CN101915086B - Coal mine underground gas borehole fracturing method - Google Patents

Coal mine underground gas borehole fracturing method Download PDF

Info

Publication number
CN101915086B
CN101915086B CN2010102521787A CN201010252178A CN101915086B CN 101915086 B CN101915086 B CN 101915086B CN 2010102521787 A CN2010102521787 A CN 2010102521787A CN 201010252178 A CN201010252178 A CN 201010252178A CN 101915086 B CN101915086 B CN 101915086B
Authority
CN
China
Prior art keywords
coal
coal mine
gas
ground
drilled holes
Prior art date
Application number
CN2010102521787A
Other languages
Chinese (zh)
Other versions
CN101915086A (en
Inventor
付峻青
张海军
李海贵
王德璋
胡包生
Original Assignee
山西晋城无烟煤矿业集团有限责任公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 山西晋城无烟煤矿业集团有限责任公司 filed Critical 山西晋城无烟煤矿业集团有限责任公司
Priority to CN2010102521787A priority Critical patent/CN101915086B/en
Publication of CN101915086A publication Critical patent/CN101915086A/en
Application granted granted Critical
Publication of CN101915086B publication Critical patent/CN101915086B/en

Links

Abstract

The invention relates to a coal mine gas extraction method, in particular to a coal mine underground gas borehole fracturing method being suitable for a high-gas coal bed. The invention solves the problems of coal mine fissure ratio nondevelopment and low extraction efficiency of extracted gas underground in the existing coal mine. A well is drilled on the construction ground above a laneway, pipes are arranged in the drilled well, and pipelines are auxiliarily arranged in the laneway; a long borehole of the coal mine is arranged in the laneway, the pipelines are connected with the long borehole, the borehole is effectively sealed, and at the time, the long borehole and the ground drilled well are communicated by the pipelines; and then the coal bed at a long borehole construction area is fractured by utilizing ground drilled well fracturing equipment so as increase the air permeability of the coal bed. The extraction efficiency of the coal bed underground can be improved.

Description

The method of coal mine underground gas borehole fracturing
Technical field
The present invention relates to a kind of coal mine gas pumping method, be specially a kind of method that is applicable to the coal mine underground gas borehole fracturing of high gas layer.
Background technology
The down-hole drilling extraction is one of control of coalmine gas major measure outstanding with eliminating coal and gas, reduces coal seam gas-bearing capacity by extraction, the danger that the gas emission when reducing the mine back production is outstanding with reducing coal and gas.The mode of ground extraction is, in the ground construction drilling well, and pressure break is carried out in the coal seam, in the coal seam, form the pressure break influence area by well casing, natural pressure release or re-injection water by gas discharges gas then, thereby reaches the effect of gas in the extraction coal seam.This technology comes from oil recovery technique, at present the comparative maturity of operation.But present coal mining geology structure more complicated, the direct extraction in ground can not reach the effect of thorough mash gas extraction fully.Under many circumstances, the method that also will lean against the extraction of directly holing in the underworkings is come gas-removing, finds that in practice for the obsolete coal seam of crack degree, directly carry out hole pumping and mining in the down-hole, speed that gas discharges naturally and output effect are all poor.
Summary of the invention
The present invention provides a kind of method of coal mine underground gas borehole fracturing in order to solve mash gas extraction exists under the existing coal mine cracks in coal seam degree agensis, the inefficient problem of extraction.
The present invention is realized by following technical scheme, a kind of method of coal mine underground gas borehole fracturing, and the ground drilling of constructing above the tunnel in the drilling well inner lower tube, and is assisted in the tunnel and is established pipeline; This coal seam long drilled holes of construction in underworkings, pipeline is connected with boring, and carries out effective sealing of hole, boring this moment and ground drilling pipeline UNICOM in the junction, utilize the ground drilling fracturing unit that pressure break is carried out in the coal seam of the long drilled holes construction area in this coal seam then, increase gas permeability of coal seam.
Compared with prior art, advantage of the present invention is, can be according to the trend and the layout of underworkings, select the position of ground well-digging neatly, utilizing ground pressure break equipment with technology the large tracts of land pressure break to be carried out in this drainage from coal seam zone under the coal mine increases crack degree and gas permeability, can improve down-hole this drainage from coal seam efficient.
Description of drawings
Fig. 1 is the schematic diagram that utilizes ground fracturing unit pressure break down-hole drilling of the present invention
Fig. 2 is the vertical view that the scene of the method for the invention is arranged
Among the figure: 1-long drilled holes, 2-tunnel, 3-connecting pipe, the standby back production of 4-district, 5-ground drilling, 6-pressure break pipeline, 7-ground fracturing unit, 8-pipe connections
The specific embodiment
A kind of method of coal mine underground gas borehole fracturing, the ground drilling of constructing above the tunnel in the drilling well inner lower tube, and is assisted in the tunnel and is established pipeline; The down-hole utilizes km rig this coal seam long drilled holes of constructing in the tunnel, pipeline is connected with long drilled holes, and carry out effective sealing of hole in the junction, this moment long drilled holes and ground drilling pipeline UNICOM, utilize the ground drilling fracturing unit that pressure break is carried out in the coal seam of the long drilled holes construction area in this coal seam then, increase gas permeability of coal seam.
As shown in Figure 1, 2, by position finding, the ground construction ground drilling 5 above tunnel 2, following pressure break pipeline 6 in drilling well, and in tunnel 2, assist and establish connecting pipe 3.To the long drilled holes 1 in these coal seams of construction, standby back production district 4, and carry out effective sealing of hole in tunnel 2, it connects with ground fracturing unit 7 by the connecting pipe 3 in wellbore tubing 6 and the tunnel.Utilize ground fracturing unit 7 that pressure break is carried out in the coal seam in standby back production district 4 after the connection, increase gas permeability of coal seam.Then this coal bed drilling of down-hole is inserted down-hole original gas pumping system, connect by the underground gas extraction system and take out.
Long drilled holes 1 can be many, and be arranged in the tunnel about two help, utilize 5 pairs of many long drilled holes 1 of single ground drilling to implement pressure break one by one.Both save the quantity of ground drilling, also improved the efficient of pressure break simultaneously.
Can also above the tunnel, implement ground drilling targetedly according to the trends of design and the layout of underworkings, when treating that the drilling well below is got in the tunnel, just can utilize this ground drilling to implement this method immediately.

Claims (2)

1. the method for a coal mine underground gas borehole fracturing is characterized in that, (2) top construction ground drilling (5) in the tunnel in drilling well inner lower tube (6), and is assisted in tunnel (2) and established pipeline (3), and described pipeline (3) is communicated with pipe (6); This coal seam long drilled holes (1) of construction in underworkings, pipeline (3) is connected with long drilled holes (1), the junction effectively seals, pipeline (3) UNICOM that long drilled holes this moment (1) and ground drilling are used, utilize ground drilling fracturing unit (7) that pressure break is carried out in the coal seam of the long drilled holes construction area in this coal seam then, increase gas permeability of coal seam.
2. the method for coal mine underground gas borehole fracturing according to claim 1 is characterized in that, long drilled holes (1) is many, and be arranged in the tunnel about two help, single ground drilling (5) is implemented pressure break one by one to many long drilled holes (1).
CN2010102521787A 2010-08-13 2010-08-13 Coal mine underground gas borehole fracturing method CN101915086B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102521787A CN101915086B (en) 2010-08-13 2010-08-13 Coal mine underground gas borehole fracturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102521787A CN101915086B (en) 2010-08-13 2010-08-13 Coal mine underground gas borehole fracturing method

Publications (2)

Publication Number Publication Date
CN101915086A CN101915086A (en) 2010-12-15
CN101915086B true CN101915086B (en) 2011-06-22

Family

ID=43322700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102521787A CN101915086B (en) 2010-08-13 2010-08-13 Coal mine underground gas borehole fracturing method

Country Status (1)

Country Link
CN (1) CN101915086B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080526B (en) * 2011-01-17 2012-08-22 河南理工大学 Method for extracting gas from bedding level fractured well of ground coal seam roof
CN102383830B (en) * 2011-09-30 2014-12-24 中煤科工集团重庆研究院有限公司 Comprehensive outburst prevention method for outburst coal seam region
CN102493831B (en) * 2011-11-14 2014-05-28 山西晋城无烟煤矿业集团有限责任公司 Method for extracting coal seam gas through ground fracturing and underground horizontal drill holes
CN102587959B (en) * 2012-03-13 2014-08-20 华晋煤层气综合利用有限责任公司 Method for draining coal seam gas
CN105201480B (en) * 2015-10-14 2017-09-26 山西晋煤集团技术研究院有限责任公司 Surface well underground long drilled holes pressure break coal seam method
CN108661697A (en) * 2018-05-31 2018-10-16 中煤科工集团西安研究院有限公司 Long drilled holes gas enhanced gas extraction method under the service well of ground
CN109653787A (en) * 2019-01-25 2019-04-19 安徽理工大学 A kind of high artesian high gas layer group coordination pumping and mining pressure relief method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4687060A (en) * 1986-06-13 1987-08-18 Methane Drainage Ventures Production and grout liner for methane drainage in subterranean boreholes and method
US4836611A (en) * 1988-05-09 1989-06-06 Consolidation Coal Company Method and apparatus for drilling and separating
CN100356037C (en) * 2003-03-28 2007-12-19 淮南矿业(集团)有限责任公司 Low premeability high gas soft thick coal layer remote pressure relief gas exhausting method
CN101240715A (en) * 2008-01-24 2008-08-13 淮北矿业(集团)有限责任公司 One well three-purpose mash gas harnessing method for ground well drilling and ground well drilling
CN101403314B (en) * 2008-11-18 2011-03-23 河南理工大学 Coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique

Also Published As

Publication number Publication date
CN101915086A (en) 2010-12-15

Similar Documents

Publication Publication Date Title
CN105114048B (en) A kind of staged fracturing of horizontal well single-well injection-production oil production method
CN105332684B (en) A kind of water under high pressure is quick-fried and CO2The coal bed gas displacement extraction technique that pressure break is combined
RU2616635C1 (en) Method of improved combustible gas recovery using underground two-phase gas-liquid variable based on phases of unworked coal fracturing in coal mine
CN103362538B (en) Pressure alternate gas exhausting method by slotting and fracturing coal seams
CN104481574B (en) A kind of method utilizing high energy acoustic-electric complex technique to improve gas permeability of coal seam
Sang et al. Stress relief coalbed methane drainage by surface vertical wells in China
CN100455769C (en) Method for extracting hydrate on bottom of sea by deep earth heart water circulation
CN102116140B (en) Construction method for enhancing extraction effect of ground coal bed gas
CN104100292B (en) Regional forced gas extraction method for single low-permeability outburst thick coal seam
CN103696800B (en) A kind of brill cuts pressure and takes out method
CN203081397U (en) Grouting bag type hole packer
CN102168575B (en) Loose blasting gas extraction technology for horizontal branch well of coal seam floor
CN102031950B (en) Hole-forming process method for comb gas extraction borehole in coal seam roof
CN102383828B (en) Refection reducing and outburst eliminating method for deep-hole hydraulic fracture driving gas shallow hole extraction
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN105201481B (en) Liquid CO2Phase transformation multiple spot fracturing anti-reflection method
CN103133028B (en) Underground coal seam hydrofracture crack oriented developing method
CN103883293B (en) Hydraulic jet radial drilling and fracturing integrating method
CN102678117B (en) Directional hydraulic fracturing method based on energizing blasting
CN102926700B (en) Grouting bag type hole packer with multi-section seal
CN102140901B (en) High pressure resistant drilled hole sealing method
CN102080526B (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN103114871A (en) Extraction device and method utilizing microwave coal heating layer
CN102852546B (en) Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area
CN105507938B (en) Hydraulic flushing in hole combines the construction method of anti-reflection extraction system with presplit blasting in drilling

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shanxi Lanyan Coalbed Methane Group Co., Ltd.

Assignor: Shanxi Jincheng Anthracite Mining Industry Group Co., Ltd.

Contract record no.: 2012990000180

Denomination of invention: Coal mine underground gas borehole fracturing method

Granted publication date: 20110622

License type: Exclusive License

Open date: 20101215

Record date: 20120401

TR01 Transfer of patent right

Effective date of registration: 20161011

Address after: Lee Village town 048204 Shanxi city of Jincheng province Qinshui County Scarlett

Patentee after: Shanxi Lanyan Coalbed Methane Group Co., Ltd.

Address before: 048006, Shanxi City, Jincheng Province North Stone Shop Shanxi Coal Group

Patentee before: Shanxi Jincheng Anthracite Mining Industry Group Co., Ltd.

C41 Transfer of patent application or patent right or utility model