CN102587962A - Methods for arranging and supporting wall-expanded gas extraction drill sites - Google Patents

Methods for arranging and supporting wall-expanded gas extraction drill sites Download PDF

Info

Publication number
CN102587962A
CN102587962A CN2012101066736A CN201210106673A CN102587962A CN 102587962 A CN102587962 A CN 102587962A CN 2012101066736 A CN2012101066736 A CN 2012101066736A CN 201210106673 A CN201210106673 A CN 201210106673A CN 102587962 A CN102587962 A CN 102587962A
Authority
CN
China
Prior art keywords
roof
roadway
drilling
drill site
stepping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101066736A
Other languages
Chinese (zh)
Inventor
郑西贵
张农
刘玉栋
阚甲广
张磊
曹栩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN2012101066736A priority Critical patent/CN102587962A/en
Publication of CN102587962A publication Critical patent/CN102587962A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

一种扩帮瓦斯抽采钻场的布置及支护方法,在回采巷道的两帮内交错布置多个呈楔形状的迈步式钻场,迈步式钻场的跨度沿回采巷道掘进方向逐渐增大;在迈步式钻场内帮壁上向本煤层或顶、底板邻近煤层裂隙带布置1~3排抽采钻孔;在抽采钻孔的孔口内安放护孔管,然后安装与护孔管相连的瓦斯抽采管;钻场跨度沿回采巷道掘进方向逐渐增大,并交错迈步式分布于回采巷道两帮内。楔形结构不但为钻孔机械和瓦斯抽采设备提供了足够的作业空间,而且大大减少了钻场施工量,降低了施工难度;交错迈步式分布和楔形结构使跨度大幅度减小,利于支护与维护,并可保证抽采与回采巷道掘进同时进行,提高了掘进效率,带来更高地经济效益。

Figure 201210106673

A method of layout and support for gas drainage drilling sites with extended sides, in which a plurality of wedge-shaped stepping drilling sites are arranged staggeredly in the two sides of the mining roadway, and the span of the stepping drilling sites increases gradually along the excavation direction of the mining roadway ; Arrange 1 to 3 rows of extraction boreholes on the inner side wall of the stepping drilling site to the coal seam or the coal seam fissure zone adjacent to the roof and floor; place the protective hole pipe in the hole of the extraction drilling hole, and then install the protective hole pipe Connected gas drainage pipes; the span of the drill site gradually increases along the excavation direction of the mining roadway, and is distributed in the two sides of the mining roadway in a staggered step. The wedge-shaped structure not only provides enough working space for drilling machinery and gas drainage equipment, but also greatly reduces the amount of drilling site construction and reduces the difficulty of construction; the staggered step distribution and wedge-shaped structure greatly reduce the span, which is beneficial to support and maintenance, and can ensure that the excavation and recovery roadway excavation are carried out at the same time, which improves the excavation efficiency and brings higher economic benefits.

Figure 201210106673

Description

A kind of layout and supporting method that expands group's gas pumping drill site
Technical field
The present invention relates to a kind of layout and supporting method that expands group's gas pumping drill site, be particularly useful for the gas pumping and the stope drift active workings supporting in this coal seam in the gas projecting mine or top, the contiguous coal seam of base plate.
Background technology
It is main energy-consuming big country with the coal that China is one, and almost 95% coal resources are from underground mining, and condition of coal seam occurrence is complicated and changeable, and dynamic disaster accidents such as gas and dust explosion, coal and gas are outstanding, roof collapse happen occasionally.In coal mine roof plate, gas, water damage three big disasters, gas accident occupies ratio in particularly serious accident the highest, and the gas disaster is the biggest threat of restriction Coal Production.In China's minable coal seam, absolute ratio is occupied in the soft low coal seam of passing through, and along with the continuous extension of the coal mining degree of depth, this ratio also will increase, the working condition more sophisticated of coal mine operation, and the security threat that the constructor receives is also more and more important.Weak seam is because loosely organized, in this coal seam drilling process, occurs drilling accidents such as spray orifice, gas are outstanding, hole wall collapse easily, and drilling depth is received considerable restraint, seriously restricts Safety of Coal Mine Production, influence driving or coal mining efficient.
China's coal-mine gas disaster is threatening mine staff's life security with being on the rise, is restricting the development that mine is produced, and brings heavy financial burden for coal enterprise, forces many high gas projecting mine long-term losses to be managed, have in addition be on the verge of bankruptcy.For improving safety of coal mines exploitation situation, alleviate and produce pressure, adopt the fire damp drainage method since the fifties, to the end of the year 1999, down-hole extraction system and ground transmission & distribution gas system have been set up in existing 158 collieries, the whole nation, and a year pumping volume reaches 7.89 billion cubic meters.
Coal bed gas drainage generally is meant gas pump or other extraction equipment of utilizing, and extracts the gas of coal seam middle and high concentration, and the pipe network through isolating with stope drift active workings, drains into the gas of the high concentration of extraction in ground or the mine main return airway.Think that at present gas discharge in mine is not only the reduction mine gas emission rate, the important measures of the outstanding disaster of control gas explosion and coal and gas; And can turn bane into boon; Associated resources as coal develops, therefore, and from the 1950's; Each main coal producer very payes attention to the gas drainage under suction in colliery in the world, makes gas drainage under suction work obtain development faster.In recent years, along with the increase of the coal mining degree of depth and the raising of mining rate, mine gas emission rate increases, and draws out methane more and more be called the high gas layer exploitation one than indispensable important step, and essential condition is provided for the coal mine gas utilization.
The boring method mash gas extraction is a down-hole coal bed gas drainage under suction pumping method the most commonly used.Take out this coal-bed gas in advance owing to have easy construction, low, the concentration that the draws out methane advantage of higher of cost like boring method, in China's coal-mine, obtained using widely.Boring method is taken out this coal-bed gas in advance and is mainly contained two kinds of arrangements, i.e. a layer-through drilling arrangement and a suitable layer bore arrangement mode.When adopting boring to take out in advance, drill site can be located at floor rock stope drift active workings or contiguous coal mining roadway, punches layer boring to mined bed, carries out digging through getting into the coal seam again after the extraction, thereby can solve the gas problem in driving and the coal mining process.When adopting along layer bore arrangement mode, then generally be to utilize the coal road of digging out in advance of taking, beat along the coal seam along layer boring, carry out back production again through after the extraction, to solve the problem of gushing out of gas in the exploitation process.
The next layer gas drainage method can be divided into surface drilling method, down-hole drilling extraction method and top board stope drift active workings substantially and combine boring extraction method.Because the restriction that surface drilling extraction method and top board stope drift active workings combine the application of boring method to receive ocurrence of coal seam and open up conditions such as stope drift active workings layout is so mainly adopt down-hole drilling extraction method.General layout ocurrence of coal seam situation is different with the arrangement of developing stope drift active workings, the down-hole drilling arrangement divides for by stope drift active workings in the mined bed arrange that extraction is holed and outside mined bed in the stope drift active workings layout drill site and extraction hole two kinds.Wherein, arrange that by stope drift active workings in the mined bed method of extraction boring can be located at drill site in the tailentry, punch coal bed drilling to contiguous coal seam, the gas in the contiguous coal seam of extraction by drill site; Can drill site be located in the work plane air intake lane in addition, punch layer boring extraction the next layer gas to adjacent layer by drill site.In addition; The method applicable elements of outside mined bed, arranging drill site and extraction boring in the stope drift active workings is wider; Can be used for the coal seam of different angle and the stope of different coal-mining methods; It can be located at drill site in the mined bed floor roadway, punches layer boring, the gas in the extraction adjacent layer by drill site to contiguous coal seam; Also can drill site be located in the mined bed top board rock gangway, punch a layer extraction boring extraction the next layer gas to contiguous coal seam by drill site.
At present; The gas pumping in general this coal seam or top, the contiguous coal seam of base plate; Need be when stope drift active workings tunnel expand group and arrange the gas pumping drill site at assigned address correspondingly, in drill site to the fissure zone boring in this coal seam or top, the contiguous coal seam of base plate and carry out the gas pumping operation.Mostly traditional expansion group gas pumping drill site form is alcove formula, vertical, inclined, and the alcove formula is just as " hole " of cutter one solid in the group of lane, and with vertical basic identical, the drill site space face of bowing is square or rectangle; The inclined drill site space face of bowing assumes diamond in shape, and forward and backward two skew walls and stope drift active workings tunneling direction are parallel to each other at an angle.Though traditional form has reached the effect of expection this coal seam of extraction or top, the contiguous coal-bed gas of base plate, it is big to expand group's stope section stope drift active workings section span, and supporting is difficult, and maintenance difficulties is big, and simultaneously, the disturbing factor that is easy to generate is many.In addition, traditional drill site form, the stope drift active workings road heading machinery digs cutter and is difficult to once-forming, often needs manual work to carry out secondary forming, and the artificial construction measures greatly, and the engineering time is long; Because poor anti jamming capability is influenced greatly by disturbing factor, before shaping of traditional type drill site and the supporting, should not proceed the stope drift active workings driving, this has just influenced the stope drift active workings drivage efficiency, has lagged behind the duration.
Summary of the invention
Technical problem: the objective of the invention is to overcome the weak point in the prior art, a kind of simple in structure, antijamming capability is strong, the gas pumping drill site is helped in expansion that be easy to supporting and maintenance layout and supporting method are provided.
Technical scheme: the layout of gas pumping drill site is helped in expansion of the present invention, comprises the steps:
The layout of gas pumping drill site is helped in expansion of the present invention, comprises the steps:
A. in two of stope drift active workings are helped, be staggered front to back and arrange a plurality of step type drill sites that are wedge shape; The step type drill site is staggered front to back the distance of being separated by and is not less than 2m; The span of step type drill site increases along the stope drift active workings tunneling direction gradually; Wherein: span is 0.5 ~ 3 m, is 3 ~ 8 m along the length of stope drift active workings tunneling direction, and spacing is 60 ~ 100m between the adjacent step type drill site;
B. in the step type drill site, arrange 1 ~ 3 row's extraction borehole to this coal seam or top, the contiguous cracks in coal seam band of base plate on group's wall; Row's spacing of said extraction borehole is 2 ~ 3m; The quantity in every gang drill hole is 3 ~ 15, and the angle of extraction borehole and top board normal is 0 °~180 °, and the degree of depth is 10 ~ 100m;
C. in the aperture of extraction borehole, lay the guard aperture pipe that length is 5 ~ 6m, the gas pumping pipe that links to each other with the guard aperture pipe is installed then;
D. extraction borehole is carried out sealing of hole, fixing guard aperture pipe, said sealed borehole length is 10 ~ 50m.
The present invention expands the supporting method that group's gas pumping drill site is arranged, comprises the steps:
A. the synchronous supporting of step type drill site and stope drift active workings by array pitch skyhook between equal, and the whole wire lath of laying, drill site and stope drift active workings top board entire arrangement, is hung equally spaced back timber;
B. each makes a call to an anchor cable hole on step type drill site top board between back timber and the back timber and stope drift active workings top board; Two pitchs of holes are 2 ~ 3m, and along lateral arrangement, two holes are down " eight " font; Anchor cable hole bearing of trend and stope drift active workings roof water plane included angle are 45 ° ~ 55 °; In the anchor cable hole, squeeze into and add long anchor cable, adding long anchor cable length is 10m ~ 12m, and the outstanding part of revealing of the outer anchor cable of top board is connected and fixed with the truss connector;
C. row's anchor pole is vertically arranged in group intersection in two in the step type drill site, and anchor pole quantity is 4 ~ 6, and spacing is 0.5m ~ 0.8m;
D. be the concrete of 10 ~ 15cm to step type drill site top board and inwall thereof and the whole evenly jet thickness of back and lane group;
E treats after the abundant drying of concrete; In the step type drill site, longitudinally top board is carried out monomer hydraulic support shed shoring apart from group 0.6m place, stope drift active workings lane; The length of monomer hydraulic support shed shoring articulated roof beam is 6 ~ 7m; Face a hinged tilting hydraulic prop between two monomer hydraulic supports mutually, to strengthen support.
Beneficial effect: owing to adopted technique scheme, the present invention is good to the country rock integrality, but the good location drill site supporting of anchor pole anchoring effect can be laid wire lath earlier, and the suspension joist is squeezed into anchor pole then and carried out anchoring, sprayed mortar afterwards on joist.Wherein anchor pole can bear most ofly and press, and prevents that wall rock loosening from destroying, and has certain scalability, can be with the shrinkage strain simultaneously of stope drift active workings country rock, rather than remove support capacity; Joist couples together single anchor pole, has formed a monocoque structure, has significantly improved the whole structure of bolt support; The concrete that sprays can be closely connected with country rock, and the instant sprayed construction of ability seals country rock after scar exposes; Thereby eliminate water, moisture laden air and weathering adverse effect, reduce country rock intensity and descend, reach the purpose of indirect raising country rock intensity rock mass; The concrete that sprays simultaneously can be filled and led up the uneven place on country rock surface; Form a smooth surface, eliminate the stress concentration phenomenon that causes because of the scar injustice, thereby avoid stress to concentrate the surrounding rock failure that is caused.The step type drill site that is wedge shape has been not only for drilling machine and gas pumping equipment provide enough working spaces, and reduced difficulty of construction, avoided the manual secondary of drill site to be shaped, and greatly reduces construction volume, shortened the engineering time; Simultaneously, the wedge structure antijamming capability is strong, is easy to supporting; It is simple that drill site is safeguarded, combines with staggered step type distribution mode, reduced the stope drift active workings total span greatly; Be beneficial to supporting and maintenance, stope drift active workings section stability is improved relatively, can guarantee that gas pumping and stope drift active workings driving carries out simultaneously; Improve driving speed, correspondingly improved economic benefit.It is simple in structure, and bearing capacity is bigger, and contractibility can better be used with the anchor and spray net once supporting, and supporting effect is good.
Description of drawings
Fig. 1 is the plane structure sketch map that the gas pumping drill site is helped in expansion of the present invention.
Fig. 2 is the cross-sectional view that the gas pumping drill site is helped in expansion of the present invention.
Fig. 3 is the cross-sectional view in expansion group's gas pumping drill site of the present invention and contiguous coal seam.
Among the figure: the 1-drill site; 2-lane group; The 3-stope drift active workings; The 4-extraction borehole.
The specific embodiment
Below in conjunction with accompanying drawing one embodiment of the present of invention are further described:
As shown in Figure 1, the present invention expands the layout of group's gas pumping drill site:
The layout of gas pumping drill site is helped in expansion of the present invention: at first press routine techniques; Utilize the driving mode of combining pick or big gun pick to tunnel stope drift active workings; Help to be staggered front to back in 2 a plurality of step type drill sites 1 that are wedge shape of layout at two of stope drift active workings 3 then; Step type drill site 1 is staggered front to back the distance of being separated by and is not less than 2m, and the span of step type drill site 1 increases along stope drift active workings 3 tunneling directions gradually, and its span is 0.5 ~ 3 m; Length along stope drift active workings 3 tunneling directions is 3 ~ 8 m, and spacing is 60 ~ 100m between the adjacent step type drill site 1; Treat that synchronous supporting is transported rig after finishing in drill site to drill site and tunnel; In step type drill site 1, arrange 1 ~ 3 row's extraction borehole 4 to this coal seam or top, the contiguous cracks in coal seam band of base plate on group's wall; The spacing of wells is 2 ~ 3m; The quantity in every gang drill hole is 3 ~ 15, and extraction borehole 4 is 0 °~180 ° with the angle of top board normal, and the degree of depth is 10 ~ 100m; After boring finished, in the aperture of extraction borehole 4, laying length was the guard aperture pipe of 5 ~ 6m, and the gas pumping pipe that links to each other with the guard aperture pipe is installed then; At last extraction borehole 4 is carried out sealing of hole, fixing guard aperture pipe, said sealed borehole length is 10 ~ 50m.
The supporting method that expansion of the present invention helps the gas pumping drill site to arrange; According to the gas pumping drill site of arranging; Utilize the stope drift active workings development machine to excavate the step type drill site 1 that is wedge shape according to the length of the gas pumping drill site of arranging and span index, the mode that increases gradually by the tunneling direction span, treat that the gas pumping drill site excavates after, step type drill site 1 and stope drift active workings 3 synchronous supportings; By array pitch skyhook between equal; And the whole wire lath of laying, drill site 1 and stope drift active workings 3 top boards by entire arrangement, hang equally spaced back timber, by the routine techniques mode: jumbolter boring, lay wire lath, hang joist, then anchor pole squeezed into armature boring through joist; Add top tray, fastening nut.Each makes a call to an anchor cable hole on step type drill site 1 top board between back timber and the back timber and stope drift active workings 3 top boards; Two pitchs of holes, 2 ~ 3m, along lateral arrangement, two holes are down " eight " font; Anchor cable hole bearing of trend and stope drift active workings roof water plane included angle are 45 ° ~ 55 °; In the anchor cable hole, squeeze into and add long anchor cable, adding long anchor cable length is 10m ~ 12m, and the outer anchor cable of top board is outstanding to be revealed part and connect with the truss connector and fix; Row's anchor pole is vertically arranged in group intersection in two in step type drill site 1, and anchor pole quantity is 4 ~ 6, and spacing is 0.5m ~ 0.8m; To step type drill site 1 top board and inwall thereof and tunnel 3 top boards and lane group 2 whole evenly jet thickness is the concrete of 10 ~ 15cm.Treat after the abundant drying of concrete; In step type drill site 1, longitudinally top board is carried out the single-side stand shed shoring apart from group 0.6m place, stope drift active workings lane; Its articulated roof beam length is 6 ~ 7m, faces a hinged tilting hydraulic prop between two monomer hydraulic supports mutually, to strengthen support.

Claims (2)

1.一种扩帮瓦斯抽采钻场的布置,其特征在于包括如下步骤: 1. a kind of arrangement of expanding side gas drainage drilling site, it is characterized in that comprising the steps: a.在回采巷道(3)的两帮(2)内前后交错布置多个呈楔形状的迈步式钻场(1),迈步式钻场(1)前后交错相隔的距离不小于2m,迈步式钻场(1)的跨度沿回采巷道(3)掘进方向逐渐增大,其中:跨度为0.5~3 m,沿回采巷道(3)掘进方向的长度为3~8 m,相邻迈步式钻场(1)之间间距为60~100m; a. In the two sides (2) of the recovery roadway (3), a plurality of wedge-shaped stepping drilling sites (1) are arranged in a staggered front and back direction. The span of the drilling field (1) increases gradually along the excavation direction of the mining roadway (3), among which: the span is 0.5-3 m, and the length along the excavation direction of the mining roadway (3) is 3-8 m. (1) The distance between them is 60~100m; b.在迈步式钻场(1)内帮壁上向本煤层或顶、底板邻近煤层裂隙带布置1~3排抽采钻孔(4),所述抽采钻孔(4)的排间距为2~3m,每排钻孔的数量为3~15个,抽采钻孔(4)与顶板法线的角度为0°~180°,深度为10~100m; b. Arrange 1-3 rows of extraction boreholes (4) on the inner side wall of the stepping drill site (1) to the coal seam or the roof and floor adjacent to the coal seam fissure zone, and the row spacing of the extraction boreholes (4) 2~3m, the number of boreholes in each row is 3~15, the angle between the drainage borehole (4) and the roof normal is 0°~180°, and the depth is 10~100m; c.在抽采钻孔(4)的孔口内安放长度为5~6m的护孔管,然后安装与护孔管相连的瓦斯抽采管; c. Place a borehole pipe with a length of 5-6m in the orifice of the drainage borehole (4), and then install a gas drainage pipe connected to the borehole pipe; d.对抽采钻孔(4)进行封孔,固定护孔管,所述封孔长度为10~50m。 d. Seal the drainage borehole (4) and fix the hole protection pipe. The length of the sealed hole is 10-50m. 2.一种如权利要求1所述的扩帮瓦斯抽采钻场布置的支护方法,其特征在于包括如下步骤: 2. a support method arranged in the gas drainage drill field of expanding the side as claimed in claim 1, is characterized in that comprising the steps: a.迈步式钻场(1)与回采巷道(3)同步支护,按同等间排距安装锚杆,并整体铺设金属网,钻场(1)与回采巷道(3)顶板整体布置、悬挂等间距的顶梁;  a. Stepping drilling site (1) and recovery roadway (3) are supported synchronously, anchor rods are installed at the same row spacing, and metal mesh is laid as a whole, and the roof of drilling site (1) and recovery roadway (3) is overall arranged and suspended Equally spaced top beams; b.在顶梁与顶梁之间的迈步式钻场(1)顶板及回采巷道(3)顶板上各打一个锚索孔,两孔间距为2~3m,沿横向布置,两孔呈倒“八”字形,锚索孔延伸方向与回采巷道顶板水平面夹角为45°~55°,在锚索孔内打入加长锚索,加长锚索长度为10m~12m,顶板外锚索悬露部分用桁架连接器连接固定;  b. Drill an anchor cable hole on the roof of the walking drill field (1) and the roof of the mining roadway (3) between the roof beam and the roof beam. The distance between the two holes is 2~3m, arranged along the horizontal direction, and the two holes are inverted "Eight" shape, the angle between the extension direction of the anchor cable hole and the horizontal surface of the mining roadway roof is 45°~55°, and an extended anchor cable is driven into the anchor cable hole. The length of the extended anchor cable is 10m~12m, and the anchor cable is suspended outside the roof. Parts are connected and fixed with truss connectors; c.在迈步式钻场(1)内两内帮相交处,沿竖直方向布置一排锚杆,锚杆数量为4~6根,间距为0.5m~0.8m; c. Arrange a row of anchor rods in the vertical direction at the intersection of the two inner sides in the stepping drilling site (1), the number of anchor rods is 4~6, and the distance is 0.5m~0.8m; d.对迈步式钻场(1)顶板及其内壁与巷道(3)顶板及巷帮(2)整体均匀喷射厚度为10~15cm的混凝土; d. Spray concrete with a uniform thickness of 10-15cm on the roof and its inner wall of the walking drill field (1) and the roadway (3) roof and side of the roadway (2); e待混凝土充分干燥之后,在迈步式钻场(1)内距离回采巷道巷帮0.6m处沿纵向对顶板进行单体液压支架架棚支护,单体液压支架架棚支护铰接顶梁的长度为6~7m,相临两个单体液压支架之间铰接一根斜置的单体液压支柱,以加强支撑。 eAfter the concrete is fully dried, support the roof with a single hydraulic support frame and shed along the longitudinal direction at a distance of 0.6m from the side of the mining roadway in the stepping drilling site (1), and support the hinged roof beam with a single hydraulic support frame The length is 6~7m, and an oblique single hydraulic prop is hinged between two adjacent single hydraulic supports to strengthen the support.
CN2012101066736A 2012-04-13 2012-04-13 Methods for arranging and supporting wall-expanded gas extraction drill sites Pending CN102587962A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101066736A CN102587962A (en) 2012-04-13 2012-04-13 Methods for arranging and supporting wall-expanded gas extraction drill sites

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101066736A CN102587962A (en) 2012-04-13 2012-04-13 Methods for arranging and supporting wall-expanded gas extraction drill sites

Publications (1)

Publication Number Publication Date
CN102587962A true CN102587962A (en) 2012-07-18

Family

ID=46477129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101066736A Pending CN102587962A (en) 2012-04-13 2012-04-13 Methods for arranging and supporting wall-expanded gas extraction drill sites

Country Status (1)

Country Link
CN (1) CN102587962A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877857A (en) * 2012-09-24 2013-01-16 山西晋城无烟煤矿业集团有限责任公司 Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions
CN104975868A (en) * 2015-06-13 2015-10-14 山西晋城无烟煤矿业集团有限责任公司 Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN105888686A (en) * 2016-05-17 2016-08-24 陕西正通煤业有限责任公司 Pressure relief method capable of satisfying parallel operation of tunneling and pressure relieving
CN106014474A (en) * 2016-05-17 2016-10-12 陕西正通煤业有限责任公司 Three-hole combined construction method meeting requirements of downhole pressure releasing, water draining and prospecting and gas drainage
CN106321140A (en) * 2016-08-31 2017-01-11 辽宁工程技术大学 Arrangement method of extra-thick seam gas pre-extraction drill holes
CN108005714A (en) * 2017-12-04 2018-05-08 中铁二十三局集团有限公司 Constructing tunnel gushes out gas closure method
CN108590741A (en) * 2018-05-02 2018-09-28 辽宁工程技术大学 A kind of super high seam mash gas pumping drilling method for arranging
CN109653773A (en) * 2019-01-31 2019-04-19 淮北矿业(集团)有限责任公司 Fully-mechanized mining working expands peace integral process and method
CN113605959A (en) * 2021-07-26 2021-11-05 中煤科工集团沈阳研究院有限公司 Method for controlling gas emission of limestone in driving roadway

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182482A (en) * 2011-04-25 2011-09-14 义马煤业集团股份有限公司跃进煤矿 Impact-resistant combined anti-pressure supporting system
CN201982123U (en) * 2010-12-30 2011-09-21 枣庄矿业集团新安煤业有限公司 Anchor mesh ladder and single body combined roadway support device for working face open-off cut of coal mine
CN102226413A (en) * 2011-05-24 2011-10-26 中国矿业大学 Gas Drainage Method in the Drilling Area of the Gas Discharge Roadway
CN102268998A (en) * 2011-08-02 2011-12-07 山西潞安环保能源开发股份有限公司 Dual-micro-arch span-reducing support method of large-span open-off cut

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201982123U (en) * 2010-12-30 2011-09-21 枣庄矿业集团新安煤业有限公司 Anchor mesh ladder and single body combined roadway support device for working face open-off cut of coal mine
CN102182482A (en) * 2011-04-25 2011-09-14 义马煤业集团股份有限公司跃进煤矿 Impact-resistant combined anti-pressure supporting system
CN102226413A (en) * 2011-05-24 2011-10-26 中国矿业大学 Gas Drainage Method in the Drilling Area of the Gas Discharge Roadway
CN102268998A (en) * 2011-08-02 2011-12-07 山西潞安环保能源开发股份有限公司 Dual-micro-arch span-reducing support method of large-span open-off cut

Non-Patent Citations (10)

* Cited by examiner, † Cited by third party
Title
《煤》 20090315 杜忠江 巷帮钻场"边抽边掘"在高瓦斯煤矿的应用 第18卷, 第3期 *
张永青等: "深部复合顶板煤巷预应力桁架锚索梁支护技术", 《矿业工程研究》, vol. 26, no. 4, 20 December 2011 (2011-12-20) *
张牧君: "太原南峪煤矿瓦斯抽采设计", 《科技情报开发与经济》, vol. 21, no. 27, 25 September 2011 (2011-09-25) *
杜忠江: "巷帮钻场"边抽边掘"在高瓦斯煤矿的应用", 《煤》, vol. 18, no. 3, 15 March 2009 (2009-03-15) *
秦永强: "高瓦斯矿井掘进工作面瓦斯综合治理", 《陕西煤炭》, no. 2, 15 April 2011 (2011-04-15) *
罗立强等: "高应力软岩巷道预应力桁架锚索支护技术", 《湖南科技大学学报(自然科学版)》, vol. 27, no. 1, 25 March 2012 (2012-03-25) *
葛亚兵: "大采高综采面回采巷道支护技术", 《煤》, vol. 20, no. 12, 15 December 2011 (2011-12-15) *
贾明坤: "锚杆锚索联合支护在11-12#合并层的应用", 《科技信息》, 25 August 2010 (2010-08-25) *
陈宝元: "桁架锚索支护技术在二次动压巷道中的应用", 《煤矿开采》, vol. 15, no. 4, 15 August 2010 (2010-08-15) *
高厚奇: "高应力软煤岩巷道锚喷支护技术", 《煤矿开采》, vol. 10, no. 3, 25 June 2005 (2005-06-25) *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877857A (en) * 2012-09-24 2013-01-16 山西晋城无烟煤矿业集团有限责任公司 Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions
CN104975868A (en) * 2015-06-13 2015-10-14 山西晋城无烟煤矿业集团有限责任公司 Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN106014474B (en) * 2016-05-17 2018-06-01 陕西正通煤业有限责任公司 Meet underground release, leting speeper, gas drainage under suction three holes and use construction method
CN105888686A (en) * 2016-05-17 2016-08-24 陕西正通煤业有限责任公司 Pressure relief method capable of satisfying parallel operation of tunneling and pressure relieving
CN106014474A (en) * 2016-05-17 2016-10-12 陕西正通煤业有限责任公司 Three-hole combined construction method meeting requirements of downhole pressure releasing, water draining and prospecting and gas drainage
CN105888686B (en) * 2016-05-17 2018-04-06 陕西正通煤业有限责任公司 A kind of pressure relief method for meeting pick and unloading parallel operations
CN106321140B (en) * 2016-08-31 2019-02-01 辽宁工程技术大学 A kind of method for arranging of super high seam gas pre-drainage drilling
CN106321140A (en) * 2016-08-31 2017-01-11 辽宁工程技术大学 Arrangement method of extra-thick seam gas pre-extraction drill holes
CN108005714A (en) * 2017-12-04 2018-05-08 中铁二十三局集团有限公司 Constructing tunnel gushes out gas closure method
CN108005714B (en) * 2017-12-04 2020-01-14 中铁二十三局集团有限公司 Method for intercepting gas gushed out in tunnel construction
CN108590741A (en) * 2018-05-02 2018-09-28 辽宁工程技术大学 A kind of super high seam mash gas pumping drilling method for arranging
CN109653773A (en) * 2019-01-31 2019-04-19 淮北矿业(集团)有限责任公司 Fully-mechanized mining working expands peace integral process and method
CN113605959A (en) * 2021-07-26 2021-11-05 中煤科工集团沈阳研究院有限公司 Method for controlling gas emission of limestone in driving roadway
CN113605959B (en) * 2021-07-26 2023-08-22 中煤科工集团沈阳研究院有限公司 A method for controlling limestone gas gushing in excavation roadway

Similar Documents

Publication Publication Date Title
CN102587962A (en) Methods for arranging and supporting wall-expanded gas extraction drill sites
CN105971606B (en) A kind of thick sandstone coal wall recovery method
CN103233740B (en) Top-cutting roadway coal-pillar-free mining method of close-range thin coal seam
CN202064981U (en) Soft coal layer roadway supporting structure
CN110529144B (en) A hybrid advance support method for small section mining roadway
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN110067592B (en) Roof gas cooperative control method based on hard roof ground fracturing
CN108894784A (en) A kind of tight roof orientation acid fracturing control top pressure relief method
CN117780349A (en) A method for densely drilling and cutting the top to relieve pressure and retaining lanes along the goaf in the goaf area of a close-range coal seam
CN110966002B (en) A method of roof cutting and pressure relief based on dense drilling
CN103362539A (en) Method for extracting pressure relief gas by retained roadway drill site drilling
CN102900449B (en) Support method for underground goaf roof of coal mine
CN110529151A (en) A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method
CN109630168A (en) Comprehensive extracting and caving face tunnel is arranged along floor strata and support pattern
CN112610258A (en) Impact mine stoping roadway advanced support method applied to smart mine
CN110130928A (en) Integrated mole and technique under fully mechanized coal face coal top
CN112832837A (en) A kind of support method of mining roadway under close coal seam goaf
CN111425205B (en) Mining support method for steeply inclined extremely thin ore body
CN104265294A (en) Coal pillar-free mining technology for blasting mining face of steeply dipping seam
CN113847055B (en) A roadway layout and support method for down-mining coal seam groups at extremely short distances
CN105909284A (en) Sloughing prevention and control method for large mining height coal wall
CN110566238A (en) Mud rock roof small coal pillar gob-side roadway supporting structure and method thereof
CN118423071A (en) A filling mining method based on multi-purpose roof horizontal well
CN110552731A (en) top coal caving stoping roadway grouting anchor cable supporting structure and advanced supporting method thereof
CN106246182A (en) Medium-length hole room column method for synchronously forming spaced ore columns

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120718