CN108223004A - The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction - Google Patents

The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction Download PDF

Info

Publication number
CN108223004A
CN108223004A CN201810011669.9A CN201810011669A CN108223004A CN 108223004 A CN108223004 A CN 108223004A CN 201810011669 A CN201810011669 A CN 201810011669A CN 108223004 A CN108223004 A CN 108223004A
Authority
CN
China
Prior art keywords
drilling
crossheading
face
track
mash gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810011669.9A
Other languages
Chinese (zh)
Other versions
CN108223004B (en
Inventor
程波
邹银辉
程建圣
孙炳兴
周勇
张占国
王智立
李大勇
熊云威
何云文
向衍斌
徐腾飞
冀超辉
刘俊
张锋
杜文波
黄光利
肖乔
马智勇
冉庆雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG Chongqing Research Institute Co Ltd
Original Assignee
CCTEG Chongqing Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG Chongqing Research Institute Co Ltd filed Critical CCTEG Chongqing Research Institute Co Ltd
Priority to CN201810011669.9A priority Critical patent/CN108223004B/en
Publication of CN108223004A publication Critical patent/CN108223004A/en
Application granted granted Critical
Publication of CN108223004B publication Critical patent/CN108223004B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of methods of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction, it is included in the tunneling process of underground coal mine support in gateway of coal mining face, construction long range directional drilling is inclined to along stope track crossheading, face haulage crossheading and the affiliated coal body of track crossheading of standby mining face are taken out in advance.With the driving of stope track crossheading, construct the drilling of this coal bed gas extraction along the tendency of stope.During face haulage crossheading tunnels, exposed long range directional drilling is blocked using sealing material, and the across strike direction in face haulage crossheading simultaneously, construct this coal bed gas extraction drilling, be allowed to drill to form plane or crossings on different level with this coal bed gas extraction constructed in working face track crossheading.The method of the present invention improves the efficiency of coal mine gas hazard management, reduces the construction volume of coal mine gas harnessing project, has high technology and economy.

Description

The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction
Technical field
The invention belongs to gas pumping technical fields, are related to a kind of two-way stereo staggered drilling collaboration directional long borehole joint The method of mash gas extraction.
Background technology
With the rapid development of current Chinese national economy, the demand to the energy is also growing day by day.And China is one poor The country of oil, less gas, rich coal, therefore coal is for a long time in occupation of the main status of China's one-time-consumption energy.But current China coal The depth of ore deposit exploitation is stepped up, and the degree of coal and gas dynamical disaster shows constantly soaring situation.Coal in China industry Generally implement the improvement of mine gas disaster using exploitation protective layer or the method for large area extraction.But part mine is due to coal seam The reason of preservation, does not have the condition of exploitation protective layer.Therefore, it is pre- using construction coal mine down-hole drilling implementation large area region Pumping is the technical way that such mine implements Achievements of Gas Control.With the continuous development of underground coal mine drilling technology, mesh The coal mine gas extraction in preceding China has formd the progressive protected type extraction in region, large area region grid drills, intensive flat The technical system of the compositions such as row drilling, level-crossing drilling, crossings on different level hole pumping and mining coal-bed gas technique, and put into practice at the scene In achieve good application effect.But for middle thick-thick high methane or the gas control in coal and gas prominent coal seam, due to it Coal seam thickness is larger, and often there are one or more layers dirt band in the middle part of coal seam, the presence of dirt band layer hinders gas in coal seam Migration between stratification., certainly will be there are certain pumping blind zone if the extraction borehole of construction does not penetrate dirt band layer, and then influence The gas pumping effect of thickness-high seam.
Invention content
In view of this, the purpose of the present invention is to provide a kind of two-way stereo staggered drilling collaboration directional long borehole joints to take out The method of mash gas, so as to provide the underground coal mine that a kind of quantities is small, stability is high, gas pumping amount is big, extraction concentration is high The method of two-way stereo staggered drilling collaboration directional long borehole joint draining coal seam gas.
In order to achieve the above objectives, the present invention provides following technical solution:
The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction, this method comprise the following steps:
S1:In the track crossheading of stope, across strike direction construction long range directional drilling, along the top in coal seam Plate, construction of bottom plates visit top, bottom out drilling, and the geological exploration data of supplement Perfect the work face coal body after construction, accesses back production The extraction pipeline laid in working face track crossheading, starts to connect pumping;
S2:During the track crossheading driving of underground coal mine stope, using drilling machine, edge is inclined in slot on the way It constructs to direction the downlink mash gas pumping drilling in this coal seam, after construction, is laid in access stope track crossheading Extraction pipeline carries out connecing pumping;
S3:Underground coal mine face haulage crossheading replaces driving with standby mining face track crossheading using double lanes, In the tunneling process of underground coal mine face haulage crossheading, across strike direction, the uplink gas pumping in this coal seam of constructing bores Hole is allowed to form level-crossing or crossings on different level with the downlink mash gas pumping drilling constructed in track crossheading, after construction, connect Enter the extraction pipeline laid in face haulage crossheading, carry out connecing pumping;
S4:In the tunneling process of underground coal mine face haulage crossheading, by exposure, using sealing material to track The long range directional drilling of across strike direction exposure constructed in crossheading is blocked;
S5:After underground coal mine stope track crossheading and haulage gate tunnel in place, penetrate through working face cuts eye, Long range directional drilling in track crossheading, downlink mash gas pumping drilling, the uplink mash gas pumping drilling difference in haulage gate With corresponding extraction pipeline is grid-connected connects pumping, form two-way stereo staggered drilling collaboration directional long borehole joint draining coal seam gas.
Further, the spacing of across strike direction construction long range directional drilling is 50~80m in step S1.
Further, in step S2 downlink mash gas pumping drilling hole depth to face haulage crossheading inwardly along the position of 15m It puts.
Further, the depth that the long range directional drilling exposed to the across strike direction constructed in track crossheading is blocked For 15m.
The beneficial effects of the present invention are:The method of the present invention can to high methane or with coal and gas prominent danger coal seam Carry out gas pumping.The extraction amount that has with ground well drainage coal-bed gas is big, extraction concentration is high, extracting result is good Advantage, and have many advantages, such as that good stability, construction is simple and quantities are small.Particularly, it constructs in stope track crossheading Long range directional drilling, face haulage crossheading can not only be carried out with standby mining face track crossheading coal body advanced Extraction, conscientiously ensure coal road safety driving, while long range directional drilling after main aperture is formed move back brill during, can also apply Work visits top, bottoms out drilling, and supplement improves geological exploration data, the dirt band layer in coal seam can be further penetrated, with working face track The two-way stereo staggered drilling collaboration constructed in crossheading, haulage gate forms crisscross " drilling network system ", increases The effective range of mash gas pumping drilling.Meanwhile uplink this coal bed gas extraction drilling constructed in working face haulage gate, It may also be advantageous for draining.
Description of the drawings
In order to make the purpose of the present invention, technical solution and advantageous effect clearer, the present invention provides drawings described below and carries out Explanation:
Fig. 1 is schematic diagram of the present invention.
Specific embodiment
Below in conjunction with attached drawing, the preferred embodiment of the present invention is described in detail.
The present invention provides a kind of method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction, such as Fig. 1 It is shown, wherein 1 represents stope track crossheading, 2 represent that the two-way stereo staggered drilling collaboration of underground coal mine orients over long distances Drill joint mash gas extraction, and 3 represent to stop adopting line, and 4 be face haulage slot, and 5 represent standby mining face track crossheading, 6 tables Show that long range directional drilling draws back mining face haulage gate and standby mining face track crossheading coal body, the method for the present invention in advance in advance It comprises the following steps,
A. during underground coal mine support in gateway of coal mining face is tunneled, in the track crossheading 1 of stope, edge is inclined To direction construction long range directional drilling, to coal body belonging to the track crossheading 5 of face haulage crossheading 4 and standby mining face It is taken out in advance, reduces coal seam gas-bearing capacity;Long range directional drilling is constructed every 50~80m in the across strike direction, along coal seam Top plate, construction of bottom plates visit top, bottom out drilling, supplement the geological exploration data of Perfect the work face coal body, and visit top, bottom out brill Hole can also penetrate the dirt band layer in coal seam;And after treating long range directional drilling construction, stope track is accessed immediately The extraction pipeline laid in crossheading, starts to connect pumping.
B. during the track crossheading 1 of underground coal mine stope tunnels, using drilling machine, in track crossheading, Across strike direction, this coal bed gas extraction drilling of construction downlink, drilling hole are deep to face haulage crossheading inwardly along 15m's Position;After construction hole to be drilled, the extraction pipeline laid in stope track crossheading is accessed immediately, starts to connect pumping.
C. underground coal mine face haulage crossheading and standby mining face track crossheading replace driving using double lanes, and In the tunneling process of underground coal mine face haulage crossheading, across strike direction, this coal bed gas extraction drilling of construction uplink, It is allowed to drill to form plane or crossings on different level with downlink this coal bed gas extraction constructed in track crossheading, as shown in Figure 2;It treats After drilling construction, the extraction pipeline laid in face haulage crossheading is accessed immediately, starts to connect pumping.
D. in the tunneling process of underground coal mine face haulage crossheading, the across strike direction of construction in track crossheading Long range directional drilling will exposure, exposed long range directional drilling is blocked using sealing material, prevents underground from adopting Air in pick space is entered in drilling, and it is 15m to block length and depth.
E. after underground coal mine stope track crossheading and haulage gate tunnel in place, penetrate through working face cuts eye, Long range directional drilling in track crossheading drills with downlink tendency, the uplink tendency drilling in haulage gate, respectively with accordingly The grid-connected pattern for connecing pumping, forming two-way stereo staggered drilling collaboration directional long borehole joint draining coal seam gas of extraction pipeline.
Finally illustrate, preferred embodiment above is only to illustrate the technical solution of invention and unrestricted, although passing through Above preferred embodiment is described in detail the present invention, however, those skilled in the art should understand that, can be in shape Various changes are made in formula and to it in details, without departing from claims of the present invention limited range.

Claims (4)

1. the method for two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction, it is characterised in that:This method includes Following steps:
S1:In the track crossheading of stope, across strike direction construction long range directional drilling, along seam roof, bottom Plate construction visits top, bottoms out drilling, and the geological exploration data of supplement Perfect the work face coal body after construction, accesses actual mining The extraction pipeline laid in the track crossheading of face, starts to connect pumping;
S2:Underground coal mine stope track crossheading driving during, using drilling machine in slot on the way across strike side To the downlink mash gas pumping drilling in this coal seam of constructing, after construction, the extraction of laying in access stope track crossheading Pipeline carries out connecing pumping;
S3:Underground coal mine face haulage crossheading replaces driving with standby mining face track crossheading using double lanes, in coal mine In the tunneling process of underground face haulage crossheading, across strike direction, the uplink mash gas pumping drilling in this coal seam of constructing makes Form level-crossing or crossings on different level with the downlink mash gas pumping drilling constructed in track crossheading, after construction, access back The extraction pipeline laid in mining face haulage gate, carries out connecing pumping;
S4:In the tunneling process of underground coal mine face haulage crossheading, by exposure, using sealing material to track crossheading The long range directional drilling of the across strike direction exposure of interior construction is blocked;
S5:After underground coal mine stope track crossheading and haulage gate tunnel in place, the eye of cutting of working face, track are penetrated through Long range directional drilling in crossheading, downlink mash gas pumping drilling, uplink mash gas pumping drilling in haulage gate respectively with phase The extraction pipeline answered is grid-connected to connect pumping, forms two-way stereo staggered drilling collaboration directional long borehole joint draining coal seam gas.
2. the method for two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction according to claim 1, It is characterized in that:The spacing of across strike direction construction long range directional drilling is 50~80m in step S1.
3. the method for two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction according to claim 1, It is characterized in that:In step S2 downlink mash gas pumping drilling hole depth to face haulage crossheading inwardly along the position of 15m.
4. the method for two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction according to claim 1, It is characterized in that:The depth blocked to the long range directional drilling that the across strike direction constructed in track crossheading exposes is 15m.
CN201810011669.9A 2018-01-05 2018-01-05 The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction Active CN108223004B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810011669.9A CN108223004B (en) 2018-01-05 2018-01-05 The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810011669.9A CN108223004B (en) 2018-01-05 2018-01-05 The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction

Publications (2)

Publication Number Publication Date
CN108223004A true CN108223004A (en) 2018-06-29
CN108223004B CN108223004B (en) 2019-04-26

Family

ID=62643052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810011669.9A Active CN108223004B (en) 2018-01-05 2018-01-05 The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction

Country Status (1)

Country Link
CN (1) CN108223004B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578060A (en) * 2019-02-01 2019-04-05 西安闪光能源科技有限公司 Coal bed gas extraction method based on controllable shock wave technology
CN109915197A (en) * 2019-04-11 2019-06-21 河南理工大学 A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN110617047A (en) * 2019-10-21 2019-12-27 中煤科工集团重庆研究院有限公司 Coal seam gas extraction method based on directional drilling and liquid nitrogen quick freezing thermal cracking
CN111101998A (en) * 2020-01-19 2020-05-05 山西晋城无烟煤矿业集团有限责任公司 Method for intercepting gas extracted from directional long drill hole

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587959A (en) * 2012-03-13 2012-07-18 华晋煤层气综合利用有限责任公司 Method for draining coal seam gas
CN104018874A (en) * 2014-06-13 2014-09-03 中煤科工集团重庆研究院有限公司 Method for bedding drilling and working surface gas pre-extraction
CN104832198A (en) * 2015-03-13 2015-08-12 中煤科工集团重庆研究院有限公司 Roadway surrounding rock deformation, rock burst and coal and gas outburst comprehensive treatment method
CN106014475A (en) * 2016-07-05 2016-10-12 安徽理工大学 High-gas coal bed group dip orientation drilling cluster and gas extracting method
CN106321140A (en) * 2016-08-31 2017-01-11 辽宁工程技术大学 Arrangement method of extra-thick seam gas pre-extraction drill holes

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587959A (en) * 2012-03-13 2012-07-18 华晋煤层气综合利用有限责任公司 Method for draining coal seam gas
CN104018874A (en) * 2014-06-13 2014-09-03 中煤科工集团重庆研究院有限公司 Method for bedding drilling and working surface gas pre-extraction
CN104832198A (en) * 2015-03-13 2015-08-12 中煤科工集团重庆研究院有限公司 Roadway surrounding rock deformation, rock burst and coal and gas outburst comprehensive treatment method
CN106014475A (en) * 2016-07-05 2016-10-12 安徽理工大学 High-gas coal bed group dip orientation drilling cluster and gas extracting method
CN106321140A (en) * 2016-08-31 2017-01-11 辽宁工程技术大学 Arrangement method of extra-thick seam gas pre-extraction drill holes

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578060A (en) * 2019-02-01 2019-04-05 西安闪光能源科技有限公司 Coal bed gas extraction method based on controllable shock wave technology
CN109578060B (en) * 2019-02-01 2024-04-26 西安闪光能源科技有限公司 Coal seam gas extraction method based on controllable shock wave technology
CN109915197A (en) * 2019-04-11 2019-06-21 河南理工大学 A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN110617047A (en) * 2019-10-21 2019-12-27 中煤科工集团重庆研究院有限公司 Coal seam gas extraction method based on directional drilling and liquid nitrogen quick freezing thermal cracking
CN111101998A (en) * 2020-01-19 2020-05-05 山西晋城无烟煤矿业集团有限责任公司 Method for intercepting gas extracted from directional long drill hole
CN111101998B (en) * 2020-01-19 2021-03-19 山西晋城无烟煤矿业集团有限责任公司 Method for intercepting gas extracted from directional long drill hole

Also Published As

Publication number Publication date
CN108223004B (en) 2019-04-26

Similar Documents

Publication Publication Date Title
CN108223004B (en) The method of two-way stereo staggered drilling collaboration directional long borehole joint mash gas extraction
CN107313778B (en) A kind of second mining super high seam stops the method for adopting line coal column
CN102080518B (en) Method for extracting gas from coal seam roof complex branched well
CN104100270B (en) A kind of low-angle dip mineral ore Truckless mining method
CN106050234B (en) The construction technology that underground water is protected in progress of coal mining
CN106930763B (en) A method of the filling residual mining area roadway support coal column of second mining super high seam
CN106907175A (en) The efficient extraction coal roadway stripe gas of base plate concordant long drilled holes staged fracturing and region outburst elimination method
CN106761757A (en) A kind of full stage combination chisel it is quick-fried fall the efficient mining methods of ore deposit
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN106640027A (en) Spatial structure well pattern construction method for underground river type carbonate karst reservoir of fractured-vuggy reservoir
CN104963721A (en) Downhole stereo rapid water drainage method through the combination of horizontal drilling holes and vertical drilling holes
CN107559008A (en) A kind of method combined second mining super high seam and stop adopting line coal column
CN108301866A (en) Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN101915118A (en) Method for progressive gas drainage in high gas medium-hard coal seam
CN108825237A (en) A kind of special thick coal continuous milling machine divides excavating technology with the layering combined is filled
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN107503790B (en) Fast extraction fully mechanized coal face comprehensive gas drainage arranges administering method
CN109098711A (en) It is a kind of to block the heavily stressed method in ore body top using pressure relief groove
CN209742871U (en) Coal-based gas multilayer co-production well type structure
CN104563971B (en) Mining system and the mining methods in the overlapping mining area of resource
CN106948860B (en) The method for cooperateing with progressive draining coal seam gas with directional drilling based on U-shaped well
CN106593444A (en) Method for reducing mining vibration energy under hard rock stratum
CN113294199B (en) Method for arranging gas control roadway under mining of lower protective layer
CN205936553U (en) Raising output is transformed and novel coal seam gas well of formation to old well
CN108590741A (en) A kind of super high seam mash gas pumping drilling method for arranging

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant