after carrying out pressure break to old crack, pressure break discharge capacity is by 1.6m 3/ min ~ 2.4m 3/ min is down to 0.5m 3/ min, open the high pressure line plug valve pitching on fracturing string 1, this high pressure line plug valve pitching is the solid steel ball of φ 38mm, namely destroys sliding sleeve throttling device 3, falls into shaft bottom, and then improves discharge capacity, realizes oil jacket with note, when discharge capacity is greater than 6m 3during/min, step 4 can be carried out;
Step 4, proppant and slippery water are added a crack according to mass fraction than the mixture formed for 1:8, support a crack, proppant, base fluid are respectively added major fracture according to mass fraction than the mixture formed for 1:3 than the mixture formed for 1:5 and proppant, base fluid according to mass fraction simultaneously, support major fracture.Namely utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture, before implementation step four, need calculate according to reservoir intrinsic fracture opening pressure, if calculation of pressure result is 1.8MPa ~ 3.0MPa, and reach the discharge capacity of required net pressure requirement in the seam of old crack simultaneously, namely discharge capacity is greater than 6m 3during/min, utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture, thus make the complex fracture system (major fracture and a crack) formed in reservoir can realize effective support.Adopt down-hole micro-seismic monitoring means, Real-Time Monitoring fracture propagation rule and form simultaneously, make crack bandwidth, belt length extends to termination of pumping after designing requirement.
This fracturing yield increasing method provided by the invention, concrete, it is the fracturing yield increasing method that alternative infill well improves old filed recovery ratio, achieve employing and taping the latent power of old crack side direction remaining oil, add recoverable reserves, too increase the transformation volume of reservoir simultaneously, improve the reservoir recovery ratio of old filed.
embodiment 2:
On the basis of embodiment 1, concrete, the particle diameter of the proppant in step 2 is 8 order ~ 16 orders, and diverting agent is CDD-3 oil-soluble crack diverting agent, and particle diameter is 3mm ~ 6mm, and the density of CDD-3 oil-soluble crack diverting agent is 1.30 ± 0.20g/cm 3, softening temperature:>=30 DEG C, dissolution time (40 DEG C): < 90min.
Before this fracturing yield increasing method of enforcement, need the flow string first tripping out former well, and sting wash clean, then drift size gauge tool drifting is used, namely use drift size gauge tool drifting to the artificial bottom of a well of well in operation, guarantee that described well in operation pit shaft is clean, like this, whether standard is met by the internal diameter of drift size gauge tool Inspection well, if well in operation has distortion or blocking, then check the biggest size of element that distortion or the well in operation after blocking can pass through, if the biggest size of element that can pass through does not meet pressure break requirement, then first well workover implements pressure break again; Then well-flushing, adopts the active water with reservoir compatibility, returns well-flushing to former pit shaft, returns out flushing fluid content of impurities and is less than 0.2% for qualified, and again tag in fact; Engineering log, casing pressure test, carry out engineering log to full well section, if sleeve pipe is without breakage, then adopts casing pressure test drilling tool to carry out pressure testing to full casing, after pressure testing is qualified to 30MPa, trip out tubing string, carry out lower step measure, if the unsuccessful stopping construction of pressure testing, selects well again, until select well success; According to step one to step 4 pressing crack construction; Closing well, open flow.
Concrete, fracturing string 1 in step one is connected with packer 2 and sliding sleeve throttling device 3, wherein, sliding sleeve throttling device 3 is selected is furnished with the sliding sleeve throttling device 3 that ∮ 22mm directly chews son, K344-98 packer 2 selected by packer 2, K344 series packer 2 supports the use with sliding sleeve throttling device 3, and K344 series packer 2 in the course of the work, without the need to mechanical movement, therefore preferably K344 series packer 2, as the packer 2 in the present invention, utilizes above-mentioned fracturing string 1 to realize implementing oil jacket with noting fracturing to the perforated interval on stratum, place, old crack;
Step 2, adds and, according to mass fraction is carried out shielding to old crack stifled temporarily than being the mixture that 5:2:1 forms, and old crack being pressed off formation major fracture and a crack by proppant, sand plug, diverting agent in old crack; Namely proppant, sand plug, diverting agent is utilized to carry out shielding to old crack stifled temporarily, impel old crack to stitch interior static pressure to improve, realization presses off the new crack of side direction, form major fracture and a crack, and make major fracture and a fracture extension, wherein, the particle diameter of proppant is 8 order ~ 16 orders, diverting agent is CDD-3 oil-soluble crack diverting agent, and particle diameter is 3mm ~ 6mm, and the density of CDD-3 oil-soluble crack diverting agent is 1.30 ± 0.20g/cm 3, softening temperature:>=30 DEG C, dissolution time (40 DEG C): < 90min;
The sliding sleeve throttling device 3 on fracturing string 1 is destroyed in pitching in step 3, it should be noted that, the mode of destroying sliding sleeve throttling device 3 is accurately that after carrying out pressure break to old crack, pressure break discharge capacity is by 1.6m 3/ min ~ 2.4m 3/ min is down to 0.5m 3/ min, open the high pressure line plug valve pitching on fracturing string 1, this high pressure line plug valve pitching is the solid steel ball of φ 38mm, namely destroys sliding sleeve throttling device 3, falls into shaft bottom, and then improves discharge capacity, realizes oil jacket with note, when discharge capacity is greater than 6m 3during/min, step 4 can be carried out;
Step 4, proppant and slippery water are added a crack according to mass fraction than the mixture formed for 1:8, support a crack, proppant, base fluid are respectively added major fracture according to mass fraction than the mixture formed for 1:3 than the mixture formed for 1:5 and proppant, base fluid according to mass fraction simultaneously, support major fracture.Namely utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture, before implementation step four, need calculate according to reservoir intrinsic fracture opening pressure, if calculation of pressure result is 1.8MPa ~ 3.0MPa, and reach the discharge capacity of required net pressure requirement in the seam of old crack simultaneously, namely discharge capacity is greater than 6m 3during/min, utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture, thus make the complex fracture system (major fracture and a crack) formed in reservoir can realize effective support.Adopt down-hole micro-seismic monitoring means, Real-Time Monitoring fracture propagation rule and form simultaneously, make crack bandwidth, belt length extends to termination of pumping after designing requirement.
This fracturing yield increasing method provided by the invention, concrete, it is the fracturing yield increasing method that alternative infill well improves old filed recovery ratio, achieve employing and taping the latent power of old crack side direction remaining oil, add recoverable reserves, too increase the transformation volume of reservoir simultaneously, improve the reservoir recovery ratio of old filed.
embodiment 3:
On the basis of embodiment 2, it should be noted that, in step 4, the particle diameter of the proppant that slippery water carries is 40 order ~ 70 orders, and the particle diameter of the proppant that base fluid, crosslinked fluid carry is 20 order ~ 40 orders.
Before this fracturing yield increasing method of enforcement, need the flow string first tripping out former well, and sting wash clean, then drift size gauge tool drifting is used, namely use drift size gauge tool drifting to the artificial bottom of a well of well in operation, guarantee that described well in operation pit shaft is clean, like this, whether standard is met by the internal diameter of drift size gauge tool Inspection well, if well in operation has distortion or blocking, then check the biggest size of element that distortion or the well in operation after blocking can pass through, if the biggest size of element that can pass through does not meet pressure break requirement, then first well workover implements pressure break again; Then well-flushing, adopts the active water with reservoir compatibility, returns well-flushing to former pit shaft, returns out flushing fluid content of impurities and is less than 0.2% for qualified, and again tag in fact; Engineering log, casing pressure test, carry out engineering log to full well section, if sleeve pipe is without breakage, then adopts casing pressure test drilling tool to carry out pressure testing to full casing, after pressure testing is qualified to 30MPa, trip out tubing string, carry out lower step measure, if the unsuccessful stopping construction of pressure testing, selects well again, until select well success; According to step one to step 4 pressing crack construction; Closing well, open flow.
Concrete, fracturing string 1 in step one is connected with packer 2 and sliding sleeve throttling device 3, wherein, sliding sleeve throttling device 3 is selected is furnished with the sliding sleeve throttling device 3 that ∮ 22mm directly chews son, K344-98 packer 2 selected by packer 2, K344 series packer 2 supports the use with sliding sleeve throttling device 3, and K344 series packer 2 in the course of the work, without the need to mechanical movement, therefore preferably K344 series packer 2, as the packer 2 in the present invention, utilizes above-mentioned fracturing string 1 to realize implementing oil jacket with noting fracturing to the perforated interval on stratum, place, old crack;
Step 2, adds and, according to mass fraction is carried out shielding to old crack stifled temporarily than being the mixture that 5:2:1 forms, and old crack being pressed off formation major fracture and a crack by proppant, sand plug, diverting agent in old crack; Namely proppant, sand plug, diverting agent is utilized to carry out shielding to old crack stifled temporarily, impel old crack to stitch interior static pressure to improve, realization presses off the new crack of side direction, form major fracture and a crack, and make major fracture and a fracture extension, wherein, the particle diameter of proppant is 8 order ~ 16 orders, diverting agent is CDD-3 oil-soluble crack diverting agent, and particle diameter is 3mm ~ 6mm, and the density of CDD-3 oil-soluble crack diverting agent is 1.30 ± 0.20g/cm 3, softening temperature:>=30 DEG C, dissolution time (40 DEG C): < 90min;
The sliding sleeve throttling device 3 on fracturing string 1 is destroyed in pitching in step 3, it should be noted that, the mode of destroying sliding sleeve throttling device 3 is accurately that after carrying out pressure break to old crack, pressure break discharge capacity is by 1.6m 3/ min ~ 2.4m 3/ min is down to 0.5m 3/ min, open the high pressure line plug valve pitching on fracturing string 1, this high pressure line plug valve pitching is the solid steel ball of φ 38mm, namely destroys sliding sleeve throttling device 3, falls into shaft bottom, and then improves discharge capacity, realizes oil jacket with note, when discharge capacity is greater than 6m 3during/min, step 4 can be carried out;
Step 4, proppant and slippery water are added a crack according to mass fraction than the mixture formed for 1:8, support a crack, proppant, base fluid are respectively added major fracture according to mass fraction than the mixture formed for 1:3 than the mixture formed for 1:5 and proppant, base fluid according to mass fraction simultaneously, support major fracture.Namely utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture, wherein, the particle diameter of the proppant that slippery water carries is 40 order ~ 70 orders, and the particle diameter of the proppant that base fluid, crosslinked fluid carry is 20 order ~ 40 orders, before implementation step four, need calculate according to reservoir intrinsic fracture opening pressure, if calculation of pressure result is 1.8MPa ~ 3.0MPa, and reach the discharge capacity of required net pressure requirement in the seam of old crack, namely discharge capacity is greater than 6m simultaneously 3during/min, utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture, thus make the complex fracture system (major fracture and a crack) formed in reservoir can realize effective support.Adopt down-hole micro-seismic monitoring means, Real-Time Monitoring fracture propagation rule and form simultaneously, make crack bandwidth, belt length extends to termination of pumping after designing requirement.
This fracturing yield increasing method provided by the invention, concrete, it is the fracturing yield increasing method that alternative infill well improves old filed recovery ratio, achieve employing and taping the latent power of old crack side direction remaining oil, add recoverable reserves, too increase the transformation volume of reservoir simultaneously, improve the reservoir recovery ratio of old filed.
embodiment 4:
On the basis of embodiment 3, further, described slippery water adopts EM-30 type slippery water, and described base fluid adopts CJ2-6 type base fluid, described crosslinked fluid adopts JL-13 type crosslinked fluid, and the sliding sleeve throttling device 3 of described step 3 adopts HT-J-CQ sliding sleeve throttling device 3.
Before this fracturing yield increasing method of enforcement, need the flow string first tripping out former well, and sting wash clean, then drift size gauge tool drifting is used, namely use drift size gauge tool drifting to the artificial bottom of a well of well in operation, guarantee that described well in operation pit shaft is clean, like this, whether standard is met by the internal diameter of drift size gauge tool Inspection well, if well in operation has distortion or blocking, then check the biggest size of element that distortion or the well in operation after blocking can pass through, if the biggest size of element that can pass through does not meet pressure break requirement, then first well workover implements pressure break again; Then well-flushing, adopts the active water with reservoir compatibility, returns well-flushing to former pit shaft, returns out flushing fluid content of impurities and is less than 0.2% for qualified, and again tag in fact; Engineering log, casing pressure test, carry out engineering log to full well section, if sleeve pipe is without breakage, then adopts casing pressure test drilling tool to carry out pressure testing to full casing, after pressure testing is qualified to 30MPa, trip out tubing string, carry out lower step measure, if the unsuccessful stopping construction of pressure testing, selects well again, until select well success; According to step one to step 4 pressing crack construction; Closing well, open flow.
Concrete, fracturing string 1 in step one is connected with packer 2 and sliding sleeve throttling device 3, wherein, sliding sleeve throttling device 3 is selected is furnished with the sliding sleeve throttling device 3 that ∮ 22mm directly chews son, K344-98 packer 2 selected by packer 2, K344 series packer 2 supports the use with sliding sleeve throttling device 3, and K344 series packer 2 in the course of the work, without the need to mechanical movement, therefore preferably K344 series packer 2, as the packer 2 in the present invention, utilizes above-mentioned fracturing string 1 to realize implementing oil jacket with noting fracturing to the perforated interval on stratum, place, old crack;
Step 2, adds and, according to mass fraction is carried out shielding to old crack stifled temporarily than being the mixture that 5:2:1 forms, and old crack being pressed off formation major fracture and a crack by proppant, sand plug, diverting agent in old crack; Namely proppant, sand plug, diverting agent is utilized to carry out shielding to old crack stifled temporarily, impel old crack to stitch interior static pressure to improve, realization presses off the new crack of side direction, form major fracture and a crack, and make major fracture and a fracture extension, wherein, the particle diameter of proppant is 8 order ~ 16 orders, diverting agent is CDD-3 oil-soluble crack diverting agent, and particle diameter is 3mm ~ 6mm, and the density of CDD-3 oil-soluble crack diverting agent is 1.30 ± 0.20g/cm 3, softening temperature:>=30 DEG C, dissolution time (40 DEG C): < 90min;
The sliding sleeve throttling device 3 on fracturing string 1 is destroyed in pitching in step 3, it should be noted that, sliding sleeve throttling device 3 adopts HT-J-CQ sliding sleeve throttling device 3, and the mode of destroying sliding sleeve throttling device 3 is accurately that after carrying out pressure break to old crack, pressure break discharge capacity is by 1.6m 3/ min ~ 2.4m 3/ min is down to 0.5m 3/ min, open the high pressure line plug valve pitching on fracturing string 1, this high pressure line plug valve pitching is the solid steel ball of φ 38mm, namely destroys sliding sleeve throttling device 3, falls into shaft bottom, and then improves discharge capacity, realizes oil jacket with note, when discharge capacity is greater than 6m 3during/min, step 4 can be carried out;
Step 4, proppant and slippery water are added a crack according to mass fraction than the mixture formed for 1:8, support a crack, proppant, base fluid are respectively added major fracture according to mass fraction than the mixture formed for 1:3 than the mixture formed for 1:5 and proppant, base fluid according to mass fraction simultaneously, support major fracture.Namely utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carries proppant respectively and supports major fracture, wherein, the particle diameter of the proppant that slippery water carries is 40 order ~ 70 orders, base fluid, the particle diameter of the proppant that crosslinked fluid carries is 20 order ~ 40 orders, slippery water adopts EM-30 type slippery water, base fluid adopts CJ2-6 type base fluid, crosslinked fluid adopts JL-13 type crosslinked fluid, before implementation step four, need calculate according to reservoir intrinsic fracture opening pressure, if calculation of pressure result is 1.8MPa ~ 3.0MPa, and reach the discharge capacity of required net pressure requirement in the seam of old crack simultaneously, namely discharge capacity is greater than 6m 3during/min, utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture, thus make the complex fracture system (major fracture and a crack) formed in reservoir can realize effective support.Adopt down-hole micro-seismic monitoring means, Real-Time Monitoring fracture propagation rule and form simultaneously, make crack bandwidth, belt length extends to termination of pumping after designing requirement.
This fracturing yield increasing method provided by the invention, 33 mouthfuls of well field trials are carried out at old filed, down-hole micro-seismic monitoring shows that the more conventional pressure break of reservoir reconstruction volume increases by 148%, moisture stable or account for 69% lower than the well before measure after service shaft pressure, day oil increment be 2.29 times of conventional pressure break.It substitutes the fracturing yield increasing method that infill well improves old filed recovery ratio, achieves employing and taping the latent power of old crack side direction remaining oil, adds recoverable reserves, too increase the transformation volume of reservoir simultaneously, improve the reservoir recovery ratio of old filed.
More than exemplifying is only illustrate of the present invention, does not form the restriction to protection scope of the present invention, everyly all belongs within protection scope of the present invention with the same or analogous design of the present invention.

Claims (7)

1. a fracturing yield increasing method, is characterized in that, comprises the steps:
Step one, enter in the stratum at place, old crack, and the perforated interval of formation carries out fracturing, open old crack by under fracturing string (1);
Step 2, utilizes proppant, sand plug, diverting agent to carry out shielding to old crack stifled temporarily, forms major fracture and a crack; Add in old crack and, according to mass fraction shielding is carried out to old crack stifled temporarily than being the mixture that 5:2:1 forms, and old crack being pressed off formation major fracture and a crack by proppant, sand plug, diverting agent;
Step 3, the sliding sleeve throttling device (3) on fracturing string (1) is destroyed in pitching;
Step 4, utilize slippery water to carry proppant and support a crack, base fluid, crosslinked fluid carry proppant respectively and support major fracture; Proppant and slippery water are added a crack according to mass fraction than the mixture formed for 1:8, support a crack, proppant, base fluid are respectively added major fracture according to mass fraction than the mixture formed for 1:3 than the mixture formed for 1:5 and proppant, base fluid according to mass fraction simultaneously, support major fracture.
2. a kind of fracturing yield increasing method as claimed in claim 1, is characterized in that, the particle diameter of the proppant in described step 2 is 8 order ~ 16 orders, and diverting agent is CDD-3 oil-soluble crack diverting agent, and particle diameter is 3mm ~ 6mm.
3. a kind of fracturing yield increasing method as claimed in claim 1, is characterized in that, in described step 4, the particle diameter of the proppant that slippery water carries is 40 order ~ 70 orders, and the particle diameter of the proppant that base fluid, crosslinked fluid carry is 20 order ~ 40 orders.
4. a kind of fracturing yield increasing method as claimed in claim 3, is characterized in that, described slippery water adopts EM-30 type slippery water.
5. a kind of fracturing yield increasing method as claimed in claim 3, is characterized in that, described base fluid adopts CJ2-6 type base fluid.
6. a kind of fracturing yield increasing method as claimed in claim 3, is characterized in that, described crosslinked fluid adopts JL-13 type crosslinked fluid.
7. a kind of fracturing yield increasing method as claimed in claim 1, is characterized in that, the sliding sleeve throttling device (3) of described step 3 adopts HT-J-CQ sliding sleeve throttling device.
CN201410797617.0A 2014-12-22 2014-12-22 Fracturing production increasing method Active CN104594870B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410797617.0A CN104594870B (en) 2014-12-22 2014-12-22 Fracturing production increasing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410797617.0A CN104594870B (en) 2014-12-22 2014-12-22 Fracturing production increasing method

Publications (2)

Publication Number Publication Date
CN104594870A true CN104594870A (en) 2015-05-06
CN104594870B CN104594870B (en) 2017-07-07

Family

ID=53120879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410797617.0A Active CN104594870B (en) 2014-12-22 2014-12-22 Fracturing production increasing method

Country Status (1)

Country Link
CN (1) CN104594870B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105114050A (en) * 2015-09-15 2015-12-02 中国石油大学(北京) Novel fracturing pump-injection method
CN105201478A (en) * 2015-09-30 2015-12-30 大庆井泰石油工程技术股份有限公司 Oil and gas well fracture network system fracturing technology
CN106223922A (en) * 2016-08-26 2016-12-14 中国石油集团川庆钻探工程有限公司 Shale gas horizontal well proppant intra-seam shielding temporary plugging staged fracturing process
CN107558980A (en) * 2017-07-18 2018-01-09 中国石油天然气股份有限公司 Low-density temporary plugging crack length-extension-restraining fracturing method
CN107701143A (en) * 2016-08-09 2018-02-16 中国石油化工股份有限公司 A kind of multi-section multi-layer sealing skill devices and methods therefor based on one-trip string
CN109505568A (en) * 2018-12-27 2019-03-22 中国石油天然气股份有限公司 Repeated transformation method for residual geological reserves for combination of same-layer driving and pressing
CN110805421A (en) * 2019-11-26 2020-02-18 西南石油大学 Shale gas pressure crack modification method for guiding temporary plugging agent addition through seismic energy monitoring
CN112963135A (en) * 2021-02-07 2021-06-15 中国石油天然气股份有限公司 Fracturing method for improving formation pressure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060157243A1 (en) * 2005-01-14 2006-07-20 Halliburton Energy Services, Inc. Methods for fracturing subterranean wells
CN101158280A (en) * 2007-01-29 2008-04-09 邹积鹏 Oil well high water-bearing layer pressure blocking method
US20080236825A1 (en) * 2007-03-26 2008-10-02 Evgeny Borisovich Barmatov Particulate Material for Proppant Flowback Control
CN101476452A (en) * 2009-01-16 2009-07-08 庆阳长庆井下油田助剂有限责任公司 Water-control fracturing yield increasing method for oil gas well
CN103306660A (en) * 2012-03-13 2013-09-18 中国石油化工股份有限公司 Shale gas reservoir hydraulic fracturing production increasing method
CN103615228A (en) * 2013-11-26 2014-03-05 中国石油天然气股份有限公司 Temporary plugging and fracturing process in degradable fiber seam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060157243A1 (en) * 2005-01-14 2006-07-20 Halliburton Energy Services, Inc. Methods for fracturing subterranean wells
CN101158280A (en) * 2007-01-29 2008-04-09 邹积鹏 Oil well high water-bearing layer pressure blocking method
US20080236825A1 (en) * 2007-03-26 2008-10-02 Evgeny Borisovich Barmatov Particulate Material for Proppant Flowback Control
CN101476452A (en) * 2009-01-16 2009-07-08 庆阳长庆井下油田助剂有限责任公司 Water-control fracturing yield increasing method for oil gas well
CN103306660A (en) * 2012-03-13 2013-09-18 中国石油化工股份有限公司 Shale gas reservoir hydraulic fracturing production increasing method
CN103615228A (en) * 2013-11-26 2014-03-05 中国石油天然气股份有限公司 Temporary plugging and fracturing process in degradable fiber seam

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105114050B (en) * 2015-09-15 2018-05-25 中国石油大学(北京) A kind of new fracturing pump injecting method
CN105114050A (en) * 2015-09-15 2015-12-02 中国石油大学(北京) Novel fracturing pump-injection method
CN105201478A (en) * 2015-09-30 2015-12-30 大庆井泰石油工程技术股份有限公司 Oil and gas well fracture network system fracturing technology
