CN103628912B - The construction method of filling grouting is processed in a kind of goaf - Google Patents

The construction method of filling grouting is processed in a kind of goaf Download PDF

Info

Publication number
CN103628912B
CN103628912B CN201310537073.XA CN201310537073A CN103628912B CN 103628912 B CN103628912 B CN 103628912B CN 201310537073 A CN201310537073 A CN 201310537073A CN 103628912 B CN103628912 B CN 103628912B
Authority
CN
China
Prior art keywords
grouting
goaf
hole
boring
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310537073.XA
Other languages
Chinese (zh)
Other versions
CN103628912A (en
Inventor
朱品安
周兵
石艳军
苟永平
童耀
张栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cggc Foundation Engineering Co Ltd
Original Assignee
Cggc Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cggc Foundation Engineering Co Ltd filed Critical Cggc Foundation Engineering Co Ltd
Priority to CN201310537073.XA priority Critical patent/CN103628912B/en
Publication of CN103628912A publication Critical patent/CN103628912A/en
Application granted granted Critical
Publication of CN103628912B publication Critical patent/CN103628912B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A construction method for filling grouting is processed in goaf, and the method comprises the following steps: 1) preparation of construction before boring; 2) in the process range of goaf, arrange filling grout hole, measure the setting-out drilling hole position in goaf; 3) cover layer to goaf and rock section are crept into; 4) boring in goaf is rinsed; 5) by boring, grouting treatment is carried out in inside, goaf: it is the Cement fly ash of the high fly ash of 0.8:1 or 1:1, wherein cement that grouting adopts water-solid ratio: the weight ratio of flyash is 0.15:0.85; 6) grouting quality inspection. The construction method of filling grouting is processed in a kind of goaf provided by the invention, adopt boring grouting method to efficiently solve the engineering geological problems in goaf, to stop the further inbreak of upper overlying strata body, prevent surface subsidence or subside, ensure the security of operation through building on goaf.

