CN107083988A - Mining induced fissure band gas pumping technical method based on km directional drilling - Google Patents

Mining induced fissure band gas pumping technical method based on km directional drilling Download PDF

Info

Publication number
CN107083988A
CN107083988A CN201710511319.4A CN201710511319A CN107083988A CN 107083988 A CN107083988 A CN 107083988A CN 201710511319 A CN201710511319 A CN 201710511319A CN 107083988 A CN107083988 A CN 107083988A
Authority
CN
China
Prior art keywords
gas
directional drilling
extraction
coal
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710511319.4A
Other languages
Chinese (zh)
Other versions
CN107083988B (en
Inventor
徐超
王凯
李雷
吕靖豪
周爱桃
杜锋
贾恒义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201710511319.4A priority Critical patent/CN107083988B/en
Publication of CN107083988A publication Critical patent/CN107083988A/en
Application granted granted Critical
Publication of CN107083988B publication Critical patent/CN107083988B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well

Abstract

A kind of mining induced fissure band gas pumping technical method based on km directional drilling, on analysis coal-face overlying rock cranny development and gas migration regular basis, determine the technical parameters such as layer position, length, quantity, spacing, extraction negative pressure, the extraction time of km directional drilling, then utilize km directional drilling machine in the drill site of return side to some km directional drillings of goaf top crack belt construction, extraction is carried out to the gas in mining induced fissure band, until coal-face back production terminates.This method extracting result is good, construction cost is low, construction period is short, operating efficiency is high, can effectively solve the problem that upper corner and goaf gas accumulation overrun issues.

Description

Mining induced fissure band gas pumping technical method based on km directional drilling
Art
The present invention relates to a kind of coal mine gas extraction technical method, it is based especially on adopting for km directional drilling and splits Gap band gas pumping technical method, it is adaptable to which upper corner and goaf gas gather the improvement of overrun issues.
Technical background
Coal is the main body energy of China, and a large amount of exploitations of coal cause coal mining depth to increase year by year, and then cause Coal-bed gas pressure gradually increases with gas bearing capacity, and gas emission constantly increases.For coal seam group near interval, working face In recovery process, substantial amounts of crack is formed in roof strata, the next layer gas and this coal seam goaf gas are in roof fracture band Interior a large amount of accumulations, cause face upper corner angle gas to gather and transfinite, mine safety production are threatened.For this problem, The solution of most of mines is suction road of being constructed in the fissure zone in mining influence formation at the top of mined bed, makes top plate Fissure zone gas enters in suction road under extraction suction function along crack, extracts high concentration gas out through extraction pipeline;Or from Constructed at a certain distance in air way drill site, to work face goaf direction construction top plate high drainage roadway from drill site, intercept top Plate fissure zone gas pours in stope.
However, suction road long construction period, cost is high, the digging duration is influenceed, it is more next under current coal situation It is more unsuitable.From drill site to work face goaf direction construction top plate high drainage roadway, drilling only is arranged on crack belt position, Extracting result is just preferable, but with the propulsion of working face, and nose end progresses into caving zone, and as top plate is across falling to be easily caused Extraction gas flow is excessive, it is impossible to which extraction high concentration gas is directly blocked ineffective, it is necessary to punch again, is taken time and effort. Therefore, how efficient extraction is carried out to the gas in mining induced fissure band, ensures the safety in production of stope, be to put at the scene A difficult problem in face of engineering science and technology personnel.
Goal of the invention
It is an object of the invention to provide a kind of extracting result is good, construction cost is low, construction period is short, operating efficiency is high, energy The band gas of the mining induced fissure based on km directional drilling of enough effectively solution upper corner and goaf gas accumulation overrun issues is taken out Adopt technical method.
Technical scheme
The technical proposal for solving the technical problem of the invention is:
A. coal mining geology condition, Oceurence Patterns of Petrographic Facies and coal-face mining conditions are combined, synthesis uses mine pressure With CONTROL OF STRATA MOVEMENT is theoretical and UDEC discrete element simulation softwares, calculating coal-face overlying rock three with (caving zone, fissure zone and Warp damage) development height, analyze overlying rock and be caving, be broken and absciss layer feature and its Evolution, determine overlying rock Middle crack intensive development position and gas rich region;
B. according to coal-face mining conditions and Gas Preservative Law, research coal-face stope gas migration rule Restrain, layer position, length, quantity, spacing, extraction negative pressure, extraction time of comparative analysis km directional drilling etc., technical parameter was to adopting The influence of dynamic fissure zone gas migration, the coupling studied between the technical parameter and gas migration rule of km directional drilling is closed System, primarily determines that the rational technique parameter of km directional drilling;
C. constructed in the return airway nearer apart from exploiting field main entry one 3m × 3m × 3m drill site;
D. utilize km directional drilling machine in drill site to some km directional drillings of goaf top crack belt construction, km The technical parameters such as layer position, length, quantity, the spacing of directional drilling are determined by step b;
E. gas pumping pipe end is placed in km directional drilling, and carries out sealing of hole, connect gas pumping pipe one end Km directional drilling is connect, the other end is connected in gas drainage system;
F. the technical parameter such as extraction negative pressure, extraction time according to determined by step b, adjusts the extraction of gas drainage system Negative pressure, opening conduits valve carries out extraction to the gas in mining induced fissure band, until coal-face back production terminates;
G. the extraction data such as gas extraction flow, concentration of actual measurement km directional drilling, analyze the layer of km directional drilling The corresponding relation of the technical parameters such as position, length, quantity, spacing, extraction negative pressure, extraction time and gas pumping data, further Optimization determines the technical parameter of applicable km directional drilling, and in the work of next Cracked Field On Coal Face gas pumping It is middle to be applied.
Beneficial effects of the present invention:
(1) present invention determines the reasonable of mash gas pumping drilling according to the cranny development rule of coal-face overlying rock Technical parameter, improves gas pumping rate, can effectively solve the problem that upper corner and goaf gas accumulation overrun issues, and method is simple Easy, engineering reliability is strong;
(2) present invention is constructed km directional drilling by km directional drilling machine, and the stationkeeping ability of rig is strong, construction cost Low, construction period is short, and operating efficiency greatly improved.
Brief description of the drawings
Fig. 1 is the technical method floor map of the present invention.
Fig. 2 is the technical method diagrammatic cross-section of the present invention.
In figure, 1- coal-faces, 2- caving zones, 3- fissure zones, 4- warp damages, 5- km directional drillings, 6- is adopted Area's main entry, 7- return airways, 8- drill sites, 9- goafs, 10- extraction systems, 11- air intake lanes.
Embodiment
1 and 2 pair of implementation of the invention is further analysed description below in conjunction with the accompanying drawings:
The band gas pumping technical method of the mining induced fissure based on km directional drilling of the present invention, including coal-face 1, Caving zone 2, fissure zone 3, warp damage 4, km directional drilling 5, exploiting field main entry 6, return airway 7, drill site 8, goaf 9, take out Extraction system 10, air intake lane 11, concrete operation step is as follows:
A. coal mining geology condition, Oceurence Patterns of Petrographic Facies and the mining conditions of coal-face 1 are combined, synthesis uses mine pressure With CONTROL OF STRATA MOVEMENT theory and UDEC discrete element simulation softwares, the overlying rock three of coal-face 1 is calculated with (caving zone 2, fissure zone 3 and warp damage 4) development height, analysis overlying rock be caving, be broken and absciss layer feature and its Evolution, determine overlying Crack intensive development position and gas rich region in rock stratum;
B. according to the mining conditions of coal-face 1 and Gas Preservative Law, research coal-face stope gas migration rule Restrain, layer position, length, quantity, spacing, extraction negative pressure, extraction time of comparative analysis km directional drilling 5 etc., technical parameter was to adopting The influence of dynamic fissure zone gas migration, the coupling between the technical parameter and gas migration rule of research km directional drilling 5 is closed System, primarily determines that the rational technique parameter of km directional drilling 5;
C. constructed in the return airway 7 nearer apart from exploiting field main entry 6 one 3m × 3m × 3m drill site 8;
D. constructed some km directional drillings 5 to the top fissure zone 3 of goaf 9 in drill site 8 using km directional drilling machine, The technical parameters such as layer position, length, quantity, the spacing of km directional drilling 5 are determined by step b;
E. gas pumping pipe end is placed in km directional drilling 5, and carries out sealing of hole, connect gas pumping pipe one end Km directional drilling 5 is connect, the other end is connected in gas drainage system 10;
F. the technical parameter such as extraction negative pressure, extraction time according to determined by step b, adjusts taking out for gas drainage system 10 Negative pressure is adopted, opening conduits valve carries out extraction to the gas in mining induced fissure band 3, until the back production of coal-face 1 terminates;
G. the extraction data such as gas extraction flow, concentration of actual measurement km directional drilling 5, analyze km directional drilling 5 The corresponding relation of the technical parameters such as layer position, length, quantity, spacing, extraction negative pressure, extraction time and gas pumping data, enters one Step optimization determines the technical parameter of applicable km directional drilling 5, and in next Cracked Field On Coal Face gas pumping Applied in work.

Claims (1)

1. a kind of mining induced fissure band gas pumping technical method based on km directional drilling, it is characterised in that:
A. coal mining geology condition, Oceurence Patterns of Petrographic Facies and coal-face mining conditions are combined, it is comprehensive to use mine pressure and rock Layer control theory and UDEC discrete element simulation softwares, calculate coal-face overlying rock three with (caving zone, fissure zone and bending Sinking band) development height, analyze overlying rock and be caving, be broken and absciss layer feature and its Evolution, determine to split in overlying rock Gap intensive development position and gas rich region;
B. according to coal-face mining conditions and Gas Preservative Law, coal-face stope gas migration rule is studied, it is right The technical parameters such as layer position, length, quantity, spacing, extraction negative pressure, extraction time than analyzing km directional drilling are to mining induced fissure Influence with gas migration, studies the coupled relation between the technical parameter and gas migration rule of km directional drilling, tentatively Determine the rational technique parameter of km directional drilling;
C. constructed in the return airway nearer apart from exploiting field main entry one 3m × 3m × 3m drill site;
D. utilize km directional drilling machine in drill site to some km directional drillings of goaf top crack belt construction, km orientation The technical parameters such as layer position, length, quantity, the spacing of drilling are determined by step b;
E. gas pumping pipe end is placed in km directional drilling, and carries out sealing of hole, gas pumping pipe one end is connected thousand Rice directional drilling, the other end is connected in gas drainage system;
F. the technical parameter such as extraction negative pressure, extraction time according to determined by step b, the extraction of regulation gas drainage system is born Pressure, opening conduits valve carries out extraction to the gas in mining induced fissure band, until coal-face back production terminates;
G. the extraction data such as gas extraction flow, concentration of actual measurement km directional drilling, analyze layer position, the length of km directional drilling The corresponding relation of the technical parameters such as degree, quantity, spacing, extraction negative pressure, extraction time and gas pumping data, further optimization is true Surely the technical parameter of applicable km directional drilling, and being carried out in the work of next Cracked Field On Coal Face gas pumping Using.
CN201710511319.4A 2017-06-27 2017-06-27 Mining induced fissure band gas drainage technical method based on km directional drilling Active CN107083988B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710511319.4A CN107083988B (en) 2017-06-27 2017-06-27 Mining induced fissure band gas drainage technical method based on km directional drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710511319.4A CN107083988B (en) 2017-06-27 2017-06-27 Mining induced fissure band gas drainage technical method based on km directional drilling

Publications (2)

Publication Number Publication Date
CN107083988A true CN107083988A (en) 2017-08-22
CN107083988B CN107083988B (en) 2019-10-25

Family

ID=59606467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710511319.4A Active CN107083988B (en) 2017-06-27 2017-06-27 Mining induced fissure band gas drainage technical method based on km directional drilling

Country Status (1)

Country Link
CN (1) CN107083988B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590653A (en) * 2018-03-02 2018-09-28 煤炭科学技术研究院有限公司 Coal and gas prominent release energy dissipating cooperates with preventing control method with media property transformation
CN109488381A (en) * 2018-12-11 2019-03-19 太原理工大学 A kind of method of accurate determining goaf gas extraction best well location and layer position
CN109519211A (en) * 2019-01-15 2019-03-26 中煤科工集团重庆研究院有限公司 A method of coal bed gas surface well extraction minery gas is taken out using pre-
CN109736876A (en) * 2018-12-19 2019-05-10 中煤科工集团重庆研究院有限公司 It adopts kinetoplast and gushes out gas top plate major diameter directional long borehole pumping method
CN109915197A (en) * 2019-04-11 2019-06-21 河南理工大学 A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN110259503A (en) * 2019-06-14 2019-09-20 华北理工大学 A kind of expansion rock stratum high position horizontal bore gas pumping method
CN110685734A (en) * 2019-10-24 2020-01-14 中煤科工集团西安研究院有限公司 Panel gas treatment method based on partition step-by-step increasing tree-shaped directional long drilling
CN111425245A (en) * 2020-04-29 2020-07-17 湖南科技大学 Coal and gas symbiotic disaster prevention and control method based on goaf air leakage field optimization
AU2017404561B2 (en) * 2017-05-02 2020-09-17 China University Of Mining And Technology Method for precisely extracting coal-mine gas
CN111894656A (en) * 2020-06-24 2020-11-06 山西晋煤集团技术研究院有限责任公司 Method for extracting gas in working face goaf of single thick coal seam by stages and zones
CN111963109A (en) * 2020-07-20 2020-11-20 西山煤电(集团)有限责任公司钻探分公司 Multi-branch horizontal well coal mining goaf gas extraction process
CN112240221A (en) * 2020-10-15 2021-01-19 西安乔木科技技术有限公司 Gas extraction method based on directional long drill hole
CN112377238A (en) * 2020-08-25 2021-02-19 山西晋煤集团技术研究院有限责任公司 One-hole dual-purpose gas extraction drill hole arrangement method
CN112593997A (en) * 2020-12-11 2021-04-02 山西晋煤集团技术研究院有限责任公司 Method for extracting gas in goaf through top plate high-position comb-shaped drill hole
CN113279808A (en) * 2021-06-15 2021-08-20 安徽理工大学 Intelligent gas extraction system and method based on double-layer directional long drill hole
CN113653527A (en) * 2021-09-17 2021-11-16 中煤科工集团重庆研究院有限公司 Method for extracting top coal gas during fully mechanized top coal caving period of extra-thick coal seam
CN114382527A (en) * 2022-01-13 2022-04-22 中国矿业大学(北京) Technical method for cooperatively extracting gas from high-position roadway and low-position roadway of high-gas coal seam group

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900428A (en) * 2012-09-13 2013-01-30 焦作市美格安矿业科技有限公司 Device and method for detecting sealing quality and gas-leakage position of coal seam gas extraction drill-hole
CN103016047A (en) * 2012-12-20 2013-04-03 大同煤矿集团有限责任公司 Method of draining gas in gob through long drill hole in roof trend on fully mechanized caving face
CN103775127A (en) * 2013-12-31 2014-05-07 中国矿业大学 Method for comprehensively treating gas in low-air-permeability high-gas-content coal seam group
CN103821554A (en) * 2014-03-07 2014-05-28 重庆大学 Coal pillar-free exploitation Y-shaped venting goaf drilling hole location method
CN105240046A (en) * 2015-11-02 2016-01-13 山西晋煤集团技术研究院有限责任公司 Drill hole layout method for gas extraction during primary mining and stoping of large mining height fully-mechanized face
CN105351000A (en) * 2015-06-24 2016-02-24 山西晋城无烟煤矿业集团有限责任公司 Goaf roof high-position directional borehole gas extraction technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900428A (en) * 2012-09-13 2013-01-30 焦作市美格安矿业科技有限公司 Device and method for detecting sealing quality and gas-leakage position of coal seam gas extraction drill-hole
CN103016047A (en) * 2012-12-20 2013-04-03 大同煤矿集团有限责任公司 Method of draining gas in gob through long drill hole in roof trend on fully mechanized caving face
CN103775127A (en) * 2013-12-31 2014-05-07 中国矿业大学 Method for comprehensively treating gas in low-air-permeability high-gas-content coal seam group
CN103821554A (en) * 2014-03-07 2014-05-28 重庆大学 Coal pillar-free exploitation Y-shaped venting goaf drilling hole location method
CN105351000A (en) * 2015-06-24 2016-02-24 山西晋城无烟煤矿业集团有限责任公司 Goaf roof high-position directional borehole gas extraction technology
CN105240046A (en) * 2015-11-02 2016-01-13 山西晋煤集团技术研究院有限责任公司 Drill hole layout method for gas extraction during primary mining and stoping of large mining height fully-mechanized face

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
,赵耀江等: "综采面顶板走向大直径长钻孔瓦斯抽采技术参数的研究", 《太原理工大学学报》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2017404561B2 (en) * 2017-05-02 2020-09-17 China University Of Mining And Technology Method for precisely extracting coal-mine gas
CN108590653B (en) * 2018-03-02 2019-09-03 煤炭科学技术研究院有限公司 Coal and gas prominent release energy dissipating cooperates with preventing control method with media property transformation
CN108590653A (en) * 2018-03-02 2018-09-28 煤炭科学技术研究院有限公司 Coal and gas prominent release energy dissipating cooperates with preventing control method with media property transformation
CN109488381A (en) * 2018-12-11 2019-03-19 太原理工大学 A kind of method of accurate determining goaf gas extraction best well location and layer position
CN109736876A (en) * 2018-12-19 2019-05-10 中煤科工集团重庆研究院有限公司 It adopts kinetoplast and gushes out gas top plate major diameter directional long borehole pumping method
CN109519211A (en) * 2019-01-15 2019-03-26 中煤科工集团重庆研究院有限公司 A method of coal bed gas surface well extraction minery gas is taken out using pre-
CN109915197A (en) * 2019-04-11 2019-06-21 河南理工大学 A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN110259503A (en) * 2019-06-14 2019-09-20 华北理工大学 A kind of expansion rock stratum high position horizontal bore gas pumping method
CN110685734B (en) * 2019-10-24 2021-01-29 中煤科工集团西安研究院有限公司 Panel gas treatment method based on partition step-by-step increasing tree-shaped directional long drilling
CN110685734A (en) * 2019-10-24 2020-01-14 中煤科工集团西安研究院有限公司 Panel gas treatment method based on partition step-by-step increasing tree-shaped directional long drilling
CN111425245A (en) * 2020-04-29 2020-07-17 湖南科技大学 Coal and gas symbiotic disaster prevention and control method based on goaf air leakage field optimization
CN111894656A (en) * 2020-06-24 2020-11-06 山西晋煤集团技术研究院有限责任公司 Method for extracting gas in working face goaf of single thick coal seam by stages and zones
CN111963109A (en) * 2020-07-20 2020-11-20 西山煤电(集团)有限责任公司钻探分公司 Multi-branch horizontal well coal mining goaf gas extraction process
CN112377238A (en) * 2020-08-25 2021-02-19 山西晋煤集团技术研究院有限责任公司 One-hole dual-purpose gas extraction drill hole arrangement method
CN112240221A (en) * 2020-10-15 2021-01-19 西安乔木科技技术有限公司 Gas extraction method based on directional long drill hole
CN112593997A (en) * 2020-12-11 2021-04-02 山西晋煤集团技术研究院有限责任公司 Method for extracting gas in goaf through top plate high-position comb-shaped drill hole
CN113279808A (en) * 2021-06-15 2021-08-20 安徽理工大学 Intelligent gas extraction system and method based on double-layer directional long drill hole
CN113279808B (en) * 2021-06-15 2022-04-15 安徽理工大学 Intelligent gas extraction system and method based on double-layer directional long drill hole
CN113653527A (en) * 2021-09-17 2021-11-16 中煤科工集团重庆研究院有限公司 Method for extracting top coal gas during fully mechanized top coal caving period of extra-thick coal seam
CN114382527A (en) * 2022-01-13 2022-04-22 中国矿业大学(北京) Technical method for cooperatively extracting gas from high-position roadway and low-position roadway of high-gas coal seam group

Also Published As

Publication number Publication date
CN107083988B (en) 2019-10-25

Similar Documents

Publication Publication Date Title
CN107083988B (en) Mining induced fissure band gas drainage technical method based on km directional drilling
CN103670496B (en) Single low permeability outburst coal seam gob side entry retaining with take out section coal-bed gas method in advance
CN101915083B (en) Method for extracting coalbed gases from coal mines by upper and lower combination
CN103883304B (en) A kind of gasifying underground coal method building gasification furnace passage
CN112593936B (en) Advanced comprehensive control method for multi-disaster area of deep mine
CN107740707A (en) Thick coal-layer mining water damage prevention and controls under a kind of deep high artesian
CN102644476A (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN103485786B (en) A kind of half-edge coal seam moves towards longwall machinery and melts mining method
CN104832176A (en) One-tunnel-multi-use arrangement method of low-breathability coal seam group pressure relief gas extraction high-drainage tunnel
Kazanin et al. Numerical study of the air-gas dynamic processes when working out the Mosshny seam with longwall faces
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well
CN104975868A (en) Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN106285770B (en) A kind of method that working seam bottom plate mud stone increases closely projecting coal bed group's gas permeability as protective layer
CN107152279A (en) Wangeviry stope top plate hydraulic fracturing method for weakening and device
CN112780340A (en) Method for preventing rock burst in advance in coal mine underground and upper regions
CN112647906B (en) Method for extracting gas from ground of multi-goaf without coal pillar
CN110173295A (en) A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing
CN207847676U (en) A kind of high prominent U-shaped ventilating system of mine coal-cutting working face
CN108505999A (en) A kind of high prominent more lane method for arranging of working face of coal seam
CN113236340A (en) Method for realizing continuous gas extraction by high-position drilling in working face extraction process
RU2453705C1 (en) Method for degassing of coal beds
CN204327172U (en) Formula boring goaf extraction structure before and after high-rise position
CN103410557B (en) Single, low air permeability coal seam mash gas harnessing method
CN109779634B (en) Method for determining position of fractured hard top plate of coal mine ground vertical well
CN205743985U (en) A kind of gas at upper corner exhaust device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant