CN108505999A - A kind of high prominent more lane method for arranging of working face of coal seam - Google Patents

A kind of high prominent more lane method for arranging of working face of coal seam Download PDF

Info

Publication number
CN108505999A
CN108505999A CN201810233143.5A CN201810233143A CN108505999A CN 108505999 A CN108505999 A CN 108505999A CN 201810233143 A CN201810233143 A CN 201810233143A CN 108505999 A CN108505999 A CN 108505999A
Authority
CN
China
Prior art keywords
tailgate
coal
working face
lane
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810233143.5A
Other languages
Chinese (zh)
Inventor
陈才贤
苏静
汤铸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liupanshui Normal University
Original Assignee
Liupanshui Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liupanshui Normal University filed Critical Liupanshui Normal University
Priority to CN201810233143.5A priority Critical patent/CN108505999A/en
Publication of CN108505999A publication Critical patent/CN108505999A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/006Ventilation at the working face of galleries or tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

A kind of high prominent more lane method for arranging of working face of coal seam do not stay coal column to tunnel upper tailgate completely along the mined out area edge of upper curtate, and tailgate stays the coal column for setting 2 5m to excavate lower tailgate on interval, and two lanes are formed through mine total head by open-off cut and divulge information.Lane and this section haulage way among this section are excavated again, is penetrated through by open-off cut and intermediate lane, tailgate, are formed working face and are carried out back production;It repeats the above steps until completing the exploitation in all section coal seams.Advantage is:Reduce rock tunnel engineering amount in outburst prevention measures, improve coal resources recovery ratio, realize " two into two times " or " three into one times " draft type, greatly improve gas at upper corner overrun issues, it is ensured that high methane and the safety in production of projecting coal bed working face.

Description

A kind of high prominent more lane method for arranging of working face of coal seam
Technical field
The present invention relates to coal mine diggings and gas pumping field.It is especially adapted for use in high methane and projecting coal bed exploitation A kind of high prominent more lane method for arranging of working face of coal seam.
Background technology
The most of mines in China are high methane or projecting mine, with mining level deepening, coal-bed gas pressure and content It is stepped up, seriously threatens the safety in production of working face.
《Prevent coal and gas prominent regulation》Regulation:" not digging prominent head, do not adopt raised face ".In digging production process(With For containing remote coal mine), driving face is before implementation, it is necessary to floor rock gas drainage under suction lane is utilized, to two side slat of digging laneway Band is taken out in advance, and ability digging laneway after outburst hazard to be canceled, of high cost since outburst prevention measures quantities is big, the time is long, Lead to return air, haulage way driving delay, and then influences working face and normally go into operation.
After coal working face is formed, traditional U-shaped draft type can only be used, gas at upper corner outburst amount is caused often to surpass Mark threatens working face safety, it is necessary to readopt gas and take out, discharges and change air quantity measure, reduce gas density, constrain work Make face normally to produce, greatly reduces the economic benefit of mine.In addition the coal column for having set 15-20m is stayed when face take-over, is caused Section coal pillar loss is big, results in waste of resources.
Invention content
Technical problem:The purpose of the present invention is overcoming the shortcoming in prior art, propose to reduce rock in outburst prevention measures Lane quantities, improves coal resources recovery ratio, realizes " two into two times " or " three into one times " draft type, it is ensured that high methane and A kind of high prominent more lane method for arranging of working face of coal seam of projecting coal bed working face safety in production.Technical solution:The present invention's is a kind of high The more lane method for arranging of prominent working face of coal seam, include the following steps:
A. upper curtate working face extraction terminates, after goaf overlying rock is basicly stable, along goaf edge completely not The upper tailgate of coal column driving is stayed, after upper tailgate excavates, tailgate stays the coal column for setting 2m-5m to tunnel next time on interval Wind gallery, two lanes are formed through mine total head by open-off cut and divulge information.
B. it descends in tailgate along moving towards arrangement parallel concordant drilling with extraction pipeline unicom to lower part certain area coal Layer carries out gas pumping.
C. it is taken out in advance through coal seam, after eliminating outburst danger, cuts eye from lower return air heading extension, then centre is excavated by cutting eye Lane, intermediate lane constitute mine total head with tailgate after the completion of tunneling and divulge information.
D. along moving towards, the parallel concordant of arrangement drills and extraction pipeline unicom is to lower part certain area coal seam in intermediate lane Carry out gas pumping.
E. it is taken out in advance through coal seam, after eliminating outburst danger, driving, which extends, cuts eye, then excavates haulage way by cutting eye, by centre Lane, haulage way as air inlet, upper tailgate and lower tailgate as air return lane, constitute " two into two times " or " three into One time " draft type formation working face progress back production.
F. it repeats the above steps and excavates new working face and carry out back production, be carried out at the same time new section gas pumping, until complete At the exploitation in coal seam.Its feature 1 does not stay coal column to tunnel upper tailgate completely along the mined out area edge of upper curtate, and return air is flat on interval Lane stays the coal column for setting 2m-5m to excavate lower tailgate, and upper and lower tailgate is arranged within the scope of release extinction, is equivalent in nothing Outburst dangerous area is tunneled, and often promotes 10~15m at least to carry out area validation twice during driving, without taking outburst prevention measures.
Feature 2 is that by digging upper and lower tailgate along sky, it is logical to constitute mine total head in conjunction with intermediate lane and haulage way Wind realizes " two into two times " or " three into one times " draft type, and gas at upper corner transfinites during efficiently solving working face extraction Problem realizes the safe and efficient production of working face.
Advantageous effects:1, coal column is not stayed or 2-5m coal columns is stayed to tunnel double lanes technology along goaf, by upper and lower return air Gallery is arranged within the scope of release extinction, is equivalent to and is tunneled in no outburst dangerous area, only need to be carried out area validation during driving, is not required to Outburst prevention measures are taken, reduces rock tunnel engineering amount in outburst prevention measures, reduces production cost.2, " two are formed in working face extraction Into two times " or " three into one times " draft type, greatly improve face upper corner angle gas exceeding limit problem, it is ensured that working face is pacified Full production.
Description of the drawings
Fig. 1 is a kind of gas pumping schematic diagram of the high prominent more lane method for arranging of working face of coal seam of the present invention.
Fig. 2 is a kind of working face extraction schematic diagram of the high prominent more lane method for arranging of working face of coal seam of the present invention.
In Fig. 1, Fig. 2:The goafs 1-, 2- coal columns, the upper tailgates of 3-, tailgate under 4-;Lane among 5-, 6- transports are flat Lane, 7- open-off cuts, the drilling of 8,9- concordants.
Specific implementation mode
As shown in Figure 1 and Figure 2, a kind of high prominent more lane method for arranging of working face of coal seam of the invention, include the following steps:
A. upper curtate working face extraction terminates, and works as goaf(1)After overlying rock is basicly stable, along goaf(1)Edge The upper tailgate of coal column driving is not stayed completely(3), wait for tailgate(3)After excavating, tailgate on interval(3)It stays and sets 2m- The coal column of 5m(2)The lower tailgate of driving(4), two lanes pass through open-off cut(7)Mine total head is formed through to divulge information, it is every during driving 10~15m is promoted at least to carry out area validation twice.
B. tailgate is descended(4)In drill along moving towards the parallel concordant of arrangement(8)It is certain to lower part with extraction pipeline unicom Regional coal-seam carries out gas pumping.Wherein, concordant drills(12)Sealed borehole length be 8m-10m, concordant drilling(12)Between array pitch be 2m~4m, concordant drilling(12)A diameter of 75mm~110mm, concordant drilling(12)Length be 60m~90m.
C. taken out in advance through coal seam, eliminate outburst danger after, i.e., when the remaining gas pressure in extraction coal seam drop to 0.75MPa with Lower and gas remainder quantity is down to 8m3When/t or less, from lower tailgate(4)Driving, which extends, cuts eye(7), then by cutting eye(7)Pick Go out intermediate lane(5), intermediate lane(5)The ventilation of mine total head is constituted after the completion of driving with tailgate, often promote 10 during driving~ 15m at least carries out area validation twice.
D. in intermediate lane(5)In drill along moving towards the parallel concordant of arrangement(9)With extraction pipeline unicom to the certain area in lower part Domain coal seam carries out gas pumping.Wherein, concordant drills(12)Sealed borehole length be 8m-10m, concordant drilling(12)Between array pitch be 2m ~4m, concordant drilling(12)A diameter of 75mm~110mm, concordant drilling(12)Length be 60m~90m.
E. it is taken out in advance through coal seam, after eliminating outburst danger, i.e., when the remaining gas pressure in extraction coal seam drops to 0.75MPa or less It is down to 8m with gas remainder quantity3When/t or less, driving, which extends, cuts eye(7), then by cutting eye(7)Excavate haulage way(6), driving Period often promotes 10~15m at least to carry out area validation twice, finally by intermediate lane(5), haulage way(6)As air inlet, Upper tailgate (3) and lower tailgate(4)As air return lane, constitutes " two into two times " or " three into one times " draft type and formed Working face carries out back production.
F. it repeats the above steps and excavates new working face and carry out back production, be carried out at the same time new section gas pumping, until complete At the exploitation in coal seam.Its feature 1 does not stay coal column to tunnel upper tailgate completely along the mined out area edge of upper curtate, and return air is flat on interval Lane stays the coal column for setting 2m-5m to excavate lower tailgate, and upper and lower tailgate is arranged within the scope of release extinction, is equivalent in nothing Outburst dangerous area is tunneled, and often promotes 10~15m at least to carry out area validation twice during driving, without taking outburst prevention measures.
Feature 2 is that by digging upper and lower tailgate along sky, it is logical to constitute mine total head in conjunction with intermediate lane and haulage way Wind realizes " two into two times " or " three into one times " draft type, and gas at upper corner transfinites during efficiently solving working face extraction Problem realizes the safe and efficient production of working face.

Claims (4)

1. a kind of high prominent more lane method for arranging of working face of coal seam, it is characterised in that:The tunnelling and gas pumping method packet Include following steps:
A. upper curtate working face extraction terminates, and works as goaf(1)After overlying rock is basicly stable, along goaf(1)Edge It does not stay the upper tailgate of coal column driving completely, waits for tailgate(3)After excavating, tailgate on interval(3)It stays and sets 2m-5m's Coal column(2)The lower tailgate of driving(4), two lanes pass through open-off cut(7)It is formed through the ventilation of mine total head.
B. tailgate is descended(4)In drill along moving towards the parallel concordant of arrangement(8)With extraction pipeline unicom to lower part certain area Coal seam carries out gas pumping.
C. it is taken out in advance through coal seam, after eliminating outburst danger, from lower tailgate(4)Driving, which extends, cuts eye(7), then by cutting eye(7)Pick Go out intermediate lane(5), intermediate lane(5)The ventilation of mine total head is constituted after the completion of driving with tailgate.
D. in intermediate lane(5)In drill along moving towards the parallel concordant of arrangement(9)With extraction pipeline unicom to lower part certain area coal Layer carries out gas pumping.
E. it is taken out in advance through coal seam, after eliminating outburst danger, driving, which extends, cuts eye(7), then by cutting eye(7)Excavate haulage way(6), by Intermediate lane(5), haulage way(6)As air inlet, upper tailgate (3) and lower tailgate(4)As air return lane, constitute " two into two times " or " three into one times " draft type forms working face and carries out back production.
F. it repeats the above steps and excavates new working face and carry out back production, be carried out at the same time new section gas pumping, until completing coal The exploitation of layer.
2. a kind of progressive extinction roadway layout method of tendency according to claim 1, feature 1 is along upper curtate goaf side Edge does not stay coal column to tunnel upper tailgate completely, and tailgate stays the coal column for setting 2m-5m to excavate lower tailgate on interval, will Within the scope of upper and lower tailgate arrangement release extinction, it is equivalent to and is tunneled in no outburst dangerous area, often promote 10 during driving~ 15m at least carries out area validation twice, without taking outburst prevention measures.
3. feature 2 constitutes working face extraction using lower tailgate, intermediate lane and haulage way, recyclable coal column between section carries High coal recovery rate.
4. feature 3 is by digging upper and lower tailgate along sky, the ventilation of mine total head is constituted in conjunction with intermediate lane and haulage way, Realize " two into two times " or " three into one times " draft type, gas at upper corner, which transfinites, during efficiently solving working face extraction asks Topic realizes the safe and efficient production of working face.
CN201810233143.5A 2018-03-21 2018-03-21 A kind of high prominent more lane method for arranging of working face of coal seam Pending CN108505999A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810233143.5A CN108505999A (en) 2018-03-21 2018-03-21 A kind of high prominent more lane method for arranging of working face of coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810233143.5A CN108505999A (en) 2018-03-21 2018-03-21 A kind of high prominent more lane method for arranging of working face of coal seam

Publications (1)

Publication Number Publication Date
CN108505999A true CN108505999A (en) 2018-09-07

Family

ID=63377725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810233143.5A Pending CN108505999A (en) 2018-03-21 2018-03-21 A kind of high prominent more lane method for arranging of working face of coal seam

Country Status (1)

Country Link
CN (1) CN108505999A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397463A (en) * 2019-07-22 2019-11-01 中国矿业大学(北京) Longwall mining section faces the method for ventilation of the preset pipeline in mined out side
CN110886611A (en) * 2019-12-06 2020-03-17 河南力行科创矿山技术开发有限公司 Gob-side entry driving process for high-gas large-mining-height working face
CN111622773A (en) * 2020-06-10 2020-09-04 中国矿业大学 High-gas working face roadway structure, arrangement method and coal pillar width determination method thereof
CN112963146A (en) * 2021-02-05 2021-06-15 北京科技大学 Joint-cutting carbon dioxide fracturing device and rock mass directional blasting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397463A (en) * 2019-07-22 2019-11-01 中国矿业大学(北京) Longwall mining section faces the method for ventilation of the preset pipeline in mined out side
CN110886611A (en) * 2019-12-06 2020-03-17 河南力行科创矿山技术开发有限公司 Gob-side entry driving process for high-gas large-mining-height working face
CN110886611B (en) * 2019-12-06 2020-12-25 河南力行科创矿山技术开发有限公司 Gob-side entry driving process for high-gas large-mining-height working face
CN111622773A (en) * 2020-06-10 2020-09-04 中国矿业大学 High-gas working face roadway structure, arrangement method and coal pillar width determination method thereof
CN112963146A (en) * 2021-02-05 2021-06-15 北京科技大学 Joint-cutting carbon dioxide fracturing device and rock mass directional blasting method

Similar Documents

Publication Publication Date Title
CN103670496B (en) Single low permeability outburst coal seam gob side entry retaining with take out section coal-bed gas method in advance
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
WO2016206618A1 (en) Longwall mine construction method n00
CN108397227A (en) A kind of progressive extinction roadway layout method of tendency
CN105221179B (en) A kind of highly gassy mine Y type method of ventilations
CN104481578B (en) A kind of high gas layer large-mining-height working surface mash gas harnessing method
CN100526606C (en) Method for extracting protruded coal-bed downward bedding long-borehole step-by-step covering area gas
CN110130899B (en) Coal mining method without coal pillar, roadway and tunneling in whole mining area
CN108505999A (en) A kind of high prominent more lane method for arranging of working face of coal seam
CN109252862A (en) Ultra-large stope large diameter, deep borehole high-stage open stope afterwards filling mining method
CN107083988A (en) Mining induced fissure band gas pumping technical method based on km directional drilling
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN107313777A (en) The main return channel hydraulic fracturing pressure relief method of fully-mechanized mining working and device
CN104100292A (en) Regional forced gas extraction method for single low-permeability outburst thick coal seam
CN103485786B (en) A kind of half-edge coal seam moves towards longwall machinery and melts mining method
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well
CN108756882A (en) A kind of district sublevel entry adopts recovery method without the short length of filling of driving formula
CN104975868A (en) Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN102777180A (en) Method for actively and regionally preventing and controlling rock burst in coal mines
CN113653492B (en) Method for preventing rock burst in filling mining
CN105239964A (en) Protective coal seam decompressing ground and underground three-dimensional coal and coal seam gas coordinated development method
CN106468177A (en) A kind of coal and gas harmonic extraction method
CN101881167B (en) Coal face stump mining method
CN109630112A (en) A kind of N00 mining codes for cutting top filling
CN105134212B (en) A kind of method that three soft high seam tunnel ensures the rate of extraction along top driving longwall top coal caving

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180907