CN100526606C - Method for extracting protruded coal-bed downward bedding long-borehole step-by-step covering area gas - Google Patents

Method for extracting protruded coal-bed downward bedding long-borehole step-by-step covering area gas Download PDF

Info

Publication number
CN100526606C
CN100526606C CNB2007100211604A CN200710021160A CN100526606C CN 100526606 C CN100526606 C CN 100526606C CN B2007100211604 A CNB2007100211604 A CN B2007100211604A CN 200710021160 A CN200710021160 A CN 200710021160A CN 100526606 C CN100526606 C CN 100526606C
Authority
CN
China
Prior art keywords
work plane
less
extraction
hole
gas pumping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007100211604A
Other languages
Chinese (zh)
Other versions
CN101029575A (en
Inventor
沐俊卫
程远平
沈永铜
王庆永
王海锋
沈怀津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinan Coal Mine Coal Industry Co Ltd Huaibei Mining Industry Group
China University of Mining and Technology CUMT
Original Assignee
Qinan Coal Mine Coal Industry Co Ltd Huaibei Mining Industry Group
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinan Coal Mine Coal Industry Co Ltd Huaibei Mining Industry Group, China University of Mining and Technology CUMT filed Critical Qinan Coal Mine Coal Industry Co Ltd Huaibei Mining Industry Group
Priority to CNB2007100211604A priority Critical patent/CN100526606C/en
Publication of CN101029575A publication Critical patent/CN101029575A/en
Application granted granted Critical
Publication of CN100526606C publication Critical patent/CN100526606C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

This is a gas extraction method for a single burst coal bed of stable coal occurrence, angle less than 10o, and firm index over 0.5. Drill a hole from top working face downward along the coal bed from shallow bed to deep, from low gas concentration zone to high for pre-extraction to lower down the gas concentration.

Description

Projecting coal bed down to the regional gas pumping method of shielding that goes forward one by one along layer long drilled holes
Technical field
The present invention relates to projecting coal bedly down to the regional gas pumping method of shielding that goes forward one by one along a layer long drilled holes, be particularly useful for that ocurrence of coal seam is stable, the inclination angle less than 10 °, solid coefficient greater than 0.5 single projecting coal bed zonal gas pumping.
Background technology
Along with the increase of the seam mining degree of depth, coal-bed gas pressure and gas bearing capacity are increasing, and the part coal seam is converted into projecting coal bed.According to national relevant regulations, should carry out gas pumping before the projecting coal bed exploitation, the regional gas pumping method matcoveredn exploitation and the floor roadway coal seam of usually adopting are taken out two kinds in advance, but these two kinds pumping method is long in time limit, cost is high.
Summary of the invention
In view of the problem that prior art exists, it is short, projecting coal bed down to the regional gas pumping method of shielding that goes forward one by one along layer long drilled holes cheaply to the purpose of this invention is to provide a kind of duration.
Of the present invention projecting coal bed down to the regional gas pumping method of shielding that goes forward one by one along layer long drilled holes:
1) in the following group in upper curtate work plane machine lane, to first regional construction drill of gas pumping work plane, boring is arranged in parallel along the coal seam tendency, cover first zone of gas pumping work plane, the spacing of wells is that 2~5m, diameter are 90mm, boring is passed and is set work plane Yao Xiang position, continues to creep into, and guarantees at the bottom of the hole that apart from work plane waist lane group is not less than 10m down;
2) after drilling construction finishes, withdraw from drilling rod, insert hole sealing tube and implement sealing of hole, sealed borehole length is not less than 10m, and hole sealing tube length is not less than 12m, diameter 40mm;
3) connect hole sealing tube with collecting pipe, will hole and the extraction pipeline connection carries out gas pumping, guarantee that the extraction system is not less than 15kPa in the negative pressure that drilling orifice forms, the extraction time was not less than 3 months;
4) coal seam outburst hazard checking is carried out in first zone of work plane, gas remainder quantity drops to 8m when the coal seam 3/ t is following or remaining gas pressure drops to below the 0.74MPa, stops extraction, otherwise continues extraction, until reaching requirement;
5) along desired location driving face waist lane, the section in waist lane is 5~8m 2
6) in the following group in work plane waist lane, to second regional construction drill of gas pumping work plane, boring is arranged in parallel along the coal seam tendency, cover second zone of gas pumping work plane, the spacing of wells is that 2~5m, diameter are 90mm, boring is passed and is set work plane Yao Xiang position, continues to creep into, and guarantees at the bottom of the hole that apart from work plane machine lane group is not less than 10m down;
7) after drilling construction finishes, withdraw from drilling rod, insert hole sealing tube and implement sealing of hole, sealed borehole length is not less than 10m, and hole sealing tube length is not less than 12m, diameter 40mm;
8) connect hole sealing tube with collecting pipe, will hole and the extraction pipeline connection carries out gas pumping, guarantee that the extraction system is not less than 15kPa in the negative pressure that drilling orifice forms, the extraction time was not less than 3 months;
9) coal seam outburst hazard checking is carried out in second zone of work plane, gas remainder quantity drops to 8m when the coal seam 3/ t is following or remaining gas pressure drops to below the 0.74MPa, stops extraction, otherwise continues extraction, until reaching requirement;
10) in desired location development machine lane, repeat said process, carry out the gas pumping of lower curtate work plane.
Described waist lane across pitch is arranged in the middle part of work plane tendency.
This method adopts along layer long drilled holes extraction heading driving zone and working face mining zone coal body gas, be applicable to that ocurrence of coal seam is stablized, the inclination angle less than 10 °, solid coefficient greater than 0.5 single projecting coal bed zonal gas pumping.This method by superficial part to the deep, by the present low gas district to high gas district, by the construction of last bank face machine lane or waist lane down to tilting along a layer long drilled holes, taking out coal-bed gas in advance, can effectively reduce coal seam gas-bearing capacity, regional eliminating removes the outburst hazard in coal seam, realizes comprehensive mechanized driving of projecting coal bed tunnel and safety and high efficiency; Adopt this method also can reduce the gas pumping engineering quantity significantly, shorten the gas control time, realize comprehensive mechanized driving of projecting coal bed tunnel and safety and high efficiency.Effectively the gas emission during reduction tunnelling and the working face extraction guarantees the safety in production of work plane.The coal road driving speed is brought up to more than the 350m by 40~50m, has shortened work plane time, and the work plane daily output can reach more than the 5000t.
The specific embodiment
The present invention is projecting coal bed down to the regional gas pumping method of shielding that goes forward one by one along layer long drilled holes:
Set technological parameter: holing is arranged in parallel along the coal seam tendency, spacing 2~5m, and diameter 90mm, the length of holing is a false add 10m of work plane tendency length, guarantees that the distance in the group whole hole of distance boring under work plane waist lane or the machine lane is not less than 10m; Drilling and sealing length is not less than 10m, and the hole sealing tube diameter is 40mm, and will hole by collecting pipe is communicated with the extraction pipeline.The waist lane is that face gas is administered special-purpose tunnel, and across pitch is arranged in the middle part of work plane tendency, and design of section is 5~8m 2Guarantee that the drilling orifice negative pressure is not less than 15kPa, finding time in advance is not less than 3 months.
First regional drilling construction: from upper curtate work plane machine lane construction down to along a layer long drilled holes, first regional coal-bed gas of extraction work plane, sealing of hole immediately after drilling construction finishes, and with the collecting pipe connection extraction pipeline of will hole.
First regional gas pumping: boring is carried out gas pumping after being communicated with the extraction pipeline immediately, guarantees enough finding time in advance, realizes the evenly effectively extraction of first regional coal-seam of work plane.
The outburst hazard checking is eliminated in first zone: by gas pumping, first regional coal-seam gas remainder quantity of work plane should be reduced to 8m 3Following or the remaining gas pressure of/t is reduced to 0.74MPa, thoroughly eliminates the outburst hazard of first regional coal-seam of work plane, guarantees the safe construction in waist lane.
Waist lane construction: after first regional coal-seam of work plane is eliminated outburst danger, in work plane middle part construction waist lane, for second regional extraction borehole of construction working face is prepared.
Second regional drilling construction: from the waist lane construction down to along a layer long drilled holes, second regional coal-bed gas of extraction work plane, sealing of hole immediately after drilling construction finishes, and be connected into the extraction pipeline with collecting pipe.
Second regional gas pumping: carry out gas pumping immediately after boring is connected into the extraction pipeline, guarantee enough finding time in advance, realize the evenly effectively extraction of second regional coal-seam of work plane.
The outburst hazard checking is eliminated in second zone: by gas pumping, second regional coal-seam gas remainder quantity of work plane should be reduced to 8m 3Following or the remaining gas pressure of/t is reduced to 0.74MPa, thoroughly eliminates the outburst hazard of second regional coal-seam of work plane, guarantees the safe construction in machine lane.
Driving heading back production coal seam: after the work plane coal body was all eliminated outburst danger, the heading of just can constructing carried out the back production coal seam.

Claims (2)

1. projecting coal bed down to the regional gas pumping method of shielding that goes forward one by one along layer long drilled holes, it is characterized in that:
1) in the following group in upper curtate work plane machine lane, to first regional construction drill of gas pumping work plane, boring is arranged in parallel along the coal seam tendency, cover first zone of gas pumping work plane, the spacing of wells is that 2~5m, diameter are 90mm, boring is passed and is set work plane Yao Xiang position, continues to creep into, and guarantees at the bottom of the hole that apart from work plane waist lane group is not less than 10m down;
2) after drilling construction finishes, withdraw from drilling rod, insert hole sealing tube and implement sealing of hole, sealed borehole length is not less than 10m, and hole sealing tube length is not less than 12m, diameter 40mm;
3) connect hole sealing tube with collecting pipe, will hole and the extraction pipeline connection carries out gas pumping, guarantee that the extraction system is not less than 15kPa in the negative pressure that drilling orifice forms, the extraction time was not less than 3 months;
4) coal seam outburst hazard checking is carried out in first zone of work plane, gas remainder quantity drops to 8m when the coal seam 3/ t is following or remaining gas pressure drops to below the 0.74MPa, stops extraction, otherwise continues extraction, until reaching requirement;
5) along desired location driving face waist lane, the section in waist lane is 5~8m 2
6) in the following group in work plane waist lane, to second regional construction drill of gas pumping work plane, boring is arranged in parallel along the coal seam tendency, cover second zone of gas pumping work plane, the spacing of wells is that 2~5m, diameter are 90mm, boring is passed and is set work plane Yao Xiang position, continues to creep into, and guarantees at the bottom of the hole that apart from work plane machine lane group is not less than 10m down;
7) after drilling construction finishes, withdraw from drilling rod, insert hole sealing tube and implement sealing of hole, sealed borehole length is not less than 10m, and hole sealing tube length is not less than 12m, diameter 40mm;
8) connect hole sealing tube with collecting pipe, will hole and the extraction pipeline connection carries out gas pumping, guarantee that the extraction system is not less than 15kPa in the negative pressure that drilling orifice forms, the extraction time was not less than 3 months;
9) coal seam outburst hazard checking is carried out in second zone of work plane, gas remainder quantity drops to 8m when the coal seam 3/ t is following or remaining gas pressure drops to below the 0.74MPa, stops extraction, otherwise continues extraction, until reaching requirement;
10) in desired location development machine lane, repeat said process, carry out the gas pumping of lower curtate work plane.
2. according to claim 1 projecting coal bed down to the regional gas pumping method of shielding that goes forward one by one along layer long drilled holes, it is characterized in that: waist lane across pitch is arranged in the middle part of work plane tendency.
CNB2007100211604A 2007-04-02 2007-04-02 Method for extracting protruded coal-bed downward bedding long-borehole step-by-step covering area gas Expired - Fee Related CN100526606C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100211604A CN100526606C (en) 2007-04-02 2007-04-02 Method for extracting protruded coal-bed downward bedding long-borehole step-by-step covering area gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100211604A CN100526606C (en) 2007-04-02 2007-04-02 Method for extracting protruded coal-bed downward bedding long-borehole step-by-step covering area gas

Publications (2)

Publication Number Publication Date
CN101029575A CN101029575A (en) 2007-09-05
CN100526606C true CN100526606C (en) 2009-08-12

Family

ID=38715107

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100211604A Expired - Fee Related CN100526606C (en) 2007-04-02 2007-04-02 Method for extracting protruded coal-bed downward bedding long-borehole step-by-step covering area gas

Country Status (1)

Country Link
CN (1) CN100526606C (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101575983B (en) * 2009-02-27 2012-07-04 河南省煤层气开发利用有限公司 Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN101649740B (en) * 2009-09-03 2011-08-31 周福宝 Ground bored well body structure for gas extraction
CN101781989B (en) * 2010-01-31 2011-01-26 山西晋城无烟煤矿业集团有限责任公司 High-gas mine crossheading echelon short-drainage rapid tunneling process
CN102061933B (en) * 2010-12-13 2012-10-31 山西晋城无烟煤矿业集团有限责任公司 Long drilling positioning construction process
CN102337922B (en) * 2011-09-30 2013-06-12 中煤科工集团重庆研究院 Method for inspecting burst-preventing effect of areas
CN102678166B (en) * 2012-05-25 2014-03-26 中国矿业大学 Method for increasing gas extraction rate by permeability increasing of single thick coal seam
CN103670497A (en) * 2013-12-25 2014-03-26 大同煤矿集团有限责任公司 Gas treatment method used when tunneled underground coal mine roadway is communicated with abandoned roadway
CN104793261A (en) * 2015-04-07 2015-07-22 中国矿业大学 Drilling detection method for coal measure stratum structuring, weak area recognition and stratum inversion
CN105909254B (en) * 2016-04-29 2018-04-24 中煤科工集团西安研究院有限公司 Projecting coal bed bottom plate, which is faced upward, wears the advanced area cover coal roadway tunneling method of layer directional hole
CN106089289B (en) * 2016-06-08 2018-12-21 中国矿业大学 Alternately protected type stope concordant drilling hydraulic flushing in hole makes cave construction method
CN106894837B (en) * 2017-03-20 2018-09-25 中国矿业大学 A kind of progressive protected type gas release pumping method
CN108104865B (en) * 2017-11-28 2019-06-11 中国矿业大学 A kind of concordant drilling Anti-air-leakage gas pumping method
CN108331611A (en) * 2018-04-10 2018-07-27 山西霍尔辛赫煤业有限责任公司 Short-hole rapid extraction structure and method for high-gas tunneling working face
CN112392538B (en) * 2020-11-18 2023-03-14 太原理工大学 Progressive shield type bedding hydraulic cave construction method for tunneling working face of structural coal seam
CN114086958B (en) * 2022-01-21 2022-04-08 太原理工大学 Progressive bedding hydraulic cave-making construction method for stope face of monocline coal seam

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693654A (en) * 2005-06-02 2005-11-09 淮南矿业(集团)有限责任公司 Gas pressure relief method of ground drilling extraction minery and goaf

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693654A (en) * 2005-06-02 2005-11-09 淮南矿业(集团)有限责任公司 Gas pressure relief method of ground drilling extraction minery and goaf

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
井巷揭煤过程中的防突工序及其应用. 周言安.煤矿开采,第12卷第1期. 2007 *
淮北矿区煤层气资源及抽放技术. 范景坤.中国煤层气,第1卷第2期. 2004 *
淮北矿区瓦斯突出煤层煤层气抽采方法. 范景坤.中国煤层气,第4卷第1期. 2007 *

Also Published As

Publication number Publication date
CN101029575A (en) 2007-09-05

Similar Documents

Publication Publication Date Title
CN100526606C (en) Method for extracting protruded coal-bed downward bedding long-borehole step-by-step covering area gas
CN103670496B (en) Single low permeability outburst coal seam gob side entry retaining with take out section coal-bed gas method in advance
CN101915083B (en) Method for extracting coalbed gases from coal mines by upper and lower combination
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN103939135B (en) A kind of fully-mechanized mining working removes frame passage rapid constructing method
CN102383828A (en) Refection reducing and outburst eliminating method for deep-hole hydraulic fracture driving gas shallow hole extraction
CN104131831A (en) Coal-bed gas well vertical three-dimensional united extraction method
CN110397428A (en) A kind of gas displacing coal-bed method for increasing of straight well and U-shaped butt shaft unitized production coal bed gas
CN101915085B (en) Low-air-permeability coal-bed gas extraction method
CN104481540A (en) Method for controlling multiple coal mining hazards by high level borehole grouting
CN104405283A (en) Technique for extracting gas from L-shaped ground drilling well in mining area
CN102777180A (en) Method for actively and regionally preventing and controlling rock burst in coal mines
CN103147734A (en) Method for multi-section hydraulic fracture along coal layer of underground coal mine
CN103306714A (en) Gas control method for drilling hole and hole three-purpose in close-range coal seam group bottom drainage roadway
CN105804753A (en) Carbon dioxide blasting-based method for weakening top caving coal on hard coal seam
CN104975868A (en) Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN103362539A (en) Method for extracting pressure relief gas by retained roadway drill site drilling
CN104405281A (en) Casing drilling technique for over-goaf
CN103161492A (en) Gas extraction well location method based on overlying rock fracture shell
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well
CN113653492B (en) Method for preventing rock burst in filling mining
CN102777185A (en) Inclined well shaft construction technology
CN110173295A (en) A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing
CN104594943A (en) Ground composite L-shaped drilling well for gas control and gas control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090812

Termination date: 20100402