Description

The construction method of filling grouting is processed in a kind of goaf
Technical field
The present invention relates to a kind of goaf and process the construction method of filling grouting, belong to the base of hydraulic engineering and corresponding engineeringPlinth is processed and geological hazard control field.
Background technology
Along with greatly developing of national basis construction, engineering addressing and geological conditions become increasingly complex, and a large amount of mineral productsExploitation makes Goaf Area area increasing. And a series of environmental geotechnical that cause due to gob collapse interrogateTopic, as land subsidence, road cracking, the minimizing etc. of ploughing, often has a strong impact on the people's normal life, causes great economy to damageLose.
The experience of building engineering, especially hydraulic engineering both at home and abroad on goaf is little, without ripe construction experience, andDo not have relevant Regulations and the technical bid will definitely reference. Route is large hydraulic engineering, and engineering is in safetyAspect requires high, and while carrying out engineering addressing, Route Henan Province Yuzhou section cannot be avoided goaf.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of goaf and processes the construction method that filling is in the milk, and adopts and boresHole grouting method efficiently solves the engineering geological problems in goaf, to stop the further inbreak of upper overlying strata body, prevents groundSedimentation or subside, ensures the security of operation through building on goaf.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: filling grouting is processed in a kind of goafConstruction method, the method comprises the following steps:
1) preparation of construction before boring;
2) in the process range of goaf, arrange filling grout hole, measure the setting-out drilling hole position in goaf;
3) cover layer to goaf and rock section are holed;
4) boring in goaf is rinsed;
5) by boring, grouting treatment is carried out in inside, goaf: grouting employing water-solid ratio is that the height of 0.8:1 or 1:1 is mixed powderThe Cement fly ash of coal ash, wherein cement: the weight ratio of flyash is 0.15:0.85;
6) grouting quality inspection.
Step 3) in, for the different lithology feature of coal mined-out area overlying strata, adopt respectively alloy bit, diamondThin drilling bit, full section alloy or diamond bit, and adopt bentonite slurry as circulation fluid retaining wall.
Step 5) in, adopt ground slurry preparing station system to join Cement fly ash, adopt pressure grout method to be in the milk.
Grouting obstruction mode before grouting is used " aperture sealing method " and " like ring flange method ".
The construction method of filling grouting is processed in a kind of goaf provided by the invention, and beneficial effect is as follows:
1,, in the process range of goaf, arrange filling grout hole, the space by slip casing by pressure normal direction rock stratum and adopt skyDistrict's fracture belt, caving zone and adopt empty part and inject the slurry material with better filling performance and bonding capacity, after slurries sclerosisFormation has the supporter of some strength, and overlying strata body on goaf is formed to supporting role, to stop the further of upper overlying strata bodyInbreak, prevents surface subsidence or subsides, and ensures the security of operation through building on goaf (structures); Adopt boring slip casting sideMethod efficiently solves the engineering geological problems in goaf, to stop the further inbreak of upper overlying strata body, prevents surface subsidence or collapsesFall into, ensure the security of operation through building on goaf.
2,, for the different lithological characteristic of overburden of the goaf (loam layer, boulder bed, rock section etc.), adopt respectively alloy to boreHead, diamond thin-wall drill bit, full section alloy or diamond bit, and be aided with bentonite slurry as circulation retaining wall liquid, effectivelySolved the rapidly and efficiently problem of pore-forming of goaf coal measure strata.
3, filling grouting adopts the Cement fly ash of high fly ash, and doping quantity of fly ash, up to 85%, not only reducesThe cost of raw material, solved preferably again the depression stable problem of overlying strata body on goaf.
4,, according to the large feature of goaf filling grouting amount, adopted the ground slurry preparing station water distribution processed that slurrying efficiency is higherMud pulverized fuel ash slurry, has met the filling successional requirement of being in the milk, and has improved filling grouting construction work efficiency, and has guaranteed fillingThe construction quality of grouting.
5, it is easy to operation that mode is blocked in the grouting before grouting: the effect of orifice tube of having held concurrently of borehole wall-protection sleeve pipe, and directConnecting aperture locking device can be in the milk, easy to operation, and has saved to a certain extent material and process costs.
Brief description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is construction flow chart of the present invention.
Detailed description of the invention
A construction method for filling grouting is processed in goaf, and the method is made up of following steps:
1) preparation of construction before boring, preparation is as follows:
1-1) build operation platform: adopt the welding of channel-section steel or I-steel to form the larger operation platform of supporting surface, and with brillThe frame entirety bolt of machine connects, the construction stability requirement when guaranteeing high mast operation.
1-2) rig configuration: the buried depth of coal mine gob is generally larger, and complex formation, therefore that boring is generally selected is movingRevolution or down-the-hole drill that power 11KW is above, moment of torsion is not less than 1110N.m.
1-3) drilling tool configuration: for the different lithology spy of overburden of the goaf (loam layer, boulder bed, rock section etc.)Point, should configure respectively alloy bit, diamond thin-wall drill bit, full section alloy or diamond bit some; Drilling rod bores by actualThe different size such as φ 42mm, φ 50mm need to be selected in hole, adopts lock Threaded Connector Coupling.
1-4) grouting equipment configuration: goaf grouting amount is large and the continuous grouting time is generally longer. Therefore, require groutingThe low-grade theoretical displacement of pump is not less than 80L/min and possesses multistep speed regulation function, and in practice of construction, multiselect is filled with by BW250/50 typeStock pump is as main force's type.
1-5) pulp feeding system processed: because goaf is larger for slurry demand, pulping equipment adopts with automatic control systemThe unified system of large-scale ground mixing plant is joined, and is delivered to each operation side by terminal; Consider high fly ash cement groutThe feature of poor fluidity, very fast, the easy plugging of precipitation, slurry water gray scale (weight ratio) generally should not be richer than 0.6:1.
2) in the process range of goaf, arrange filling grout hole, measure the setting-out drilling hole position in goaf.
3) cover layer to goaf and rock section are holed, and step is as follows:
3-1) drilling construction order: the periphery hole in territory, subdrilling goaf to be processed, then advances to middle part, simultaneously graduallyOn order hole, point two orders are carried out, subdrilling I order hole, then bore II order hole;
3-2) boring location: drilling hole position, according to design cloth hole principle, adopts total powerstation or GPS, is combined with steel ruler and putsSample;
3-3) drilling hole array pitch: according to industrial experimentation situation, detect slurries range of scatters, determine that filling drilled grout holeExcellent hole array pitch, generally selects 18~22m, and largest hole is apart from being no more than 30m.
3-4) boring hole depth: reach the requirement of design hole depth, specifically, to occur significantly falling to bore after phenomenon in boring procedure, continueContinuous creeping into passing seat earth 1~1.5m, to guarantee that being subject to fill with section fully discloses.
3-5) boring aperture: it is differential that perforate aperture should be greater than two, aperture, whole hole, often adopts φ 110~130mm, is drilled into darkEnter after basement rock 5m, reducing is that φ 76~91mm continues to creep into, until reach whole hole depth.
3-6) boring hole deviation: because array pitch between filling grout hole is generally larger, and boring be as the criterion to drill goaf, boreHole deviation controlling is less demanding, but should be before boring perforate or rear strict correction rig vertical shaft angle in place again, ensures boringPerpendicularity requirement.
3-7) protection casing is buried underground: boring perforate is to going deep into after basement rock 5m, and the protection casing of imbedding φ 108~127mm (canDouble as grout pipe), quantitatively inject the striaght cement slurries build-in pin of 0.5:1, anchorage length must not exceed this basement rock segment length. For addingThe drilling construction progress of fast grout compartment, can add the accelerator of cement weight 1%~3%, accelerates sleeve pipe build-in cement groutSolidify.
3-8) drilling method: goaf boring generally (comprises bending through loam layer, boulder bed, rock section from top to bottomBand, fissure zone, caving zone), for different stratum characteristics, drilling method can adopt following several mode to carry out:
1. loam layer creeps into employing alloy bit, as three pages of brills, using bentonite slurry as circulation fluid retaining wall, middle and slow speed of revolutionCreep into;
2. boulder bed creeps into employing diamond thin-wall drill bit, and using bentonite slurry as circulation fluid retaining wall, the slow-speed of revolution is crept into;
3. general full section drill bit, long drill pipe, the high speed of adopting of rock section crept into, and adopts clear water as circulation fluid, midwayNeed not carry and drill through core, reduce and added drilling rod number of times in drilling process, can greatly improve drilling efficiency; Meet the higher quartz of intensityWhen sandstone formation, should carry boring and use diamond thin-wall drill bit instead and creep into.
4) boring in goaf is rinsed:
The boring mud of loam layer, boulder bed, outside portalling, enters in mud overfall pond by the suspension effect band of bentonite slurryPrecipitation is discharged; Rock section adopts full section drill bit to creep into, and can strengthen the flow of clear water flushing liquor in boring procedure, and rock dust is gone outOutside hole; Hole behind whole hole, do not carry boring and continue to rinse and be no less than 10min with pressure clear water, by the charges in rock fracture, spaceTake away, so that slurries range of scatter strengthens when slip casting.
5) grouting before grouting is blocked:
Grouting obstruction mode can adopt " aperture sealing method " and " like ring flange method " two kinds:
5-1), before grouting, mechanical type disabler is blocked in protection casing, or adopts orifice closure and protection casingDirectly connect. Adopt this obstruction mode, simple and easy to do, but the rear sleeve that is in the milk has for a long time been difficult for pulling out.
5-2) boring finish after, rise pull out protection casing, by one end with reducing place in hand-hole under the Grouting Pipe of flange pallet,The reverse screwed connection of slip casting bottom tube, so that after slip casting finishes, can forward propose top Grouting Pipe, reuses; ThenTo the dense cement grout that between hole wall and Grouting Pipe, quantitatively injected water gray scale is 0.5:1, by Grouting Pipe and hole wall build-in, build-in heightAlso be no more than the basement rock length of this section.
6) by boring, grouting treatment is carried out in inside, goaf:
6-1) total sequence of construction:
Grout hole is by the incline direction in goaf, grout hole and the structure of the gob floor absolute altitude lower position of first constructingThe grout hole at position, more along inclined direction from low to high, constructed to center deployment by limit portion. On order hole, point two orders are entered simultaneouslyOK, first fill with I order hole, then fill with II order hole, to form the filling grouting effect of " enclose, squeeze, press ".
6-2) grouting material:
It is the Cement fly ash (cement: fine coal of the high fly ash of 0.8:1 or 1:1 that filling grouting adopts water-solid ratioAsh=0.15:0.85). Wherein cement adopts P.O42.5 level Portland cement, and flyash adopts II level flyash. GenerallyMore than 0.60.
6-3) grouting line arrangement:
Overfall pipeline should not be arranged on grouting pump exit, should lengthen pipeline to aperture overfall, while preventing from pouring into for a long time,Stop up pulp-inlet pipe road, cause unnecessary trouble; Meanwhile, a check-valves should be installed before the return pipe of aperture, to be controlled at fillingThe slurry starting stage is when passive state, prevents slurry reflux and stops up overfall pipeline.
6-4) grouting method
Filling grouting adopts " pure pressure type, continuous grouting method ", in the time that grouting amount is large or crack, goaf, space are larger,Aperture adds funnelform sand slinging machine, with slurries by sand or slag band hand-hole.
6-5) grouting segment length: grouting segment length is that segment length to whole hole after reducing, gos deep into extremely holing eventually after basement rock 5mThat segment length in hole.
6-6) grouting pressure control: grouting flow and the grouting pressure of filling grouting are negative correlativing relation, i.e. filling processMiddle grouting is substantially taking the perfusion of gravity flow (pressure is as 0MPa) state, and last 5~30min is in the milk flow rapid drawdown to 10L/min,Grouting pressure rises to 1.0~1.5MPa from 0MPa.
Therefore, grouting pressure control should send special messenger to monitor, and in the time that pressure exceedes 0.3MPa, reminds workmen immediatelyCheck-valves is opened, prevented the generation of booster phenomenon. On the other hand, in the perfusion state with no pressure of last stage, for avoiding slurriesBy overfall pipeline blockage, in filling process, should close check-valves.
6-7) grouting ending standard: the ending phase of considering to be in the milk is lasted shorter, strict ending standard and is not difficult to reach.Therefore, can adopt when aperture pressure is in the force value (1.0MPa) of regulation, pump amount is less than 10L/min, stablizes 10~15min,Can finish the filling grouting construction in this hole.
6-8) grouting record: to adopt grouting automatic recording instrument to be recorded as master, consider that filling grouting lasts longer, in constructionUnder on-the-spot complicated rugged environment condition,, inevitably can there is signal interruption, printout not in recorder long-playThe fault such as complete, now, should adopt hand-kept filling process immediately.
7) grouting quality inspection:
7-1) test mode: carry out the inspection of filling grouting quality after corresponding units engineering mortar depositing construction finishes 7 days, checkMode, taking geology CT boring scanning and mud jacking inspection as main, is auxiliary in conjunction with boring and coring and grouting data Analysis on Results simultaneously, comprehensiveClose judgement grouting effect.
7-2) inspection opening is arranged: every 40~50 holes are divided into a unit, and each unit arranges two inspection openings, adjacentTwo pitchs of holes should be controlled within the scope of the accuracy of detection of CT scanner, are generally 25~30m;
7-3) mud jacking inspection: adopt the Cement fly ash continuous grouting of water-solid ratio 0.8:1 or 1:1, ending standard is sameFilling grouting requirement. After mud jacking finishes, inject dry ash consumption with inspection opening single hole and carry out two class comparisons, the one, be less than this unit flatAll 25% of single hole dry ash consumption, think that slip casting effect is better, the 2nd, with inspection opening single hole dry ash consumption control (according toGrouting data is determined), if be less than this value, think that slip casting effect is better, inspection opening mud jacking meets above-mentioned any one standard,Think that element project grouting quality is qualified.
7-4) consider that coal mine gob Overburden Rock Failure form is generally " trizonal ", filling grouting treatment scope is mainly adoptsEmpty part, caving zone and fracture belt. Therefore, inspection opening is got core and only the goaf section of the above 50m scope of whole hole depth is got to core, rockCore taking rate is not less than the regulation of technical requirement on design.
7-5) for the underproof unit of quality examination, according to geology CT scan, mud jacking inspection, grouting effect Information integrationAnalyze, determined whether to need supplementary irrigation or supplement to check by management or designing unit.
8) special circumstances processing:
8-1) boring bit freezing, bury drills phenomenon
Coal measure strata is taking soft mud stone as main, and sandstone mostly is argillaceous agglutination, adopts the construction method of full-face drilling, hasA large amount of rock dust produce, and " bury drills " phenomenon very easily occurs; " three bands " distributes obviously, and cranny development, falls piece phenomenon and happen occasionally, bit freezingThe phenomenon frequency also can be higher.
While there is this situation, focus on obviate: the one, adopt the larger slewing drilling machine of moment of torsion, can effectively avoidThe generation of bit freezing, bury drills phenomenon; The 2nd, in drilling process, strengthen flushing fluid and flushing pressure, in time rock dust is gone out to holeOutward; The 3rd, it is differential that the caliber of protection casing should be greater than two, aperture, whole hole, while being convenient to occur drilling accident, extracts processing.
8-2) earth's surface grout phenomenon
Open while filling, occur earth's surface grout phenomenon, wash boring immediately, ensures that perfusion channel is unimpeded, then re-startsGrouting processing; Longer for infusion time, or the earth's surface grout phenomenon of boost phase appearance, the perfusion of step-down immediately, along spillagePoint is taked " earth bag or sandbag ballast " grouting measure; When ballast grouting is still invalid, after pointing out underflow, treats spillage solidifying being no less than8h, then cleaning bottom of hole is filled with again.
8-3) string hole phenomenon
In goaf grouting process, when pour in a hole, close on around sometimes hole, even, every a hole, there is holeInterior " grout leaking " phenomenon. While there is this phenomenon, gone out after underflow wait ganging up hole, take two holes or porous to pour into simultaneously.
8-4) midge phenomenon not
In the filling process of goaf, part gets into the reserved coal column in colliery, does not connect with coal mine gob; Part is boredThe position that subsides to coal mine gob, and the situation of subsiding is more serious, and poor with the connectivity of adjacent regions, there are indivedual holes notEat the phenomenon of slurry. For this phenomenon, can take grouting pressure suitably to strengthen, the plane of weakness at the position that subsides is punctured and strengthenedConcrete castability; While can not pressure puncturing, need to pay close attention to the perfusion situation of periphery hole, take appropriate measures and guarantee that the grouting of periphery hole is continuousProperty, to increase its range of scatter.

Claims (4)

1. a construction method for filling grouting is processed in goaf, it is characterized in that the method comprises the following steps:
1) preparation of construction before boring, specific as follows;
1-1) build operation platform: adopt the welding of channel-section steel or I-steel to form the larger operation platform of supporting surface, and with rigFrame entirety bolt connects, the construction stability requirement when guaranteeing high mast operation,
1-2) rig configuration: select power 11KW is above, moment of torsion is not less than 1110N.m revolution or down-the-hole drill,
1-3) drilling tool configuration: for the different lithology feature of overburden of the goaf, configuration alloy bit, diamond core drill bitHead, full section alloy or diamond bit are some; Drilling rod need to be selected the different size such as φ 42mm, φ 50mm by reality boring,Adopt lock Threaded Connector Coupling,
1-4) grouting equipment configuration: the low-grade theoretical displacement of grouting pump is not less than 80L/min and possesses multistep speed regulation function,
1-5) pulp feeding system processed: because goaf is larger for slurry demand, pulping equipment employing is large-scale with automatic control systemThe unified system in ground slurry preparing station is joined, and is delivered to each operation side by terminal; Slurry water ash weight ratio is not richer than 0.6:1,
2) in the process range of goaf, arrange filling grout hole, measure the setting-out drilling hole position in goaf;
3) cover layer to goaf and rock section are holed, specific as follows;
3-1) drilling construction order: the periphery hole in territory, subdrilling goaf to be processed, then advances to middle part, gradually simultaneously in orderKong Shangfen two orders are carried out, subdrilling I order hole, then bore II order hole,
3-2) boring location: drilling hole position, according to design cloth hole principle, adopts total powerstation or GPS, is combined with steel ruler setting-outCan,
3-3) drilling hole array pitch: according to industrial experimentation situation, detect slurries range of scatter, determine the optimum hole of filling drilled grout holeArray pitch, is 18~30m,
3-4) boring hole depth: reach the requirement of design hole depth, specifically to occur significantly falling to bore after phenomenon in boring procedure, continue to boreProceed to through seat earth 1~1.5m, to guarantee that being subject to fill with section fully discloses,
3-5) boring aperture: it is differential that perforate aperture should be greater than two, aperture, whole hole, often adopts φ 110~130mm, is drilled into and gos deep into baseAfter rock 5m, reducing is that φ 76~91mm continues to creep into, until reach whole hole depth,
3-6) boring hole deviation: because array pitch between filling grout hole is generally larger, and boring be as the criterion to drill goaf, drilling holeTiltedly control less demanding, but should be before boring perforate or rear strict correction rig vertical shaft angle in place again, ensure hanging down of boringThe requirement of straight degree,
3-7) protection casing is buried underground: boring perforate, to going deep into, after basement rock 5m, imbedding the protection casing of φ 108~127mm, is quantitatively notedThe striaght cement slurries build-in pin that enters 0.5:1, anchorage length must not exceed this basement rock segment length, for accelerating the drilling construction of grout compartmentProgress, can add the accelerator of cement weight 1%~3%, accelerates solidifying of sleeve pipe build-in cement grout,
3-8) creep into being chosen as of drilling method:
1. loam layer creeps into employing alloy bit, and using bentonite slurry as circulation fluid retaining wall, middle and slow speed of revolution creeps into;
2. boulder bed creeps into employing diamond thin-wall drill bit, and using bentonite slurry as circulation fluid retaining wall, the slow-speed of revolution is crept into;
3. rock section adopts full section drill bit, long drill pipe, high speed to creep into, and adopts clear water as circulation fluid, need not carry brill midwayGet core, reduced and added drilling rod number of times in drilling process, can greatly improve drilling efficiency; Meet the higher quartzy sandstone stratum of intensityTime, should carry boring and use diamond thin-wall drill bit instead and creep into;
4) boring in goaf is rinsed;
5) by boring, grouting treatment is carried out in inside, goaf; Specific as follows:
5-1) sequence of construction:
Grout hole is by the incline direction in goaf, grout hole and the structure position of the gob floor absolute altitude lower position of first constructingGrout hole, more along inclined direction from low to high, constructed to center deployment by limit portion, on order hole, point two orders are carried out simultaneously, firstFill with step 3-1) the I order hole of boring, then fill with II order hole,
5-2) grouting material:
It is the Cement fly ash of the high fly ash of 0.8:1 or 1:1, wherein cement that filling grouting adopts water-solid ratio: fine coalThe weight ratio of ash is 0.15:0.85; Wherein cement adopts Portland cement, and flyash adopts II level flyash,
5-3) grouting line arrangement:
Overfall pipeline is arranged on grouting pump exit, should lengthen pipeline to aperture overfall, while preventing from pouring into for a long time, stops up into slurryPipeline, causes unnecessary trouble; Meanwhile, a check-valves should be installed before the return pipe of aperture, to be controlled at the initial rank of groutingSection is when passive state, prevents slurry reflux and stops up overfall pipeline;
5-4) grouting method
Filling grouting adopts " pure pressure type, continuous grouting method ", in the time that grouting amount is large or crack, goaf, space are larger, in apertureAdd funnelform sand slinging machine, with slurries by sand or slag band hand-hole,
5-5) grouting segment length: grouting segment length be that segment length in whole hole extremely after reducing, i.e. step 3-5) in go deep into after basement rock 5m extremelyHole that segment length in whole hole,
5-6), when aperture pressure is in the force value of regulation, pump amount is less than 10L/min, stablizes 10~15min, finishes filling of this holeFill out grouting construction,
6) grouting quality inspection.
2. the construction method of filling grouting is processed in a kind of goaf according to claim 1, it is characterized in that: step 3)In, for the different lithology feature of coal mined-out area overlying strata, adopt respectively alloy bit, diamond thin-wall drill bit, Quan DuanFace alloy or diamond bit, and adopt bentonite slurry as circulation fluid retaining wall.
3. the construction method of filling grouting is processed in a kind of goaf according to claim 1 and 2, it is characterized in that: step5) in, adopt ground slurry preparing station system to join Cement fly ash, adopt pressure grout method to be in the milk.
4. the construction method of filling grouting is processed in a kind of goaf according to claim 1 and 2, it is characterized in that: groutingFront grouting obstruction mode is used " aperture sealing method ".
CN201310537073.XA 2013-11-04 2013-11-04 The construction method of filling grouting is processed in a kind of goaf Active CN103628912B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310537073.XA CN103628912B (en) 2013-11-04 2013-11-04 The construction method of filling grouting is processed in a kind of goaf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310537073.XA CN103628912B (en) 2013-11-04 2013-11-04 The construction method of filling grouting is processed in a kind of goaf

Publications (2)

Publication Number Publication Date
CN103628912A CN103628912A (en) 2014-03-12
CN103628912B true CN103628912B (en) 2016-05-11

Family

ID=50210326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310537073.XA Active CN103628912B (en) 2013-11-04 2013-11-04 The construction method of filling grouting is processed in a kind of goaf

Country Status (1)

Country Link
CN (1) CN103628912B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439463A (en) * 2019-07-31 2019-11-12 江河水利水电咨询中心 Mined-out Area control injected hole pore-creating technique

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847404A (en) * 2015-03-24 2015-08-19 中交一航局第四工程有限公司 Construction technology of gob grouting method
CN104762950B (en) * 2015-04-07 2016-04-27 山西交科岩土工程有限公司 Highway goaf harnessing method
CN105019940B (en) * 2015-07-24 2018-04-10 金川集团股份有限公司 A kind of method that damaged filling borehole reparation utilizes
CN105089043B (en) * 2015-07-24 2017-03-22 北京科技大学 Spatial isolation type runway pavement underlying goaf treatment method
CN106320982B (en) * 2016-08-18 2018-12-18 山东新巨龙能源有限责任公司 Detect hole construction technology in a kind of underground Neogene System stratum
CN106761543B (en) * 2016-12-02 2019-07-19 淮北矿业股份有限公司 A method of drilling misses section by goaf
CN109750670A (en) * 2017-11-04 2019-05-14 重庆第二师范学院 A kind of reinforcing of rich water boulder bed Deep Foundation Pit bottom mini-valve tube and construction technology
CN110672062A (en) * 2019-08-23 2020-01-10 广州市地质调查院(广州市地质环境监测中心) Embedding method of monitoring points for monitoring settlement of bedrock
CN111411909A (en) * 2020-04-23 2020-07-14 山东省煤田地质局第一勘探队 Artificial wall building method for treating drilling engineering in coal mining subsidence area
CN111561262A (en) * 2020-05-29 2020-08-21 贵州建工集团第一建筑工程有限责任公司 Hole forming method of rotary drilling rig for large-size pile hole in karst area
CN112903974B (en) * 2021-03-19 2023-02-03 青海省地质调查局 Deep deposit investigation prediction system
CN112982374A (en) * 2021-05-10 2021-06-18 中铁九局集团第七工程有限公司 Multilayer goaf drilling and grouting method
CN114109458B (en) * 2021-11-29 2022-07-26 长沙矿山研究院有限责任公司 Reinforced concrete artificial ore pillar construction method
CN114233378B (en) * 2021-12-17 2023-11-10 中国十七冶集团有限公司 Goaf self-walking drilling grouting integrated equipment and installation and use method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1032378A (en) * 1987-09-26 1989-04-12 抚顺矿务局 Slow down the method and the facilities and equipments thereof of bank surface subsidence
CN101270582A (en) * 2007-06-01 2008-09-24 中铁西北科学研究院有限公司 Method for setting bracing column in underground cavity
CN102330567A (en) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 Goaf slip casting treatment method of road
CN102704933A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section grouting filling coal-mining method for mining overburden rock

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1032378A (en) * 1987-09-26 1989-04-12 抚顺矿务局 Slow down the method and the facilities and equipments thereof of bank surface subsidence
CN101270582A (en) * 2007-06-01 2008-09-24 中铁西北科学研究院有限公司 Method for setting bracing column in underground cavity
CN102330567A (en) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 Goaf slip casting treatment method of road
CN102704933A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section grouting filling coal-mining method for mining overburden rock

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439463A (en) * 2019-07-31 2019-11-12 江河水利水电咨询中心 Mined-out Area control injected hole pore-creating technique

Also Published As

Publication number Publication date
CN103628912A (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN103628912B (en) The construction method of filling grouting is processed in a kind of goaf
CN103603689B (en) Curtain grouting construction method for treating mined-out areas
CN108240234B (en) A kind of Along Railway underlies coal mine gob Grouting method
CN105422170B (en) Middle deep goaf grouting reinforcing and processing method under a kind of building foundation
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN100464055C (en) Construction method of shallow buried underground excavating tunnel super large section using PBA method
CN103899351B (en) A kind of filling reinforcement means of processing complicated cavity
CN108915736B (en) Method for preventing and controlling water damage of roadway tunneling under strong water-rich and weak-cementation aquifer
CN107288657A (en) The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN103643918B (en) A kind of searching for Ordovician limestone mining area and the method preventing mine from seeping water
CN102561950B (en) Process for realizing grouting consolidation for aggregates filled in cavities of strata and jetting drill bit
CN105952475A (en) Coal mine residual mining zone falling waste roadway grouting reinforcing technology and method
CN102877857B (en) Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions
CN203487528U (en) Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area
CN1657711A (en) Rotary spray anchoring pile construction process
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN101205721A (en) Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN109083183A (en) Collapsible loess super long large diameter pile foundation churning driven expires hole mud wet process pore-forming technique
CN108590706A (en) One kind being used for speciality single-track railway tunnel drifter with booms Construction Techniques of Grouting in Heavy Curtain
CN106837382B (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN113027462B (en) Reinforcing method for shaft penetrating through weak surrounding rock
CN108797618A (en) One kind being used for Urban Underground pipe gallery drainage of foundation pit structure and its construction method
CN110439463A (en) Mined-out Area control injected hole pore-creating technique

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 443000 Hubei city of Yichang Province, Jianshe Road No. 40

Applicant after: CGGC FOUNDATION ENGINEERING CO., LTD.

Address before: 443000 Hubei city of Yichang Province, Jianshe Road No. 40

Applicant before: Gezhouba Group Foundation Engineering Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant