CN103967507B - A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff - Google Patents

A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff Download PDF

Info

Publication number
CN103967507B
CN103967507B CN201410150803.5A CN201410150803A CN103967507B CN 103967507 B CN103967507 B CN 103967507B CN 201410150803 A CN201410150803 A CN 201410150803A CN 103967507 B CN103967507 B CN 103967507B
Authority
CN
China
Prior art keywords
hole
grouting
curtain
water
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410150803.5A
Other languages
Chinese (zh)
Other versions
CN103967507A (en
Inventor
王运敏
汪为平
李何林
范庆
娄广文
武飞
汪绍元
路洪斌
李同鹏
唐开元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Engineering Investigation & Design Institute Of Sinosteel Maanshan Co Ltd
Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Investigation & Design Institute Of Sinosteel Maanshan Co Ltd, Huawei National Engineering Research Center of High Efficient Cyclic and Utilization of Metallic Mineral Resources Co Ltd, Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Engineering Investigation & Design Institute Of Sinosteel Maanshan Co Ltd
Priority to CN201410150803.5A priority Critical patent/CN103967507B/en
Publication of CN103967507A publication Critical patent/CN103967507A/en
Application granted granted Critical
Publication of CN103967507B publication Critical patent/CN103967507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff.Injected hole arrangement is: each chamber arrangement face upward 5 °, 15 ° and 25 ° on to injected hole each 6, the injected hole of each degree mutually staggers in the plane 60 ° and is evenly arranged; At end chamber arrangement to outside lower to-5 ° ,-30 ° and-60 ° of injected holes.Its grouting process is: ground depot sacked cement is transported to down-hole needs slip casting level, face through work mix station, secondary pulp storage tank, grouting pump, Grouting Pipe, aperture high-pressure installation carry out slip casting, after reaching the final grouting pressure of design, terminate slip casting, after further maintenance, cleaning bottom of hole, complete whole curtain-grouting operation.The present invention is directed to top board Karst Fissures, build the grouting curtain of high water plugging rate in down-hole, the double action of water proof and reinforcing can be played; safely and efficiently ore body is freed under the protection of grouting curtain; for the safety and high efficiency in mine provides technical guarantee, less engineering investment, the duration is short.

Description

A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff
Technical field
The present invention relates to a kind of underground mine stopping up water work technology, especially relate to a kind of ore body roof Karst Fissures to grow and underground mine exploitation stopping up water work technology under strong rich water condition, be specially adapted to aquifer Karst Fissures, solution cavity is grown, moisture abundant and apply in the stopping up water work of the underground mine of ore body Relatively centralized exploitation.
Background technology
To the mine of rich groundwater, for ensureing that downhole safety is produced, often draining drainage will be carried out, mine pump drainage underground water will inevitably produce large-area precipitation funnel, easy initiation surface collapse, and cause groundwater table to decline, cause stop flow of spring water, well dry, as Shuikoushan Lead-zinc Mine, all Kou Kuang, the plumbous franklinite in nasal mucus top etc., have a strong impact on local people life and industrial and agricultural production.The cost that mine drainage costs a lot of money, meanwhile, periphery hydrogeological environment is subject to grievous injury.For this reason, China's mine water management worker uses for reference Hydropower Dam grouting experience and develops mining area drapery injected technology.Put into practice through nearly 40 years, develop, China's mining area drapery injected technology steps into the practical stage, reaches its maturity.Current China attracts great attention to Mine Geological Disasters, can say, drapery injected technology certainly will become one of major technique of flood mine water management.
External mining area curtain-grouting mostly is shallow section of curtain in Quaternary system topsoil, and major part digs the underground impervious wall of method construction, compares, cannot be mentioned in the same breath with the dark large curtain of China.Can say, from range of application, the curtain scale of mining area curtain, and the aspect such as the economic benefit obtained, social benefit is weighed, and the mining area drapery injected technology of China's original creation is all in world lead level.
Have nearly 20 case histories at ground, mining area curtain-grouting both at home and abroad at present, down-hole country rock curtain-grouting then rare report, both are in water plugging rate and safety, all there is obvious difference, the former has certain distance apart from exploiting field, not by the impact of mining engineering, requires certain water plugging rate, and in curtain, have perfect drainage system, there is not the threat of water inrush and inundate mine; And the latter is close to ore body, easily destroy by mining activity (explosion, sedimentation etc.), guarantee water inrush and inundate mine accident does not occur, therefore its technical difficulty is well imagined simultaneously.
" application of curtain-grouting in water-control in mine " literary composition that " western mineral exploration engineering " the 3rd phase in 2008 delivers is pointed out: " curtain grouting is exactly in the peripheral certain distance of main mine body; utilize the method for curtain grouting to be cut off in ore body location and extraneous hydraulic connection, reduce pit inflow of water to greatest extent ".In " application of curtain-grouting in the water blockoff of mine, all mouth areas " literary composition delivered " engineering construction " in February, 2009, the construction method of carrying out curtain-grouting under strong river channels is introduced, its resolution and principle are: carry out slip casting by the boring running through underground water mobile layer to permeable stratum (being mainly kettle sky group's dolomitic limestone and Datang rank argillaceous limestone), blocking underground water active tunnel, makes stratum local property change and forms relatively waterproof cylindrical region.The approach that main underflow enters pit is crossed in line, line carries out Equidistant Nodes formula bored grouting, columnar phase is made to be joined together to form relatively fluid-tight curtain together to waterproof region, curtain connects relative water resisting layer emperor ridge group graniphyric limestone, block with this path that underground water flows into pit, reach the object stoping mine pit water discharge.But this drapery injected technology, is difficult to adapt to ore body roof Karst Fissures and grows and the drapery injected in strong Fu Shui mineral deposit.
Summary of the invention
Object of the present invention is exactly the above-mentioned defect for existing in prior art, and provides a kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff, not only can strengthen steady of roof, play impermeable role simultaneously, and water plugging rate is high, safe and reliable.
For realizing above-mentioned purpose of the present invention, the present invention is a kind of is suitable for the curtain-grouting technique of rich water mine down-hole exploitation water blockoff by the following technical solutions:
1) first should analyze the hydrological engineering geologic information of exploratory bore-hole and tunnel, exploratory bore-hole in early stage situation about disclosing in early stage, find out mine Karst Fissures developmental state and mine water inrush situation;
2) choose suitable curtain anti-seepage standard, require that its water plugging rate reaches 80 ~ 95%;
3) utilize underworkings and chamber to carry out the construction of slip casting tunnel and detecting water by pilot hole injected hole, and the supporting of shotcrete with steel bar nets method is taked to the unsteady tunnel of lithology;
4) the curtain thickness of the leakage slope determination curtain-grouting that the maximal head that can bear according to curtain and injecting paste material can allow: T=H s/ J 0, m,
In formula: H sthe maximal head that-curtain can bear, m,
J 0the leakage slope that-injecting paste material can allow;
5) each chamber arrangement face upward 5 °, 15 ° and 25 ° on to injected hole each 6, grouting borehole design with chamber center for basic point, each degree injected hole mutually staggers in the plane 60 ° and is evenly arranged, hole depth 45 ~ 60m, mutually staggers in the plane 20 ° between 5 °, 15 ° and 25 ° of injected holes and is evenly arranged.At the scene in implementation process, and the requirement of accurate engineering mustn't be adopted and adjust according to the hydrology slip casting situation disclosed.
The boring Controling network degree formed to injected hole on described controls within 8m × 8m as good.
At end chamber arrangement to outside lower to-5 ° ,-30 ° and-60 ° of injected holes, hole depth 45 ~ 60m, to hold chamber center for basic point, to be respectively arranged symmetrically with in the plane to injected hole down, mutual angle is 10 °; At the scene in implementation process, and the requirement of accurate engineering must be adopted and adjust according to the hydrology slip casting situation disclosed.
6) adopt in down-hole underground drill rig and hidden hole drilling to construct the injected hole of each degree, and arrange aperture safety device, aperture safety device is made up of orifice tube, aperture water dam;
7) grout spreading range that diffuse to form of slurries in crack must meet simultaneously:
1. design formulas: R=
In formula: R-is grout spreading range, m,
K-is rock stratum transmission coefficient,
T-slip casting perdurabgility, h,
R-feed pipe for mortar radius, mm,
μ 1the coefficient of viscosity of-water,
μ 2the coefficient of viscosity of-slurries,
H grouting pressure, MPa,
The porosity of n-rock stratum;
2. according to " slurry injection technique code " regulation, in marble fissured waterbearing stratum, the effective dilation angle of slurries gets 6 ~ 15m;
8) in whole slip casting process, grouting pressure changes at any time along with the change of the situation such as diffusion, precipitating, filling pressure break of slurries around injected hole, respectively according to initial pressure, pressure process and final value pressure three phases, design the force value of this three phases respectively;
Generally, the initial pressure of design is 1.0 times of hydrostatic pressure, and pressure process controls between 1.5 ~ 2 times of hydrostatic pressing force value, and the final value pressure of design is 2.0 ~ 3.0 times of hydrostatic pressures.
9) in order to reach best slip casting effect, enough slurries amounts must be injected, to ensure that slurries have certain range of scatter, forming enough slip casting thickness.According to similar mine slip casting com-parison and analysis, the slurry consumption amount of injected hole is 0.3 ~ 0.8t/m,
10) other parameter: injecting paste material, concentration of slurry, slip casting ending standard meet designing requirement; When injected hole adopts single fluid grouting, under final value pressure, slip casting section midge amount can terminate slip casting after being less than 20 ~ 35L/min, lasting 30min.
Choose slurry viscosity low, the property noted is good, and grout spreading range is suitable for, and slurries calculus rate is high, impervious good, good stability, and calculus is soaked for a long time and material that state becomes do not occurred as injecting paste material, as neat slurry and clay cement grout in water; For the crack of different in width, take the slurries of several variable concentrations, first rare rear dense.
A kind of technical characteristics being suitable for the curtain-grouting technique of rich water mine down-hole exploitation water blockoff of the present invention has: in underground construction boring, with strong points, invalid creeping into is lacked; For top board Karst Fissures, play the double action of water proof and reinforcing; Less engineering investment, the duration is short, and has following effect:
(1), after visiting water hole mortar depositing construction by level, occurrence and the scale in ore body permeable structure crack can substantially be found out, the features such as groundwater regularities of distribution, the quiet dynamic reserve of qualitative analysis underground water.
(2) after implementing down-hole curtain encryption Grouting engineering, the hydrogeological characteristics of nearly ore body country rock is investigated thoroughly substantially, the water producing fractures of the overwhelming majority and leak " skylight " are by shutoff, pit inflow of water obviously reduces, estimation can reduce pit inflow of water about 70% ~ 80%, analysis of possibility of water inrush reduces greatly, ensures for ore body safety and high efficiency provides strong technology;
(3) by the enforcement to down-hole, mineral deposit Grouting Curtain Engineering, possessing under certain technical safety measures condition, the safe working that below grouting curtain ore deposit is measured can substantially be ensured;
(4), after ore body forms overall underground grouting curtain, can save a large amount of effluent costs, economic interests are remarkable;
(5), after Grouting Curtain Engineering is implemented, can substantially ensure that groundwater in mining area does not decline, subsiding does not appear in ground substantially;
(6) reduce Karst Fissures to grow and the exploitation risk in strong Fu Shui mine, and can apply in various conditions of similarity mine.
Accompanying drawing explanation
Fig. 1 is a kind of curtain-grouting technique longitudinal projection figure being suitable for rich water mine down-hole exploitation water blockoff of the present invention.
Fig. 2 be the present invention a kind of be suitable for rich water mine down-hole exploitation water blockoff curtain-grouting technological level to perspective view.
Fig. 3 be the present invention a kind of be suitable for rich water mine down-hole exploitation water blockoff curtain-grouting technique grouting process flow chart.
Reference numeral is: 1-chamber; 2-tunnel; 3-5 ° of Water prospect grouting hole; 4-15 ° of Water prospect grouting hole; 5-25 ° of Water prospect grouting hole; 6-waterline.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further details.
A kind of curtain-grouting technique longitudinal projection being suitable for rich water mine down-hole exploitation water blockoff of the present invention as shown in Figure 1 schemes and composition graphs 2 is found out, tunnel 2 is positioned under waterline 6, and each chamber 1 is along tunnel 2 lateral arrangement.
1) arrange to Water prospect grouting hole on: arrange at each chamber 1 and face upward 5 °, 15 ° and each 6 of 25 ° of Water prospect grouting holes, forming boring Controling network degree is within 8m × 8m.Visit note drilling design with chamber center for basic point, mutually stagger in the plane 60 ° separately and be evenly arranged in 25 ° of Water prospect grouting holes 5,4,6,15 ° of Water prospect grouting holes, 63,6,5 ° of Water prospect grouting holes, hole depth 50m.Mutually stagger between 5 °, 15 ° and 25 ° of Water prospect grouting holes 20 ° and be evenly arranged.At the scene in implementation process, and the requirement of accurate engineering mustn't be adopted and adjust according to the hydrology slip casting situation disclosed.
2) arrange to Water prospect grouting hole under: to-5 ° ,-30 ° and-60 ° of Water prospect grouting holes under end chamber is outwards arranged, hole depth 50m.To hold chamber center for basic point, to be respectively arranged symmetrically with in the plane to Water prospect grouting hole down, mutual angle is 10 °.At the scene in implementation process, and the requirement of accurate engineering must be adopted and adjust according to the hydrology slip casting situation disclosed.
3) according to adopting the requirement of accurate engineering, carry out holing, slip casting, form grouting curtain, design parameter is:
(1) curtain thickness is: T=H s/ J 0, m,
In formula: H sthe maximal head that-curtain can bear, m,
J 0the leakage slope that-injecting paste material can allow;
(2) grout spreading range that diffuse to form of slurries in crack must meet simultaneously:
1. design formulas: R=
In formula: R-is grout spreading range, m,
K-is rock stratum transmission coefficient,
T-slip casting perdurabgility, h,
R-feed pipe for mortar radius, mm,
μ 1the coefficient of viscosity of-water,
μ 2the coefficient of viscosity of-slurries,
H grouting pressure, MPa,
The porosity of n-rock stratum;
2. according to " slurry injection technique code " regulation, in marble fissured waterbearing stratum, the effective dilation angle of slurries gets 6 ~ 15m;
(3) other parameter: injecting paste material, grouting pressure, concentration of slurry, slip casting ending standard meet designing requirement.
1. grouting pressure
Grouting pressure is the power that slurries overcome that flow resistance carries out diffusion, is the principal element determining slip casting effect.In whole slip casting process, grouting pressure changes at any time along with the change of the situation such as diffusion, precipitating, filling pressure break of slurries around injected hole, is generally divided into initial pressure, pressure process and final value pressure three phases.
Initial pressure: now because slip casting just starts, should adopt thin pulp low-pressure grouting, makes slurries excessively loose, filling slowly, and general initial pressure is 1.0 times of hydrostatic pressure.
Pressure process: the mid-term appearing at slip casting process, now slurries diffuses flow, precipitating, filling in crack, large crack reduces gradually, rimala starts into slurry filling.Pressure process controls between 1.5 ~ 2 times of hydrostatic pressing force value.
Final value pressure: appear at slip casting latter stage, pressure at the end of being slip casting, now occur that grouting amount raises and the phenomenon of reduction with pressure, still need keep grouting pressure and stablize a period of time, its objective is the space under high pressure compacting further making filling full, the duration in this stage is shorter, because pressure curve obviously rises, mark slip casting closes on end, should terminate slip casting work by slip casting ending standard, and design final grouting pressure is 2.0 ~ 3.0 times of hydrostatic pressures.In actual slip casting work, should consider, apply in a flexible way, when there being more charges in rock fracture agensis or Karst Fissures, especially the broken contact zones of ore body upper lower burrs, should adopt to it, high-pressure slip-casting carries out that densification is compacted, filling slight crack or consolidation process; If Karst Fissures is grown, then should adopt low pressure, underflow, quantitatively interval grouting method, in order to avoid slurries diffuse through far, cause waste.
2. concentration of slurry
The concentration of the slurries of injected hole directly affects the property noted and the set strength of slurries, due to the crack containing different in width in slip casting section, therefore all should adopt the slurries of several concentration in each slip casting, principle is first rare rear dense, deacclimatizes the crack of various different in width with the slurries of variable concentrations respectively.The initial concentration of single liquid cement paste is determined by the rock stratum water absorption rate of each bored grouting section.Single liquid cement paste initial concentration carries out proportioning by four ranks such as water/binder ratio 2:1,1.5:1,1:1 and 0.8:1, selects for during slip casting; Cement, water glass dual slurry generally adopt the volume of the cement paste of 1:1 and the volume proportion of water glass, and volume ratio is 1:1 and 1:0.8 bis-ranks.
3. slurries injection rate
In order to reach best slip casting effect, enough slurries amounts must be injected, to ensure that slurries have certain range of scatter, forming enough slip casting thickness.Slurries injection rate is relevant with slip casting section thickness, rock fracture rate, rate of karstification, slurries gel time etc., but is difficult to accurately provide due to the crack rate of rock, the therefore slurries injection rate calculated value in every hole, can only for reference when preparing material.According to similar mine slip casting com-parison and analysis, the slurry consumption amount of every meter of injected hole is 0.3 ~ 0.8t/m.
4. slip casting ending standard: during injected hole single fluid grouting, under the final value pressure of design, slip casting section midge amount is less than 20 ~ 35L/min, after continuing 30min, can terminate slip casting.
5. injecting paste material.Injecting paste material should meet following requirement: slurry viscosity is low, and the property noted is good, and grout spreading range is suitable for; Slurries calculus rate is high, impervious good, good stability, and calculus is soaked for a long time and state change is not occurred in water.According to above-mentioned requirements, neat slurry and clay cement grout can be selected.Compared with neat slurry, the cost of clay cement grout only has 60% of neat slurry, and the property noted, stability and anti-dilution are better, and should preferentially select when condition is suitable for, its shortcoming is that intensity is lower, and pulping process is complicated.
4) carry out in strict accordance with relevant technical requirements in boring and slip casting process.
The present invention is as shown in Figure 3 a kind of be suitable for the curtain-grouting technique of rich water mine down-hole exploitation water blockoff grouting process flow chart and composition graphs 1, Fig. 2 find out, its grouting process simplified summary is: ground depot sacked cement is transported to down-hole needs slip casting level, face through work mix station, secondary pulp storage tank, grouting pump, Grouting Pipe, aperture high-pressure installation carry out slip casting, after reaching the final grouting pressure of design, terminate slip casting, after further maintenance, cleaning bottom of hole, complete whole curtain-grouting operation.Specifically carry out according to following technological process:
1) first should analyze the hydrological engineering geologic information of exploratory bore-hole and tunnel, exploratory bore-hole in early stage situation about disclosing in early stage, find out mine Karst Fissures developmental state and mine water inrush situation;
2) choose suitable anti-seepage standard, its water plugging rate of General Requirements reaches about 90%, just may meet the smooth enforcement that mining is produced;
3) utilize underworkings and chamber to carry out the construction of slip casting tunnel and detecting water by pilot hole injected hole, and the supporting of shotcrete with steel bar nets method is taked to the unsteady tunnel of lithology;
4) thickness of the leakage slope determination curtain-grouting that the maximal head that can bear according to curtain and injecting paste material can allow;
5) usually adopt in down-hole underground drill rig and hidden hole drilling to construct the injected hole of each degree, and arrange aperture safety device, aperture safety device is made up of orifice tube, aperture water dam;
6) in conjunction with the situation of change of the factors such as transmission coefficient, fracture opening, grouting pressure, concentration of slurry and injection length, and according to " slurry injection technique code " regulation, slurry dilation angle is determined;
7) in whole slip casting process, grouting pressure changes at any time along with the change of the situation such as diffusion, precipitating, filling pressure break of slurries around injected hole, generally be divided into initial pressure, pressure process and final value pressure three phases, design the force value of this three phases respectively;
8) choose slurry viscosity low, the property noted is good, and grout spreading range is suitable for, and slurries calculus rate is high, impervious good, good stability, and calculus is soaked for a long time and material that state becomes do not occurred as injecting paste material, as neat slurry and clay cement grout in water;
9) for the crack of different in width, the slurries of several variable concentrations are taked, first rare rear dense;
10) in order to reach best slip casting effect, enough slurries amounts must be injected, to ensure that slurries have certain range of scatter, forming enough slip casting thickness.According to similar mine slip casting com-parison and analysis, the slurry consumption amount of every meter of injected hole is 0.3 ~ 0.8t/m.
11) during injected hole single fluid grouting, under final value pressure, slip casting section midge amount is less than 20 ~ 35L/min, after continuing 30min, can terminate slip casting.

Claims (3)

1. be suitable for a curtain-grouting technique for rich water mine down-hole exploitation water blockoff, it is characterized in that by the following technical solutions:
1) first should analyze the hydrological engineering geologic information of exploratory bore-hole and tunnel, exploratory bore-hole in early stage situation about disclosing in early stage, find out mine Karst Fissures developmental state and mine water inrush situation;
2) choose suitable curtain anti-seepage standard, require that its water plugging rate reaches 80 ~ 95%;
3) utilize underworkings and chamber to carry out the construction of slip casting tunnel and detecting water by pilot hole injected hole, and the supporting of shotcrete with steel bar nets method is taked to the unsteady tunnel of lithology;
4) the curtain thickness of the leakage slope determination curtain-grouting that the maximal head that can bear according to curtain and injecting paste material can allow: T=H s/ J 0, m,
In formula: H sthe maximal head that-curtain can bear, m,
J 0the leakage slope that-injecting paste material can allow;
5) each chamber arrangement face upward 5 °, 15 ° and 25 ° on to injected hole each 6, grouting borehole design with chamber center for basic point, each degree injected hole mutually staggers in the plane 60 ° and is evenly arranged, hole depth 45 ~ 60m, mutually staggers in the plane 20 ° between 5 °, 15 ° and 25 ° of injected holes and is evenly arranged; At end chamber arrangement to outside lower to-5 ° ,-30 ° and-60 ° of injected holes, hole depth 45 ~ 60m, to hold chamber center for basic point, to be respectively arranged symmetrically with in the plane to injected hole down, mutual angle is 10 °;
6) adopt in down-hole underground drill rig and hidden hole drilling to construct the injected hole of each degree, and arrange aperture safety device, aperture safety device is made up of orifice tube, aperture water dam;
7) grout spreading range that diffuse to form of slurries in crack must meet simultaneously:
1. design formulas: R=
In formula: R-is grout spreading range, m,
K-is rock stratum transmission coefficient,
T-slip casting perdurabgility, h,
R-feed pipe for mortar radius, mm,
μ 1the coefficient of viscosity of-water,
μ 2the coefficient of viscosity of-slurries,
H grouting pressure, MPa,
The porosity of n-rock stratum;
2. according to " slurry injection technique code " regulation, in marble fissured waterbearing stratum, the effective dilation angle of slurries gets 6 ~ 15m;
8) in whole slip casting process, respectively according to initial pressure, pressure process and final value pressure three phases, design the force value of this three phases respectively, the initial pressure of design is 1.0 times of hydrostatic pressure, pressure process controls between 1.5 ~ 2 times of hydrostatic pressing force value, and the final value pressure of design is 2.0 ~ 3.0 times of hydrostatic pressures;
9) the slurry consumption amount of injected hole is 0.3 ~ 0.8t/m;
10) other parameter: injecting paste material, concentration of slurry, slip casting ending standard meet designing requirement.
2. as claimed in claim 1 a kind of be suitable for rich water mine down-hole exploitation water blockoff curtain-grouting technique, it is characterized in that: on described to injected hole formed boring Controling network degree within 8m × 8m.
3. as claimed in claim 1 or 2 a kind of be suitable for rich water mine down-hole exploitation water blockoff curtain-grouting technique, it is characterized in that: when injected hole adopts single fluid grouting, under final value pressure, slip casting section midge amount can terminate slip casting after being less than 20 ~ 35L/min, lasting 30min.
CN201410150803.5A 2014-04-16 2014-04-16 A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff Active CN103967507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410150803.5A CN103967507B (en) 2014-04-16 2014-04-16 A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410150803.5A CN103967507B (en) 2014-04-16 2014-04-16 A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff

Publications (2)

Publication Number Publication Date
CN103967507A CN103967507A (en) 2014-08-06
CN103967507B true CN103967507B (en) 2016-03-30

Family

ID=51237465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410150803.5A Active CN103967507B (en) 2014-04-16 2014-04-16 A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff

Country Status (1)

Country Link
CN (1) CN103967507B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843343A (en) * 2018-05-30 2018-11-20 陕煤集团神木张家峁矿业有限公司 A kind of coal mine waits for covering the grouting method of burnt rock water seal curtain on mining face

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401971B (en) * 2015-09-02 2017-10-27 煤科集团沈阳研究院有限公司 Combine regional grouting method above and below a kind of well
CN106837351A (en) * 2017-01-22 2017-06-13 中南大学 Tunnel karst water detection and treatment method
CN107386309A (en) * 2017-08-15 2017-11-24 山东大学 The prominent water burst method for blocking of the mine big flow high flow rate pipeline crack type karst that is recessed
CN108625895A (en) * 2018-04-25 2018-10-09 贵州开磷集团股份有限公司 A method of it detects and excludes dark solution cavity ponding in ore body
CN108708687B (en) * 2018-05-23 2021-05-28 首钢滦南马城矿业有限责任公司 Unsealed drilling hole plugging process and structure
CN112144507B (en) * 2020-09-29 2021-08-13 西安工业大学 Method for determining reinforcement parameters during soil body permeation grouting and reinforcement method using method
CN112879045B (en) * 2021-02-03 2022-04-08 中煤科工集团西安研究院有限公司 Method for building deep-buried huge-thickness solution gap fracture aquifer curtain
CN113217025A (en) * 2021-05-21 2021-08-06 长沙矿山研究院有限责任公司 Curtain grouting method suitable for rapid mining of large water deposit
CN113309565B (en) * 2021-06-07 2022-06-24 中国矿业大学 Large-space large-inclination goaf curtain grouting method
CN114320308B (en) * 2021-12-10 2024-01-02 北京中煤矿山工程有限公司 Design of vertical shaft grouting curtain and grouting process under deep asymmetric stress condition
CN114278312B (en) * 2021-12-31 2023-10-17 中铁五局集团有限公司 Karst treatment construction method for river channel region in subway tunnel shield construction
CN114920308B (en) * 2022-04-18 2023-02-07 长沙矿山研究院有限责任公司 Underground mine wastewater zero discharge process

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100562938B1 (en) * 2003-08-20 2006-03-22 주식회사 우지스 The waterproofing air-bubbles grouting method of construction for tunnel hollow filling
CN101638987B (en) * 2009-07-24 2013-05-01 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN102493822B (en) * 2011-12-29 2014-04-02 中铁二十三局集团有限公司 Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN103470267B (en) * 2013-09-28 2016-05-18 中铁二十局集团第二工程有限公司 The one Rapid Construction of Tunnels technique of growing up

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843343A (en) * 2018-05-30 2018-11-20 陕煤集团神木张家峁矿业有限公司 A kind of coal mine waits for covering the grouting method of burnt rock water seal curtain on mining face
CN108843343B (en) * 2018-05-30 2019-07-30 陕煤集团神木张家峁矿业有限公司 A kind of coal mine waits for covering the grouting method of burnt rock water seal curtain on mining face

Also Published As

Publication number Publication date
CN103967507A (en) 2014-08-06

Similar Documents

Publication Publication Date Title
CN103967507B (en) A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN102926770B (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN104694746B (en) A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof
CN103277120A (en) Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN106837237A (en) A kind of coal rock layer of body containing weak structure solidification forming hole method
CN102587859A (en) Technology for blocking mine water bursting through backflow grouting
CN105155563A (en) Reinforcing and treating method for water burst of soft-flow muddy stratum of foundation pit
PL237727B1 (en) Indexes of structural differentiation of upper zones of Ordovician limestone filling and method to determine it
CN111075478A (en) Pre-grouting reinforcement process for ground construction of broken belt of excavation working face structure
CN109322699A (en) Pollution isolation blocking technology under a kind of mine
CN103967506B (en) A kind of ore body roof Karst Fissures is grown and the curtain-grouting method in strong Fu Shui mineral deposit
CN108915690B (en) Novel method for preventing water gushing of vertical shaft well wall in vertical shaft aquifer tunneling
CN102011591A (en) Grouting process for working surface of deep well
CN112814737A (en) Collapse column advanced treatment method and system based on laminated multi-branch horizontal well
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN112523170A (en) Seepage-proofing treatment method for deep-buried karst seepage channel of reservoir
CN110749533B (en) Water-retention coal mining discrimination method based on equivalent water-resisting layer thickness
CN110821498B (en) Safe and rapid water plugging and reinforcing method in strong water-rich soft surrounding rock of operation tunnel
CN103883291A (en) Hydrological well intra-tube gravel removing and shaft forming device and construction method
CN204627527U (en) A kind of double-deck grouting pipe
CN115126506A (en) Grouting transformation method for protecting coal pillar of fourth aquifer of liberation shallow part
CN114837608A (en) Method for reconstructing mining overburden rock water barrier by multi-section graded grouting
CN205152954U (en) Grout three -way tube structure that renovation shallow layer cover type karst ground sinks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Co-patentee after: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Co-patentee after: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH, ENGINEERING INVESTIGATION AND DESIGN Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Co-patentee before: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.

Co-patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH, ENGINEERING INVESTIGATION AND DESIGN Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221103

Address after: 243000 No. 666 Xitang Road, Ma'anshan Economic Development Zone, Anhui Province

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Patentee after: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 243000 No. 666 Xitang Road, Ma'anshan Economic Development Zone, Anhui Province

Patentee before: MAANSHAN Mine Research Institute Co.,Ltd.

Patentee before: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH, ENGINEERING INVESTIGATION AND DESIGN Co.,Ltd.