CN107701143B (en) * 2016-08-09 2019-08-30 中国石油化工股份有限公司 A kind of multi-section multi-layer sealing skill devices and methods therefor based on one-trip string
CN107701143A (en) * 2016-08-09 2018-02-16 中国石油化工股份有限公司 A kind of multi-section multi-layer sealing skill devices and methods therefor based on one-trip string
CN106223922A (en) * 2016-08-26 2016-12-14 中国石油集团川庆钻探工程有限公司 Shale gas horizontal well proppant intra-seam shielding temporary plugging staged fracturing process
CN106223922B (en) * 2016-08-26 2020-06-26 中国石油集团川庆钻探工程有限公司 Shale gas horizontal well proppant intra-seam shielding temporary plugging staged fracturing process
CN107558980B (en) * 2017-07-18 2020-05-08 中国石油天然气股份有限公司 Low-density temporary plugging crack length-extension-restraining fracturing method
CN107558980A (en) * 2017-07-18 2018-01-09 中国石油天然气股份有限公司 Low-density temporary plugging crack length-extension-restraining fracturing method
CN109505568A (en) * 2018-12-27 2019-03-22 中国石油天然气股份有限公司 Repeated transformation method for residual geological reserves for combination of same-layer driving and pressing
CN110805421A (en) * 2019-11-26 2020-02-18 西南石油大学 Shale gas pressure crack modification method for guiding temporary plugging agent addition through seismic energy monitoring
CN110805421B (en) * 2019-11-26 2021-05-18 西南石油大学 Shale gas pressure crack modification method for guiding temporary plugging agent addition through seismic energy monitoring
CN112963135A (en) * 2021-02-07 2021-06-15 中国石油天然气股份有限公司 Fracturing method for improving formation pressure

Also Published As

Publication number Publication date
CN104594870B (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN104594870B (en) Fracturing production increasing method
RU2686742C1 (en) Method of eliminating blocking and increasing gas permeability for methane wells of coal beds under electric impulse
CN102926770B (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN110397428B (en) Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well
CN106285617B (en) Gas water horizontal well completion method
CN103967472B (en) A kind of coal bed gas staged fracturing horizontal well enhanced gas extraction method
CN102022104B (en) Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN106223922A (en) Shale gas horizontal well proppant intra-seam shielding temporary plugging staged fracturing process
CN104481487B (en) The multistage many seam staged fracturing methods of horizontal well
CN109931045B (en) Self-supporting acid fracturing method of double-seam system
CN103967507B (en) A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff
CN104963671B (en) A kind of fracturing reform method of High angle from formula well reservoir
CN105239984B (en) A kind of coal mine underground fracturing crack extends control method
CN102392677A (en) Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN105114061A (en) Multi-parameter combination test rapid water exploration pipe column and method for immobile pipe column of horizontal well
CN105507865A (en) Re-fracturing method for oil, gas and water wells
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN107620581B (en) Construction method of one-well dual-purpose coal mine shaft inspection hole
CN107989586A (en) Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave
CN104389559A (en) Method and device for preventing and controlling gas transfinite in thick-coal-seam mining process
CN108180002B (en) Coal mine underground coal seam hydraulic pressure-cutting coupling permeability increasing method
CN103048184A (en) Testing method of breakthrough pressure of repeated fracturing plugging agent
RU2570157C1 (en) Method for enhanced oil recovery for deposit penetrated by horizontal well
CN103628914B (en) The separate zone production of a kind of low-angle dip coal seam is visited to lower and is oozed the method for low-permeability thick-layer bedrock aquifer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant