CN103669365A - External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof - Google Patents

External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof Download PDF

Info

Publication number
CN103669365A
CN103669365A CN201210327266.8A CN201210327266A CN103669365A CN 103669365 A CN103669365 A CN 103669365A CN 201210327266 A CN201210327266 A CN 201210327266A CN 103669365 A CN103669365 A CN 103669365A
Authority
CN
China
Prior art keywords
pile
stake
diagonal
foundation pit
bracing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210327266.8A
Other languages
Chinese (zh)
Inventor
张绍球
邹宗煊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210327266.8A priority Critical patent/CN103669365A/en
Publication of CN103669365A publication Critical patent/CN103669365A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Provided is an external diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile. The external diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile is characterized by being composed of an internal diagonal-bracing pile, an external diagonal-pulling pile and a top crown beam; the internal diagonal-bracing pile is a reinforced concrete pouring pile or a precast pile which inclines towards the wall of a foundation pit by 10-35 degrees, the diameter of the internal diagonal-bracing pile is 400-1000mm, the length of the internal diagonal-bracing pile is 10-35m, the external diagonal-pulling pile is a wire rope cemented soil rotary jet grouting anchor pile or a reinforced concrete pouring pile which inclines towards the interior of the foundation pit by 20-70 degrees, the diameter of the external diagonal-pulling pile is 200-900mm, the length of the external diagonal-pulling pile is 10-40m, and the internal diagonal-bracing pile and the external diagonal-pulling pile are connected through the top crown beam. Compared with the prior art, the external diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile has the advantages that the construction process is simple, the foundation pit support is stressed more reasonably, the manufacturing cost is lower, the safety degree of the foundation pit is high, no internal support exists in the foundation pit, soil can be largely excavated conveniently, and the pile can be used in soft soil areas of national eastern coastal cities and can also be used in national area with the good soil property.

Description

The chevron shaped foundation pit supporting pile of a kind of outer oblique pull interior leg brace and construction method thereof
Technical field
The present invention relates to building foundation engineering field, relate in particular to the chevron shaped foundation pit supporting pile of a kind of outer oblique pull interior leg brace and construction method thereof.
Background technology
As everyone knows, China coast city belongs to soft foundation more, in 20 meters of near surfaces, is mud or mucky soil, in the 1-2 of excavation depth 5-10m layer Basement pit supporting, adopts bored pile to add inner support or diagonal brace as retaining piles more; Or inside and outside two arrange the stiff frame of straight stake along foundation ditch periphery, and though the former is safe and reliable, cost is high, soil excavation is very inconvenient with construction; The latter's cost is low, but foundation pit walls is large to hole intrinsic displacement, and foundation ditch degree of safety is lower.
Summary of the invention
The object of the present invention is to provide the chevron shaped foundation pit supporting pile of a kind of outer oblique pull interior leg brace and construction method thereof, in the pattern foundation pit supporting structure of the waterproof mud that can extensively distribute in China coast city, apply, have that construction technology is simple, pattern foundation pit supporting structure is stressed more rationally, cost is lower, in foundation ditch without inner support and diagonal brace, the hole wall supporting displacement that goes to zero, foundation ditch degree of safety is high, the advantages such as also convenient cubic metre of earth of employing heavy excavation, and basement construction is convenient.
The object of the invention is to be achieved through the following technical solutions: the chevron shaped foundation pit supporting pile of a kind of outer oblique pull interior leg brace, it is characterized in that, chevron shaped foundation pit supporting pile is comprised of interior leg brace stake and outer slope bolt piles and top crown beam, interior leg brace stake is to foundation pit walls inclination 10-35 degree, diameter 400-1000mm, the deposited reinforced concrete pile of the long 10-35m of stake or prefabricated stake, outer slope bolt piles is to the tilted 20-70 degree of foundation ditch, diameter 200-900mm, cable wire cement-soil jet-grouted anchor pile or the deposited reinforced concrete pile of the long 10-40m of stake, diagonal brace stake is connected with the very useful Guan Liang of slope bolt piles stake.Slope bolt piles and diagonal brace stake determine that according to engineering and geological condition stake end does not expand or establishes enlarged footing or rotary churning pile major part or pile bottom post grouting, when foundation depth is larger, establishes two rows slope bolt piles; Prefabricated stake described herein is preformed pile or prestressed pile, and deposited reinforced concrete pile is constructed by Spiral digging machine or immersed tube machine or multi-functional geological drilling rig, and jet-grouted anchor pile is by jet-grouted anchor pile drilling machine construction; Meet casing steel pipe under plastic flow mud, do not collapse and collapse in an assurance stake hole, not necking down.
The construction method of the chevron shaped foundation pit supporting pile of above-mentioned a kind of outer oblique pull interior leg brace, comprises following construction sequence successively:
(A) making of diagonal brace stake and steel concrete slope bolt piles construction:
1. pore-forming: Spiral digging machine or immersed tube (stake) machine or multi-functional geological drilling rig are positioned on stake position, by the Yu Zhuankong inclination angle, aperture of designing requirement, first immersed tube or pore-forming, meet casing steel pipe under plastic flow mud, a design stake end enlarged footing, construction to absolute altitude at the bottom of hole changes reaming bit reaming;
2. put reinforcing cage: in casing steel pipe or along chute, put into reinforcing cage, on reinforcing cage stirrup, be installed with for controlling the fine-stone concrete wheel shape cushion block of reinforcement cover, be designed with pile bottom post grouting, with two for the moment bore as the steel pipe of slip casting, replace two main muscle, and with assembling reinforcement cage after the cloth waste plug mouth of pipe;
3. fill with pile concrete: by existing underwater concrete perfusion rules concrete perfusion;
4. the reinforcing bar that anchors into Guan Liang is reserved on stake top;
5. as prefabricated stake for design, first prefabricated pile body is squeezed in soil by design angle by stake machine on stake position.
(B) making of cable wire cement-soil churning oblique pull anchoring pile construction:
1. jet-grouted anchor pile rig is positioned on the stake position on foundation ditch limit;
2. the three leaf drill bits (bore 15-18cm) by rig creep into projected depth to soil layer water filling;
3. exit drill bit, 2-3 root cable wire is fixed on cable wire dish, at the bottom of heading on cable wire center hole cable wire is delivered to hole by the drilling rod of rig, from aperture, send inward 3-8m simultaneously, with 20MPa high-pressure rotary-spray cement paste, spray limit, limit is entered, stake end gravel layer up and down twice churning form a stake major part; At the bottom of hole, exit the still spray while moving back;
4. the long anchor cable of the reserved 1.5-2m in aperture is made and later stage anchor cable traction stretch-draw as Guan Liang;
(C) make Guan Liang and stretch-draw cable wire: in all diagonal brace stakes and slope bolt piles, constructed, excavate out stake top and Guan Liang position, colligation hat beam steel and pouring hat beam concrete on stake top, wait being preced with beam concrete, reach after some strength, with Special jack stretch-draw cable wire, reach builder's tonnage, put cable wire positioning disk, the cable wire of the unnecessary length of oxyacetylene metal-cutting;
(D) beat the outer dewatering well of foundation ditch: the determining deviation along foundation ditch outside is beaten 300-800mm bore dewatering well, and its degree of depth surpasses the end, hole;
(E) the excavation of foundation pit earthwork, the thick pea gravel concreten of 100mm is sprayed on slope more than Guan Liang, assembling reinforcement net sheet anchor into pile body with dowel on diagonal brace stake inclined-plane, then spray the thick pea gravel concreten of 100mm.
The chevron shaped foundation pit supporting pile of a kind of outer oblique pull interior leg brace compared with prior art, there is following remarkable advantage: construction technology is simple, pattern foundation pit supporting structure is stressed more rationally, cost is lower, foundation ditch degree of safety is high, foundation ditch is interior without inner support, convenient cubic metre of earth heavy excavation, and basement construction advantage easily, can not only use in the soft clay area in Deposits in Eastern Coastal China city, Ye Neng China soil property preferably area is used.
Accompanying drawing explanation
Fig. 1 is that slope bolt piles of the present invention is the generalized section of cable wire cement-soil jet-grouted anchor pile.
Fig. 2 is that slope bolt piles of the present invention is the generalized section of deposited reinforced concrete pile.
In figure: 1. steel concrete perfusion diagonal brace stake, 2. reinforcing cage, 3. fine-stone concrete steel mesh reinforcement and pile body joint bar link, 4. cable traction positioning disk, 5. Guan Liang, 6.100 thick fine-stone concrete, 7. gutter, 8. dewatering well, 9. miscellaneous fill, 10. cable wire, 11. cable wire cement-soil churning slope bolt piles, 12. silt clay, 13. muds, 14. end churning major parts, 15. ovum gravel beds, 16. clays, 17. slope bolt piles inclination angles, 18. foundation pit walls plumb lines, 19. diagonal brace stake inclination angle, 20. stake end enlarged footing, 21. foundation ditch bottom surfaces, 22. rubble bed courses, 23.C10 concrete bed course, 24. basement bottom boards, 25. gutters, 26. underground indoor and outdoor walls, 27. steel concrete perfusion slope bolt piles.
The specific embodiment
An exemplary embodiments of the present invention, as Fig. 1,
(a) Spiral digging machine is positioned on the stake position of foundation ditch, by the Yu Zhuankong inclination angle, aperture (19) of designing requirement, first pore-forming, casing steel pipe under plastic flow mud, and at stake end enlarged footing (20); In casing steel pipe, put into reinforcing cage (2), on reinforcing cage (2) stirrup, be installed with for controlling the fine-stone concrete wheel shape cushion block of reinforcement cover, by underwater concrete perfusion rules concrete perfusion, the reserved reinforcing bar that anchors into Guan Liang in stake top;
(b) jet-grouted anchor pile rig is positioned on the stake position on foundation ditch limit, by the three leaf drill bits (bore 15-18cm) of rig to soil layer (9), (12), (13), (15) with design angle (17) water filling, creep into projected depth, exit drill bit, 2 cable wires (10) are fixed on cable wire dish, drilling rod by rig heads on cable wire center hole, at the bottom of cable wire (10) is delivered to hole, from aperture, send inward 6m simultaneously, with 20MPa high-pressure rotary-spray cement paste, spray limit, limit is entered, stake end gravel layer (15) up and down twice churning form a stake major part (14), at the bottom of hole, exit again, the still spray while moving back, the long cable wire (10) of the reserved 1.5-2m in aperture is made and later stage cable wire (10) traction stretch-draw as Guan Liang (5),
(c) at all diagonal brace stakes (1) and slope bolt piles (11), construct complete, excavate out stake top and Guan Liang (5) position, colligation Guan Liang (5) reinforcing bar and pouring Guan Liang (5) concrete on stake top, until Guan Liang (5) concrete, reach after some strength, with Special jack stretch-draw cable wire (10), reach builder's tonnage, put cable wire positioning disk (4), the cable wire of the unnecessary length of oxyacetylene metal-cutting (10);
(d) along a determining deviation in foundation ditch outside, beat 500mm bore dewatering well (8), its degree of depth surpasses hole end 4m;
(e) the excavation of foundation pit earthwork, the thick pea gravel concreten of 100mm (6) is sprayed on slope more than Guan Liang (5), assembling reinforcement net sheet anchor into pile body with dowel on diagonal brace stake (1) inclined-plane, spray again the thick pea gravel concreten of 100mm (3), excavation gutter (7), foundation ditch outside, pit earthwork digs to bottom surface (21), hole, spread successively rubble bed course (22), C10 concrete bed course (23), then water basement bottom board (24) and underground indoor and outdoor wall (26) and gutter (25).

Claims (2)

1. the chevron shaped foundation pit supporting pile of outer oblique pull interior leg brace, it is characterized in that, chevron shaped foundation pit supporting pile is comprised of interior leg brace stake and outer slope bolt piles and top crown beam, interior leg brace stake is to the deposited reinforced concrete pile of foundation pit walls inclination 10-35 degree, diameter 400-1000mm, the long 10-35m of stake or prefabricated stake, outer slope bolt piles is to the tilted 20-70 degree of foundation ditch, diameter 200-900mm, cable wire cement-soil jet-grouted anchor pile or the deposited reinforced concrete pile of the long 10-40m of stake, diagonal brace stake is connected with the very useful Guan Liang of slope bolt piles stake.
2. the construction method of the chevron shaped foundation pit supporting pile of outer oblique pull interior leg brace, comprises following construction sequence successively:
(A) making of diagonal brace stake and steel concrete slope bolt piles construction:
1. pore-forming: Spiral digging machine or immersed tube (stake) machine or multi-functional geological drilling rig are positioned on stake position, by the Yu Zhuankong inclination angle, aperture of designing requirement, first immersed tube or pore-forming, meet casing steel pipe under plastic flow mud, a design stake end enlarged footing, construction to absolute altitude at the bottom of hole changes reaming bit reaming;
2. put reinforcing cage: in casing steel pipe or along chute, put into reinforcing cage, on reinforcing cage stirrup, be installed with for controlling the fine-stone concrete wheel shape cushion block of reinforcement cover, be designed with pile bottom post grouting, with two for the moment bore as the steel pipe of slip casting, replace two main muscle, and with assembling reinforcement cage after the cloth waste plug mouth of pipe;
3. fill with pile concrete: by existing underwater concrete perfusion rules concrete perfusion;
4. the reinforcing bar that anchors into Guan Liang is reserved on stake top;
5. as prefabricated stake for design, first prefabricated pile body is squeezed in soil by design angle by stake machine on stake position.
(B) making of cable wire cement-soil churning oblique pull anchoring pile construction:
1. jet-grouted anchor pile rig is positioned on the stake position on foundation ditch limit;
2. the three leaf drill bits (bore 15-18cm) by rig creep into projected depth to soil layer water filling;
3. exit drill bit, 2-3 root cable wire is fixed on cable wire dish, at the bottom of heading on cable wire center hole cable wire is delivered to hole by the drilling rod of rig, from aperture, send inward 3-8m simultaneously, with 20MPa high-pressure rotary-spray cement paste, spray limit, limit is entered, stake end gravel layer up and down twice churning form a stake major part; At the bottom of hole, exit the still spray while moving back;
4. the long anchor cable of the reserved 1.5-2m in aperture is made and later stage anchor cable traction stretch-draw as Guan Liang;
(C) make Guan Liang and stretch-draw cable wire: in all diagonal brace stakes and slope bolt piles, constructed, excavate out stake top and Guan Liang position, colligation hat beam steel and pouring hat beam concrete on stake top, wait being preced with beam concrete, reach after some strength, with Special jack stretch-draw cable wire, reach builder's tonnage, put cable wire positioning disk, the cable wire of the unnecessary length of oxyacetylene metal-cutting, completes making and the construction of the chevron shaped foundation pit supporting pile of all outer oblique pull interior leg braces.
CN201210327266.8A 2012-08-29 2012-08-29 External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof Pending CN103669365A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210327266.8A CN103669365A (en) 2012-08-29 2012-08-29 External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210327266.8A CN103669365A (en) 2012-08-29 2012-08-29 External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof

Publications (1)

Publication Number Publication Date
CN103669365A true CN103669365A (en) 2014-03-26

Family

ID=50308079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210327266.8A Pending CN103669365A (en) 2012-08-29 2012-08-29 External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN103669365A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104647583A (en) * 2015-02-16 2015-05-27 中交第二航务工程局有限公司 Immersed-tube prefabricated outer wall support
CN105239586A (en) * 2015-11-05 2016-01-13 云南建工集团有限公司 Support structure for supporting foundation pit and method for supporting foundation pit
CN105442615A (en) * 2015-11-26 2016-03-30 中国建筑股份有限公司 Inverted-Y-shaped supporting structure for foundation pit engineering and construction method of inverted-Y-shaped supporting structure
CN107677498A (en) * 2017-11-02 2018-02-09 中国建筑第八工程局有限公司 The simulation test device and method of the stake soil support combination supporting system mechanism of action
CN108277808A (en) * 2017-01-05 2018-07-13 上海城地建设股份有限公司 Support, anchor cable post-tensioning H-type component building enclosure and its application process before a kind of steel pipe
CN108385692A (en) * 2018-01-18 2018-08-10 武汉中力岩土工程有限公司 Deep basal pit shear connector support system
CN108867658A (en) * 2018-07-18 2018-11-23 江苏东合南岩土科技股份有限公司 Tilt piling bar foundation pit supporting construction and construction method
WO2019104924A1 (en) * 2017-12-01 2019-06-06 徐少钢 Portable mechanically assembled ground fixation stake device
CN110029673A (en) * 2019-04-16 2019-07-19 潮峰钢构集团有限公司 Anchor cable drilling pilework and its enclosing method suitable for Extra-Deep Foundation Pit
CN110644497A (en) * 2019-09-18 2020-01-03 长安大学 Soft soil foundation deep foundation pit supporting device
CN111733878A (en) * 2020-07-09 2020-10-02 济南城建集团有限公司 Full-prefabricated assembled superposed comprehensive pipe gallery supporting construction structure and process
CN111851539A (en) * 2020-08-27 2020-10-30 北交智汇千路(北京)科技有限公司 Groove type anti-slide pile for slope structure safety and construction method thereof
CN112459078A (en) * 2020-11-11 2021-03-09 中国建筑第二工程局有限公司 Construction method of foundation pit supporting system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1514073A (en) * 2003-03-10 2004-07-21 李宪奎 Supporitng structure of breast wall
CN101408023A (en) * 2008-11-11 2009-04-15 天津大学 Method for supporting and protecting row pile pit
JP4318749B1 (en) * 2009-04-17 2009-08-26 六郎 海野 Slope protection device
CN101748726A (en) * 2009-12-20 2010-06-23 高玉书 Wind driven generator base anchor pile construction technology taking rock as bearing stratum
CN201649076U (en) * 2010-04-14 2010-11-24 江苏江中集团有限公司 Inversed Y-type single-row unidirectional rotary spraying, mixing and reinforcing combined tangent pile
CN102182196A (en) * 2011-03-28 2011-09-14 北京鑫实路桥建设有限公司 Reverse circulation grouting anchor rod reinforcing method for road rock side slope

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1514073A (en) * 2003-03-10 2004-07-21 李宪奎 Supporitng structure of breast wall
CN101408023A (en) * 2008-11-11 2009-04-15 天津大学 Method for supporting and protecting row pile pit
JP4318749B1 (en) * 2009-04-17 2009-08-26 六郎 海野 Slope protection device
CN101748726A (en) * 2009-12-20 2010-06-23 高玉书 Wind driven generator base anchor pile construction technology taking rock as bearing stratum
CN201649076U (en) * 2010-04-14 2010-11-24 江苏江中集团有限公司 Inversed Y-type single-row unidirectional rotary spraying, mixing and reinforcing combined tangent pile
CN102182196A (en) * 2011-03-28 2011-09-14 北京鑫实路桥建设有限公司 Reverse circulation grouting anchor rod reinforcing method for road rock side slope

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜爱民: "灌注桩与高压旋喷桩形成止水帷幕的施工应用", 《山西建筑》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104647583A (en) * 2015-02-16 2015-05-27 中交第二航务工程局有限公司 Immersed-tube prefabricated outer wall support
CN105239586A (en) * 2015-11-05 2016-01-13 云南建工集团有限公司 Support structure for supporting foundation pit and method for supporting foundation pit
CN105239586B (en) * 2015-11-05 2017-04-12 云南省建设投资控股集团有限公司 Method for supporting foundation pit by adopting support structure
CN105442615A (en) * 2015-11-26 2016-03-30 中国建筑股份有限公司 Inverted-Y-shaped supporting structure for foundation pit engineering and construction method of inverted-Y-shaped supporting structure
CN108277808A (en) * 2017-01-05 2018-07-13 上海城地建设股份有限公司 Support, anchor cable post-tensioning H-type component building enclosure and its application process before a kind of steel pipe
CN107677498A (en) * 2017-11-02 2018-02-09 中国建筑第八工程局有限公司 The simulation test device and method of the stake soil support combination supporting system mechanism of action
CN107677498B (en) * 2017-11-02 2023-10-03 中国建筑第八工程局有限公司 Simulation test device and method for action mechanism of pile-soil-support combined support system
WO2019104924A1 (en) * 2017-12-01 2019-06-06 徐少钢 Portable mechanically assembled ground fixation stake device
US11242664B2 (en) 2017-12-01 2022-02-08 Shaogang XU Portable mechanically assembled ground fixation stake device
CN108385692A (en) * 2018-01-18 2018-08-10 武汉中力岩土工程有限公司 Deep basal pit shear connector support system
CN108867658A (en) * 2018-07-18 2018-11-23 江苏东合南岩土科技股份有限公司 Tilt piling bar foundation pit supporting construction and construction method
CN110029673A (en) * 2019-04-16 2019-07-19 潮峰钢构集团有限公司 Anchor cable drilling pilework and its enclosing method suitable for Extra-Deep Foundation Pit
CN110029673B (en) * 2019-04-16 2023-10-13 潮峰钢构集团有限公司 Anchor cable bored pile structure suitable for deep foundation pit support and support method thereof
CN110644497A (en) * 2019-09-18 2020-01-03 长安大学 Soft soil foundation deep foundation pit supporting device
CN110644497B (en) * 2019-09-18 2021-05-04 长安大学 Soft soil foundation deep foundation pit supporting device
CN111733878A (en) * 2020-07-09 2020-10-02 济南城建集团有限公司 Full-prefabricated assembled superposed comprehensive pipe gallery supporting construction structure and process
CN111851539A (en) * 2020-08-27 2020-10-30 北交智汇千路(北京)科技有限公司 Groove type anti-slide pile for slope structure safety and construction method thereof
CN112459078A (en) * 2020-11-11 2021-03-09 中国建筑第二工程局有限公司 Construction method of foundation pit supporting system

Similar Documents

Publication Publication Date Title
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
US20140026518A1 (en) Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN104895055A (en) Building grouting pile foundation construction method
CN106150506A (en) A kind of gateway open excavation section inverted side-wall construction method
CN100510281C (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN103485347A (en) Batter pile used for building foundation pit support and construction method thereof
CN104695458A (en) Construction method of deep stirring and jet grouting compound pile waterproof curtain
CN211200426U (en) Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall
CN106149745A (en) A kind of truss type steel tube grouting pile basis and construction method thereof
CN201801843U (en) Overwater gravity type earth-retaining structure with anchoring structure
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN110080779A (en) Tunnel tunnel bottom karst cave treatment construction method
CN201459749U (en) Stable structure for construction platform of deep water steel pipe pile
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
CN210263075U (en) Arrange bars formula tubular pile post back slip casting internal anchor outer stagnant water support system
CN103046556B (en) Without inner support annular space enclosing structure and preparation method thereof
CN101603311B (en) Jet grouting pile construction method adopting heavy hammer-tamping compaction soil preformed hole
CN106120833A (en) A kind of underground truss-like pile foundation and construction method thereof
CN216551791U (en) Riprap reinforcing structure for shield tunnel to pass through lake or river
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Zou Zongxuan

Document name: Notification of Passing Preliminary Examination of the Application for Invention

PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140326

DD01 Delivery of document by public notice

Addressee: Zou Zongxuan

Document name: Notification that Application Deemed to be Withdrawn