CN113431097A - Protection structure of shallow foundation building next to deep foundation pit engineering and construction method - Google Patents

Protection structure of shallow foundation building next to deep foundation pit engineering and construction method Download PDF

Info

Publication number
CN113431097A
CN113431097A CN202110548526.3A CN202110548526A CN113431097A CN 113431097 A CN113431097 A CN 113431097A CN 202110548526 A CN202110548526 A CN 202110548526A CN 113431097 A CN113431097 A CN 113431097A
Authority
CN
China
Prior art keywords
foundation
deep
building
shallow
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110548526.3A
Other languages
Chinese (zh)
Inventor
许宁
黄文杰
李水生
邓洋
郑东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202110548526.3A priority Critical patent/CN113431097A/en
Publication of CN113431097A publication Critical patent/CN113431097A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Abstract

The application relates to a protection structure and a construction method of a shallow foundation building next to a deep foundation pit project, which comprises deep pile foundations arranged next to an original shallow foundation building, wherein the upper ends of the deep pile foundations are connected with connecting beams, and the connecting beams are connected with ring beams of the original shallow foundation building; and grouting and reinforcing the soil body between the deep pile foundation and the newly-built deep foundation pit support structure to form a grouting reinforcing layer, embedding sleeve valve pipes at the bottom of the original shallow foundation building, and simultaneously adopting a process of reversing first and then reversing second for deep foundation pit engineering construction. The application reduces the disturbance of deep foundation pit engineering to the former shallow foundation building of close proximity greatly with "initiative + passive" protection thinking, reaches the effect that improves former shallow foundation building stability.

Description

Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
Technical Field
The application relates to the field of building engineering, in particular to a protection structure of a shallow foundation building next to a deep foundation pit engineering and a construction method.
Background
Along with the continuous development of cities, land resources are increasingly tense, some municipal works and building works in cities are constructed next to the existing building by inevitable 'joint pins', and some new works are very close to the existing building or even less than 2 meters away from the existing building, so that the original building is inevitably disturbed.
In view of the above-mentioned related technologies, the inventor believes that many house buildings constructed in cities before 2000 in particular are shallow foundation structures which are extremely sensitive to soil deformation/groundwater level fluctuation, and when deep foundation pit engineering is performed next to these shallow foundation buildings, the consequences of building settlement, deformation, cracking and the like are extremely easy to cause.
Disclosure of Invention
In order to protect a shallow foundation structure and ensure construction safety quality, the application provides a protection structure and a construction method for a shallow foundation building close to a deep foundation pit project.
In a first aspect, the application provides a protection structure for a shallow foundation building next to a deep foundation pit engineering, which adopts the following technical scheme:
a protection structure of a shallow foundation building next to a deep foundation pit engineering comprises deep pile foundations arranged next to an original shallow foundation building, wherein the upper ends of the deep pile foundations are connected with connecting beams, and the connecting beams are connected with ring beams of the original shallow foundation building; and a grouting reinforcement layer is also arranged between the deep pile foundation and the newly-built deep foundation pit.
By adopting the technical scheme, the pile foundation arranged on the side wall of the original shallow foundation building can play a role in protecting between the deep foundation pit engineering and the original shallow foundation building, and the influence of the deep foundation pit engineering on the original shallow foundation building is reduced; the connecting beams formed on the pile foundations are connected with the ring beams of the original shallow foundation building, so that a plurality of pile foundations are connected with the original shallow foundation building into a whole, and the plurality of pile foundations bear the deformation of the original shallow foundation building, so that when the soil body at the bottom of the building and the water level change cause settlement, uplift or deformation, the original shallow foundation building deforms along with the deformation of the soil body and can be transmitted to the connecting beams along with the ring beams and then transmitted to the pile foundations, and the pile foundations can provide stable jacking force or uplift force, thereby greatly inhibiting the deformation of the original shallow foundation building and further reducing the influence of deep foundation pit construction on the original shallow foundation building;
and meanwhile, a grouting reinforcement layer is arranged between the pile foundation and the deep foundation pit, so that the grouting reinforcement layer is used for reinforcing the soil body between the deep foundation pit and the original shallow foundation building, an isolation layer is formed, the underground water level fluctuation in the soil body is reduced, the deformation of the deep foundation pit and the deformation and water level change of the soil body at the bottom and the peripheral area of the original shallow foundation building caused by drainage are further reduced, and the stability of the original shallow foundation building is further improved.
Optionally, bar-embedded steel bars are arranged between the connecting beam and the ring beam of the original shallow foundation building, and the connecting beam is formed by firstly binding the steel bars and then pouring concrete.
Through adopting above-mentioned technical scheme, utilize and set up the bar planting reinforcing bar between ring roof beam and pile foundation, carry out concrete placement again and form even roof beam, make its even roof beam of pouring shaping and ring roof beam, pile foundation solidify in an organic whole, reinforcing pile foundation and the stable connectivity between the ring roof beam, improve the stable effort of pile foundation to former shallow foundation building.
Optionally, the construction method further comprises a grouting pipe obliquely placed below the original shallow foundation building, and one end of the grouting pipe extends out of the ground on one side of the pile foundation.
By adopting the technical scheme, after the construction of the deep foundation pit is completed, the soil body under the original shallow foundation building can be subjected to supplementary grouting reinforcement and filled with the settled soil body through the grouting pipe according to the settlement deformation condition of the soil body, the foundation under the original shallow foundation building is stably reinforced, and the deformation of the original shallow foundation building is further reduced.
In a second aspect, the present application provides a deep foundation pit construction method next to a shallow foundation building, which adopts the following technical scheme:
a construction method of a deep foundation pit adjacent to a shallow foundation building comprises the following steps:
step 1, newly adding a deep pile foundation: the deep pile foundation is arranged along the original shallow foundation building towards three sides of the newly-built deep foundation pit, the deep pile foundation base is arranged in the excavation range of the deep foundation pit which is not less than 1 time, and the deep pile foundation is connected with the ring beam of the original shallow foundation building;
step 2, grouting reinforcement: grouting between the deep foundation pit and the deep pile foundation to form a reinforcing layer;
step 3, excavating the deep foundation pit: firstly constructing a foundation pit enclosure structure, then performing earth excavation work from top to bottom, stopping excavation after earth excavation reaches a top plate, and paving a template to construct a top plate structure; after the top plate reaches the design strength, continuously excavating the soil body downwards, and constructing the middle plate and the bottom plate in sequence; after the construction of the structural slab is completed, the side walls between the bottom plate and the middle plate and between the middle plate and the top plate are constructed sequentially from bottom to top.
By adopting the technical scheme, the deep pile foundation is connected with the ring beam of the original shallow foundation building, so that the foundation force of the original shallow foundation building can be improved, and meanwhile, a reinforcing layer is formed by grouting between the shallow foundation building and the deep foundation pit, so that the disturbance of deep foundation pit engineering on the original shallow foundation building can be reduced, and the influence of the original shallow foundation building on the construction of the deep foundation pit is reduced;
and then the deep foundation pit adopts the construction mode of' reverse first and then forward first, after the roof, the middle plate and the bottom plate are constructed layer by layer first, then the side wall is constructed, because after the roof and the middle plate, the middle plate and the bottom plate are directly excavated (at the moment, the roof, the middle plate, the bottom plate and the enclosure structure form a stable cavity), then the side wall between the middle plate and the bottom plate and between the middle plate and the roof is constructed, the extrusion force to the soil body in the construction process of the side wall can be reduced, thereby the disturbance to the soil body in the peripheral area in the construction process can be reduced, and further the influence to the original shallow foundation building can be reduced.
Optionally, in step 1, pile top concrete is removed after the construction of the deep pile foundation, then a ring beam of the original shallow foundation building is excavated and steel bars are planted, the steel bars are integrally connected with the ring beam and the top steel bars of the deep pile foundation, and then formwork is erected to pour concrete, so that a connecting beam integrated with the ring beam and the deep pile foundation is formed.
Through adopting above-mentioned technical scheme, utilize bar planting reinforcing bar and the whole back of deep pile foundation top steel bar connection, the concrete of pouring again forms the even roof beam integrative with collar tie beam, deep pile foundation, can strengthen the stability of being connected between former shallow foundation building and the deep pile foundation to improve the stable effort of deep pile foundation to former shallow foundation building.
Optionally, in step 2, before the reinforcing layer is formed by grouting, a grouting pipe is pre-buried under the original shallow foundation building, the grouting pipe is obliquely arranged, the opening end of the grouting pipe extends to the ground on one side of the deep pile foundation, and the grouting pipe opening is blocked.
By adopting the technical scheme, after the construction of the deep foundation pit is completed, the soil body under the original shallow foundation building can be subjected to supplementary grouting reinforcement and filled with the settled soil body through the grouting pipe according to the settlement deformation condition of the soil body, the foundation under the original shallow foundation building is stably reinforced, and the deformation of the original shallow foundation building is further reduced.
Optionally, in step 3, during the construction of the enclosure structure, a reinforcing steel bar connector connected with the top plate and the middle plate is reserved on the inner side of the enclosure structure.
By adopting the technical scheme, the construction of the subsequent top plate and the middle plate is facilitated by utilizing the steel bar connector preset on the inner side of the enclosure structure, the stable connectivity among the top plate, the middle plate and the enclosure structure can be improved, and the subsequent construction is facilitated; and the bottom plate is directly abutted against the ground soil, so that the connection with the enclosure structure through the steel bar connector is not needed, and the stability is very high.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the pile foundation is added on the side wall of the original shallow foundation building and is connected with the ring beam of the original shallow foundation building, so that the stability of the original shallow foundation building can be enhanced, the tendency that the original shallow foundation building is deformed by soil deformation is reduced, and the stability of the original shallow foundation building is ensured;
a reinforcing layer is formed between the pile foundation and the deep foundation pit by grouting, and underground water level fluctuation in a soil body in the construction process of the deep foundation pit can be reduced, so that deformation and water level change of the soil body around the original shallow foundation building caused by deformation of the deep foundation pit or drainage are reduced, and the stability of the original shallow foundation building is further improved;
2. the deep foundation pit adopts a construction mode of 'reverse first and then forward', the top plate, the middle part and the bottom plate are constructed layer by layer first, and then the side wall is constructed, so that the extrusion force to the soil body in the construction process can be reduced, the disturbance to the soil body in the peripheral area in the construction process can be reduced, and the influence on the original shallow foundation building can be further reduced.
Drawings
Fig. 1 is a schematic view of step 1 of a deep foundation pit construction method next to a shallow foundation structure according to an embodiment of the present application.
Fig. 2 is a top view of the structure of the deep foundation pit and the next to shallow foundation structure according to the embodiment of the present application.
Fig. 3 is a construction completion structure diagram of a deep foundation pit construction method next to a shallow foundation building according to an embodiment of the present application.
Description of reference numerals: 1. building an original shallow foundation; 2. a ring beam; 3. a deep pile foundation; 4. a deep foundation pit; 5. a reinforcement layer; 6. a sleeve valve tube; 7. connecting the beams; 8. an enclosure structure; 9. a top plate; 10. a middle plate; 11. a base plate; 12. a side wall; 13. and (5) planting reinforcing steel bars.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses a deep foundation pit construction method next to a shallow foundation building, and the method comprises the following steps with reference to fig. 1-3:
step 1, newly adding a deep pile foundation 3:
step 1.1: and laying detection control points for the original shallow foundation building 1, and collecting initial values, wherein the initial values are the position, the elevation and the real-time displacement parameters of the original shallow foundation building.
Step 1.2: deep pile foundation 3 construction, three sides that are close to newly-built deep basal pit 4 along former shallow basic building 1 carry out deep pile foundation 3 construction, and process flow does not: the method comprises the steps of field leveling → pile position paying-off → slurry pool excavation, slurry ditch → pile casing embedding → drilling machine in-place, hole site correction → hole forming, slurry circulation, waste slurry removal, mud residue → first hole cleaning → quality acceptance → steel reinforcement cage and steel guide pipe → second hole cleaning → underwater concrete pouring → pile forming. In the embodiment, a spiral drilling machine which does not extrude soil and has low vibration can be adopted for forming holes; the deep pile foundation 4 base cloth is established in the excavation scope of 1 time deep foundation ditch 4, and 3 intervals of deep pile foundation can be 3m, and the degree of depth is for 30m, the diameter is for 600 mm.
Step 1.3: after the deep pile foundation 3 is finished, pile top concrete is broken, the ring beam 2 of the original shallow foundation building 1 is excavated manually and steel bars are planted, the steel bars 13 are integrally connected with the ring beam 2 and the top steel bars of the deep pile foundation 3, and then formwork is erected to pour concrete to form the coupling beam 7. In this embodiment, before the concrete is poured, the new and old concrete surfaces are constructed according to the steps of chiseling → washing → wetting and painting the cement-based material, so as to ensure the close connection of the new and old concrete. Meanwhile, the distance between the transverse direction and the longitudinal direction of the steel bar planting reinforcing steel bars 13 can be 150 mm.
Step 2: implanting a grouting pipe between the deep foundation pit 4 and the original shallow foundation building 1, wherein in the embodiment, the grouting pipe can be a sleeve valve pipe 6; grouting the sleeve valve pipe 6 into soil between the deep foundation pit 4 and the original shallow foundation building 1 for reinforcement, wherein in the embodiment, the sleeve valve pipe 6 adopts a retreating grouting method for grouting. Meanwhile, in the process, the grouting slurry is determined according to geological and hydrological conditions, and cement slurry or double-fluid slurry can be selected.
And step 3: and (3) adopting a down-the-hole drilling machine, driving the deep pile foundation 3 into the foundation part of the original shallow foundation through an inclined angle at one side, then placing the sleeve valve pipe 6 into the hole, and plugging the sleeve valve pipe 6 for grouting and reinforcing the soil body at the bottom of the original shallow foundation building 1 after the subsequent foundation pit construction is finished.
And 4, step 4: and (4) constructing a deep foundation pit:
step 4.1: firstly, constructing a foundation pit enclosure structure 8, wherein the enclosure structure 8 can adopt an underground continuous wall, and in the embodiment, the thickness of the underground continuous wall is not less than 600mm, and the depth is not less than 1.5 times of the excavation depth of the deep foundation pit 4; and a reinforcing bar connector is embedded in the inner side of the envelope structure 8 and is used for being connected with a subsequent structural plate.
Step 4.2: excavating earth, namely excavating and taking earth from top to bottom by adopting a long-arm excavator and transporting the earth outwards, stopping excavating after the earth is excavated to the height of the top plate 9, paving a template after fine leveling and fine pressing, and constructing a structure of the top plate 9 (in the process, reinforcing steel bars in the top plate 9 are connected with reinforcing steel bar connectors corresponding to the building enclosure 8); in this embodiment, a reinforcing bar connector is reserved on the top plate 9 for connecting with the subsequent side wall 12.
Step 4.3: after the top plate 9 reaches the design strength, the soil body continues to be excavated downwards, the excavation is stopped after the soil body is excavated to the bottom elevation of the middle plate 10, the template is laid after the fine leveling and the fine pressing, the structure of the middle plate 10 is constructed (in the process, the reinforcing steel bars in the middle plate 10 are connected with the reinforcing steel bar connector corresponding to the enclosure structure 8), and in the embodiment, the reinforcing steel bar connector is reserved on the middle plate 10 and is used for being connected with the subsequent side wall 12.
Step 4.4: after the middle plate 10 reaches the design strength, the soil body continues to be excavated downwards, after the soil body is excavated to the elevation of the bottom plate 11, the excavation is stopped, the template is laid after the fine flattening and the fine pressing, and the structure of the bottom plate 11 is constructed (in the process, the reinforcing steel bars in the bottom plate 11 are connected with the reinforcing steel bar connector corresponding to the enclosure structure 8).
In this embodiment, in the processes of step 4.3 and step 4.4, due to the structural interference of the top plate 9, the soil below the top plate 9 is excavated from the side, and the small excavator is relayed to pour out the projection area of the structural slab and finally is moved out by the long arm excavator.
And 5: construction of the side wall 12: firstly constructing a side wall 12 between a bottom plate 11 and a middle plate 10, and then constructing a side wall 12 between the middle plate 10 and a top plate 9; in the process, the steel bars of the side wall 12 are respectively connected with the steel bar connectors on the middle plate 10 and the top plate 9, so that the side wall 12 structural plates are connected into a whole.
Step 6: in the construction process of the deep foundation pit 4, the deformation, sedimentation and cracking conditions of the structure of the original shallow foundation building 1 need to be strictly detected, and grouting reinforcement is carried out towards the bottom of the original shallow foundation building 1 through the sleeve valve pipe 6.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (7)

1. The utility model provides a shallow basic building protection architecture of next-door neighbour deep basal pit engineering which characterized in that: the construction method comprises deep pile foundations (3) arranged close to an original shallow foundation building (1), wherein the upper ends of the deep pile foundations (3) are connected with connecting beams (7), and the connecting beams (7) are connected with ring beams (2) of the original shallow foundation building (1); and a grouting reinforcement layer (5) is also arranged between the deep pile foundation (3) and the newly-built deep foundation pit (4).
2. The protection structure for the shallow foundation building next to the deep foundation pit engineering according to claim 1, wherein: and bar-planting reinforcing steel bars (13) are arranged between the connecting beam (7) and the ring beam (2) of the original shallow foundation building (1), and the connecting beam (7) is formed by firstly binding the reinforcing steel bars and then pouring concrete.
3. The protection structure for the shallow foundation building next to the deep foundation pit engineering according to claim 1, wherein: the pile foundation structure is characterized by further comprising a grouting pipe obliquely arranged below the original shallow foundation building (1), wherein one end of the grouting pipe extends out of the ground on one side of the pile foundation.
4. A deep foundation pit construction method using the shallow foundation construction protection structure of any one of claims 1 to 3, characterized in that: the method comprises the following steps:
step 1, newly adding a deep pile foundation (3): the deep pile foundation (3) is arranged towards three sides of a newly-built deep foundation pit (4) along the original shallow foundation building (1), the deep pile foundation (3) is distributed in the excavation range of the deep foundation pit (4) which is not less than 1 time, and the deep pile foundation (3) is connected with a ring beam (2) of the original shallow foundation building (1);
step 2, grouting reinforcement: grouting between the deep foundation pit (4) and the deep pile foundation (3) to form a reinforcing layer (5);
step 3, excavating the deep foundation pit (4): firstly constructing a foundation pit enclosure structure (8), then performing earth excavation from top to bottom, stopping excavation after earth excavation reaches a top plate (9), and laying a template to construct a top plate (9) structure; after the top plate (9) reaches the design strength, continuously excavating the soil body downwards, and constructing a middle plate (10) and a bottom plate (11) in sequence; after the construction of the structural slab is finished, the side walls (12) between the bottom plate (11) and the middle plate (10) and between the middle plate (10) and the top plate (9) are constructed sequentially from bottom to top.
5. A method of constructing a deep foundation pit (4) next to a shallow foundation structure according to claim 4, characterized in that: in the step 1, pile top concrete is removed after the deep pile foundation (3) is constructed, ring beams (2) of the original shallow foundation building (1) are excavated and bar-planted, bar-planted bars (13) are integrally connected with the ring beams (2) and pile foundation top bars, and then formwork is erected to pour concrete, so that connecting beams (7) integrated with the ring beams (2) and the deep pile foundation (3) are formed.
6. The method for constructing a deep foundation pit adjacent to a shallow foundation structure as claimed in claim 4, wherein: and 2, before the reinforcing layer (5) is formed by grouting, embedding a grouting pipe under the original shallow foundation building (1), wherein the grouting pipe is obliquely arranged, and the opening end of the grouting pipe extends to the ground on one side of the deep pile foundation (3) and plugs the grouting pipe opening.
7. The method for constructing a deep foundation pit adjacent to a shallow foundation structure as claimed in claim 1, wherein: in the step 3, when the enclosure structure (8) is constructed, a steel bar connector connected with the top plate (9) and the middle plate (10) is reserved on the inner side of the enclosure structure (8).
CN202110548526.3A 2021-05-19 2021-05-19 Protection structure of shallow foundation building next to deep foundation pit engineering and construction method Pending CN113431097A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110548526.3A CN113431097A (en) 2021-05-19 2021-05-19 Protection structure of shallow foundation building next to deep foundation pit engineering and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110548526.3A CN113431097A (en) 2021-05-19 2021-05-19 Protection structure of shallow foundation building next to deep foundation pit engineering and construction method

Publications (1)

Publication Number Publication Date
CN113431097A true CN113431097A (en) 2021-09-24

Family

ID=77802493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110548526.3A Pending CN113431097A (en) 2021-05-19 2021-05-19 Protection structure of shallow foundation building next to deep foundation pit engineering and construction method

Country Status (1)

Country Link
CN (1) CN113431097A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108617A (en) * 2021-11-12 2022-03-01 山西机械化建设集团有限公司 Method for removing groove and planting bar for foundation pit supporting pile by using down-the-hole drill
CN114775622A (en) * 2022-05-18 2022-07-22 中铁二十二局集团有限公司 Construction method of special-shaped deep foundation pit with construction space limitation of adjacent building structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179204A (en) * 2014-08-28 2014-12-03 山西钢铁建设(集团)有限公司 Pile foundation underpinning method for building foundation adjacent to deep foundation pit
CN206220101U (en) * 2016-10-17 2017-06-06 上海建工一建集团有限公司 A kind of support reinforcement structure of deep basal pit
CN112554198A (en) * 2020-11-04 2021-03-26 中建五局土木工程有限公司 Construction method of deep foundation pit protection structure next to high-rise building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179204A (en) * 2014-08-28 2014-12-03 山西钢铁建设(集团)有限公司 Pile foundation underpinning method for building foundation adjacent to deep foundation pit
CN206220101U (en) * 2016-10-17 2017-06-06 上海建工一建集团有限公司 A kind of support reinforcement structure of deep basal pit
CN112554198A (en) * 2020-11-04 2021-03-26 中建五局土木工程有限公司 Construction method of deep foundation pit protection structure next to high-rise building

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
卿三惠等: "《隧道及地铁工程 第2版》", 31 October 2013, 中国铁道出版社 *
李赞: "紧邻建筑物大断面浅埋暗挖地铁隧道施工技术研究", 《智能城市》 *
王从军丛书: "《建筑施工技术运用》", 30 May 2019, 东北林业大学出版社 *
蒋硕忠: "《绿色化学灌浆技术》", 31 August 2006, 长江出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108617A (en) * 2021-11-12 2022-03-01 山西机械化建设集团有限公司 Method for removing groove and planting bar for foundation pit supporting pile by using down-the-hole drill
CN114775622A (en) * 2022-05-18 2022-07-22 中铁二十二局集团有限公司 Construction method of special-shaped deep foundation pit with construction space limitation of adjacent building structure
CN114775622B (en) * 2022-05-18 2024-01-02 中铁二十二局集团有限公司 Construction method for special-shaped deep foundation pit with limited construction space of close-proximity building structure

Similar Documents

Publication Publication Date Title
CN103741714B (en) Underground engineering full sheltered reverse excavation construction method
CN108842819B (en) Urban rail transit cable line tunnel construction method
CN104110038A (en) Construction method for large-area pit support structure in deep-sludge type soft soil area
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN102286984A (en) Water-stop curtain and construction method thereof
CN112554198B (en) Construction method of deep foundation pit protection structure adjacent to high-rise building
CN104895055A (en) Building grouting pile foundation construction method
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN102286981A (en) Waterproof curtain and construction method thereof
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN202194149U (en) Water-proof curtain
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
CN114411756A (en) Construction method and construction device for water-rich sand layer subway station open excavation foundation pit without precipitation
CN112695763A (en) Deep sludge stratum foundation pit excavation method
CN109723055B (en) Underground diaphragm wall bottom reinforcing structure and construction method thereof
CN109989392B (en) Construction grooving process for sandy soil underground continuous wall
CN114575355A (en) Soil protection and descent construction method
CN110777775A (en) Foundation pit structure and construction method thereof
CN113216215A (en) Deep groove support reverse construction method in complex environment
CN111456021A (en) Construction method for reversely making enclosure structure by utilizing RJP piles
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN111519647A (en) Novel foundation suitable for marine soft foundation treatment and reinforcement and construction method
CN113266362B (en) Top pipe cover excavation construction method for penetrating through existing dense anchor cable area
CN114922195A (en) Construction method of soft soil deep and large foundation pit adjacent to protected object

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination