CN105089043B - Spatial isolation type runway pavement underlying goaf treatment method - Google Patents

Spatial isolation type runway pavement underlying goaf treatment method Download PDF

Info

Publication number
CN105089043B
CN105089043B CN201510441075.8A CN201510441075A CN105089043B CN 105089043 B CN105089043 B CN 105089043B CN 201510441075 A CN201510441075 A CN 201510441075A CN 105089043 B CN105089043 B CN 105089043B
Authority
CN
China
Prior art keywords
dead zone
goaf
section
prospecting
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510441075.8A
Other languages
Chinese (zh)
Other versions
CN105089043A (en
Inventor
高永涛
吴顺川
潘旦光
金爱兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN201510441075.8A priority Critical patent/CN105089043B/en
Publication of CN105089043A publication Critical patent/CN105089043A/en
Application granted granted Critical
Publication of CN105089043B publication Critical patent/CN105089043B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Bridges Or Land Bridges (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention discloses a spatial isolation type runway pavement underlying goaf treatment method and relates to goaf treatment in the fields of mining engineering, civil engineering, traffic engineering and the like. The goaf treatment method aims to solve the problem that the number of underlying excavation roadways is large, and the roadways may be communicated with one another. A plurality of investigation sections are arranged by excavating, digging and investigating a level, it is guaranteed that a reinforcing project is totally within a determined goaf range, an isolation structure is arranged on the boundary of a continuous goaf, and therefore it can be guaranteed that all reinforcing filler is added and diffused within a definite range. The method overcomes the defect that slurry flows in disorder under unrestrained conditions in a conventional grouting filling goaf, and consequently it is difficult to guarantee that the slurry is effectively diffused within a definite range.

Description

A kind of road face of spatial separation formula is underlied goaf Treatment Methods
Technical field:
A kind of road face of spatial separation formula is underlied goaf Treatment Methods, is related to mining engineering, civil engineering, traffic engineering Punish in goaf in field.
Background technology:
In recent years, with the continuous development of Chinese national economy, economic construction is constantly carried to what transportation system was required Height, highway and railway construction are also advanced at an unprecedented rate.Due to road network it is more and more intensive, the height in some areas Fast highway and railway inevitably need to pass through or set up in old goaf earth's surface, particularly more in some Privately operated mines wells Area, the situation for disorderly adopting disorderly digging are serious, and major part does not have systematic mining data, and the distribution in goaf is disorderly and unsystematic, and deposits In the situation that goaf is interpenetrated.Goaf of underliing such as is dealt with improperly, especially airfield runway, railway, highway, load Greatly, the speed of service is fast, and stratum deformation may be caused to cause ground drawing crack, land upheaval, ground inclination, distortion etc., affect airport, The normal use of railway and highway, for ensuring safety, it is necessary to carries out project treatment to goaf.This kind of goaf is processed at present Method has two kinds:The first is full excavating load, i.e., goaf is excavated, and is directly backfilled using filler.The method destroys country rock Globality, be difficult control to the STRESS VARIATION of country rock, there is potential safety hazard, and the method quantities is huge, costly.Second It is to carry out borehole or drilling to make concrete perfusion or serosity after goaf and extraneous insertion to plant, though this method can ensure to greatest extent The integrity of country rock, but it is more and in the case of being mutually communicated in goaf, there is serosity unordered flowing under unconfined condition, It is difficult to ensure that the defect that serosity is effectively spread in the range of restriction.
The content of the invention:
It is an object of the invention to when overcoming using conventional method slip casting filling goaf, it is difficult to ensure that serosity is limiting model Enclose the defect of interior effective diffusion.For achieving the above object, the present invention provides following technical scheme:
Underlie goaf Treatment Methods in a kind of road face of spatial separation formula, it is characterised in that key step includes:(1) excavate Prospecting tunnel, determines prospecting section in tunnel, detection of punching in section;(2) to the dead zone opening connecting passages for detecting; (3) vertical reinforced concrete divider wall is set up across dead zone laying reinforced concrete vacation bottom on continuous dead zone border in designed elevation;(4) it is right All isolation dead zones are filled consolidation process;(5) structure thicker road face.
Wherein step (1) determines prospecting section in prospecting gallery, and detection of punching in section is in one or more lanes Arrange a prospecting section in road at a certain distance, punch perpendicular to mineral ore that flat inspecting hole of first fetching water such as proves that dead zone is present, Then be directly perpendicular to mineral ore lane is tied to dead zone;Such as no dead zone, then lay to inspecting hole, if any dead zone, then beat to inclined shaft Visit to dead zone;Finally stamp to inspecting hole, if any dead zone, then make a call on one and visit to dead zone to inclined shaft.These lead to mineral ore gallery and Inclined shaft can punish passage as dead zone.As three directions there all are not discovery dead zone, then continue to drill next prospecting section, By that analogy, finally can ensure that all of reinforcing engineering completely it is determined that dead zone within the scope of;
Step (4) is to carry out slip casting (cement mortar or cement mortar) using surface drilling or well lane engineering to the dead zone for isolating Filled, so can ensure that all reinforcing implants in the range of restriction are filled and spread;
After the completion of step (5) is dead zone reinforcing engineering, viaduct structure thicker road face is laid on ground, such that it is able to guarantee i.e. Make, in the case where there is slight movement dead zone of underliing, also to can guarantee that the safety and stability in overlying structure road face.
It is of the invention compared with original conventional slip casting fill method, accurately can limit slip casting filling region, overcome As empty interval is mutually communicated, conventional grouting method is difficult to ensure that the defect that serosity is effectively spread in controlled range.
Description of the drawings:
Fig. 1 is the inventive method flow chart;
Fig. 2 is digging tunnel provided in an embodiment of the present invention site plan;
Fig. 3 is inspecting hole arrangement schematic diagram provided in an embodiment of the present invention;
Fig. 4 is that profile is disposed in dead zone provided in an embodiment of the present invention.
In figure:1- connecting taxiways, 2- prospecting inspecting holes, 3- engineering structures road face, 4-1# prospectings tunnel, 5-2# prospectings tunnel, 6- Reinforced concrete divider wall, 7- it is upper under inspecting hole, the horizontal inspecting holes of 8-, 9- to inspecting hole, 10- reinforced concrete viaducts, the slip casting of 11- dead zones, 12- steel Muscle concrete vacation bottom, 13- dead zones, 14- gallerys.
Specific embodiment:
For making the objects, technical solutions and advantages of the present invention become more apparent, below in conjunction with drawings and Examples, to this Invention is further elaborated.It should be appreciated that specific embodiment described herein is used only for explaining the present invention, not For limiting the present invention.
In embodiment, it is flourishing that certain large-scale road face engineering plans to build regional historical mining industry, due to Privately operated mines well it is planless Mining data, and disorderly adopt random digging phenomenon seriously, cause the distribution in goaf disorderly and unsystematic.Underlie in the range of whole construction and excavate lane Up to as many as 20,000 m, dead zone is in disordered state in spatial distribution and has good connectivity in road, if using conventional slip casting filling Goaf, serosity is under unconfined condition by unordered flowing, it is difficult to ensure that serosity is effectively spread in the range of restriction, so as to reach not To expected consolidation effect, if especially ready-built structure road face dead zone of underliing timely and effectively can not be processed, certainly will be right The safe operation of Future Projects hides some dangers for.
Region is planned to build using the present invention to the road face engineering carries out Mined-out area disposal, comprises the following steps that:
(1) connecting taxiway 1 is dug in absolute altitude+25m perpendicular to engineering structure road face 3 using existing vertical shaft, then distinguish Along 2# mineral ores, disk and 10# mineral ores lower wall dig two prospecting gallerys, respectively 1# prospectings tunnel 4,2# prospecting tunnel 5.Refer to figure 2;
(2) a prospecting section is arranged every 10m in this two gallerys, prospecting 2 layout drawing of inspecting hole is as shown in Figure 3.Hang down Straight to punch in mineral ore, hole depth is less than 20m, and flat inspecting hole 8 of first fetching water such as proves that dead zone is present, then be directly perpendicular to mineral ore and tie lane 14 to dead zone;Such as no dead zone, then lay to inspecting hole 9, if any dead zone, then beat and visit to dead zone to inclined shaft;Finally stamp to Inspecting hole 7, if any dead zone, then makes a call on one and visits to dead zone to inclined shaft.These gallerys and inclined shaft for leading to dead zone can be punished as dead zone Passage.As three directions there all are not discovery dead zone, then continue to drill next prospecting section, by that analogy;
(3) design is filled consolidation process to the dead zone of all more than absolute altitude+20m.Using above-mentioned gallery and inclined shaft As passage, one reinforced concrete vacation bottom 12 is laid in more than+20m across dead zone, as its isolation structure thing with bottom dead zone. At the two ends (beyond the scope for affecting structure road face or so each 20m) of continuous dead zone, one vertical reinforced concrete isolation is respectively set up Wall 6.Its punishment profile is as shown in Figure 4;
(4) grouting filling is carried out to the dead zone for isolating using surface drilling;
(5), after the completion of the reinforcing engineering of dead zone, finally 10 structure thicker road face of reinforced concrete viaduct is laid on ground, such that it is able to Even if guaranteeing, in the case where there is slight movement dead zone of underliing, also to can guarantee that the safety and stability in overlying structure road face.
Although the above-mentioned accompanying drawing that combines is described to the specific embodiment of the present invention, not to present invention protection model The restriction enclosed, it is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of spirit or essential attributes without departing substantially from the present invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention has appended power Profit is required rather than described above is limited.

Claims (1)

1. a kind of road face of spatial separation formula is underlied goaf Treatment Methods, it is characterised in that key step includes:(1) excavate and survey Tunnel is examined, prospecting section is determined in tunnel, detection of punching in section;(2) to the dead zone opening connecting passages for detecting; (3) vertical reinforced concrete divider wall is set up across dead zone laying reinforced concrete vacation bottom on continuous dead zone border in designed elevation;(4) it is right All isolation dead zones are filled consolidation process;(5) structure thicker road face;
Wherein described to determine prospecting section in tunnel, detection of punching in section is every certain in one or more tunnels One prospecting section of distance arrangement, vertical mineral ore punching, flat inspecting hole of first fetching water such as prove that dead zone is present, then be directly perpendicular to ore deposit Arteries and veins ties lane to dead zone;Such as no dead zone, then lay to inspecting hole, if any dead zone, then beat and visit to dead zone to inclined shaft;Finally beat On to inspecting hole, if any dead zone, then make a call to, such as three directions all and do not find dead zone, then continue to next Individual prospecting section is drilled, by that analogy.
CN201510441075.8A 2015-07-24 2015-07-24 Spatial isolation type runway pavement underlying goaf treatment method Active CN105089043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510441075.8A CN105089043B (en) 2015-07-24 2015-07-24 Spatial isolation type runway pavement underlying goaf treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510441075.8A CN105089043B (en) 2015-07-24 2015-07-24 Spatial isolation type runway pavement underlying goaf treatment method

Publications (2)

Publication Number Publication Date
CN105089043A CN105089043A (en) 2015-11-25
CN105089043B true CN105089043B (en) 2017-03-22

Family

ID=54570303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510441075.8A Active CN105089043B (en) 2015-07-24 2015-07-24 Spatial isolation type runway pavement underlying goaf treatment method

Country Status (1)

Country Link
CN (1) CN105089043B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973093A (en) * 2019-02-27 2019-07-05 山西鸿太旭飞能源科技有限公司 A kind of back production, the form of construction work for reinforcing underground coal resource goaf or destruction area
CN110130317A (en) * 2019-05-07 2019-08-16 中铁十六局集团第一工程有限公司 Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel
CN110173301B (en) * 2019-05-09 2020-11-24 中煤科工集团西安研究院有限公司 Fully mechanized goaf grouting method based on cluster multilateral well directional drilling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425453A (en) * 2011-11-11 2012-04-25 中煤平朔煤业有限责任公司 Large-scale re-mining method for filling small-kiln destruction area
CN103603689A (en) * 2013-11-04 2014-02-26 葛洲坝集团基础工程有限公司 Curtain grouting construction method for treating mined-out areas
CN103628912A (en) * 2013-11-04 2014-03-12 葛洲坝集团基础工程有限公司 Goaf management filling grouting construction method
CN103899351A (en) * 2014-03-28 2014-07-02 中冶沈勘工程技术有限公司 Filling and reinforcing method for processing complicated goafs

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010037872A (en) * 2008-08-07 2010-02-18 Toyo Tire & Rubber Co Ltd Method of filling underground space part

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425453A (en) * 2011-11-11 2012-04-25 中煤平朔煤业有限责任公司 Large-scale re-mining method for filling small-kiln destruction area
CN103603689A (en) * 2013-11-04 2014-02-26 葛洲坝集团基础工程有限公司 Curtain grouting construction method for treating mined-out areas
CN103628912A (en) * 2013-11-04 2014-03-12 葛洲坝集团基础工程有限公司 Goaf management filling grouting construction method
CN103899351A (en) * 2014-03-28 2014-07-02 中冶沈勘工程技术有限公司 Filling and reinforcing method for processing complicated goafs

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
地铁区间隧道地下空洞的探测及处理;费富华;《城市建设理论研究(电子版)》;20110831(第24期);全文 *

Also Published As

Publication number Publication date
CN105089043A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN105137488B (en) Ground water field based on artificial fluid injection describes method
Chen et al. Recent advances in high slope reinforcement in China: Case studies
CN110173301B (en) Fully mechanized goaf grouting method based on cluster multilateral well directional drilling
CN105089043B (en) Spatial isolation type runway pavement underlying goaf treatment method
Tong et al. Highway construction across heavily mined ground and steep topography in southern China
Yao et al. Numerical analysis of the influence of isolation piles in metro tunnel construction of adjacent buildings
CN103572680B (en) The roadbed filling construction method of coal mine gob
Li et al. Experimental simulation of seepage field distribution for small interval tunnel under varying-head infiltration
Hewitt et al. Dealing with the challenges of ground response on deep urban excavations adjacent to underground transport infrastructure in Australia
CN101985881B (en) Method for preventing vertical shaft wellhole from being damaged
Luo et al. Study on settlement and deformation of urban viaduct caused by subway station construction under complicated conditions
Jiajia et al. Causes of tunnel diseases in a karst stratum and remediation measures: a case study
Tan et al. Deep intervention shaft excavation in Kuala Lumpur limestone formation with pre-tunnelling construction method
Bhavsar et al. Design and construction of tunnels in zones subjected to high convergences
Zhou et al. Settlement Prediction Method of Extra‐Large Diameter Tunnels in Soft Rock Strata
Anderson A comparison of shallow and deep mining
Malkin et al. Subsidence problems in route design and construction
Bogusz Prediction of Tunneling-Induced Ground Movements
Raynor Shallow coal and ironstone mine workings on the A465 highways project in South Wales: assessment, mitigation and treatment
Wei et al. Integrated Monitoring and Control of Deformation of Metro under Construction effected by the Construction of Foundation Pit
Chen et al. Seepage interaction mechanism of crossing tunnels and existing tunnels: Model test and numerical analysis
Bar et al. Ground Characterization and Design of a Drainage Gallery Tunnel Network for a Large Open Pit Mine in a High Rainfall Environment
Boudjellal et al. Numerical Modeling by Plaxis Software (3D), the Effect of Digging a Tunnel on the Behavior of the Ground and Overlying Structures: Case: Subway of Algiers (Algeria)
Jayarama et al. Geotechnical challenges of conventional tunnelling underneath sensitive structures
Rayudu et al. Risk Assessment-Based Approach To Remediation Of Abandoned Underground Coal Mines For A Motorway Upgrade-A Case Study

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant