CN102587959A - Method for draining coal seam gas - Google Patents

Method for draining coal seam gas Download PDF

Info

Publication number
CN102587959A
CN102587959A CN2012100649075A CN201210064907A CN102587959A CN 102587959 A CN102587959 A CN 102587959A CN 2012100649075 A CN2012100649075 A CN 2012100649075A CN 201210064907 A CN201210064907 A CN 201210064907A CN 102587959 A CN102587959 A CN 102587959A
Authority
CN
China
Prior art keywords
hole
coal
gas
extraction
coal seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100649075A
Other languages
Chinese (zh)
Other versions
CN102587959B (en
Inventor
李进鹏
乔炜
张沛
牛金荣
黎凤岐
张铁军
牛国斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA COAL EXPLORATION ENGINEERING Co Ltd
HUAJIN COALBED METHANE COMPLEX UTILIZATION CO Ltd
Original Assignee
NINGXIA COAL EXPLORATION ENGINEERING Co Ltd
HUAJIN COALBED METHANE COMPLEX UTILIZATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA COAL EXPLORATION ENGINEERING Co Ltd, HUAJIN COALBED METHANE COMPLEX UTILIZATION CO Ltd filed Critical NINGXIA COAL EXPLORATION ENGINEERING Co Ltd
Priority to CN201210064907.5A priority Critical patent/CN102587959B/en
Publication of CN102587959A publication Critical patent/CN102587959A/en
Application granted granted Critical
Publication of CN102587959B publication Critical patent/CN102587959B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a method for draining coal seam gas, belonging to a method for pre-draining coal seam gas in coal mines. According to the invention, the technical problem that the existing methods for draining coal seam gas are low in drainage efficiency is solved. The technical scheme of the method for draining coal seam gas comprises the steps of: firstly opening at least one butt hole drill site in a coal mine underground preparation roadway, constructing a 30-50m long butt drill hole from the butt hole drill site to a target coal seam, lowering a seamless steel sleeve to the butt drill hole and solidifying the hole by high-quality cement, then opening a ground drill site at the far end of a designed drainage area, horizontally and directionally drilling a horizontal directional main branch hole along the target coal seam toward the underground butt drill hole, butt-jointing the horizontal directional main branch hole with the underground but drill hole, enclosing the ground orifice, arranging an orifice control valve on the head of the seamless steel sleeve, connecting the control valve with a coal mine underground gas drainage pipe network, and carrying out gas drainage by using a coal mine gas drainage pump.

Description

A kind of method of extraction coal-bed gas
Technical field
The present invention relates to a kind of method of extraction coal-bed gas, it belongs to a kind of method that is applicable to that preparatory extraction is carried out to development section or its adjacent domain coal-bed gas in the colliery.
Background technology
Coal mine gas (be also referred to as " coal bed gas ", main component is a methane) is one of major casualty that threatens Safety of Coal Mine Production, is again simultaneously the abundant clean energy resourcies of a kind of reserves.China receives the mine (especially highly gassy mine) of gas disaster threat generally to adopt the mode of taking out in advance to prevent and treat the gas disaster at present, and the methane gas of extracting out is utilized.
At present, coal mine gas extraction mode can be divided into generally: two big types of ground drilling extraction and down-hole extractions.Wherein: the ground drilling extraction can be divided into straight well extraction and horizontal directional drilling extraction again; The down-hole extraction comprises down-hole drilling extraction, two kinds of forms of underworkings extraction.
The extraction of ground level directed drilling is exactly to let turn individual bending to the underground endways well of beating, and digs a well sidewards along the direction in coal seam again.The principle that directed drilling is gathered coal bed gas is the same with ground straight well pumping method, that is: through drainage and step-down, make to be the methane that adsorbed state exists in the coal body and to resolve, and comes out along microfissure, the hole seepage flow of coal body, gathers again.Horizontal directional drilling is with the difference of vertically drilling well: the latter only passes the coal seam with vertical shaft and gathers gas; And the well of horizontal orientation well is extended along the tendency in coal seam; Increase the contact area in well and coal seam greatly, thereby reached the purpose that improves gas well output and gas production efficient.
The down-hole drilling extraction; Be under coal mine, drill site to be set; With suitable coal bed drilling of coal mine roadway drilling machine construction or layer-through drilling (comprising up boring, descending boring); The good boring of will constructing again inserts coal mine gas extraction pipeline, utilize this coal seam of extraction pump extraction or on/gas in the down contiguous coal seam.
Generally speaking, adopt the ground level directed drilling and adopt down-hole drilling extraction coal-bed gas that following excellent, shortcoming is arranged respectively:
1, the advantage of ground level directed drilling extraction is: 1) methane concentration is high in the methane gas of extraction, and is generally more than 95%, of many uses.2) with respect to the coal mine operation environment, the ground drill site is open, and the type selecting scope of drilling equipment is wide, can adopt high-power drilling equipment, so the efficient of drillng operation is high.3) utilize ready-made oil, the high-power drilling equipment of natural gas, can in the coal seam, construct out multiple-limb, heavy caliber wellhole more than the km, so extraction efficient is high, individual well daily output tolerance can reach several ten thousand steres.4) owing to have difference in height between ground and the subterranean coal, the boring well is good at an overfill protection compacted under of drilling well liquid columnpressure, is difficult for the hole of collapsing, and helps gas pumping.Its shortcoming is: 1) the drainage and step-down cycle long, wellhole must be away from the Coal Production operation area, is not damaged because of the digging activity in colliery in effective campaign to guarantee gas well.2) need bury gas transmission line underground on ground, the methane gas of extraction is transported to gas gathering station.3) burying underground of extraction operation place, gas transmission line all needs land occupation, increased cost, and there is adverse effect in ecological environment.
2, the advantage of coal mine down-hole drilling extraction is: 1) discrepancy in elevation is very little between the aperture of down-hole drilling and the eyelet; Even be lower than well; Therefore the drainage and step-down cycle is short; For most of colliery,, only need that the automatic drain valve door is set and to solve drainage problem in the extraction pipeline because the coal seam moisture content is extremely low.2) can utilize that existing extraction pipeline is delivered directly to gas gathering station with the extraction methane gas in the underworkings of colliery.3) the gas production operation is carried out under coal mine, does not have the land occupation problem.Its shortcoming is: 1) owing to restricted by multiple factor, the down-hole drilling sealing quality is low, poor air-tightness; Sneaked into underground air in the methane gas of extraction to some extent; Cause methane concentration low, generally can only be as the source of the gas of gas fired-boiler, be used for heat supply or generating.At present, still there is a large amount of extraction gas in domestic colliery, because its methane concentration is crossed low and can't be utilized, can only directly enter atmosphere, causes environment pollution.2) receive the underground work spatial constraints, down-hole drilling equipment power is low, and labor strength is big, and drillng operation efficient is low, and production has high input.3) owing to receive the restriction of rig equipment capability, the general aperture of boring of down-hole construction is little, distance is short, and the single hole gas deliverability is low, can only remedy with increasing cloth hole density usually, thereby need to consume great amount of manpower and material resources and financial resources.4) owing to the discrepancy in elevation between colliery underworkings and the coal seam is little; The head of liquid of drilling fluid is not enough to eyelet is formed effective support during drilling well, well takes place during the drilling construction easily collapse, and not only causes lock of tool drilling; And can block the extraction passage, be unfavorable for gas pumping.
Summary of the invention
The objective of the invention is to solve the above-mentioned technical problem that the method for existing extraction coal-bed gas exists, and a kind of method of the extraction coal-bed gas that the ground level directional well is docked with coal mine down-hole drilling is provided.
The present invention solves the problems of the technologies described above the technical scheme that adopts to be: a kind of method of extraction coal-bed gas; It at first opens up at least one butt hole drill site in the preparatory working under coal mine; From the opposite bore of this butt hole drill site, in opposite bore, be lowered to the solid hole of seamless steel sleeve Guan Bingyong high-mark cement to a 30~50m of target coal seam construction; At the far-end in design extraction zone, open up a ground drill site then, to down-hole opposite bore direction, bore the horizontal orientation master and prop up the hole, the butt joint of horizontal orientation master Zhi Kongyu down-hole opposite bore along the target coal seam construction level is directed; Then seal the aperture, ground, the aperture by-pass valve control is installed on the seamless steel sleeve pipe tube head of down-hole opposite bore, by-pass valve control is connected with coal mine gas extraction pipe network, utilizes the gas discharge in mine pump to carry out gas pumping.
The present invention props up on the hole said horizontal orientation master, and a plurality of horizontal orientation branch holes can also be set, with the contact area in further increase extraction hole and coal seam.
The upstream or downstream of then can constructing when preparatory working is below or above target coal seam under said coal mine boring.
Preparatory working can also be substituted by development work under the said coal mine.
Because the present invention adopted technique scheme, the advantage of ground level directed drilling pumping method and coal mine down-hole drilling pumping method is combined, remedied these two kinds of gas pumping methods inferior position separately.Therefore, compare with background technology, the present invention has the advantage that can improve extraction coal mine gas efficient.
Description of drawings
Fig. 1 is the sketch map of first embodiment of the invention;
Fig. 2 is the sketch map of second embodiment of the invention;
Fig. 3 is the sketch map of third embodiment of the invention;
Fig. 4 is the I among Fig. 1, Fig. 2 and Fig. 3---the I sectional drawing;
Fig. 5 is the II among Fig. 1, Fig. 2 and Fig. 3---the II sectional drawing;
Fig. 6 is the III among Fig. 1, Fig. 2 and Fig. 3---the III sectional drawing.
Among the figure: preparatory working under 1-coal mine, 2-butt hole drill site, 3-target coal seam, 4-opposite bore; 5-seamless steel sleeve pipe, 6-high-mark cement, 7-design extraction zone, 8-ground drill site; 9-horizontal orientation master props up the hole, 10-docking point, 11-horizontal orientation branched hole.
Embodiment 1
As shown in Figure 1; The method of a kind of extraction coal-bed gas in the present embodiment; It at first opens up a butt hole drill site 2 in the preparatory working 1 under coal mine; From the opposite bore 4 of this butt hole drill site, in opposite bore 4, be lowered to seamless steel sleeve pipe 5 also with high-mark cement 6 solid holes to a 30~50m of target coal seam 3 constructions; At the far-end in design extraction zone 7, open up a ground drill site 8 then, to down-hole opposite bore 4 directions, bore the horizontal orientation master and prop up hole 9 along target coal seam 3 construction levels are directed, the horizontal orientation master props up hole 9 and docks with down-hole opposite bore 4 through docking point 10; Then seal the aperture, ground, the aperture by-pass valve control is installed on seamless steel sleeve pipe 5 tube heads of down-hole opposite bore, by-pass valve control is connected with coal mine gas extraction pipe network, utilizes the gas discharge in mine pump to carry out gas pumping.In addition, prop up on the hole 9, a plurality of horizontal orientation branch holes 11 can also be set, with the contact area of further increase extraction hole and coal seam (gas-bearing reservoir of gas) the horizontal orientation master.
The upstream or downstream of then can constructing when preparatory working 1 is below or above target coal seam 3 under above-mentioned coal mine boring.
Preparatory working 1 can also be substituted by development work under the above-mentioned coal mine.
Embodiment 2
As shown in Figure 2; The method of a kind of extraction coal-bed gas in the present embodiment; It at first opens up two butt hole drill sites 2 in the preparatory working 1 under coal mine;, in opposite bore 4, be lowered to seamless steel sleeve pipe 5 and consolidate holes to construct the respectively opposite bore 4 of a 30~50m of target coal seam 3 from two butt hole drill sites with high-mark cement 6; At the far-end in design extraction zone 7, open up a ground drill site 8 then, to down-hole opposite bore 4 directions, prop up hole 9 along two horizontal directional drill horizontal orientation masters of target coal seam 3 constructions, the horizontal orientation master props up hole 9 and docks with down-hole opposite bore 4 through docking point 10; Then seal the aperture, ground, the aperture by-pass valve control is installed on seamless steel sleeve pipe 5 tube heads of two opposite bores in down-hole, by-pass valve control is connected with coal mine gas extraction pipe network, utilizes the gas discharge in mine pump to carry out gas pumping.In addition, prop up on the hole 9, a plurality of horizontal orientation branch holes 11 can also be set, with the contact area of further increase extraction hole and coal seam (gas-bearing reservoir of gas) two horizontal orientation masters.
The upstream or downstream of then can constructing when preparatory working 1 is below or above target coal seam 3 under above-mentioned coal mine boring.
Preparatory working 1 can also be substituted by development work under the above-mentioned coal mine.
Embodiment 3
As shown in Figure 3; The method of a kind of extraction coal-bed gas in the present embodiment; It at first opens up three butt hole drill sites 2 in the preparatory working 1 under coal mine;, in opposite bore 4, be lowered to seamless steel sleeve pipe 5 and consolidate holes to construct the respectively opposite bore 4 of a 30~50m of target coal seam 3 from three butt hole drill sites with high-mark cement 6; At the far-end in design extraction zone 7, open up a ground drill site 8 then, to down-hole opposite bore 4 directions, prop up hole 9 along three horizontal directional drill horizontal orientation masters of target coal seam 3 constructions, the horizontal orientation master props up hole 9 and docks with down-hole opposite bore 4 through docking point 10; Then seal the aperture, ground, the aperture by-pass valve control is installed on seamless steel sleeve pipe 5 tube heads of two opposite bores in down-hole, by-pass valve control is connected with coal mine gas extraction pipe network, utilizes the gas discharge in mine pump to carry out gas pumping.In addition, prop up on the hole 9, a plurality of horizontal orientation branch holes 11 can also be set, with the contact area of further increase extraction hole and coal seam (gas-bearing reservoir of gas) three horizontal orientation masters.
The upstream or downstream of then can constructing when preparatory working 1 is below or above target coal seam 3 under above-mentioned coal mine boring.
Preparatory working 1 can also be substituted by development work under the above-mentioned coal mine.

Claims (4)

1. the method for an extraction coal-bed gas; It is characterized in that: at first under coal mine, open up at least one butt hole drill site (2) in the preparatory working (1); From the opposite bore (4) of this butt hole drill site, in opposite bore, be lowered to seamless steel sleeve pipe (5) also with the solid hole of high-mark cement (6) to a 30~50m of target coal seam (3) construction; At the far-end in design extraction zone (7), open up a ground drill site (8) then, to down-hole opposite bore direction, bore the horizontal orientation master and prop up hole (9), the butt joint of horizontal orientation master Zhi Kongyu down-hole opposite bore along the target coal seam construction level is directed; Then seal the aperture, ground, the aperture by-pass valve control is installed on seamless steel sleeve pipe (5) tube head of down-hole opposite bore, by-pass valve control is connected with coal mine gas extraction pipe network, utilizes the gas discharge in mine pump to carry out gas pumping.
2. the method for a kind of extraction coal-bed gas according to claim 1 is characterized in that: prop up on the hole (9) said horizontal orientation master, a plurality of horizontal orientation branch holes (11) can also be set, with the contact area in further increase extraction hole and coal seam.
3. the method for a kind of extraction coal-bed gas according to claim 1 is characterized in that: the upstream or downstream of then can constructing when preparatory working is below or above target coal seam under said coal mine boring.
4. according to the method for claim 1 or 3 described a kind of extraction coal-bed gas, it is characterized in that: preparatory working can also be substituted by development work under the said coal mine.
CN201210064907.5A 2012-03-13 2012-03-13 Method for draining coal seam gas Active CN102587959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210064907.5A CN102587959B (en) 2012-03-13 2012-03-13 Method for draining coal seam gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210064907.5A CN102587959B (en) 2012-03-13 2012-03-13 Method for draining coal seam gas

Publications (2)

Publication Number Publication Date
CN102587959A true CN102587959A (en) 2012-07-18
CN102587959B CN102587959B (en) 2014-08-20

Family

ID=46477126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210064907.5A Active CN102587959B (en) 2012-03-13 2012-03-13 Method for draining coal seam gas

Country Status (1)

Country Link
CN (1) CN102587959B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437705A (en) * 2013-08-19 2013-12-11 河南理工大学 Directional and quick hole-forming device for mining-coal bed gas extraction multi-branch holes
CN104234738A (en) * 2014-07-21 2014-12-24 河南理工大学 Low-permeability coal bed multi-branch directional drilling seam cutting anti-reflection method
CN104806285A (en) * 2015-03-25 2015-07-29 宁夏煤炭勘察工程公司 Coal mine goaf gas control method based on ground horizontal well
CN104819008A (en) * 2015-04-17 2015-08-05 陕西福瑞德石油科技有限公司 Efficient extraction method of coal seam gas
CN105257333A (en) * 2015-05-30 2016-01-20 山西晋城无烟煤矿业集团有限责任公司 Kilometer rig concentrated stripe type drainage method
CN107339093A (en) * 2017-08-25 2017-11-10 辽宁工程技术大学 A kind of drilling well for gas drainage method for arranging of imitative schneider zelkova leaf kank structure
CN107420126A (en) * 2017-07-26 2017-12-01 柴兆喜 Pressure circulation mine gas extraction system
CN108223004A (en) * 2018-01-05 2018-06-29 中煤科工集团重庆研究院有限公司 The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction
CN108590716A (en) * 2018-04-18 2018-09-28 中国矿业大学 A kind of tunnel crosses rich water tomography tree root type and dredges water blockoff integral construction method
CN108625824A (en) * 2018-05-02 2018-10-09 辽宁工程技术大学 A kind of buried aqueous coal bed gas extraction drilling method for arranging
CN110953015A (en) * 2019-12-25 2020-04-03 太原理工大学 Soft low-permeability coal seam long-drill-hole directional segmented fracturing efficient gas extraction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934649A (en) * 1974-07-25 1976-01-27 The United States Of America As Represented By The United States Energy Research And Development Administration Method for removal of methane from coalbeds
RU1809117C (en) * 1991-02-11 1993-04-15 Институт Горного Дела Ан Казсср Method for coal seams degassing
US20060266517A1 (en) * 2003-06-09 2006-11-30 Stayton Robert J Method for drilling with improved fluid collection pattern
CN2913612Y (en) * 2005-05-09 2007-06-20 柴兆喜 Well bore enclosed type coal bed air extraction well
CN101915083A (en) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 Method for extracting coalbed gases from coal mines by upper and lower combination
CN101915086A (en) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 Coal mine underground gas borehole fracturing method
CN101985888A (en) * 2010-10-25 2011-03-16 中联煤层气国家工程研究中心有限责任公司 Method for draining gas of highly gassy coal mine
CN102080518A (en) * 2011-01-17 2011-06-01 河南理工大学 Method for extracting gas from coal seam roof complex branched well
CN102226413A (en) * 2011-05-24 2011-10-26 中国矿业大学 Gas extraction method of cross hole drilling area of gas discharge laneway
CN102337919A (en) * 2011-09-01 2012-02-01 河南理工大学 Four-period-five-purpose hole-drilling high-efficiency gas extracting process

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934649A (en) * 1974-07-25 1976-01-27 The United States Of America As Represented By The United States Energy Research And Development Administration Method for removal of methane from coalbeds
RU1809117C (en) * 1991-02-11 1993-04-15 Институт Горного Дела Ан Казсср Method for coal seams degassing
US20060266517A1 (en) * 2003-06-09 2006-11-30 Stayton Robert J Method for drilling with improved fluid collection pattern
CN2913612Y (en) * 2005-05-09 2007-06-20 柴兆喜 Well bore enclosed type coal bed air extraction well
CN101915083A (en) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 Method for extracting coalbed gases from coal mines by upper and lower combination
CN101915086A (en) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 Coal mine underground gas borehole fracturing method
CN101985888A (en) * 2010-10-25 2011-03-16 中联煤层气国家工程研究中心有限责任公司 Method for draining gas of highly gassy coal mine
CN102080518A (en) * 2011-01-17 2011-06-01 河南理工大学 Method for extracting gas from coal seam roof complex branched well
CN102226413A (en) * 2011-05-24 2011-10-26 中国矿业大学 Gas extraction method of cross hole drilling area of gas discharge laneway
CN102337919A (en) * 2011-09-01 2012-02-01 河南理工大学 Four-period-five-purpose hole-drilling high-efficiency gas extracting process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李国君: "铁法矿区井下瓦斯抽采与地面煤层气开发", 《中国煤层气》, vol. 6, no. 4, 15 August 2009 (2009-08-15) *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437705B (en) * 2013-08-19 2015-06-03 河南理工大学 Directional and quick hole-forming device for mining-coal bed gas extraction multi-branch holes
CN103437705A (en) * 2013-08-19 2013-12-11 河南理工大学 Directional and quick hole-forming device for mining-coal bed gas extraction multi-branch holes
CN104234738A (en) * 2014-07-21 2014-12-24 河南理工大学 Low-permeability coal bed multi-branch directional drilling seam cutting anti-reflection method
CN104806285A (en) * 2015-03-25 2015-07-29 宁夏煤炭勘察工程公司 Coal mine goaf gas control method based on ground horizontal well
CN104819008A (en) * 2015-04-17 2015-08-05 陕西福瑞德石油科技有限公司 Efficient extraction method of coal seam gas
CN105257333A (en) * 2015-05-30 2016-01-20 山西晋城无烟煤矿业集团有限责任公司 Kilometer rig concentrated stripe type drainage method
CN107420126B (en) * 2017-07-26 2024-03-29 柴兆喜 Pressure equalizing circulation mine gas extraction system
CN107420126A (en) * 2017-07-26 2017-12-01 柴兆喜 Pressure circulation mine gas extraction system
CN107339093A (en) * 2017-08-25 2017-11-10 辽宁工程技术大学 A kind of drilling well for gas drainage method for arranging of imitative schneider zelkova leaf kank structure
CN108223004A (en) * 2018-01-05 2018-06-29 中煤科工集团重庆研究院有限公司 The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction
CN108590716A (en) * 2018-04-18 2018-09-28 中国矿业大学 A kind of tunnel crosses rich water tomography tree root type and dredges water blockoff integral construction method
CN108625824A (en) * 2018-05-02 2018-10-09 辽宁工程技术大学 A kind of buried aqueous coal bed gas extraction drilling method for arranging
CN110953015A (en) * 2019-12-25 2020-04-03 太原理工大学 Soft low-permeability coal seam long-drill-hole directional segmented fracturing efficient gas extraction method
CN110953015B (en) * 2019-12-25 2021-04-13 太原理工大学 Soft low-permeability coal seam long-drill-hole directional segmented fracturing efficient gas extraction method

Also Published As

Publication number Publication date
CN102587959B (en) 2014-08-20

Similar Documents

Publication Publication Date Title
CN102587959B (en) Method for draining coal seam gas
CN101915083B (en) Method for extracting coalbed gases from coal mines by upper and lower combination
CN102080526B (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN102116167B (en) Ground and underground three-dimensional extraction system of coal seam gas
CN107905834A (en) A kind of hypotonic high prominent coal seam architecture gas production method
CN103867229B (en) A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining
CN103628912B (en) The construction method of filling grouting is processed in a kind of goaf
CN107916953A (en) Gas drainage system, pumping method and construction technology based on roof horizontal drilling
CN103306714B (en) Coal seam group with near interval Di Chou holes in lane the mash gas harnessing method in a hole three
CN102852490A (en) High gas suction and discharge process method for complex well
CN104653161A (en) Coal mine underground pulse hydraulic slot cutting-fracturing integral anti-reflection extraction device and method
CN106948843A (en) A kind of double-deck multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
CN104806217A (en) Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group
CN104819008B (en) A kind of efficient pumping method of coal-bed gas
CN105971662A (en) Method for gas extraction by coal seam roof weakening through L-shaped drilling staged fracturing
CN109209474A (en) A kind of method that dual-lateral well extracts lower coal seam and top more goaf gas and ponding
CN101915086B (en) Coal mine underground gas borehole fracturing method
CN106089291A (en) A kind of collaborative extraction is caving the old dead zone of formula and the method for lower coal seam coal bed gas
CN104763368A (en) Orifice seal device for large-diameter downhole hammer and reverse circulation construction technology for orifice seal device
CN104196453B (en) Coalbed methane development well
CN102877857A (en) Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions
CN108316964A (en) A kind of low air permeability coal seam pressure relief gas pumping mining method
CN113653531B (en) Method for dredging low-permeability roof water
CN201924839U (en) Primary production string
CN204327172U (en) Formula boring goaf extraction structure before and after high-rise position

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant